Loading…
Loading…
Tender Value
₹61.1 L
EMD Value
₹1.2 L
Closing Date
25 May 2026, 4:00 pmClosed
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Construction of New Earthen Pond at Village (Shoray) Garkone.
2026_PWD_18902_5
e-Tender 05 of 2026-27/INFC Kargil
Open Tender
Civil Works - Others
Works
70 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹620
Payable To Executive Engineer I-FC Division Kargil
₹1.2 L
7 May 2026
7 May 2026
26 May 2026
7 May 2026
25 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means over areas (exceeding 30cm in depth ,1.5m in weadth as well as 10 sqm on plan ) including getting out and disposal of excavated earth lead upto 50m and lift upto 1.5m ,as directed by Engineer -in-charge | |||||
| 1.01 | All Kind of Soil 50% | 2,630 | Cum | 531.04 | ₹13,96,635.2 |
| 1.02 | Hard Rock (R.B) 50% | 2,630 | Cum | 1,182.08 | ₹31,08,870.4 |
| 2Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 2.01 | All Kind of soil 100% | 38.25 | Cum | 431.41 | ₹16,501.43 |
| 3 | Dumping /Filling of stones in horizontal level excluding cost of stone | 9.45 | Cum | 225.14 | ₹2,127.57 |
| 4 | Reinforced cement concrete work in wall’s (any thickness) including attached pilasters, buttresses plinth and string courses, fillets columns, pillars piers, abutments, post and struts etc up to floor 5 level excluding cost of centering, shuttering, finishing and reinforcement 1:1.5:3 (1 cement 1.5 course sand and 3 graded crushed stone agg. 20mm nominal size. | 1.65 | Cum | 10,742.59 | ₹17,725.27 |
| 5 | Reinforcement for RCC works including straightening ,cutting,bending placing in position and binding and all complete.Hot Rolled deformed bars. | 103.8 | KG | 105.78 | ₹10,979.96 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size) (Crushed) | 29.14 | Cum | 7,585.5 | ₹2,21,041.47 |
| 7 | Removal of surface boulder by mechanical means including disposal of usual lead and lift | 400 | No | 246 | ₹98,400 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45115.xls
BOQ • 0.44 MB
Corrigem.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .