Loading…
Loading…
2,17,034 results • Latest
IMPROVEMENT OF ILLUMINATION BY INSTALLATION LED LIGHT FITTINGS AND ALLIED ELECTRICAL WORKS AT DIFFRENT PLACES IN WARD NO-14 UNDER BR-III.
RESTORATION OF PAVER BLOCK FOOTPATH,I.P.PASSAGE AND CONCRETE DISTURBED BY P.U.AGENCY AND NATURAL WEAR AND TEAR AT ESTERN SIDE OF GOPAL MUKHERJEE ROAD AND ADJACENT AREA IN WARD NO.60
Construction of Concrete Road at Approach of 57 Kalikup Primary School ICDS Centre at Kalikup P.S. No.- 50 under Bahadurpur G.P. within MJ Development Block under APAS during the Year 2025-26.
PURNENDU SAHOOS GARDEN TO GOURANGA SAHOOS LAND. PLOT NO. - 45-38 UNDER BOOTH NO 230 - Baligeria Madan Mohan Aadarsha vidyapith
Urgent dismantling of damaged RCC Water Storage Tank on the roof of RS Hostel (West Side) and installation of New PVC Water Storage Tanks (East and West Side) on the roof including necessary Civil and Plumbing Works at 205 B.T. Road ISI, Kolkata-108.
Fulbari Kumarganj Road from 15.00 Km to 26.00 km in Stretches, Emergent patch repairing works under Dakshin Dinajpur Highway Division in the district of Dakshin Dinajpur during the year 2026 27.
WBPHE/EE/JMD/NIeT 08_76 OF 2026-2027
Day to day operation of 2 nos. OTIS make 16 Passengers and 02(Two) nos. KONE make 16-passengers 3 Stop V3F controlled lifts installed near Gate-B, Main Building of Honorable High Court, Calcutta. (For Twelve Months)
IMPROVEMENT OF ILLUMINATION BY INSTALLATION LED LIGHT FITTINGS AND ALLIED ELECTRICAL WORKS AT EM BYPASS( FROM HUDCO MORE TO BENGAL CHEMICAL ) UNDER BR-III KMC
RESTORATION OF I.P PASSAGE AND CONCRETE SURFACE DISTURBED BY CESC LTD. AND NATURAL WEAR AND TEAR NEAR PREMISES NO. 10B AGA MEHDI STREET, 4A A.K MD SIDDIQUI LANE, 13 NO. NAWAB ABDUL REHMAN STREET ETC. IN WD-62
Supply of Hospital Furniture and Equipment
Repairing of Ghoshpara Road by mending potholes and patch surfacing in stretches from 13.5km to 14.2kmp, 15.50km to 16.3km, 18.00km to 20.50km and 25.1km to 25.3km under Barrackpore Division during the year 2026-2027.
Improvement of PCC Road from pitch road to Tarun Das house at Uttar Sujnipara village sansad 17 (2nd call)
Construction of concrete road with pilling at Chak Jagaddal Bor house to towrads Gakhali under Poleghat GP
Construction Of Cement Concrete road from Ashok Jana house towards Sandip Jana house at Paschim Bamunia-I Sansad.JL-588,PLOT-1298-1291
Repair and replacement of defective Relays of HT outgoing Breakers of different Substations under Medical College Hospital Kolkata
Annual Comprehensive , Preventive and Corrective Maintenance Contract of Air Conditioners at Araksha Bhawan and CP Bungalow, Salt Lake City, Kolkata - 91 for FY 2026-2027. (1st Call)
Supply and fixing of AC Ceiling Fan at various Wards under Jalpaiguri Central C. Home.
SOLAR LIGHT AT MALGORIA VILLAGE AREA 15NOS APAS/01/268/12/0002
RESTORATION OF THREE NOS. HIGH MAST AT BAGMARI BAZAR , TRIKONE PARK AND VATIKHANA IN WARD NO 14,33 AND 35 , BR III ,UNDER KMC
RESTORATION OF DAMAGED AND DEPRESSED PAVER BLOCK FOOTPATH ALONG RAFI AHMAD KHIDWAI ROAD AND OTHER PLACES IN WARD NO- 62.
Repairing of Pucca Road from Sovaganj Bazar to Sanjib Das House at Chaparer I Gp in APD II PS
Emergent restoration to Sundarban Embankment damaged due to Full moon Kotal on and from 30.06.2026 to 03.07.2026 for a length of 50.00 M from Ch. 11.50 Km to Ch. 11.550 Km at Mouza - Mandirtala in Block-Sagar facing left bank of Hooghly under
Installation of Submersible Pump at BDO office quarter under Memari-II Panchayat Samity
Choto Mahadev Village road from 0.50 km to 3.00th km, patch repairing work in stretches under Cooch Behar Highway Division in district of Cooch Behar.
Modification for Eye Bank at 4th floor of Prafulla Chandra Sen Government Medical College and Hospital, Arambag, District -Hooghly
Construction of Concrete Road from Kalikup Jumma Mosque to to Idgah at Kalikup P.S. No.- 50 under Bahadurpur G.P. within MJ Development Block under APAS during the Year 2025-26.
IMPROVEMENT OF STREET LIGHTING SYSTEM AT MANIKTALA MAIN ROAD AND KANKURGACHI UNDERPASS UNDER BR-III KMC
RESTORATION OF DISTURBED AND DAMAGED IPS AND PAVER BLOCK FOOTPATH AT DIFFERENT PLACES LIKE PRINCEP STREET, METCALFE STREET, GRANT LANE, DACRES LANE ETC. IN WD NO.-046.
Repairing to the Hamidpurhat to Shibdaspur Natun Hat Road via Kadermore and Gobindamore from 0.50km to 3.75km (in patches) by providing WBM, Bituminous potholes, and premixed carpeting and seal coat (Type-B) during the year 2026-27.
Balurghat Laskarhat Road from 4.00 Kmp to 10.00 Kmp in Stretches, Emergent patch repairing works under Dakshin Dinajpur Highway Division, in the district of Dakshin Dinajpur during the year 2026 27.
Construction of CC road from house of Akramul Mallick to house of Atibar Mallick at Rameswarpur in Chatta GP. (Length- 30.0 mtr.) (FUND-MPLAD)
Dakshin Murabania SSK Building Plaster at Dakshin Murabania Sansad,JL-581,PLOT-424
Repairing of existing Ducting system and allied works at SSB MCH Kolkata COVID WARD
Improvement of PCC road from laltu Rabidas house to rabi Pramanik house at Fatullapur Paschimpara Village Sansad 22
Supply of Hospital Furniture and Equipment
INSTALLATION OF 13 NOS SOLAR LIGHT AT BOCHPUR APAS/01/268/18/0008
SUPPLY AND DELIVERY OF STREET LIGHT LED FITTINGS AT KANKURGACHI AND OTHER PLACES IN WARD NO-31 UNDER BR-III
RESTORATION OF COURTYARD AND PASSAGE AT 185/1 A.J.C BOSE LABOUR QUARTER DISTURBED DUE TO DRAINAGE WORK IN WARD NO-61
Setup Submersible pump with water reserver and water testing report at new GP office Land at Kakhuriabari
Upkeepmentand MaintenanceofElectrical Installation RegularPeriodical Maintenance as well as PreventiveandCorrective Maintenanceat SumangalamHomefor BoysBishnupurunder.For theyearof25 26SITCof splitACmachineatthe Officeofthe Superintendent
CONSTRUCTION OF PAVER BLOCK ROAD FROM NANDA ROY HOUSE TO LALDOH ORAON HOUSE UNDER SAKOAJHORA-I GP WITHIN BANARHAT DEVELOPMENT BLOCK UNDER APAS FUND. (SCHEME ID-APAS/01/014/225/0002)
Corutruction of Concrete road from house of Swapan sardar towards house of Nirmal Sardar via Shyamal Sardar at Kushumkhola at Mukundabagh GP under M-J Dev. Block.
Construction Of Pucca Drain With Soakpit Dakshin Murabania Nayanjuli to Jumma Masjid at Dakshin Murabania sansad.JL_581,PLOT-213-216
Improvement of PCC road from Hajrat sk house to Jahangir Sk via Rajjak sk house at Raghunathpur village Sansad 11
RESTORATION OF DAMAGED AND DEPRESSED I.P. AND PAVER BLOCK PASSAGE AT 12 BEDFORD LN, 17,26, RIPON LN, 13,21 ELLIOT LN AND DIFFERENT PLACES IN WARD NO-61.
WBPHE/EE/JMD/NIeT 08_75 OF 2026-2027
Procurement of heavy-duty pillow block bearings for Wagon Tippler 1 and 2 at CHP, BTPS.
SITC of split AC machine including necessary Electrical Installation work at the Bill Section of the Bishnupur Division office and office establishment of the Bishnupur Sub Division Office, PWD.
IMPROVEMENT OF THE UTILITY ZONES URROUNDING AREAS ATTACH WITH THE MODULE-1 HAVING CAPACITY 20MGD POTABLE WATER, UNDER IGWTP.