Loading…
Loading…
29,913 results • Latest
Monthly Basis Cab & Taxi Hiring Services - MUV; 2500 km x 320 hours; Outstation 24*7
Bronze/Gun metal gate valves (15mm), Bronze/Gun metal gate valves (25 mm), Bronze/Gun metal gate valves (40 mm), Bronze/Gun metal gate valves (50 mm)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Drilling Rig; Electrical System or Installation; Service Provider
Annual Maintenance service-AIR CONDITIONER
Cable Chipping Machine
Manikins for CPR with Airway Training (Q3) (3 (3 ))
Glass Tableware (V2) Conforming to IS 1961 (Q4) MSE Relaxation for Years Of Experience Yes | Complete Startup Relaxation for Years Of Experience Yes | Complete
PROTECTION AND PREVENTION OF SOUTH BURIBAIL AREA UNDER SILCHAR REVENUE CIRCLE FROM EROSION OF RIVER BORAK UNDER SDMF FOR THE YEAR 2025-26 IN CACHAR DISTRICT OF ASSAM.
Mitigation of URBAN FLOOD of Silchar Town by de-siltation of Drainage Channel within Silchar Town Under SDMF 2025-26.
Construction of embankment on the L/B of river MoraPagladia from Pakhamara to Alekjar Dole para including A/E measures at different reaches. Package 1
Repair and Overhauling Service - Diesel Generators- Dg Sets (DFM); 50000; Yes; Buyer Premises
Digital Grounding Systemwith Equipment Protection (Q3)
Repair and Overhauling Service - Ductable Air Conditioner (DFM); DEHUMIDIFIER; Yes; Buyer Premises
Toner Cartridges/Ink Cartridges/Consumables for Printers (Q2) (3 (3 ))
CARPET 200X290 MM, WALLPAPER, AC SERVICING AND GAS REFILLING, CONSOLE TABLE, CURTAIN SEVEN FEET, SEAT COVER BIG, SEAT COVER SMALL, FOOT MAT, HAND TOWEL
Laying of UTP 4 pair CAT 6 LSZH LAN cable in the existing surface or recessed Steel or PVC conduit as required etc. in Siang Hostel, IIT Guwahati
Repairing of Forest IB of Range HQ, Pobitora WLS including landscaping
Interactive Panels with CPU (Q2), Multimedia Projector (MMP) (Q2) (3 (3 ))
High End Desktop Computer (Q2), Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) ( ( 3 3 ))
Repairing of Hanging bridge at Pobitora WLS
Monthly Basis Cab & Taxi Hiring Services - SUV; 3000 Km x 364 hours; Outstation 24*7
Procurement of Weightlifting items (Eleiko) through PAC
Deployment of Manpower (Technical and Supporting) under RO, Guwahati on Outsourced basis during 2026-27
Centralized Bio-metric Attendance System for Tezpur University
Construction of new Ant-Poaching Camp building at Amchang Wildlife Sanctuary
Supply of 6 1/4" Poly Pack rubber, Steam pump
SPL REPAIR WK FOR RE-SURFACING OF TAXI TRACK NEAR 351 AAS (LCH) AT MISSAMARI
Second Hand Empty Gunny Bags(V2) (Q4)
Annual Afloat Repair of AB Sivalik and AB Himgiri for the year 2026-27
BTR_RIDF_XXXI_25_26_27 Construction of road at Bhorpur village by providing Black Topping (From Ch. 0.00m to Ch. 3650.00m) under RIDF-XXXI of NABARD for the year 2025-26.
SAFETY RELIEF VALVE
Gully Control Project at Choibari village under SOPD-G 2025-26
Custom Bid for Services - Lump Sum cost of Providing Engineering Consultancy service, Custom Bid for Services - Lump Sum cost of Making site visits for inspections (30 man days) Similar Category Hiring of Consultants - Milestone/Deliverable Based Hiring of Consultants - Milestone/Deliverable Based
CE/EAP/ARRBP/OCB/Bridge1/Morigaon/03A Construction of Bridge in Morigaon District Br. No. 2/1 on NH-37 at Deusal to Dighali Beel
BANK PROTECTION WORK AT BAJALI ELIS (BICHANKUCHI POINT) UNDER STATE DISASTER MITIGATION FUND (SDMF) FOR THE YEAR 2023-24
Tanker on Agricultural Trailer (Q2) (3 (3 ))
Medium Weight Crawler Rock Drill
Construction of Bridge in Sonitpur district i)No.1 Tejalpatty to No. 2 Tejalpatty Connected Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Sonitpur/23
Construction of Bridge in Udalguri district i) Br. No. 2/1 on Talukdar Chuba to Mancachar Baksa Border Package No. CE/EAP/ARRBP/OCB/Bridge-1/Udalguri/19
Construction of Bridge in Darrang district i) Br. No. 2/1 on Naharbari to Bechimari Road Package No. CE/EAP/ARRBP/OCB/Bridge-1/Darrang/16
CE/EAP/ARRBP/OCB/Bridge1/Udalguri/18 Construction of Bridge in Udalguri district i) Br. No. 1/1 on Santipur to Bongurum
provision of bs and br items for afs borjhar
Manpower Outsourcing Services - Minimum wage - Unskilled; Not Required; Others
ONE POINT FIVE TON SPLIT AC, WINDOW AC ONE POINT FIVE TON, WATER DISPENSER, FARRATA FAN, JUICER MIXER GRINDER, PHOTO FRAME, RO WATER PURIFIER, CURTAIN
CHAIN, PITCH, 1-789-031&10, MCNALLY BHARAT
SIDE BEAM, 1-B020+001&06, MCNALLY BHARAT