Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹5.9 LQualified | ₹5.9 L | Qualified |
| 2 | Qualified | - | Qualified |
| 3 | Qualified | - | Qualified |
| 4 | Qualified | - | Qualified |
| 5 | Qualified | - | Qualified |
Tender Value
Refer Docs
EMD Value
₹16,000
Closing Date
21 Feb 2024, 3:00 pmClosed
Chief Manager (C&M)
C&M, POWERGRID WR-I, RHQ NAGPUR
Construction of Gents and Ladies Toilet for contract workers at 765/400 KV POWERGRID Bilaspur Sub-Station.
WR-1/CNM/PS/I-2836/NIT-2023/Rfx-5005009514
Limited
Civil Works – General
Works
Bilaspur Sub-Station
₹16,000
2 Apr 2024
8 Feb 2024
21 Feb 2024
8 Feb 2024
21 Feb 2024
8 Feb 2024
Quantity in km.
Type Tests
Fill up only green shaded cells in Sch-1, Sch-2, Sch-3 & Discount.
All the cells in Sch-5 are auto filled, therefore no cell is required to be filled up there.
The price quoted in respect of all items shall be excluding GST applicable on transaction between the Employer and the Contractor
Manufacturer
Authorized Representative of Manufacturer
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Item No. DSR 21
Earth
All kinds of soil
All kinds of soil.
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
Foundations, footings, bases for columns
1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
Foundations, footings, bases of columns, etc. for mass concrete
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
Extruded section profile size 42x50 mm
Granite stone slab of colour black, Cherry/Ruby red
Area of slab over 0.50 sqm
Fixed to steel windows by welding
Twin rubber stopper
30 mm thick factory made Polyvinyl Chloride (PVC) door shutter made of styles and rails of a uPVC hollow section of size 60x30 mm and wall thickness 2 mm (± 0.2 mm), with inbuilt decorative moulding edging on one side. The styles and rails mitred and joint at the corners by means of M.S. galvanised/ plastic brackets of size 75x220 mm having wall thickness 1.0 mm and stainless steel screws. The styles of the shutter reinforced by inserting galvanised M.S. tube of size 25x20 mm and 1 mm (± 0.1 mm) wall thickness. The lock rail made up of 'H' section, a uPVC hollow section of size 100x30 mm and 2 mm (± 0.2 mm) wall thickness fixed to the shutter styles by means of plastic/ galvanised M.S. 'U' cleats. The shutter frame filled with a uPVC multi-chambered single panel of size not less than 620 mm, having over all thickness of 20 mm and 1 mm (± 0.1 mm) wall thickness . The panels filled vertically and tie bar at two places by inserting horizontally 6 mm galvanised M.S. rod and fastened with nuts and washers, complete as per manufacturer's specification and direction of Engineer-in-charge.
Glazed Vitrified tiles Matt/Antiskid finish of size
Size of Tile 600 x 600 mm
1:4 (1 cement: 4 coarse sand)
1:4 (1 cement: 4 coarse sand)
1:3 (1 cement : 3 fine sand)
New work (two or more coats) over and including water thinnable priming coat with cement primer
New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Two or more coats on new work
One urinal basin with 5 litre white P.V.C. automatic flushing cistern
Semi rigid pipe
32 mm dia
Rectangular shape 453x357 mm
100 mm dia
Sand cast iron S&S pipe as per IS: 1729
100 mm dia
Sand cast iron S&S as per IS : 3989
450 mm long towel rail with total length of 495 mm, 78 mm wide and effective height of 88 mm, weighing not less than 170 gms
Orissa pattern W.C. pan of size 580x440 mm
25 mm dia nominal bore
15 mm dia nominal bore
25 to 40 mm nominal bore
25 mm nominal bore
15 mm nominal bore, 122mm long, weighing not less than 99 gms
15 mm nominal bore, 86 mm long, weighing not less than 88 gms
Circular type
100 mm nominal dia
25 mm nominal bore, 152mm long, weighing not less than 440 gms
15 mm nominal bore with 45 cm length
100 mm diameter
100 mm diameter S.W. pipe
For fixed portion
Anodised aluminium (anodised transparent or dyed to required shade according to IS: 1868, Minimum anodic coating of grade AC 15)
With float glass panes of 5 mm thickness (weight not less than 12.50 kg/sqm)
Printed Name :
Designation :
Schedule - 2
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Item no.
Printed Name :
Designation :
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
ITEM NO.
All kinds of soil
Pipes, cables etc. exceeding 80mm dia but not exceeding 300mm dia.
1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Foundations, footings, bases for columns
100 mm dia
Sand cast iron S&S pipe as per IS: 1729
150 mm dia pipe
150 mm diameter pipe
150mm diameter
150 mm diameter S.W. pipe
300 mm dia RCC pipes.
With 20x20 mm square bar
Printed Name :
Designation :
Schedule - 2
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Item no.
NON-SCHEDULE ITEMS
With Fly Ash Bricks
Meter
Designation :
Schedule - 3
As per Lum-sum
AS per Percent
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Item Description
Printed Name :
Designation :
Schedule - 5
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Description
PART-A- Scheduled items
PART-B- Non Scheduled Items
PART-C- Electrical Items
Printed Name :
Schedule - 5 After Discount
Contract & Material
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Description
PART-A- Supply
PART-B- Scheduled items
PART-C- Electrical Items
Printed Name :
Letter of Discount
"Construction of Gents and Ladies Toilet for contract workers at 765/400 KV POWERGRID Bilaspur Sub-Station.”
Eq Weightage of Rs/ %
Discount on lum-sum basis on total price quoted by us. [The discount shall be proportionately applicable on all the items of all the Schdules of all the Parts i.e. (PART-A + Part-B+PART-C) In Rs.
Discount on percent basis on total price quoted by us. [The discount shall be proportionately applicable on all the items of all the Schdulesof all the Parts i.e. (PART-A + Part-B+PART-C) In Percent (%)
We hereby offer Multi-package discount as given below:
Printed Name :
Designation :
Bid Form 2nd Envelope
"Construction of Gents and Ladies Toilet for contract workers at 765/400 KV POWERGRID Bilaspur Sub-Station.”
In continuation of First Envelope of our Bid, we hereby submit the Second Envelope of the Bid, both of which shall be read together and in conjunction with each other, and shall be construed as an integral part of our Bid. Accordingly, we the undersigned, offer to execute the work of "Construction of Gents and Ladies Toilet for contract workers at 765/400 KV POWERGRID Bilaspur Sub-Station.” under the above-named package in full conformity with the said Bidding Documents for the sum of Rs. 0 (Rupees only) or such other sums as may be determined in accordance with the terms and conditions of the Bidding Documents.
Price Schedules
In line with the requirements of the Bidding documents, we enclose herewith the following Price Schedules, duly filled - in as per your proforma:
PART-A-SCHEDULED ITEM
PART-B-NON-SCHEDULED ITEM - NA
PART-C- ELECTRICAL ITEMS - NA
GRAND SUMMARY
GRAND SUMMARY after DISCOUNT
We are aware that the Price Schedules do not generally give a full description of the Work to be performed under each item and we shall be deemed to have read the Technical Specifications and other sections of the Bidding Documents and Drawings to ascertain the full scope of Work included in each item while filling-in the rates and prices. We agree that the entered rates and prices shall be deemed to include for the full scope as aforesaid, including overheads and profit.
We declare that as specified in Clause 9, Section–II: SCC, Vol.-I of the Bidding Documents, prices quoted by us in the Price Schedules shall be FIRM during the execution of Contract and not subject to any Price Adjustment .
We understand that in the price schedules, where there are errors between the total of the amounts given under the column for the price Breakdown and the amount given under the Total Price, the former shall prevail and the latter will be corrected accordingly. We further understand that where there are discrepancies between amounts stated in figures and amounts stated in words, the amount stated in words shall prevail. Similarly, any discrepancy in the total bid price and that of the summation of Schedule price (price indicated in a Schedule indicating the total of that schedule), the total bid price shall be corrected to reflect the actual summation of the Schedule prices.
We declare that items left blank in the Schedules will be deemed to have been included in other items. The TOTAL for each Schedule and the TOTAL of Grand Summary shall be deemed to be the total price for executing the Facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
We, hereby, declare that only the persons or firms interested in this proposal as principals are named here and that no other persons or firms other than those mentioned herein have any interest in this proposal or in the Contract to be entered into, if the award is made on us, that this proposal is made without any connection with any other person, firm or party likewise submitting a proposal is in all respects for and in good faith, without collusion or fraud.
Printed Name :
Designation :
hundred
thousand
crore
three
seven
eight
eleven
twelve
thirteen
fourteen
fifteen
sixteen
seventeen
eighteen
nineteen
twenty
twenty one
twenty two
twenty three
twenty four
twenty five
twenty six
twenty seven
twenty eight
twenty nine
thirty
thirty one
thirty two
thirty three
thirty four
thirty five
thirty six
thirty seven
thirty eight
thirty nine
forty
forty one
forty two
forty three
forty four
forty five
forty six
forty seven
forty eight
forty nine
fifty
fifty one
fifty two
fifty three
fifty four
fifty five
fifty six
fifty seven
fifty eight
fifty nine
sixty
sixty one
sixty two
sixty three
sixty four
sixty five
sixty six
sixty seven
sixty eight
sixty nine
seventy
seventy one
seventy two
seventy three
seventy four
seventy five
seventy six
seventy seven
seventy eight
seventy nine
eighty
eighty one
eighty two
eighty three
eighty four
eighty five
eighty six
eighty seven
eighty eight
eighty nine
ninety
ninety one
ninety two
ninety three
ninety four
ninety five
ninety six
ninety seven
ninety eight
ninety nine
Conductor Pkg. P214-CD01R for supply of 134 km of ACSR Bersimis conductor and 3265 km of ACSR Moose conductor associated with Northern Region System Strengthening Scheme – XXVIII
CC-CS/236-NR1/CD-1764/3/G7
General guidelines for filling up the Attachments
Fill up only green shaded cells in the relevent attachments.
Attachments 1, 2, 3, 4, 5 & 6& 6a and Bid Form are included here.
Copy of Cancelled Cheque to be uploaded separately
Proprietorship
Private Limited Company
Attachment-1
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Reference clause in the Specifications
Printed Name :
Designation :
Attachment-1
Reference clause in the Specifications
Printed Name :
Designation :
Attachment-2
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Name of the person with designation in POWERGRID
Printed Name :
Designation :
Attachment-3
Power Grid Corporation of India Ltd.,
Western Region -I Headquarters
Printed Name :
Designation :
Attachment-4
PO: Uppalwadi, Nagpur (MS) -440026
Supply Portion
Name of the Supplier/ Contractor in whose favour payment is to be made
Address with PIN Code and State
MSME number
Are you a MSE owned by SC/ST* enterpreuners in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012 including subsequent amendment/notification/order
If 3(b) is 'Yes', please mention whether you are (Proprietory MSE/ Partenership MSE/ Private Limited Company) owned by SC/ST Enterpreneurs
Are you a MSE owned by women in line with Public Procurement Policy for Micro and Small Enterprises (MSEs) order 2012, Public Procurement Policy for Micro and Small Enterprises (MSEs) Amendment Order 2018 including subsequent amendment/notification/order (Indicate Yes/No)
Permanent Account (PAN) No.
Work Contract Tax No.
GSTIN No.
PF Registration No. of the Company
PF Regional Office covered (with Address)
Name of Contact Person
Telephone No(s)
Bank Details for Electronic Payment
Saving Account
9 digit MICR code printed at bottom in middle, next to cheque no.
IFSC (for RTGS)/NEFT Code (to be obtained from the Bank) Sample Cancelled Cheque to be enclosed
In case of Proprietory MSE, proprietor(s) shall be SC/ST.
In case of Partenership MSE, the SC/ST partners shall be holding at least 51% shares in the unit.
In case of Private Limited Companies, at least 51% share shall be held by SC/ST promoters.
Please provide scanned copy(ies) of the SC/ST certificate(s) issued by District Authority as applicable for SC/ST MSE category as per (a), (b) or (c) above.
Printed Name :
Designation :
Attachment-5
PO: Uppalwadi, Nagpur (MS) -440026
Attachment-6
Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
Designation :
Attachment-6A
Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
Designation :
Attachment-7
Western Region -I Headquarters
Sampriti Nagar, Nari Ring Road
Designation :
thirteen
fourteen
“Construction of Gents and Ladies Toilet for contract workers at 765/400 KV POWERGRID Bilaspur Sub-Station”
Bank Draft
Banks certified Cheque
Name of Document
Covering Letter
Instruction to the Bidders : Annexure-I
Special Conditions of Contract : Annexure-II & Sample Forms & Procedure :Annexure IIA
Technical Specification & tender drawing : Annexure-III
Bid Form and Attachment Excel File : Annexure-IV comprising of following worksheets :-
Price schedule & Bid Form-II Excel File -Annexure-V
Currency
Pay Order
PRICES / VALIDITY OF BID
All prices and price components stated in the bid are firm and not subject to any price adjustment, in line with the bidding documents. All prices and other terms and conditions of this proposal are valid for a period of 90 days from the date of opening of the price bids. We further declare that prices stated in our proposal are in accordance with your bidding documents.
Further, we confirm that we have read all the provisions in Special Conditions of Contract (SCC) (inclusive of those regarding applicable taxes, duties and levies in relevant clauses) & the Instruction to Bidders and have submitted the bid accordingly.
We do hereby confirm that our lump sum bid prices quoted in BOQ (on https://etender.powergrid.in ) shall be in line with the clause "CONTRACT PRICE" in the SCC
We are aware that the BOM do not generally give a full description of the work/s to be performed under each item and we shall be deemed to have read other Bidding Documents to ascertain the full scope of work/s included in each item while filling in the rates and prices. We agree that the entered rates and prices shall be deemed to include for the full scope as aforesaid, including overheads and profits.
We understand that in the price schedule, if there is discrepancy between the unit price and total price, the same shall be corrected as per provision of bidding document.
We declare that rates of items left blank in the Line Items will be deemed to have been included in other items. The total for each line item and the total of grand summary shall be deemed to be the total price for executing the facilities and sections thereof in complete accordance with the Contract, whether or not each individual item has been priced.
BID SECURITY
In envelope-I, we have enclosed a Bid Guarantee/Earnest Money Deposit in the form of ____________________ for a sum of Rs. 16000/-. If I/We fail to keep the bid open as aforesaid or make any modifications in the terms and conditions of the bid which are not acceptable to the Owner, We agree that the Owner shall, without prejudice to any other right or remedy, be at liberty to forfeit the said bid Guarantee absolutely.
Should this bid be accepted, we hereby agree to abide by and fulfill all the terms, conditions and provisions of the aforesaid documents.
If, after the bid is accepted, we fail to commence the execution of the work/s as provided in the Conditions, We agree that the Owner shall without prejudice to any other right or remedy be at liberty to forfeit the said bid Guarantee absolutely.
DEVIATIONS
We declare that Contract shall be executed strictly in accordance with the bid documents except for the variations and deviations stated in the Attachment-1
WORK SCHEDULE
If this bid is accepted by you, we agree to complete the entire work/s in accordance with the completion schedule indicated in SCC. We fully understand that the time schedule stipulated in bid documents is the essence of the Contract.
We further agree that if our proposal is accepted, we shall abide by the Clause of SCC regarding Security Deposit / Contract Performance Guarantee.
BID PRICE
Our total price is for the entire scope of the work as specified in the specifications and documents.
We confirm that we stand committed to comply with all requirements of Social Accountability Standards i.e. SA 8000 (latest standard available at www.sa-intl.org) and maintain necessary records. 9.0 We, hereby, declare that only the persons or firms interested in this proposal as principal or principals are named herein and that no other company, persons or firms other than those herein mentioned, have any interest in this proposal or in the Contract, to be entered into, if we are awarded the Contract; and that this proposal is made without any connection with any other company/ person, firm or party like-wise submitting a proposal and that this proposal is in all respects for and in good faith without collusion or fraud.
Printed Name :
Designation :
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html
Price_schedule.xls
xls • 1.43 MB
00 - Covering Letter.doc
doc • 0.17 MB
01 - Instructions to Bidders.doc
doc • 0.17 MB
02-Special Condition of Contract.doc
doc • 0.18 MB
02A-Forms and Procedures.doc
doc • 0.06 MB
04-Attachments and Bid Forms Annex IV.xlsx
xlsx • 0.40 MB
Annex III TS.pdf
pdf • 0.24 MB
Annex-IV SSC.pdf
pdf • 0.21 MB
Proposed Location of Toilet with Bwall Clearance.PDF.PDF
pdf • 0.17 MB
Workers toilet Drawing.pdf
pdf • 1.30 MB
Workers Toilet Structure.pdf
pdf • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .