Loading…
Loading…
1,27,368 results • Latest
Please refer to Boq
Unbranded 350 ml Glass Tumbler
Unbranded 400 ml Glass Tumbler
Please refer to Boq
Unbranded Ceramic Dinner Set
Please refer to Boq
Clay Craft Ceramic 2 pcs Cups Tea Set
Please refer to Boq
Please refer to Boq
Please refer to Boq
Please refer to Boq
Construction of Lining Wall on Muniward Ladi near RD 1790 m ( Critical spots of Muniward Ladi)
Restoration of breach by way of lining wall on Boan Ladi at RD 150mtrs
Please refer to Boq
Construction of Lining wall on Left side of Draway Ladi from Rd 1200 mtrs onwards
Construction of lining wall on right side and Bed treatment of Shah 1st near RD 1100 mtrs
Construction of Lining wall on Right sides of Nogund ladi From RD 1200 mtrs onwards at spots
Checking of leakages by way of bed treatment and PCC jacketing on Shah Ist near RD 800mtrs
Please refer to Boq
Construction of lining wall on right side and bed treatment on Pranigam Ladi from 780to 3000 mtrs at spots
Construction of lining wall on right side of Vailoo Ladi from RD 580 mtrs to 700 mtrs at spots
Checking of leakages and restoration of sloughned embankments by way of Construction of Retaning/Lining Wall of Wohan Canal Right at RD 11300M
Desilting of Ganie Khul Mir Danter Canal from RD 0-2500 mtrs at spots
Please refer to Boq
Restoration of offtake points of Sayen Ladi Wangam Irrigation ladi.
Restoration of offtake points of chek ladi and breach on Zen Zen ladi near RD. 5490 mtrs.
Please refer to Boq
Repairs to Gham khul at Hardpora by way of construction of lining wall, jacketing and Coping.
Please refer to Boq
Repairs of supply channel/Escape channel of Thajiwara Canal at Headworks by way of Construction of lining wall.
Restoration of breach by way of lining wall on Voi-Waterhal ladi at Rd 400 mtrs.
Please refer to Boq
Construction of lining wall on both sides of Bragam ladi Downstream of flume.
Please refer to Boq
Please refer to Boq
Repair to Magraypora Bifurcation of D3 branch of Martand canal.
Please refer to Boq
Construction of lining wall with bed treatment and PCC jacketing on both sides of Sether minor at spots.
Restoration of breached spot at RD 2700 m on Pethan Zamindari Khul.
Repairs to supply Channel and restoration of breaches of GKMD by way of construction of lining wall at RD, 850, RD 1450 andRD 2550, crate work at offtake point and near RD 1150 and jacketing near supply channel.
Checking of overflow of Bringi Canal old by way of Construction of lining wall at RD 600, RD 1050, RD 2300, RD 2400 and RD 3100.
Strengthening of weak embankment and checking of leakages of Awantipora canal near RD 1300 mtrs.
Checking of overflow by way of construction of lining wall on Manzigam Singpora ladh offtaking from Martand canal at RD 700 mtrs.
Desilting of Zall Khul from Downstream Khan Mohalla Bridge Khan Mohalla to its Tail end at Seer Hamdam.
FACE LIFTING OF THE INSPECTION BUNGALOW AT PAHALGAM, CONSTRUCTION OF ADDITIONAL ACCOMODATION, INCLUDING WASHROOM
VLLPL Black Wax Thermal Ribbon
Unbranded Non Magnetic White Dry Erase Writing board of dimensions (in mm) 1200 x 1800
KANHYALAL 2.5 inch Round Shape Gold Finish (Polished) Medal of thickness 2 mm
Unbranded Brass Figurine Style Trophy with MDF base
Macadamization of Bagwari Bumhama Inner links by way of Providing and Laying of Wet Mix Macadam (WMM) , 50mm thick BM and 25mm thick Semidense Bituminous Concrete with 6mm thick seal coat.