Loading…
Loading…
3,453 results • Latest
Installation of 03 nos. of Rigbore tube well with submersible pump near 1) the house of Anand Baraik at booth no.14 by 08 2) near the house of Indrajit Lohar at booth no.14 by 08 3) near the house of Chingi Keot at booth no.14 by 04 under Bandapani
CONSTRUCTION OF COMMUNITY TOILETS AT NEAR ZP MORE AT LACHMANDABRI MAIRADANAGA GP, FALAKATA BLOCK
RESTORATION OF DAMAGED AND DEPRESSED PAVER BLOCK FOOTPATH ALONG PARK ST (BOTH SIDE) FROM JN. OF AJC BOSE RD TO JN OF J.L NEHRU RD IN WARD NO- 61
RESTORATION OF DISTURBED AND DAMAGED KERB CHANNEL, IPS AND PAVER BLOCK FOOTPATH BENTINK STREET, B.B.GANGULY STREET. AND SURROUNDING AREA IN WD.-46
ANNUAL OPERATION AND ROUTINE UPKEEPING OF LIGHTING SYSTEM AT WD-37
ANNUAL OPERATION AND ROUTINE UPKEEPING OF LIGHTING SYSTEM AT WD-36