Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 LAccepted-AOC JOYNAGAR NEAR MANIK DHAR GALI AGARTALA WEST TRIPURA | WEST TRIPURA | TRIPURA | 799002 | ₹10.4 L | L1 | Accepted-AOC L1 |
Tender Value
₹10.7 L
EMD Value
₹21,429
Closing Date
27 Jan 2026, 3:00 pmClosed
The Executive Engineer, DIV-I, AMC
o/o the Executive Engineer, DIV-I, AMC
Dev. of gali and drain with necessary allied works near H.O Bhabotosh Pal to Siraj Miah via Jamal Hossain Ward-36, AMC
2026_SAMC_69295_1
44/EE/DIV-I/AMC/2025-26
Open Tender
Civil Works
Percentage
60 days
Agartala
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
₹21,429
Yes
10 Jun 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
27 Jan 2026
17 Jan 2026
Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
Supplying of 2nd class brick bats including loading, unloading, carriage, laying, spreading and consolidation with road roller etc. complete as per direction of the Engineer-in-Charge.(15 % will be deducted for voids)/ (AR)
Providing and laying flat brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 KN as per MoRD Technical Specification Clause 412.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -All work upto plinth level:1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size)
Supplying bamboo (1st class) 85 mm to 100 mm dia and making shoe with end tappered upto 300 mm from the bottom of the bamboo as per drawing and specification.
Handling and driving bamboo (1st class) 85 mm to 100 mm dia upto the length required by heavy hammer as per drawing and specification.
Providing and fitting, fixing bamboo (1st class) 85 mm to 100 mm dia for horizontal, diagonal bracing, strut etc. with nails / spikes and binding wire (GI 2.00 mm) as per drawing and specification.
Providing and fitting, fixing double layer split muli bamboo tatti lining in position as per drawing and specification.
Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with ½ tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m. -All kinds of soil
First class brick work in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ).
Half brick masonry work with first class bricks in foundation and plinth including cost of all materials as required complete:-In cement mortar 1:5 ( 1 cement : 5 fine sand ).
12 mm cement plaster of mix Cement mortar 1:5 (1 cement : 5 fine sand)
Neat Cement Punning
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- -All work upto plinth level:1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto floor five level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Centering shuttering including struttings, propping etc. and removal of form work for: Suspended floors, roofs, landings, balconies and access platform with timber planks
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
DNIet44.pdf
Tender Documents • 1.49 MB
BOQ_70511.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].