Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC L1 BIDDER |
| 2 | L2₹1.9 Cr+₹19.5 L (11.4%)Rejected-Finance | ₹1.9 Cr+₹19.5 L (11.4%) | L2 | Rejected-Finance NOT THE L1 BIDDER. |
| 3 | L3₹2.0 Cr+₹27 L (15.8%)Rejected-Finance | ₹2.0 Cr+₹27 L (15.8%) | L3 | Rejected-Finance NOT THE L1 BIDDER. |
| 4 | Rejected-Technical 1ST FLOOR CHITRAKOOT 230A A J C BOSE ROAD KOLKATA 700020 | KOLKATA | KOLKATA | WEST BENGAL | 700020 | - | - | Rejected-Technical Techno-Commercially not qualified. |
Tender Value
₹1.8 Cr
EMD Value
₹3.5 L
Closing Date
4 Nov 2020, 3:00 pmClosed
The GM,STPS
1st floor of Administrative Building, STPS.
Evacuation of settled ash from ash pond-1 orash pond-2, transportation and disposal in eco-friendly manner from STPS,WBPDCL.
2020_WBPDC_299560_1
WBPDCL/STPS/NIT/E2200/20-21
Open Tender
Support/Maintenance Service
Item Rate
90 days
STPS, WBPDCL
As per NIT.
2 documents required · 2 mandatory
₹0
₹3.5 L
Yes
1st floor of Administrative Building, STPS.
31 Mar 2021
5 Oct 2020
7 Nov 2020
5 Oct 2020
4 Nov 2020
21 Oct 2020
19 Oct 2020
Amount
Evacuation of settled ash from the ash pond no.-1 and / or ash pond no-2 ash by deploying excavating machineries and other accessories including loading into dumpers at work site and unloading at destination at ( approved disposal areas i.e in mines / quarry) including the carriage of the same for any distance for any lift and lead at both loading and unloading points, dressing at desired level at disposal areas including covering up the filled ash with 300 mm thick earth after attaining the required level, all as per direction of the EIC. No leakage and spillage of ash from dumper should be maintained. Water is to be sprinkled at the loading point as well as the unloading point including movement road to prevent air pollution. Approaches inside the pond at different stages should be prepared suitably for easy and smooth movement of excavators, dumpers etc. Excavations should be done in correct profile, slope and providing proper berms at respective levels without damaging the safety and stability of the existing embankment of ash pond, including mending damages and rectification of existing embankment as per direction of Engineer-in -Charge, if required. The rate includes any dewatering of ash pond and excavated pits, necessary for execution of work, arising out of seepage, rains and whatsoever. (Measurement will be made on the basis of pre-work and post-work levels of the ash pond). Approved disposal areas should be arranged by the agency beyond a distance of 1 KM radius from Ash Pond.
Dinesh Infraprojects Pvt. Ltd.
Venus Engineering Services
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .