Loading…
Loading…
8,775 results • Latest
CONSTRUCTION OF WATCH TOWER AND FENCING WORKS AT WHITE FIELD DEPOT
Milk and milk products sales
Creating awareness about solid waste management, sanitation, waste water management and Swachh Bharat Mission topic through agency by means of video/short movie making and media(OTHERS)
Supply of chlorination cylinder for 1st and 2nd stage Water treament Plant of City Municipal Concil Dandeli Annually others
Installation of Godrej door to strong room and other modification works to the new treasury office at the Kittur Taluka Administrative Building.(Reserved for Cat II A)
MYSURU DIVISION: Escorting, operating and Comprehensive Maintenance like trip maintenances A - Check, B - Check & C - Check of 450 to 500 kVA, 750 V KIRLOSKAR OIL ENGINES LTD (KOEL) make DG sets fitted in power cars of EOG/HOG trains including need based repairs / maintenance of engines and alternators for a period of Three years.
provide the existing staff on out sourcing basis to the Water quality testing laboratories at Chickballapur, Chinthamani, Gowribidanur
Sr.DEN/North/SBC sec: SW-I: Proposed Extension of PF-1 and PF-2 for a length of 90.00 mtr at Thondebhavi (TDV) station in Bengaluru - Dharmavaram Section under ADEN/Hindupur Sub-Division. SW-II: Yelahanka : Construction of Crew lobby on 3rd floor of existing station building at Yelahanka under ADEN/Yesvantpur Sub- Division. Maintenance period is 3 years
Sr.DEN/North/SBC sec: Yelahanka - Chikkaballapur section: Construction of Foot over Bridge (FOB) at Km 20/500-600 near RUB No. 234/A for pedestrian movement under ADEN/Yesvantpur Sub-Division. Maintenance period is 12 months.
Sr.DEN/North/SBC Sec: SW-I: Proposed construction of pedestrian subway at Km 54/300-400 between Makalidurga - Thondebhavi, by Air Pushing method. Size:1x5.00x2.65m (Barrel length=33.00m). SW-II: Proposed construction of pedestrian subway at Km 6/500-600 between Penukonda - Narayanapuram stations, by Air Pushing method. Size:1x5.00x2.65m(Barrel length=20.00m). SW- III: Proposed construction of pedestrian subway at Km 7/000-100 between Penukonda - Narayanapuram stations, by Air pushing method. Size:1x5.00x2.65m(Barrel length=20.00m) under ADEN/Hindupur Sub-Divsion. Maintenance period is 4 years