Loading…
Loading…
Tender Value
₹6.3 L
EMD Value
₹6,300
Closing Date
22 May 2026, 6:00 pmClosed
Executive Engineer, P.H. Works Division, GWSSB, NAKHATRANA
Providing ,Supplying and Lowering Laying PVC 90 MM Rising Main from Tera Village Prop. bore to Tera Village Exst. UG Sump under Rejuvenation Program 2024-25
302602
09/2025-26
Open
Civil Works - Water Works
Works
Kutch
4 documents required · 4 mandatory
₹900
Executive Engineer, Public Health Works Division,Opp.Taluka Panchayat, Nakhtrana
₹6,300
7 May 2026
7 May 2026
7 May 2026
22 May 2026
7 May 2026
Estimated Cost : Rs.
Gujarat Water Supply & Sewerage Board
Volume-III, PRICE BID
Bid Documents for Design, Build & Operate Contract for
BREAK UP FOR INTERIM PAYMENTS ...............................................
Volume-III, PRICE BID
(1) Name of Work: “Providing, Supplying and Lowering Laying PVC 90 MM Rising
Main from Tera Village Prop. bore to Tera Village Exst. UG Sump under
Rejuvenation Program 2024-25.” The bidder shall quote his firm and fixed price
for the entire work under this Contract, defined in more details in various sections
of this bid document.
(2) The rates and prices shall be submitted in the electronic formats given by n-
procure which is called Schedule-B. Rates and prices received in any other formats
will be rejected and the Bids will be disqualified.
(3) It will be entirely at the discretion of the Employer to accept or reject the
bidder’s proposal, without giving any reasons whatsoever and the bidder shall not
be permitted to withdraw his bid on this account.
free supplied by client.
(5) In Schedule-B the Bidder shall quote prices for the items on lump sum / unit rate
as called for against the BOQ item.
Schedule-B only will be considered for price evaluation & shall form a part of the
Contract Agreement.
Schedule-B and shall be carried forward to Schedule-B for comparison and
(8) The Bidder shall quote his prices for Operation & Maintenance in Schedule-C. The
total shall be in line to the price quoted in Schedule-C. The total shall be carried
forward to Schedule-B for comparison and evaluation.
(9) Wherever for a particular item the quantities have been specified payment shall
be on unit rate basis and unit variation in quantity will be paid with pro rata basis.
(10) Each item is to be individually priced online and the amounts shall be added
prices shall be left blank except where the item description requires the item to
be priced on "as applicable” basis. The item shall not be priced if it is “not
applicable” to the bidder’s design, in which case the bidder shall add the words
“NOT APPLICABLE”. The wording in the item description is for subject matter
guidance only; clause references are indicative only and all other relevant clauses
shall also be referred to. The prices shall allow for all the works covered under the
bid and all liabilities and contractual obligations whether separately specified or
not. Items against which no prices are quoted shall not be separately paid for and
the bidder shall be deemed to have covered the cost of execution of such items
(according to the requirements of the bid document) in the prices quoted for
Volume-III, PRICE BID
satisfactory working/safety of the system as specified, will not be separately
paid for by the Employer when executed and shall be deemed to be already
covered by other items and rates listed in the price sheets No extra payment
shall be given for any item which is required to complete and perform the
during the pendency of the Contract. In case of any discrepancy noted in the
and arithmetic corrections if any will be considered for financial evaluation of
(13) Schedule ‘D gives the basis of interim payment for construction of works.
(14) The bidder shall be deemed to have allowed in his price for provision,
maintenance and final removal of all temporary works of whatsoever nature
required for construction including temporary bunds, diverting water, pumping,
de-watering etc. for the proper execution of works. The rates shall also be
deemed to include any works and setting out that may be required to be carried
out for laying out of all the works involved.
(15) Prices shall be filled online only.
the Specifications and other sections of these bid documents and these
documents are to be taken as mutually explanatory of one another.
(17) The bidder shall interpret the data furnished and carry out any additional survey
work, or investigation work required at his own cost.
(18) The prices quoted shall also include the cost of materials utilized for testing.
(19) The bidder should acquaint himself with the site conditions including the access to
Work site. The successful bidder shall have to make suitable access to work sites
at his own cost. These accesses will be used by the other contractors working for
the prices shall include all the equipments / materials / accessories and services
(21) The amount to be quoted for O & M shall be as per Volume-IB, General Conditions
of Contract, Clause No. 1, Security Deposit.
(22) 1% of the value of work will be deducted from the Running bill against labour cess
which is non refundable.
(23) Third Party Inspection / CSC agency will be deployed by GWSSB and charges of the
same will be borne by GWSSB.
(24) Any expenditure incurred by inspection/ CSC agency for the work misinformed by
the contractor and charges of inspection/ CSC agency without any work due to
misinformation shall be recovered from the contractor.
Volume-III, PRICE BID
(25) The prices shall be quoted inclusive of all taxes, royalties and duties prevailing at
the time of submission of the bids. Statutory variation if any during the currency
of contract shall have to borne by the agency which shall be not reimbursed by
(26) The rates should be quoted inclusive of GST and all other taxes as per Volume-I
(B), General Conditions of Contract, Clause No. 47. & Special Caluse of GST.
(27) The rates quoted shall be inclusive of all taxes, duties and GST, which shall not be
paid extra. The TDS shall be deducted at source as per provision of IT rules and
(28) The Bidders shall have to quote the rates in this tender keeping in view of the
GST. The Complete responsibility of taxes, duties, levies rests with the
Contractor/Agency only.
(29) The process requires that the bidder shall quote his price for the work components
firm and fix during the entire period of performance of the contract except price
variation allowed for supply of MS/DI/PVC/GI pipe as per Volume-IB Clause No.
59, General Conditions of Contract.
(30) Payment shall be made for the components for which lump sump prices are
quoted, as per the schedule of payment. Total cost will be worked out on the
basis of work done of individual items and rates quoted against those particular
(31) Royalties: The contractor shall be liable to pay the royalty of the quarried
materials/ minerals used in the construction of works at the rates specified in
the Narmada Water Resources, Water Supply & Kalpsar Dept. Resolution No.
GEN-2010-595- (6)- M.I.Cell ( K-1) Dt. 29-4-2011 ( Gujarati Version Copy
enclosed) and shall be recovered from the running bills of the work from time to
time and remaining amount if any shall be recovered from the final bill before
releasing the security deposit of the work. The contractor shall furnish the
statement showing the quantity of quarried materials / minerals from whom
purchased ( with full address of the seller) and copies of the bills for purchase to
the Executive Engineer of the in charge of the work. The contractor shall also
furnish such additional information as regards royalty payment to the competent
(32) Agency shall have to take Insurance policy and intimate to GWSSB along with the
evidence within time limit. In case of non compliance entire responsibility shall
be rest with the agency and required amount shall be recovered from any due
amount of the agency.
(33) GWSSB can recover penalty amount from the agency for not taking the insurance.
Though the penalty amount is recovered, responsibility of the agency for taking
insurance shall be continued and will not be escaped from the responsibility.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID
Bidders are required to fill up all the blank spaces in this Bid Form.
THE EXECUTIVE ENGINEER,
PUBLIC HEALTH WORKS DIVISION,
SUB: “Providing, Supplying and Lowering Laying PVC 90 MM Rising Main from Tera
Village Prop. bore to Tera Village Exst. UG Sump under Rejuvenation Program 2024-
25. The bidder shall quote his firm and fixed price for the entire work under this
Contract, defined in more details in various sections of this bid document.
1. Having visited the site and examined the Bid Documents, Drawings, Conditions of
Schedules etc. including Addenda/Amendments to the above, for the execution of
the above Contract, we the undersigned offer to design, Engineer, procure,
construct, complete, commission, operate and maintain the whole of the said works
for 3 years from the date of commissioning including defects liability period as given
in Conditions of Contract and in conformity with the drawings, conditions of
Documents, including Addenda Nos. (insert numbers) for Lump sum fixed
Rupees ) for Construction
including free trial run for three months or such other sum as may be ascertained in
accordance with the conditions.
