Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-Finance MANDAL SERA BAGESHWAR DISTRICT BAGESHWAR | ₹1.8 Cr | L1 | Accepted-Finance Accepted |
| 2 | L2₹1.9 Cr+₹16.5 L (9.27%)Rejected-Finance PARVATI COLONEY BITHORIA I BISHTDHARA HALDWANI NAINITAL | ₹1.9 Cr+₹16.5 L (9.27%) | L2 | Rejected-Finance Rejected |
| 3 | Not Admitted-Fee/PreQual/Technical NARSINGH MALLA NEAR FCI GODAM KAMALUAGANJA ROAD HALDWANI NAINITAL | NAINITAL | UTTARAKHAND | 244713 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | L and T Electrical and Works L2 | SANGAM ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | |||||
| 2.00 | Holding clamp SP-33 with N&B | 40 | Nos | 272.5 ₹10,900 | 250 ₹10,000 Lowest |
| 3.00 | Stay clamp S/E with N&B | 30 | Nos | 272.5 ₹8,175 | 250 ₹7,500 Lowest |
| 4.00 | 11 KV Cable ties for Pin Insulator | 392 | Nos | 2,616 ₹10,25,472 | 2,400 ₹9,40,800 Lowest |
| 5.00 | 11 KV IPC for covered to covered conductor. | 242 | Nos | 1,635 ₹3,95,670 | 1,500 ₹3,63,000 Lowest |
| 6.00 | 11 KV IPC for covered to bare conductor. | 242 | Nos | 1,853 ₹4,48,426 | 1,700 ₹4,11,400 Lowest |
| 7.00 | 11 KV MID Span Jointing kit | 90 | Nos | 2,402 ₹2,16,180 | 2,203 ₹1,98,270 Lowest |
| 8.00 | IPC with Al. Bail for Earthing 11 KV | 80 | Nos | 8,611 ₹6,88,880 | 7,900 ₹6,32,000 Lowest |
| 9.00 | 11 KV AAAC Covered Conductor AL-59, 99 Sq. mm | 20,600 | M | 654 ₹1,34,72,400 | 599 ₹1,23,39,400 Lowest |
| 10.00 | 11 KV Tension clamp with Bail & IPC | 372 | Nos | 3,052 ₹11,35,344 | 2,790 ₹10,37,880 Lowest |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
17 Oct 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Replacement of ACSR Rabbit Conductor by AAAC conductor in Banlekh Section under EDD Bageshwar
2025_UPCL9_87860_1
EDC(R)-72/2025-26
Open Tender
Electrical Works
Item Wise
90 days
Bageshwar
As per Tender Documents
2 documents required · 2 mandatory
₹11,800
Executive Engineer
₹3.6 L
2 Dec 2025
4 Oct 2025
18 Oct 2025
4 Oct 2025
17 Oct 2025
4 Oct 2025
Amount
NON-CENTRALIZED MATERIAL (SUPPLY)
Holding clamp SP-33 with N&B
Stay clamp S/E with N&B
11 KV Cable ties for Pin Insulator
11 KV IPC for covered to covered conductor.
11 KV IPC for covered to bare conductor.
11 KV MID Span Jointing kit
IPC with Al. Bail for Earthing 11 KV
11 KV AAAC Covered Conductor AL-59, 99 Sq. mm
11 KV Tension clamp with Bail & IPC
LABOUR PART (WORK)
Fabrication of steel
Excavation of pit for stay set
Erection of 11 KV Stay Set
Grouting of stay set
Excavation of pit for Pole
Erection of Single SP-33 Pole
Grouting of Pole
Muffing of Pole
Dismantling of 11 KV line (Rabbit)
Painting of SP-33 Pole
Cartage SP-33 Pole, 100-150 Km
Cartage of petty material, 100-150 Km
Headload Cartage SP-33 Pole (0-1 Km)
Headload Cartage of Material (0-1 Km)
Back Cartage of Petty material, 100-150 KM
Fixing of IPC with Al. Bail for earthing
Jumpering of D/P TPMO, Fuse Set and T/F
Opening & Making of Jumpher of Section P
Fixing of 11 KV 90 KN Tension clamp B&IPC
Fixing of 11 KV Suspension Ties
Fixing of 11 KV MID Span Jointing Kit
Back Head Load Cartage of Petty material, 0-1 KM
Fixing of 11 KV IPC for covered-covered
Fixing of 11 KV IPC covered to Bare Conductor
Laying spreading, Stringing AAAC Conductor
L and T Electrical and Works (BID ID -403028)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
TendeDocAAACBanlekh72.pdf
Tender Documents • 0.70 MB
BOQ_104278.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .