| 1 | L1₹34.0 LAdmitted-Finance DORO KASIPUR SUTAHATA PURBA MEDINIPUR PIN 721658 | MEDINIPUR EAST | WEST BENGAL | 721658 | L1 | Admitted-Finance | |
| 2 | L2₹34.6 L+₹61,840.60 (1.82%)Admitted-Finance ANGUL ODISHA 759147 UDYAM OD 01 0001580 | ANUGUL | ODISHA | 759147 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | P C JOSEPH ENGINEERING AND CONTRACTOR L2 | TAJ CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00Rotation & Replacement of MS Pipelines | |||||
| 1.01 | Rotation of 200 NB Fly Ash Surry pipe
lines by gas cutting, proper placement, edge preparation, alignment & welding. | 3,000 | Meter | 6,00,000 ₹6,00,000 | 5,98,830 ₹5,98,830 Lowest |
| 1.02 | Replacement of 200 NB Fly Ash Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 200 | Meter | 1,30,000 ₹1,30,000 | 1,23,664 ₹1,23,664 Lowest |
| 1.03 | Rotation of 250 NB Bottom Ash Surry pipe
lines by gas cutting, proper placement, edge preparation, alignment & welding. | 1,200 | Meter | 2,52,000 ₹2,52,000 | 2,50,452 ₹2,50,452 Lowest |
| 1.04 | Replacement of 250 NB Bottom Ash Surry
lines with new pipe by gas cutting, proper placement, edge preparation, alignment & welding. | 500 | Meter | 3,25,000 ₹3,25,000 | 3,24,380 ₹3,24,380 Lowest |
| 1.05 | Rotation of 300 NB BAOTP Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 400 | Meter | 86,000 ₹86,000 | 84,684 ₹84,684 Lowest |
| 1.06 | Replacement of 300 NB BAOTP Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 100 | Meter | 86,000 ₹86,000 | 65,900 ₹65,900 Lowest |
| 1.07 | Rotation of 450 NB Ash Surry disposal
pipe lines by gas cutting, proper placement, edge preparation,
alignment & welding. | 6,000 | Meter | 13,80,000 ₹13,80,000 | 13,77,360 ₹13,77,360 Lowest |
| 1.08 | Replacement of 450 NB Ash Slurry
disposal pipe lines with new pipe by gas cutting, proper
placement, edge preparation, alignment & welding. | 200 | Meter | 1,34,000 ₹1,34,000 | 1,33,742 ₹1,33,742 Lowest |
| 1.09 | Fabrication & Replacement of 450 NB
MS Bends (90 deg & 45 deg) of ash slurry disposal pipelines. | 30 | Number | 1,35,000 ₹1,35,000 | 1,22,762.4 ₹1,22,762.4 Lowest |
Tender Value
₹34.0 L
EMD Value
₹68,044
Closing Date
15 Jun 2026, 3:00 pmClosed
The General Manager, SGTPP WBPDCL
Administrative Building, SgTPP, PO-Manigram, Dist- Murshidabad, Pin-742237
Service Contract for Replacement and Rotation of MS Pipe lines (9.52 MM THK) and Replacement of MS Bends during overhauling of Unit-4 under AHP-MM-II (2X500 MW) at SGTPP.
2026_WBPDC_1015665_2
WBPDCL/SGTPP/NIT/E3926/25-26
Open Tender
Support/Maintenance Service
Lump-sum
45 days
SgTPP, WBPDCL
Qualification required as per NIT and Tender documents signed and stamped in each page as a token of acceptance.
3 documents required · 3 mandatory
₹0
₹68,044
Yes
Contract Cell, SGTPP
16 Jul 2026
20 May 2026
17 Jun 2026
20 May 2026
15 Jun 2026
20 May 2026
29 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Rotation & Replacement of MS Pipelines | |||||
| 1.01 | Rotation of 200 NB Fly Ash Surry pipe
lines by gas cutting, proper placement, edge preparation, alignment & welding. | 3,000 | Meter | 199.61 | ₹5,98,830 |
| 1.02 | Replacement of 200 NB Fly Ash Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 200 | Meter | 618.32 | ₹1,23,664 |
| 1.03 | Rotation of 250 NB Bottom Ash Surry pipe
lines by gas cutting, proper placement, edge preparation, alignment & welding. | 1,200 | Meter | 208.71 | ₹2,50,452 |
| 1.04 | Replacement of 250 NB Bottom Ash Surry
lines with new pipe by gas cutting, proper placement, edge preparation, alignment & welding. | 500 | Meter | 648.76 | ₹3,24,380 |
| 1.05 | Rotation of 300 NB BAOTP Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 400 | Meter | 211.71 | ₹84,684 |
| 1.06 | Replacement of 300 NB BAOTP Surry pipe
lines with new pipe by gas cutting, proper placement, edge
preparation, alignment & welding. | 100 | Meter | 659 | ₹65,900 |
| 1.07 | Rotation of 450 NB Ash Surry disposal
pipe lines by gas cutting, proper placement, edge preparation,
alignment & welding. | 6,000 | Meter | 229.56 | ₹13,77,360 |
| 1.08 | Replacement of 450 NB Ash Slurry
disposal pipe lines with new pipe by gas cutting, proper
placement, edge preparation, alignment & welding. | 200 | Meter | 668.71 | ₹1,33,742 |
| 1.09 | Fabrication & Replacement of 450 NB
MS Bends (90 deg & 45 deg) of ash slurry disposal pipelines. | 30 | Number | 4,092.08 | ₹1,22,762.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.15 MB
BOQ_2518173.xls
BOQ • 0.35 MB
TD2.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .