Loading…
Loading…
7,430 results • Latest
BEARING COMBINED 4.455 WITH API FLANGE, BEARING CYL. ROLLER BEARING 4.062
SLING 8MM X 2.5METER SINGLE WIRE ROPE S, SLING 1/2" X 2METER SINGLE WIRE ROPE SO, SLING 1/2" X 5METER SINGLE WIRE ROPE SO, SLING 12MM 6 MTR CHOKER SLING WIRE ROPE, SLING 16MM X 10' SINGLE WIRE ROPE HARD, WIRE ROPE SLING 16MMX10FT, WIRE ROPE SLING 16MMX(6X24) CORE 20 FT, SLING 3/4" X 2METER SINGLE WIRE ROPE SO, WIRE ROPE SLING DIA 19 MM X2, SLING 19MM X 10' SINGLE WIRE ROPE HARD, WIRE ROPE SLING 19MM X 25FT, SLING 19MM X 30' SINGLE WIRE ROPE HARD, W/R SLING 19MMX11M WITH 12" SOFT EYES, WIRE ROPE SLING 19MMX41', WIRE ROPE SLING 19MMX22 MTR, WIRE ROPE SLING 22MM(6X24) 10FT 3.2T SA*, WIRE ROPE SLING 22MM X 18FT, SLING 22MM X 10METER SINGLE WIRE ROPE S*, WIRE ROPE SLING 22MM X 9M, WIRE ROPE SLINGS 1" X8MTR, SLING 25MM 35FT SINGLE WIRE ROPE 1 END*, G- HOOK SAFETY SLING 12.5 TON, WIRE ROPE SLING 35MM X 65FT, SLING 40MM 5 METER SINGLE WIRE ROPE BOT*, G- HOOK SAFETY SLING 20.0 TON, WIRE ROPE SLING DIA 44 MM X20*, WIRE ROPE SLING 52MM X 65FT, WIRE ROPE SLING DIA 52 MM X28*, WIRE ROPE SLING 52MMX100', SLING 19MM X 30' 2 WAY WIRE ROPE HARD E*, SLING 19MM X 12METER 2 WAY WIRE ROPE MA*, SLING 1" X 6 METER 2 WAY WIRE ROPE MAST*, W/R SLING 12MMX10'/3T/4WAY/EXTRA 4RING, 4 WAY SLING 16MM X (6X24) CORE 10 FEET, SLING 16MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 19MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 22MM 5 METER 4 WAY WIRE ROPE MAIN*, SLING 7/8" X8 METER 4 WAY WITH MAIN AND*
Mtc. Of the road from Phuldungsei to Khantlang Ch.- 0.00 Km to 11.50 Km under Jampui Hill Sub-Division PWD(RnB) during the F.Y. 2025-2026SH-- WBMTack coat re-carpeting seal coating Pucca n Kacha drain etc.
Landslide clearance, kutcha drain, gunny bag placing, G.I wire crates, earth filling etc. Gr-II.
Periodical Repair of the road from i Old AA road to NH 08 via Kumarghat Block office Total Length 650 00 mtr and ii Kumarghat Buddha Mandir road L 350 00 mtr during the year 2025 26 SH Patch metalling Grouting Carpeting etc
Periodical Repair of the road from Bhati Dudpur School to Chandpuri Para via Sarkar Para and Upa Zela Sabhadhipati house Length 1100 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Periodical Repair of the road from AA road at 82 Miles to Nandadulal Das house via 82 Miles SB School in c School internal road Length 1150 00 mtr during the year 2025 26 SH Patch GSB Patch metelling Grouting Carpeting etc
Providing and Installation of Pipeline Inspection crawler robot, a non-motorised inspection camera for pipe line inspection and AI based Assessment Technology
PM-JANMAN works
Water Supply Arrangement within Agartala City under AMRUT 2.0 within AMC Area
BEAUTIFICATION OF SONAMURA RESERVE TANK, UNDER SONAMURA NAGAR PANCHAYAT, SEPAHIJALA DISTRICT, TRIPURA
Supply, Installation, Testing and Commissioning of IP CCTV system at CW, Sabroom Tripura
As Per Bid Document
As per Bid Document
As per Bid Document
Monthly Basis Cab & Taxi Hiring Services - Hatchback; 1840 km; Local
Construction of Boundary Wall of the SARS Complex (L 225 MTR 300M with GI Barbed Wire) with RCC Column (Extension Part).
Construction of 3000 MT Fertilizer Godown at Jirania under Jirania Agri Sub Division SH Repairing Boundary Fencing and Brick Soling for Yard Development.
Periodical Repair of the road from NH 08 to NH 08 via Atal Sarani L 600 00 mtr during the year 2025 26 SH Patch Soling Patch metalling Grouting Carpeting etc
Internal electrification work for the Construction of 02 nos Health Sub Centre at Purbajoy Reang Para SC, Kathaliachara SC of Bokafa RD Block under the jurisdiction of RD Santirbazar Division
Embankment Protection, Strengthening Beautification Work at Katakhal opposite to 15 MLD STP Site near Abhoynagar Bridge at a stretch of 460m and Providing 100m of Block Pitching adjacent to SBR tank of the STP.
Construction of mini open Community hall for public use at East Dudpur GP Ward No 03 under 50 Pabiacherra AC under BEUP Scheme during the year 2025 26
Internal electrification work for the Construction of 03 nos Multipurpose Centre at Lankajoy Para of Birendranagar VC, Nazirai Para of Kalshimukh VC and Birmanta Para of Srikanta Bari VC at Jolaibari RD Block under the jurisdiction of RD Santirbazar
Internal electrification work for the Construction of 04 nos Health Sub Centre at Kalashi SC, South Jolaibari SC, Kalma SC and East Pilak SC of Jolaibari RD Block under the jurisdiction of RD Santirbazar Division
Construction of mini open Community hall for public use at East Kanchanbari GP Ward No 02 under 50 Pabiacherra AC under BEUP Scheme during the year 2025 26
Periodical Repair of road i Geetanjali Lane L 150 00 mtr ii Shibsakti Lane L 150 00 mtr iii Old AA road to Bhabatarini Mandir L 150 00 mtr under Kumarghat Municipal Council iv NH 208 to NH 208 via Nikhil Namasudra house L 450 00 mtr
Construction of various buildings for IIIT Agartala including all Civil, E&M services & Development work on Engineering, Procurement and Construction (EPC) Mode-I (Design and Build) basis in the newly acquired campus at Mohanpur, Dist.- West Tripura, State-Tripura.
Clearing of debris, dismantling of damaged boundary wall on eastern side of IDTR, Jirania
Maintenance of road from Kairai Chowmuni to Mahanta Shikari (Length 3.85 Km) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 SH Patch WBM-3..(Length to be repaired from Ch 0.00 Km to 0.95 Km 0.95 Km) (Group No-I)
Mtc of different Bailey Bridge under Khumulwng Sub Division during the year 2025-26 SH Strengthening of existing Bailey Bridge by providing fitting fixing of transom clamp, nut bolts, welding, painting and other allied works etc (2nd call).
Maintenance work of Tool Room and Tranining Centre at R K Nagar Industrial Estate
Please refer to DNIeT
Improvement of Birchandra thakur para to Birendra para Gr-II under Belbari R.D. Block (L 0.893Km) during the year 2024-25.
Comprehensive Annual Maintenance Contract for 02 No Ducted type AC system installed at Administrative Building and 02 No Packaged type AC systems installed at NTI Building IGM Hospital Agartala West Tripura for a period of 03 years
FDR Maintenance of Joykrishna to Dasharambari road via Kalasathi para (Total Road Length 2.70KM) under Khumulwng Sub-Division during the year 2025-26 SH Construction of RCC Box Cell (1x4.00 mx4.00 m) Culvert at Ch 1.90Km (2nd Call).
Maintenance of road from Kairai Chowmuni to Mahanta Shikari (Length 3.85 Km) under PWD(R and B) Mandwi Sub-Division, during the year 2025-26 ..(Length to be repaired from Ch 2.85 Km to 3.85 Km 1.00 Km) (Group No-IV)
Dev. of gali with necessary allied works at Joypur from H.O Maran Biswas upto proposed by-pass road marking Ward No-36, AMC
Providing and Fixing of Aluminium Partition for cubical cabin at 2nd floor of TIDC Ltd along with connecting of corridor of TIDC and DIC office along with other allied Works
Mtc of approach and internal road of SDM Office Jirania under PWD (R and B) Jirania Sub-Division during the year 2025-26 SH GSB, WBM, Carpeting and other allied works.
Muffle Furnace (Q3)
Renovation of Existing boundary wall at DDSSC Badharghat Agartala
Maintainance of road from Purba Noagoan Milk Co-Operative to Paschimpara (L 1.00 km) under the jurisdiction of PWD (R and B) Khayerpur Sub-Division during the year 2025-26 SH Grouting, re-carpeting, sand seal coat and road side pucca drain etc.
Construction of Drain around Eastern Side of Synthetic Athletic Track at DDSSC Badharghat Agartala
Monthly Basis Cab & Taxi Hiring Services - Sedan; 2000 km x 320 hours; Local
High Performance Computing Workstation
Unbranded Single hole Plastic Twist Mechanism Handheld Manual, Unbranded Single hole Plastic Twist Mechanism Handheld Manual Pencil Sharpener
Unbranded Box of 10 Assorted Pencil Eraser
Kangaro Single Hole Paper Punch Machine of Punch hole Diameter 4.5, Kangaro Single Hole Paper Punch Machine of Punch hole Diameter 4.5 mm with Punching Capacity of Up to 20 Sheets
VIVID Packet of 1 Glue Stick of 8 gm each
DUSTER Cotton Flannelette duster of Size 16 x 16 inches