Loading…
Loading…
1,336 results • Recent activity
PISTON RING SET, RADIATOR ASSY, ENGINE SPEED SENSOR DG 6, FUEL FILTER, FUEL PUMP ASSY, FRONT WHEEL BRAKE DISC, BEARING BLOCK FRONT ANTIROLL BAR, TIMING BELT, ASSY FUEL FILTER, ASSY OIL FILTER, AIR FILTER ELEMENT, INTERMEDIATE BRAKE HOSE, BRAKE LIGHT SWITCH, FUEL PRE FILTER ASSY, CAM SHAFT SENSOR, GASKET CYLINDER HEAD MIS, ASSY SLAVE CYLINDER, CLUTCH PLATE, CLUTCH ASSY 260 DIA, CLUTCH RELEASE BEARING, BRAKE PAD, BRAKE SHOE ASSY, CALLIPER ASSY FRONT, MINIATURE RELAY 1 NO 1 NC MS TYCO AIR CON
DISTRIBUTOR HEAD, VANE PUMP, SPRING ASSY L LEAF, GOVERNOR SHAFT, REPAIR KIT TRAILER CONTROL VALVE, FUEL FILTER 2 PIN, FUEL FILTER 3 PIN, ASSY OIL FILTER, ASSY FUEL FILTER, AIR FILTER ELEMENT, FUEL FILTER ELEMENT, HOSE ASSY AIR FILTER OUTFLOW, BRAKE SHOE FRONT, POWER STEERING PUMP ASSY, BRAKE BOOSTER MASTER CYL ASSY, CHAIN AND SPROCKET KIT, LENSE TAIL LIGHT, IGNITION SWITCH, CLUTCH LEVER, BRAKE SHOE ASSY, MUD GUARD FLAP, HORN ASSY, FOG LIGHT ASSY, ASSY PIPE, WHEEL CYL ASSY, WHEEL DISC COVER
MATERIAL AND LABOUR FOR MANUFACTURE, SUPPLY AND ERECTION OF PRE-ENGINEERED PORTAL FRAME INSIDE THE EXISTING BARREL TYPE SHELTER IN NORTH SIKKIM
Line Interactive UPS with AVR (V2) (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6914064 Dated : 27-11-2025 Bid Document 1/7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 74858 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 03 X 70 KW HYBRID POWER PLANT IN NORTH SIKKIM