Loading…
Loading…
15,652 results • Latest
CONSTRUCTION OF 1HP SUBMERSIBLE WITH TANK NEAR THE HOUSE OF NAJU SK HOUSE AT KAILASHPUR UNDER KANKURIA GP OF 2025-26
M/R to main canal , DY-1 and DY-2 Canal during Rabi irrigation season in C/W Kestobazar Irrigation Scheme under Purulia Irrigation Division at Block and P.S- Baghmundi, DIST- Purulia.
Emergent restoration of Sundarban at two different locations for total length of 785.00m,damage occurred on 01.08.2026 at Mouza-Monipur, G.P.- Monipur, Block- Sandeshkhali-II along R/B of river -Raimangal under Kalinagar Irrigation Sub-division of B
Construction of outlet conduit for safe passage of stormwater near ch.2.00 of dam in c/w Khairabera (I) Scheme atBlock and P.S-Baghmundi,Dist-Purulia
Emergent Restoration of Sundarban Embankment Damaged due to Full Moon Kotal on 31.07.26 facing River- Bidyadhari (R/B) at a strech near Landmark of Bamanpukur Sluice for length 30.00 m, Mouza - Bamanpukur, G.P.- Bamanpukur, Block- Minakhan of Haroa I
Construction of BALLAH PILLING WORK AT Manikpur Subhas Block and Naskar Para in WARD NO.23 within Rajpur Sonarpur Municipality.
M/R at ch 28.00 of LBMC in connection with Turga Irrigation Scheme under Purulia Irrigation Division at Block and P.S- Baghmundi, Dist- Purulia .
Emergent restoration of Sundarban Embankment Damaged due to Full Moon Kotal occurred on 29/07/2026 at facing River- Metia (R/B) near Bholanath Patra fishery for a length 55.00 m, Mouza- Mohanpur, G.P.-Mohanpur, Block-Minakhan of Haroa Irrigation Su
Emergent restoration of Sundarban Embankment Bantala Sluice damaged occurred on dated 31.07.2026 during the Full Moon kotal facing River Bidyadhari (L/B) for a length 100.0 m, Mouza-Nazat G.P.- Nazat-II , Block- Sandeshkhali-I of Haroa Irrigation
M/R to CD Structure at ch. 65.00 of Main Canal to facilitate storm water in c/w Kestobazar Irrigation Scheme at Block and P.S- Baghmundi, Dist- Purulia under Purulia Irrigation Division.