Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.6 CrAccepted-AOC DUGDA COAL WASHERY P O DAGDA BOKARO 828404 JH INDIA | BOKARO | JHARKHAND | 828404 | ₹1.6 Cr | L-1 | Accepted-AOC L-1 bidder |
| 2 | L-2₹1.8 CrRejected-Finance | ₹1.8 Cr | L-2 | Rejected-Finance L-2 bidder |
| 3 | L-3₹1.9 CrRejected-Finance | ₹1.9 Cr | L-3 | Rejected-Finance L-3 bidder |
| 4 | L-4₹1.9 CrRejected-Finance OFFICE NO 2 2 FLOOR GUPTESHWAR COMPLEX BEKAR BANDH DHANBAD JHARKHAND 826 001 | ₹1.9 Cr | L-4 | Rejected-Finance L-4 bidder |
| 5 | L-5₹2.0 CrRejected-Finance | ₹2.0 Cr | L-5 | Rejected-Finance L-5 bidder |
| Sl No | Description | Qty | Unit | M/S DIPAK SHAW L5 | ARJUN SHARMA L1 | SHIVAM PETRO PRODUCTS PVT LTD L2 | M/S B RAI CONSTRUCTION COMPANY L4 | R R Enterprises L6 | SUSANTA SARKAR L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Sweeping of road and road berm with jharu/machin including of removal of dead animal s when required and disposal of road sweep up to 1 km lead as per direction of E/I(twice a week ) | 10,22,928 | sqm/month | 1.21 ₹12.4 L | 0.87 ₹8.9 L | 0.89 ₹9.1 L | 1.05 ₹10.7 L | 1.1 ₹11.3 L | 0.85 ₹8.7 L |
| 2.00 | Sweeping of road (daily )excluding Sunday and holiday from martyr chowk to cisf main gate of kolya nagar . | 6,50,784 | sqm/month | 3.96 ₹25.8 L | 2.95 ₹19.2 L | 3.05 ₹19.8 L | 3.42 ₹22.3 L | 2.96 ₹19.3 L | 3 ₹19.5 L |
| 3.00 | Sweeping of road (one day of week) all branches roads of sector -1,2,3,4,5,7,8,9,10,11 & New B,C,D type quarters. | 8,18,638.32 | sqm/month | 0.62 ₹5.1 L | 1 ₹8.2 L | 1.12 ₹9.2 L | 0.58 ₹4.7 L | 1.31 ₹10.7 L | 0.5 ₹4.1 L |
| 4.00 | Collection of garbage from door to door every day including Sunday and excluding holiday including disposal of collected garbage upto lead of 1 km. | 41,712 | unit/month | 143.27 ₹59.8 L | 95 ₹39.6 L | 105 ₹43.8 L | 135.02 ₹56.3 L | 123.4 ₹51.5 L | 140 ₹58.4 L |
| 5.00 | Cleaning of WC pan (once a week) including floor of bathroom D-Type quarter as per instruction of Engineer Incharge. | 6,854.4 | toilet/month | 24.77 ₹1.7 L | 60 ₹4.1 L | 75 ₹5.1 L | 23.34 ₹1.6 L | 75 ₹5.1 L | 25 ₹1.7 L |
| 6.00 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 3,931.83 | cum | 130.64 ₹5.1 L | 210 ₹8.3 L | 315 ₹12.4 L | 123.11 ₹4.8 L | 206.06 ₹8.1 L | 120 ₹4.7 L |
| 7.00 | Cutting / cleaning jungles / bushes and rank vegetation excluding uprooting and including disposal of debris upto 150m lead etc.( 4 times in a year) | 3,18,399 | sqm | 7.16 ₹22.8 L | 4.05 ₹12.9 L | 4.29 ₹13.7 L | 6.75 ₹21.5 L | 7.1 ₹22.6 L | 5 ₹15.9 L |
| 8.00 | Cleaning of drain excavating loose soil under liquid mud and taking out debris upto lead of 50.00m (twice a year) | 6,829.6 | cum | 273.94 ₹18.7 L | 178 ₹12.2 L | 189 ₹12.9 L | 258.16 ₹17.6 L | 255.52 ₹17.5 L | 350 ₹23.9 L |
| 9.00 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth | 160 | each | 240.6 ₹38,496 | 800 ₹1.3 L | 1,000 ₹1.6 L | 226.74 ₹36,278.40 | 329.7 ₹52,752 | 200 ₹32,000 |
| 10.00 | Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth | 140 | each | 1,070.81 ₹1.5 L | 1,000 ₹1.4 L | 2,000 ₹2.8 L | 1,009.12 ₹1.4 L | 824.25 ₹1.2 L | 1,000 ₹1.4 L |
Tender Value
₹2.7 Cr
EMD Value
₹3.4 L
Closing Date
29 Jan 2026, 5:00 pmClosed
GM(Civil/Welfare)
Office of GM Civil, CED HQ, BCCL, Koyla Nagar
Upkeeping of Koyla Nagar, including drain cleaning, jungle cutting and removal of fallen trees under KNTA, Koyla Nagar, for 2 years
2026_BCCL_351114_1
BCCL/CED/TC/eNIT-51/25-26/861 dated 12.01.2026
Open Tender
Miscellaneous Services
730 days
Koyla Nagar
As per NIT
5 documents required · 5 mandatory
₹3.4 L
30 Mar 2026
13 Jan 2026
31 Jan 2026
13 Jan 2026
29 Jan 2026
14 Jan 2026
13 Jan 2026 - 22 Jan 2026
Sweeping of road and road berm with jharu/machin including of removal of dead animal s when required and disposal of road sweep up to 1 km lead as per direction of E/I(twice a week )
Sweeping of road (daily )excluding Sunday and holiday from martyr chowk to cisf main gate of kolya nagar .
Sweeping of road (one day of week) all branches roads of sector -1,2,3,4,5,7,8,9,10,11 & New B,C,D type quarters.
Collection of garbage from door to door every day including Sunday and excluding holiday including disposal of collected garbage upto lead of 1 km.
Cleaning of WC pan (once a week) including floor of bathroom D-Type quarter as per instruction of Engineer Incharge.
Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved.
Cutting / cleaning jungles / bushes and rank vegetation excluding uprooting and including disposal of debris upto 150m lead etc.( 4 times in a year)
Cleaning of drain excavating loose soil under liquid mud and taking out debris upto lead of 50.00m (twice a year)
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 60 cm girth upto and including 120 cm girth
Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 120 cm girth upto and including 240 cm girth
Removing unwanted tree/plants from girth upto 150mm measured 1m above roof, wall and roof including removing roof/cutting wall and roof and filling the same by brick bats and finishing the same including ladder/scafolding Complete job upto 10metre height.
Brick work with fly ash brick F.P.S (non modular) bricks of class designation 7.5 in foundation and plinth in : Cement Mortar 1:6(1 cement :6 coarse sand )
Brick work with clay flyash F.P.S. (non modular) brick of class designation 7.5 in superstructure above plinth level: Cement Mortar 1:6(1 cement :6 coarse sand )
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources).
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
Finishing walls with water proofing cement paint of required shade : Old work (one or more coats @ 2.20 kg/10 sqm) complete.
12 mm cement plaster finished with a floating coat of neat cement of mix :1:4 (1 cement: 4 fine sand)
Bush/Grass cutting through Hiring of Bush cutter machine with petrol and operator as and when reqired as per instruction of E/I
Deployment of 1 labour as per daily requirement as per instruction of engineer incharge
Deployment of 2 sweeper as per daily requirement as per instruction of engineer incharge
Providing, hcisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills and the like, including the cost of required centering, shuttering but, excluding cost of reinforcement, with 1:1.5:3 (1 cement 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.24 MB
Tendernotice_2.pdf
PDF • 0.50 MB
BOQ_363857.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid