| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 16 12A SWAMIJI ROAD NEAR SABUJ SANGHA KOLKATA WEST BENGAL 700060 | KOLKATA | WEST BENGAL | 700060 | ₹1.5 Cr Quoted ₹1.6 Cr | L1 | Accepted-AOC L1 |
Tender Value
₹1.4 Cr
EMD Value
₹2.7 L
Closing Date
6 Nov 2024, 3:00 pmClosed
GM SGTPP
Office of the General Manager Administrative Building Sagardighi Thermal Power Project 742237
Overhauling of boiler pressure parts etc for boiler efficiency improvement of unit 4 SgTPP in Dec 2024
2024_WBPDC_761774_1
WBPDCL/SGTPP/NIT/E3132/24-25
Open Tender
Support/Maintenance Service
Lump-sum
40 days
Sagardighi Thermal Power Plant Monigram
As per NIT
3 documents required · 3 mandatory
₹0
₹2.7 L
Yes
Contract Cell Administrative Building SGTPP
15 Feb 2025
5 Oct 2024
9 Nov 2024
5 Oct 2024
6 Nov 2024
5 Oct 2024
21 Oct 2024
Overhauling of boiler
Overhauling of boiler drum
Scaffolding at first pass of the boiler (furnace zone) with top of bottom ash hopper sealing
Cleaning of furnace Zone, Div. panel,Dismantling Repairing and Refitting of CCP Bends of all 9 pulverizers.
Butt Joint (Insertion of tube) of Economiser & Water wall and Eco Hanger tubes.
Butt Joint (Insertion of tube) of LTSH ( (Including of LTSH hanger tubes), SH tubes . Other than T91 tubes )
Butt joint(Insertion of tube) of T91 tubes with out SR.
Butt joint(Insertion of tube) of T22 tubes
Scaffolding at Economiser, LTSH Zone and cleaning of Economiser Zone and LTSH, Screen area by LP water
Dissimilar butt joints of coil
Removal and fitting of tube guard(new)
Maximum 6 Inch length guard tube fittingas where requirement (Cutting/fitting/welding included) and cassette baffle repositioning
Removal &fitting of new Cassette Baffle
Inspection and run welding of ( economiser hopper& non PR parts area (Run welding)etc. )
Deposition of weld metal on tubes /stubs/header etc.
LTSH coil (Pair) lifting, inspection ( repairing and fitting with proper alignment. Per pair means coil with both upper and lower bank. )
Alignment of Div.panel,Platen, RH ( Front, RH Rear coil, LTSH,Eco coil and Spacer tube. Removing of support ,flex and ties and refixing are included. )
Replacement of HP valve of size 1 inch ( by straight tube or new valve )
Replacement of HP valve of size 2 inch ( by new valve )
Replacement of HP valve of size 3 inch ( by new valve )
Fabrication of different sizes of bends ( , U-loops etc. )
Replacement of boiler metal temp ( probe. )
Casing/membrance strip welding
D-metering of boiler tubes in all ( the high pressure zones of the boiler viz. LTSH, Economiser, DivSH,PSH, Front R/H, Rear R/H, Screen, furnace wall, roof tubes etc(as per direction of EIC). )
Radiography of pressure parts ( welding joints )
Stress relieving of welding joints ( per day )
Servicing of scaffolding door at ( boiler & pent house )
Servicing of manholes and ( peepholes of boiler. )
Scafolding below the bottom ash ( hopper for inspection of woven wire cloth and scallop plates and if found damage fixing of damage scallop plates ).
Anchor fitting for refractory work ( at different location of the boiler. )
Lance tube replacement of LRSB ( with scaffolding )
Wall soot blower (88 nos) servicing ( . Lance tube length adjustment, cleaning, greasing, compartment repair. )
DPT at inside of stub joint, wind box ( and four corner of furnace. Rate is included with scaffolding (if necessary). )
Assistance of reheater hydro test
Bottom ring header inspection
Scaffolding at just bottom of the ( backpass HDR )
Seal plate and Deeper plate of trough ( seal Removing, Repairing and Replacement )
BOILER PRESSURE PARTS EXPERT ( VISIT )
ENGAGEMENT OF BEST EXPERT FOR ( SAFETY VALVE OH WORK )
ENGAGEMENT OF BEST EXPERT FOR ( soot blower OH WORK )
ENGAGEMENT OF BEST EXPERT FOR ( HANGER SUPPORT OH WORK )
Expert Mobilization Charges
Replacement of HP valve of size 6 ( INCH by new valve )
BOILER INSPECTOR SUNDRY ( EXPENSES (OTHER THAN FEES) )
Hiring of reciprocating pump for ( boiler hydro )
Supply of NDT Level-II Expert ( (2 PERSONS) )
Replacement of HP valve of size 4 ( INCH by new valve )
Economiser coil(Pair) lifting,inspection repairing and fitting with proper alignment. Per pair means coil with tripple banks
HIRING of Hydra
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .