Loading…
Loading…
1,728 results • Latest
Excavation, laying, jointing and testing of GI pipe 25mm dia part-I (1860 rmt at various RD, part-II (1350 rmt at various RD) and part-III (380 rmt) for distribution system, Dismentalling and re-laying of GI pipe 25mm dia and 20mm dia at various RD
Estimate for replacement of lengthy service wire and LT extension from various existing Sub-Stations in (E) Sections Local and Khaddar under ESD, HPSEBL, Lad Bharol.
Butt Welding of existing G.I Pipes 125 mm dia in gravity main at various RD
Local Stone Flooring in Lower Ram Leela Maidan in ward no. 05 at Nirmand.
Deposit estimate for providing SOP to Summit Digital Infrastructure Pvt. Limited by Aug. of 63 KVA 11/0.4 KV Khund DTR to 100 KVA in (E) Section Urla under ESD, HPSEBL, Padhar.
Estimate for Aug. of 63KVA 11/0.4 KV Machkehar DTR to 100 KVA and LT extension in (E) Section Local and Ahju under ESD, HPSEBL, Chauntra.
Tender for restoration of 33 KV HT Bijni Padhar line affected with land sliding near 132 / 66 / 33 kV Sub- Station Bijani by rerouting existing 33 KV Line under Electrical Sub- Division Padhar.
Construction of RCC Storage Tank 10000 Ltrs Cap. 1 Nos at near Village Malool
Construction of Ambulance Road near Kunnu baudi (87.5m to 117.5m) in ward no. 04 at Nirmand
Restoration of path from Pritam dev house towards Yashpal Sharma house in ward no. 02 at Nirmand.