Loading…
Loading…
8,775 results • Latest
Sr.DEN/North/SBC sec: SW-I: Proposed Construction of pedestrian Subway at Km. 96/400-500 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-II: Proposed Construction of pedestrian Subway at Km. 96/700-800 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-III: Proposed Construction of pedestrian Subway at Km.97/000-100 between Devarapalle - Hindupur Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =28.00m) under ADEN/Hindupur Sub-Division. SW-IV: Proposed Construction of pedestrian Subway at Km.161/200-400 between Makkajipalli - Nagasamudram Stations, by rolling/launching method. Size: 1x5.00x2.65m (Barrel length =29.00m) under ADEN/Hindupur Sub-Division. SW-V: Proposed Construction of pedestrian Subway at Km.22/900-23/100 between Sri Sathya Sai Prashanthi Nilayam - Basampalle Stations, by rolling and launching method. Size:1x5.00x3.15m (Barrel length =22.00m) under ADEN/Hindupur Sub-Division. Maintenance period is 4 years
PRE-PRINTED TICKET PAPER ROLLS for print
Providing Food services to Sports School and Sports Hostel DYES Davanagere for the year 2026-27
Supply, Repair and Replacement of worn-out/damaged SS liner plates of wagon tippler- 5 hopper at CHP-2/RTPS for detailed scope refer tender document uploaded.
REJUVENATION WORK FOR HULIKERE GARDEN & VIEW POINT AT KOPPAL
Manufacture and Supply of Anchor RODS MS
Sr. DEN/North/SBC Sec: Yesvantpur - Sampige Road section : Proposed rebuilding of bridge of existing stone arch bridge No. 284 up (Exg 3x3.60m) with RCC box of size 1x11.00x3.0m on UP/Line side at KM 83/000-100 with air pushing method in ADEN/Yesvanthpur section. Maintenance period is 4 years
Leasing of 20 Mbps point to point P2P bandwidth from third party for multiple connectivity of Greenko Group for a period of Three (03) years
Improvements and road safety work to Tiptur-Dudda-Hassan road at ch 23.40km (SH-71) and Srirangapattana-Arasikere road at Ch 96.57km (SH-07) at Gandasi Handpost Circle in Arasikere tq
Upgradation of Building Management System - inStem