2. I/We agree that
a) if we fail to provide required facilities to the Employer’s representative or any
other person/Agency by the Employer to perform on his behalf for carrying out the
inspection and testing of materials and workmanship.
b) if we incorporate into the Works, materials before they are tested and approved
by the Engineer’s representative.
c) if we fail to deliver pure water of required quantity according to the
conditions/stipulations of the Contract, the Engineer will be at liberty to take any
action including termination of Contract and impose at his absolute discretion any
penalties, and/or reject the work.
Volume-III, PRICE BID
3. We undertake, if our Bid is accepted, to complete and deliver the works in
accordance with the Contract within months, inclusive of monsoons,
from the date or receipt of Letter of Acceptance issued to us by you.
4. We agree to abide by this Bid for a period of 180 days from the Last date of
submission of the bill and it shall remain binding upon us and may be accepted at
any time before the expiry of that period.
5. In the event of our Bid being accepted, we agree to enter into a formal Contract
Agreement with you incorporating the conditions of Contract there to annex but
until such agreement is prepared this Bid together with your written acceptance
thereof shall constitute a binding Contract between us.
6. We agree, if our Bid is accepted, to furnish performance /Security in the forms and
of value specified in the Clause 1 of Volume-IB, “General Conditions of Contract”.
7. We have independently considered the amounts of liquidated damages shown in
Appendix to Bid and agree that they represent a fair estimate of the damages likely
to be suffered by you in the event of the work not being completed by us in time.
8. We understand that you are not bound to accept the lowest or any Bid you may
Dated this day of
(Name of the Person)
Duly authorized to sign Bid for and on behalf of (fill in block capitals)
Witness Signature
Volume-III, PRICE BID
Name of Work:- “Providing, Supplying and Lowering Laying PVC 90 MM Rising Main
from Tera Village Prop. bore to Tera Village Exst. UG Sump under Rejuvenation
Program 2024-25.”
Schedule showing the approximately the materials to be supplied to the contractor
from government stores for the work to be executed and the rate at which they are to
Rate at which the
Sr. material will be charged Place of
Particular Qty.
No. to the contractor Delivery
1. The contractor submitting the Tender shall see that the rate in Schedule-A are filled
in by the Engineer in Charge at the time of issue tender.
2. The contractor while submitting the tender shall provide his own arrangement at his
own cost for loading, unloading, and transporting safety to the site of work the
cement stipulated in Schedule-A
3. Binding wire of 15 gauge of thinner gauge required for placing the reinforcement in
position shall be provided at his own cost.
4. All the materials required for the items other than labour in Schedule-A but
available with the dept. will be issued on request to the contractor. (for use in this
contract only) at prevailing market rates or departmental issue rates whichever is
5. All the surplus materials supplied by the dept. As mentioned in schedule-A should be
handed over to the Department by the contractor at the Govt. stores as directed.
6. The materials mentioned in schedule-A shall have to be checked for their
correctness and soundness by the contractor before taking the delivery of the
materials from the Government.
7. Necessary cement will be purchased by the agency at their own cost from open
8. The persons of firm submitting the Tender should see that rates in the above
schedule are filled up by the Executive Engineer, on the issue of form prior to the
submission of the Tender.
9. Carting of above materials should be done by contractor at his own cost.
10. Contractor should return the balance materials in good and acceptable condition,
otherwise recovery at the double rates will be affected in view of Clause 12.4.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B
Volume-III, PRICE BID
SUMMARY (SCHEDULE-B)
Name of Work:- Providing, Supplying and Lowering Laying PVC 90 MM Rising Main from Tera
Village Prop. bore to Tera Village Exst. UG Sump under Rejuvenation Program 2024-25
Sr. No. Name of Work Amount Rs.
1 SCHEDULE - B1
2 SCHEDULE – B2
SCHEDULE - B Total Amount B (B1 to B2)
SCHEDULE - B Total Amount B (B1 to B2)
3 Net Considering Rebate (1-2)
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Volume-III, PRICE BID
Sr. No Description Unit Qty. Rate Amount
Item no 1:Providing and supplying in standard length ISI
mark rigid unplasticised PVC pipes suitable for potable
water with ring fit joint including cost of rings, as per IS
specification no. 4985/1988 including all local and central
taxes, transportation, freight charges, octroi, inspection
charges, loading, unloading, conveyance to the
departmental stores and including cost of jointing meterial
1.1 90 MM Dia PVC 6KG/CM2 RMt 1400.00 139.00
Item no 2: PVC.Specials
Providing & Supplying P.V.C. Fittings suitablefor P.V.C.
Pipes at store or at site of work incl.freight, loading,
unloading, stacking, insurance and all taxes etc. complete.
2.1 90MM PVC 90 degree BENDS (Moulded) Light NO 5.00 216.00
2.2 90mm tail piece NO 2.00 236.00
2.3 90MM PVC ELBOWS NO 4.00 216.00
Item no 3:Providing and supplying C. I.Temper proof Air
Valves with SS 304 Float gun metal nozzle of approved
make & quality of following class and diameter including
all taxes, insurance, transportation, frieght charges, octroi,
inspection charges, loading, unloading, conveyance to
departmental stores, stacking etc. complete
F.2 Without Isolating Sluice Valve PN 1.0 80 mm dia.
3.1 Tamper Proof Air valves 50 mm NO 3.00 5499.00
Item no 4 Providing and supplying ISI mark D/F sluice
valves as per IS:14846 (Latest Edition) of Following class
and diameter including all taxes
insurance,transportation,freight charges,octrol, inspection
charges loading,unloading,conveyance to departmental
stores,stacking etc.complete.
mm Sluice valve NO 2.00 2652.00
Volume-III, PRICE BID
Item No.5: Providing and supplying ISI mark D/F reflux
valves as per IS:5312 (Latest Edition) of Following class
and diameter including all taxes
insurance,transportation,freight charges,octrol,inspection
charges loading,unloading,conveyance to departmental
stores,stacking etc.complete.
5.1 80 mm Dia Non Return valve NO 1.00 3946.00
Item no 6:Erection of Air valve riser by installing new M.S.
pipe of 6mm thick and The length of pipe is 3.20 mt.
above G.L. with necessary fitting such as flange of
appropriate size, nutbolts and embedded the pipe in
R.C.C. M:15 with offset of 10cm around pipe with
necessary steel etc complete.
6.1 50 MM Dia air valve NO 3.00 3112.00
ITEM No 7: Excavation for pipe line trenches incl. all
safety provisions using site rails and stacking excavated
stuff up to a lead of 90 mts. cleaning the site etc. complete
for lifts and strata as specified.
Depth From 0.00 M to 1.05 M
7.1 [A] In all sorts of soils & soft murrum CuM 617.40 89.00
7.2 [B] In Soft murrum, boulders, incl. Macadam road CuM 264.60 135.00
Item no 8::Lowering, laying, fixing and jointing
PVC/uPVC/cPVC pipes and specials of following class
and diameter including cost of conveyance from stores to
site of works including cost of labour, material, cement
solvent, giving satisfactory hydraulic testing as per ISI
8.1 90 MM Dia PVC 6KG/CM2 RMt 1400.00 17.00
Item No .9 : Lowering, laying and jointing in position
following C. I. / D/F Reflux valves, Butterfly valves, Sluice
9 valves and Air valves including cost of all labour, jointing
material, including nut bolts and giving satisfactory
GWSSB, testing, etc. complete (Rate for all class of
Volume-III, PRICE BID
9.1 50 mm Ø tamper proof air valves NO 3.00 178
9.2 80mm Non return valve NO 1.00 400
9.3 80MM Sluice valve NO 2.00 400
Item no 10: Providing C.C.M.:100 for encasing pipes using
trap metal size 12 mm to 50 mm incl. form work curing
consolidation etc. complete for various location on pipeline
using trap metal 20mm nominal size
Item no 11:Refilling the pipe line trenches including
11 ramming, watering, consolidation and disposal of surplus Cum 820.05 22.00
stuf as directed within a radius of 3.00 km.
Volume-III, PRICE BID
Description Unit Qty Rate Amount
Designing (aesthetically) and constructing R.C.C.
frame structure of pump room with positive suction Sq.mt 4.00 10364.68
/ negative suction.
6B: Without Gantry Structure (Up to 3.60 M)
1) Minimum 15% opening for ventilation should be
2)Pump room rolling shutter, door and windows of
aluminium section and window grill of iron should be
provided (Included in Cost).
3)Plinth level of Pump house should be min. 1 meter
4) Cost does not include foundation for pumping
Total amount of Schedule B2=
Total amount of Schedule B2=
Total of Schedule B1 and B2 =
Volume-III, PRICE BID
1. The Schedule specifies the procedure for all such assessment of the items specified
2. Each item of Schedule-B has been divided into broad components. The Employer's
Representative shall assess the value of each component as indicated in paragraph
3. Percentages are indicated against each component of each items specified in
Schedule B, based on the Employer's best appreciation of the value of the
component as related to the total costs of the concerned item as whole. A head
titled (any other item(s)) is included in each breakdown of schedule and the
tenderer shall at the time of tendering indicate any additional items which he
considers necessary but cannot be covered by any of the heads indicated in the
4. The percentage breakup as indicated in the Schedule may differ from that
corresponding to the tenderer’s scheme and design and he should take this into
account while quoting his lump sum prices for the items specified in Schedule-B.
5. The contractor shall, after approval of his detailed designs and drawings furnish to
the Employer's Representative an initial bill of quantities to all major items, to be
reviewed and updated periodically with the Employer's Representative. This bill of
quantities will be used for assessment of percentage progress of the component at
any stage. By measurement jointly taken by the Employer's Representative and the
Contractor, mutually agreed and entered in the measurement books in the form and
by the method approved by the Employer's Representative, and signed jointly by
both the parties.
BREAK UP FOR INTERIM PAYMENTS
Item Description of Items Percentage Payment to
a On receipt of materials at project site 65 % of Quoted rate
b On Excavation, Lowering, laying and Jointing 20 % of Quoted rate
c On Hydraulic testing 5 % of Quoted rate
d On refilling and disposal of surplus stuff 5 % of Quoted rate
e After commissioning 5 % of Quoted rate
g On receipt of materials on site 70 % of Quoted rate
h On erection 20 % of Quoted rate
i On Hydraulic testing 5 % of Quoted rate
j After commissioning 5 % of Quoted rate
9 Valve chambers
A On completion works as per approved drawings 95% of Quoted rate
Volume-III, PRICE BID
B After commission of system 5% of Quoted rate
10 Miscellaneous work
A All other items such as encasing, columns support 80% of quoted rate on
for culvert, pipe bridges for Canal /Drain/Khadi completion of works
crossing, internal roads, railway/highway crossing,
Anchor/thrust blocks, steel bridge for pipe
crossing, Construction of Compound Wall &
Repairing and Renovation work etc.
B On commissioning of the system 20% of quoted rate
Note: Any Changes to be made in all above Payment Schedule can be decided by Executive
Engineer P. H. Works Dn., G.W.S.S.B, Nakhatrana and it shall be binding to the contractor.
Signature of contractor Executive Engineer
P. H. Works Dn., G.W.S.S.B,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tenderv NIT.pdf
2 Shedule B.pdf
3 VOL 1 A Technical Bid.pdf
4 VOL 1 B GCC.pdf
5 VOL 2A Extent of work.pdf
6 Tech spec Civil.pdf
7 VOL 3 Price Bid.pdf
8 Ann 7 shramyogi GR compressed.pdf
09 vigilance GR.pdf
10 Form No 9 and Form 18 H (2).pdf
11 Royalty rate gezzatte.pdf
12 SD EMD GR 25-26(2).pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .