Loading…
Loading…
12,791 results • Latest
Dismantling of lime terracing for realising of overhead load and others allied works at 3rd floor of Derozio building, Presidency University, College Street Campus, during the year 2025-2026.
Floor trimming along 9D in between 16L-21L in R-IV Seam of Khottadih Colliery, Pandaveswar Area
Wire netting and Roof Bolt Support at 0L/By pass drift to 6D and By pass drift -1L to 1200te bunker both side gallery in R-IV Seam of Khottadih Colliery, Pandaveswar Area
Repairing of 15(fifteen) nos. Sectionalisation Stoppings in R-VI Seam of Khottadih Colliery, Pandaveswar Area
Repairing of 11 (Eleven) nos. Isolation Stoppings in R-VI Seam of Khottadih Colliery, Pandaveswar Area
Erection of iron sheet stoppings in R-V Seam of Khottadih Colliery, Pandaveswar Area
Cutting protrudes roof bolts along travelling/CM marching route in R-IV Seam of Khottadih Colliery, Pandaveswar Area
Repair and Maintenance of 14 (Fourteen) nos. Sectionalisation Stoppings in R-V Seam of Khottadih Colliery, Pandaveswar Area
Re-Construction of One (01) number drive head foundation at 2Wd/34L-35L in R-VI Seam of Khottadih Colliery, Pandaveswar Area
Construction of One(01) nos. Winch foundation at 9D/12L-13L in R-IV Seam of Khottadih Colliery, Pandaveswar Area