Loading…
Loading…
8,775 results • Latest
Sr. DEN/East/SBC sec : Baiyappanahalli : Unloading of Pway materials at Pway/Depot/BYPL in SSE/PWAY/SBC section under ADEN/SBC sub-division for a period of 01 year.
DEN/South/SBC Sec : Salem - Bengaluru section : Proposed construction of RUB in lieu of LC No. 66 at km 97/156 by RCC box between Dharmapuri (DPJ) - Palakkodu (PCV) station in ADEN/Dharmapuri sub-division. RCC Box of size 1x7.0x4.50m (Barrel length = 13.7m) by Rolling/Launching method. Maintenance period is 4 years
Rubber tube (Sleeve) for sensor cables as per IS 3400 Part 2 (2003) with Size:ID: 42mm. OD: 47mm, Thickness: 2.5mm and Shore hardness. 75 (plus or minus 5). Material: Nitrile rubber. Note: One metre sample to be got approved before effecting bulk supply.
Construction of ROB in lieu of LC No.15 at KM: 25/400-500 between Amritapura - Chitradurga stations of JRU-RDG section.in Mysore Division. (Composite Work)
Repair work on the Government Boys Pre-University College building on B.H. Road, Tumakuru City
DEN/South/SBC Section: Pulikere: Provision of new station building including electrical portion, approach road, Single platform, Three number of tracks (1-main line, 2 loop line), Platform shelters, borewell, drainage arrangements, culvert bridge for proposed crossing station Km 77/400-78/300 Pulikere station (between DPJ-PCV Stations), under ADEN/Dharmapuri sub-division (Composite work and tender). Maintenance period is 3 years
Continuation of repair work on the classroom at the Government Pre-University College, Nagavalli village, Nagavalli Gram Panchayat, Tumakuru Taluk (ST)
Improvement Of CC Road And Drain From Pallavi Hotel Super Market And Surrounding Area At Ward No 24 In Kalaburagi City. 2026-27 Corporation Fund
Construction of a new library room in Turuvekere Taluk Govt. model Boys Senior Primary School, Turuvekere Town
DEN/South/SBC sec : SW I : Chikka Banavara - Hassan section : Additional loop line at Shantigrama station under ADEN/KIGL sub-division. SW II : Chikka Banavara - Hassan section : Through Rail Renewal (P) of existing 52kg rails with 60 kg/110 UTS Class I Rails for a length of 40.80 km from 124/000-164/800 (SL) in SSE/PWAY/Channarayaptna section under ADEN/KIGL sub-division. SW III : Chikka Banavara - Hassan section : Through Rail Renewal (P) of existing 52kg rails with 60 kg/110 UTS Class I Rails for a length of 12.055 km from 1/000-13/055 (SL) in SSE/PWAY/Kunigal section under ADEN/KIGL sub-division.