Loading…
Loading…
Tender Value
₹5.9 L
EMD Value
₹11,900
Closing Date
23 May 2026, 4:00 pmClosed
Executive Engineer I-FC Division Kargil
Executive Engineer I-FC Division Kargil
Remodeling of Rkili Yourba Khul Saliskote from RD 3063.95-3243 mtr
2026_PWD_18935_2
Fresh e-Tender 03 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
Works
20 days
Kargil
Please refer Tender documents.
4 documents required · 4 mandatory
₹60
Payable To Executive Engineer I-FC Division Kargil
₹11,900
Yes
13 May 2026
13 May 2026
25 May 2026
13 May 2026
23 May 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in trench for foundation ,drains, pipes ,cables etc.(Not exceeding 1.5mtr in width ) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan ,depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge, disposed earth to be leveled and neatly dressed in: | |||||
| 1.01 | All kind of soil 70% | 76.83 | Cum | 295.75 | ₹22,722.47 |
| 1.02 | Ordinary rock 30% | 32.93 | Cum | 616.17 | ₹20,290.48 |
| 2 | Dumping/filling of stone in horizontal on level including cost of stone | 25.11 | Cum | 589.99 | ₹14,814.65 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size Crusshed | 65.8 | Cum | 5,243.49 | ₹3,45,021.64 |
| 4Centering and shuttring including strutting, propping etc and removal of form for:- | |||||
| 4.01 | Walls(any thickness) including attached pilasters buttresses , plinth and string course etc | 322.29 | Sqm | 393.53 | ₹1,26,830.78 |
| 5Carriage of different materials from sources to actual site of work including loading unloading and stacking complete. | |||||
| 5.01 | Sand /stone aggregate for an average lead of 05Km by MT and200 mtr by headload . | 89.49 | Cum | 464.66 | ₹41,582.42 |
| 5.02 | Cement for an average lead of 26 Km by MT and200mtr by Headload | 14.47 | MT | 535.78 | ₹7,752.74 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_45235.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .