Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance 55 A HANUMAN BLDG 3RD FLOOR 308 PERIN NARIMAN STREET FORT MUMBAI MAHARASHTRA 400001 UDYAM MH 19 0022488 27AFCPS6977F1ZX R M MSME STATUS AS VERIFIED | MUMBAI | MAHARASHTRA | 400001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical TECHNICALLY NOT QUALIFIED |
Tender Value
Refer Docs
Closing Date
16 Oct 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM 530014
REMOVAL OF PURGA SYSTEM AND INSTALLATION OF IAC MOD C SYSTEM ONBOARD IN SHIP
2021_NAVY_476281_1
COM/OFF/WEA/20-21/704
Open Tender
Marine Services
Turn-key
500 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
24 Dec 2021
18 Sept 2021
18 Oct 2021
18 Sept 2021
16 Oct 2021
1 Oct 2021
18 Sept 2021 - 16 Oct 2021
27 Sept 2021
180 days
Removal of Purga system and Installation of IAC MOD C. - Purga Control post – Removal of existing cabinet KP-108, KP-119, KP-3
Removal of Purga system and Installation of IAC MOD C. - Ops Room - Removal of KP 163 and KY-163
Removal of Purga system and Installation of IAC MOD C. - Removal of device KP-84 (for both Port and Stbd Launcher)
Removal of Purga system and Installation of IAC MOD C. - Removal of device KP-52 (for both Port and Stbd Launcher)
Removal of Purga system and Installation of IAC MOD C - Removal of wooden cabinets, spare lockers, working table along with base plates and foundation
Removal of Purga system and Installation of IAC MOD C. - Degutting of existing cable 2000 mtrs. Transporting to survey yard and Transport to be catered by vendor.
Removal of Purga system and Installation of IAC MOD C - Fabrication of platform / bracket of following as per approved diagrams :- Purga Control Post -03 Cabinets and 03 JBs R/L post Port - fitment of 02 cabinets and 02 JBs. R/L post Stbd fitment of 02 cabinets and 02 JBs
Removal of Purga system and Installation of IAC MOD C. - Installation / fitment of foundation and devices :- Purga Control Post-03 Cabinets and 03 JBs R/L post Port - fitment of 02 cabinets and 02 JBs. R/L post Stbd fitment of 02 cabinets and 02 JBs
Removal of Purga system and Installation of IAC MOD C.- Fabrication of platform / bracket of ASWC and ESI Cabinet along with their associated sub units in OPS Room
Removal of Purga system and Installation of IAC MOD C. - Installation / fitment of foundation and devices ASWC and ESI Cabinet along with their associated sub units in OPS Room
Removal of Purga system and Installation of IAC MOD C. - Surface preparation, machining and deck strengthening and associated sub units of IAC MOD C.
Removal of Purga system and Installation of IAC MOD C. - Renewal of cable trays 60 mm (Provisioning, Installation and removal of old cable tray including hot work)
Removal of Purga system and Installation of IAC MOD C - Termination of old cables by terminating the shield circumferentially and grounding the core at both ends
Removal of Purga system and Installation of IAC MOD C - Laying of new cable (laying dressing and clamping) 8.6 (sq mm ) 3 core
Removal of Purga system and Installation of IAC MOD C. - Connectorisation of over 400 connectors and glands for powering up the system with associated cable booting for the same.
Removal of Purga system and Installation of IAC MOD C. - Fabrication and Fitment of trunking from deck heads to all cables
Removal of Purga system and Installation of IAC MOD C. - Provisioning of all lagging, welding material, and welding of all devices and Compartments.
Removal of Purga system and Installation of IAC MOD C. - Resiting / Blanking of the existing ventilation trunking feeding the cabinets of radar SSR in HF compartment and centre post
Removal of Purga system and Installation of IAC MOD C - Resiting of the existing fight fixtures and manufacturing of additional cable trays in the HF compartment, centre post and OPS room during installation and associated regutting and hot Work.
Removal of Purga system and Installation of IAC MOD C - Manufacturing and fitment of cable tallies 6x3x0.5mm - Aluminium (punched)
avisan engineering enterprises
POSITIVE CONTROLS
SRI LALITHA BHAVANI ASSOCIATES
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .