Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹50.9 Cr
EMD Value
₹1.0 Cr
Closing Date
27 Feb 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer (H)
TENDER FOR OPERATION & MAINTENANCE OF EXISTING CARGO BERTHS 09 AND 10 (FROM PANEL NO. 69 TO END OF BERTH NO.10) FOR CARRYING OUT CARGO HANDLING OPERATIONS BY DEPLOYING HARBOUR MOBILE CRANES (MINIMUM HMCS 1 plus 1 NOS.) AND OTHER ASSOCIATED EQUIPMENT INCLUDING MANAGEMENT AND MARKETING
264617
HD-02/2026
Open
Support / Maintenance Service Works
Works
Kachchh
₹5,900
Yes
As per tender
₹1.0 Cr
Yes
13 Jan 2026
13 Jan 2026
13 Jan 2026
27 Feb 2026
13 Jan 2026
Part – IV Preamble to Bill of Quantities 35 -
Part – V Pre Bid Meeting
Part – VI Special Conditions of Contract 38 -
Part – VII Additional Conditions of Contract 46 -
Part – VIII General Directions and Conditions of Contract 64 -
Safety, Health, Environment & Security Policy
Security Policy
List of Formats & Annexures:
Appendix - I Format for Power of Attorney
Appendix - II Format of the Letter of Acceptance (To be submitted
by each member, in case of Joint Venture)
Appendix - III Format for Performance Guarantee Bond 77 -
Appendix - IV Format for EMD Guarantee Bond
Appendix - V Declaration no. 1 (GST)
Appendix - VI Proforma for Integrity Pact 82 -
Appendix – VII Proforma Of Joint Venture/Consortium Agreement 89 -
Appendix – VIII Proforma of Power- of-Attorney for Lead Member of
Appendix - IX Format of Bid Security Declaration from Bidders 94 -
Annexure-I Proforma of the list of works completed
Annexure-IA Turnover of the Firm/ JV
Annexure-II Proforma of the list of Engineers
Annexure-III Checklist to the Tender Schedule
Annexure-IV Techno commercial information
Section - 1 Forms of Securities and Other Formats 101-121
Section - 2 Forms of Bid, Qualification Information
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Tender No. HD-02/2026
ONLINE TENDERING (E- Tendering)
OPERATION & MAINTENANCE OF EXISTING CARGO BERTH 09 AND
10 (PANEL NO. 69 UPTO END OF BERTH No.10) FOR CARRYING OUT
CARGO HANDLING OPERATIONS BY DEPLOYING HARBOUR
MOBILE CRANES (MINIMUM HMCs 1+1 Nos.) AND OTHER
ASSOCIATED EQUIPMENT INCLUDING MANAGEMENT AND
E-Tenders are invited on-line under TWO BID SYSTEMS (Technical and Financial Bid) by the
Executive Engineer (H), Deendayal Port Authority (DPA) from the firms which have relevant
experience and meeting the eligibility criteria.
Details of the Tender Fee & Estimated Cost are as follows:
Estimated cost Last Date and Time of online
Tender Fee (In Rs.)
Submission of bid documents
Detailed Tender Notice along with complete tender documents can be downloaded from the
official web-site of Deendayal Port Authority www.deendayalport.gov.in OR
https://tender.nprocure.com.
Technical Bid will be opened on 27.02.2026 @ 16:00 Hours. Date of opening of Price bid shall
be notified after scrutiny & evaluation of Technical Bids. For further details and general
enquiries, the prospective bidders may contact the Executive Engineer (H), Deendayal Port
Authority, Nirman AO Building, Kandla – 370 201, District Kutch, State – Gujarat INDIA.
Telephone: (+91) 8758659669 E-mail: [email protected], during working hours, before
the last date and time of submission of tender document. Any modification / corrigendum, if any,
will be placed on above mentioned websites only and shall not be released in Newspapers or
any other form.
Executive Engineer (H)
DEENDAYAL PORT AUTHORITY
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
NOTICE INVITING TENDER (NIT)
Department Name Civil Engineering Department
Circle/ Division Harbour Division, Nirman Bhavan, New Kandla (Kutch) -
Tender Notice No. HD - 02/26
Name of Work OPERATION & MAINTENANCE OF EXISTING CARGO
BERTH 09 AND 10 (PANEL NO. 69 UPTO END OF BERTH
NO.10) FOR CARRYING OUT CARGO HANDLING
OPERATIONS BY DEPLOYING HARBOUR MOBILE
CRANES (Minimum HMCs 1+1 Nos.) AND OTHER
ASSOCIATED EQUIPMENT INCLUDING MANAGEMENT
Estimated Contract Rs. 50,86,10,232/- (Excluding GST)
Period of Completion Five (05) years and extendable by One (01) more year upon
mutual consent at discretion of Deendayal Port Authority
Bidding Type Open
Bid Call (Nos.) One
Tender Currency Single
Tender Currency Indian Rupee (INR)
Qualifying Criteria Average annual financial turnover during the last three
years ending 31st March of the previous financial years,
should be at least Rs. 15,25,83,070/- (The financial turnover
document must be certified by a Chartered Accountant (CA)
with the CA's stamp, signature, and UDIN/membership
number. Additionally, all necessary documents for the
verification of turnover must be provided. Failure to comply
with these requirements bid will be treated as non-
The Bidder must have handled an average of 2.54 Million
Metric Tonne of Dry Bulk Cargo and/or Break Bulk Cargo in
any Port or in any other organization consecutively for three
years during the last five years ending on 31st March,
The bidder should furnish the documentary evidence in
support of handling 2.54 Million Metric Tonne of Dry Bulk
Cargo and/or Break Bulk per annum in any Port or in any
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
other organization consecutively for three years during the
last five years ending on 31st March,
Similar Works / Contracts shall mean (a) Operation and
Maintenance of Dry Bulk cargo and/or Break bulk cargo
Terminals/Terminals in Port Sector and/or (b) Stevedore &
cargo handling activities.
i.e. End to End Logistics providers in Port Sector (right from
vessel nomination to the discharge of cargo through
The Bidder should be aware of the Port Operations and
Facilities and capable of handling Rail / Road Loading
Operations for participating in the Bid.
Integrity Pact Agreement ( Appendix-VI).
The potential bidders shall download and print the IP
Agreement signed by the Employer and their witness and
affix his/her signature on the IP Agreement in the presence
of a witness from his/her side, who shall also affix his/her
signature thereof. Having completed the signing procedure,
the potential Bidder shall upload the duly filled and signed
IP Agreement on n-procure portal.
The procedure mentioned above regarding signing of
Integrity Pact Agreement by both the parties (Employer and
Potential bidders) shall be completed online. However, in
case of any technical glitch due to which if any potential
bidder is unable to upload the IP Agreement, then he/ she
shall submit the Hard Copy of the dully filled, signed IP
Agreement, to the Department concerned of DPA within a
period of seven days and prior to opening of the Technical
Bid, failing which Bid of potential Bidder shall be treated as
Joint In case of association in the form of Consortium or Joint
Venture/Consortium Venture agreement, the members of the association shall
use the prescribed format for JV / Consortium agreement
(Appendix-VIII) and nominate one of the members as “lead
partner” for participating in the tender and signing all the
documents related therewith up to signing of agreement and
execution of all the contractual obligations there after (in
case of Grant of Contract).
Companies/Contractors may jointly undertake
contract/contracts. The number of partners in
JV/Consortium shall be limited to maximum of three. Each
entity would be jointly and severely responsible for
completing the task as per the contract, however declaration
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
of the Lead member (JV has to designate one partner as
Lead Member in their MOU) to be indicated by bidders. The
firms with at least 26% equity holding each are allowed to
jointly meet the eligibility criteria.
A legally binding Joint venture / Consortium Agreement
signed by authorized signatories of all the partners of the
JV/Consortium, as per the Performa at Appendix - VII shall
be enclosed with the bid.
Joint ventures must comply with the following requirements:
The joint venture must satisfy collectively the eligibility
criteria as described in this section. For this purpose, the
following information of each member of the joint venture
may be added together to meet the collective eligibility
1. Average Annual Turnover.
2. Particular Bulk Material Handling Experience.
3. Capacity of key Personnel.
4. Ability to own / lease relevant equipment.
5. Financial capacity
Each JV partner including the lead partner shall meet not
less than 26% of the following criteria:
1. Average Annual Turnover.
2. Particular Bulk Material Handling Experience.
3. Financial capacity
The definition of the Financial capacity shall mean the Net
worth at the close of the Preceding Financial years and
positive Net case accruals for the last 5 financial years
preceding the bid due date.
All the partners together shall satisfy 100% of the criteria.
Bid Document Fee Rs.5,900/- (including GST)
Only through Digital mode of Payment.
IFSC Code : PUNB0217700
Punjab National Bank, Kandla Branch
Bid Document Fee Only through Digital mode of Payment.
Payable To Account No. :
IFSC Code: PUNB0217700
Punjab National Bank, Kandla Branch
Bid Security/ EMD Rs. 1,01,72,205/-
(INR) through Digital mode of Payment/ Bank Guarantee in favor
of “Board of Deendayal Port Authority, issued by any
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Nationalized/Schedule (Except Co-operative) Bank only
having its branch at Gandhidham as per enclosed format
valid for 45 days beyond bid validity). EMD shall also be
accepted in form of Insurance Surety Bond as per
format and terms and condition in Form 23 A valid for
60 days beyond bid validity.
“In case of Micro and Small Enterprises (MSEs) holding
valid certificate issued by any agencies/ organization under
The Ministry of Micro, Small and Medium Enterprises
indicating the list of activity related to the subject tender as
per National Industrial Classification-2008 mentioned in the
tender only shall become eligible for exemption from
payment of Tender Fee/EMD. Such bidder shall upload the
scanned copy of valid certificate in Technical bid stage as
well as duly filled in and signed ‘Bid Securing Declaration’
as per format provided in the tender document (Appendix-
IX), failing which the bid shall be considered non-
SECTION H Transport & Storage
Division 52 Warehousing and support activities for
52242 Cargo handling incidental to water
Date & time of Pre-Bid 16.02.2026 at 16.00 hrs. either:
meeting (i) in Board room at A.O. building, Deendayal Port Authority,
Gandhidham – 370 201, Kutch Gujarat.
(ii) through Video Conference, at same date & time.
Bid Document 13/01/2026
Downloading Start
Bid Document Date: 27/02/2026, Time: 15:00 Hrs.
Downloading End
Last Date & Time for Date: 27/02/2026 Time: 15:00 Hrs. @ office of the Executive
Online submission of Engineer (H), New Kandlass
Bid Validity Period 120 Days
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Condition Integrity Pact, Tender fee & EMD which includes Technical
bid shall be submitted in electronic format through on line
(by scanning) while uploading the bid. This submission shall
mean that Integrity Pact, EMD & Tender Fee are received.
However, for the purpose of realization, bidder shall send
the same in original along with hard copy of tender (sealed
& signed of authorized person), and other PQ documents
through R.P.A.D./speed post or in person so as to reach
to Executive Engineer, Harbour Division, Nirman Building,
New Kandla within 7 days from the date of opening.
However, the Bidder shall submit the Financial Bid through
online mode only.
The bidders registered with Micro and Small Enterprise
(MSME) in appropriate category mentioned under related
activity above are exempted for submission of EMD and
Tender Fee. Scanned copy registration may be uploaded
along with ‘Bid Securing Declaration Form’.
Remarks Submission of E.M.D. Tender Fee and other Documents
during office hours upto 06/03/2026 by R.P.A.D /Speed post
or in person in the chamber of Executive Engineer, Harbour
Division, Nirman Building, First floor, New Kandla-370210,
Kutch District, Gujarat State, INDIA, Mobile
Bid Opening Date Technical Bid will be opened on 27/02/2026 @ 16:00 Hrs.
Date of opening of price bid shall be notified after scrutiny &
evaluation of Technical Bid.
Officer- Inviting Bids Executive Engineer (H), Deendayal Port Authority.
Bid Opening Authority Executive Engineer (H)
Address Executive Engineer, Harbour Division, Nirman Building,
First floor, New Kandla-370210, Kutch District, Gujarat
Contact Details Mobile No.(+91)
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
In case bidders need any clarifications or if training is required to participate in online
tenders, they can contact (n) Procure Support team at following address: -
(n) Code Solutions – A division of GNFC Ltd.,
(n)Procure Cell, 4bl03, GNFC Info tower,
S.G. Road, Bodakdev,
Ahmedabad – 380054 (Gujarat).
Contact Details of (n) code Solutions:
E-mail: [email protected]
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
INFORMATION AND INSTRUCTIONS FOR CONTRACTORS FOR E-TENDERING
FORMING PART OF NIT AND TO BE POSTED ON WEBSITE
1. Information and instructions for Contractors will form part of NIT and to be uploaded
2. The intending bidder must have class-III digital signature to submit the bid.
3. The Bid Document as uploaded can be viewed and downloaded free of cost by anyone
including intending bidder. But the bid can only be submitted after uploading the
mandatory scanned documents.
4. Bidders may modify or withdraw their bids before last date and time of submission of
bid as notified.
5. While submitting the modified bid, contractor can revise the rate of one or more item(s)
any number of times (he need not re-enter rate of all the items) but before last time
and date of submission of bid as notified.
6. On opening date, the contractor can login and see the bid opening process. After
opening of bids he will receive the competitor bid sheets.
7. Contractor can upload documents in the form of JPG format and PDF format.
8. It is mandatory to upload scanned copies of all the documents including GST
Registration No., as stipulated in the bid document. If such document is not uploaded
his bid will become invalid and cost of bid document shall not be refunded.
9. If the contractor is found ineligible after opening of bids, his bid shall become invalid
and cost of bid document shall not be refunded.
10. If any discrepancy is noticed between the documents as uploaded at the time of
submission of bid and hard copies as submitted physically by the contractor the bid
shall become invalid and cost of bid document shall not be refunded.
11. Certificate of Financial Turn Over: At the time of submission of bid contractor may
upload Certificate from CA mentioning Financial Turnover of last 3 (three) years or for
the period as specified in the NIT of the bid document.
12. Contractor must ensure to quote rate of each item. If any cell is left blank and no rate
is quoted by the bidder, rate of such item shall be treated as "0" (ZERO).
13. The Draft information and instructions to Contractors may be modified suitably by NIT
approving authority as per requirement.
14. All the mandatory document required/prescribed for pre-qualification have to be
enclosed by the bidder failing which his offer shall be rejected and treated as non-
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
responsive. However, additional documents required if any for verification of the
original documents shall be submitted by the bidder if required by DPA.
List of Documents to be scanned and uploaded within the period of bid submission:
i. Payment towards EMD shall be submitted through Digital mode Online
payment/Insurance Surety Bond/ Bank Guarantee proof for which shall be uploaded
against EMD as per Board decision.
ii. Payment towards tender fee shall be submitted through digital mode/online transfer in
the account of Port and proof for transfer with transaction number shall be uploaded
towards cost of Tender Fees.
iii. Duly signed integrity pact by the bidder & one witness to be submitted in technical bid.
iv. If the Bidder JV firm IP agreement must be signed by all and all the parties of JV need
to stamp and sign. The Agreement failing which bid will be considered as non-
v. The bidder should upload Partnership deed in case of Partnership firm and JV
Agreement in case of JV Firm and Board Resolution and POA in case of Private Ltd
i. Certificates of Work Experience of successfully completed works issued by the client.
ii. Certificate of Financial Turnover from CA.
iii. Any other Document as specified in the press notice.
iv. Affidavit as per provisions of NIT.
v. Certificate of Registration for GST, PAN and acknowledgement of up to date filed
return if required.
Executive Engineer (H)
Deendayal Port Authority
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Information to Bidders and Procedure for Bid Submission:
1. Information to bidders
Deendayal Port Authority is located on the West coast of India. The Port intends to provide
shore- based facilities to load / discharge dry bulk and break bulk cargoes. The Port would
like to encourage registered stevedores, bonafide importers / exporters or their
subsidiaries, service providers to install Harbour Mobile Cranes (HMCs) of 120 Ton
capacity as specified.
Contract Period: Five (05) years plus extendable to another 1 (one) year at the discretion
The prospective bidders are advised to visit the Port with prior intimation to Chief Engineer
/Traffic Manager, Deendayal Port Authority and inspect the berths where the HMCs would
be working after installation. The HMCs are likely to be deployed at Cargo Berth (CB) 09 &
2. Bid Submission:
Bids shall be submitted online on n-procure website (https://tender.nprocure.com) platform.
All bidders are requested to enroll in the Portal (https://tender.nprocure.com), if
not already enrolled with their user ID in the new portal
(https://tender.nprocure.com). Those bidders who have already enrolled in the
new portal (https://tender.nprocure.com) can participate in all tenders using the
existing user id and password and their Digital Signature Certificate (DSC). New
users should use the online bidders enrolment button available in the Home page
for enrolling in the portal (https://tender.nprocure.com) considering enhanced
security, Digital Signature Certificate Class III is enforced for new enrolments.
The participating bidders in the tender should register themselves on n-
procurement platform (https://tender.nprocure.com). Bidders can log-in to e-
procurement platform in secure mode only by signing with the Digital signature
certificates. The bidders, who are desirous of participating in e-procurement, shall
submit their bids as per the standard formats available at the site
(https://tender.nprocure.com).
Tender fee shall be paid through online only and EMD in the form of Digital
Payment/Insurance Surety/Bank Guarantee while submitting the bid. The proof
of payment should be uploaded by the Bidder on the n-procure portal.
If any of the certificates, documents etc., furnished by the tenderer are found to
be false / fabricated / bogus, the successful bidder will be suspended from
participating in tenders on e- procurement platform for a period of three years.
The DPA will not hold any risk and responsibility for non-visibility of the scanned
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
and uploaded documents.
The Documents uploaded alone online on e-procurement website
(https://tender.nprocure.com) only will be considered for Bid Evaluation.
However, DPA reserve the right to ask any shortfall information from the
participated bidders for ensuring better competition.
Even though the Tenderer meet the qualifying criteria, he/she/it is liable to be disqualified /
debarred / suspended / blacklisted, if the following is observed:
a) Furnished false / fabricated particulars in the forms, statements and / annexure
submitted in proof of the qualification requirements and/or
b) Not turned up for entering into agreement when called upon.
c) Record of poor performance such as abandoning the work, not properly completing
the contract, inordinate delays in completion, litigation history or financial failures etc.
d) The work was awarded to the Contractor based on false / fake certificates of
experience submitted by them.
3. One Tender per Tenderer:
Each Tenderer shall submit only one Tender for the work. A Tenderer who submits more
than one Tender (either individually or with consortium) will cause dis-qualification of all the
Tenders submitted by the Tenderer.
4. Last date / time for Submission of the Tenders:
Tenders must be submitted not later than the date and time specified in the NIT. In the
event of the specified date / time for the submission of bids declared as holiday, the bids
will be received / opened on the next working day.
5. Tender Opening and Evaluation:
The Authority shall open the bids received online through n-procure portal on the date &
time as specified in Part -I (Notice Inviting Tender) and in the presence of the Applicants
who choose to attend.
6. Clarification on the Technical Bid:
The tender opening authority may call upon any Tenderer / Bidder for clarification on the
statements, documentary proof relating to the technical bid. The request for clarification
and response thereto shall be in writing via mail and if necessary, submit the hard copies
of documents and it shall be only on the qualification information furnished by the Tenderer.
The clarification called for from the tenderer / Bidders shall be furnished within the
stipulated time.
7. Price Bid Opening:
a. The Price Bids of qualified Tenderer, whose Technical Bids are found satisfying the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
eligibility criteria shall only be opened online in the presence of the qualified Tenderer
/ Bidders, whoever is interested or their authorized representative present on the date
and time fixed.
b. Tenders shall be scrutinized in accordance with the conditions stipulated in the
Tender document. In case of any discrepancy of non-adherence to the Conditions,
the decision taken by the Tender committee on tenders shall be final.
8. Evaluation and Comparison of Price Bids:
The Tender Committee will evaluate and compare the price bids of all the qualified
9. Information relating to the examination, clarification, evaluation and comparison of Tenders
and recommendations for the award of a contract shall not be disclosed to Tenderer or any
other persons not officially concerned with such process until the awarding of the work to the
successful Tenderer has been announced by the tender accepting authority. Any effort by
a Tenderer to influence the processing of Tenders or award decisions may result in the
rejection of his Tender.
10. If any amendment or addendum is issued before opening of the tenders (Technical Bid
and/or Financial Bid), the same will be posted on website of n-procure and website of DPA
11. Award of Contract:
a. Award Criteria:
On behalf of Deendayal Port Authority, the Board of Authority of Deendayal Port through
its Authorized Officer will award the contract to the bidder whose bid has been evaluated
to be techno-commercial responsive and the lowest evaluated Bid will be considered as
the successful Bid. DPA will communicate accordingly to the successful Bidder
b. DPA’s Right to Accept or Reject any or all the Bids:
i. Notwithstanding anything contained in this NIT/Tender the Authority reserves the
right to accept or reject any Bid and to annul the Bidding Process and reject all Bids,
at any time without any liability or any obligation for such acceptance, rejection or
annulment, and without assigning any reasons thereof. In the event that the
Authority rejects or annuls all the Bids, it may, in its discretion, invite all eligible
Bidders to submit fresh Bids here under.
ii. The Authority reserves the right to reject any Bid if:
a. at any time, a material misrepresentation is made or uncovered, or
b. the Bidder does not provide, within the time specified by the Authority, the
supplemental information sought by the Authority for evaluation of the Bid.
c. The details of Financial Bid in any manner is disclosed in the Technical BID.
d. If the Bidder/Bidder is a Consortium, then the entire Consortium may be
disqualified/ rejected. If such disqualification/ rejection occurs after the Bids have
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
been opened and the Lowest Bidder gets disqualified/ rejected, then the
Authority reserves the right to:
i. invite the remaining Bidders to match the Lowest Bidder/ submit their Bids in
accordance with the Tender; or
ii. take any such measure as may be deemed fit in the sole discretion of the
Authority, including annulment of the Bidding Process.
e. The Authority reserves the right to verify all statements, information and
documents submitted by the Bidder in response to the NIT. Any such verification
or lack of such verification by the Authority shall not relieve the Bidder of its
obligations or liabilities hereunder nor will it affect any rights of the Authority
c. Notification of Award:
Officer Inviting the Bid shall mention the amount of Security deposit (within the specified
time) required to be furnished in the Letter of Acceptance (LOA) to be issued to the
successful bidder.
d. Signing of Contract:
Within 21 days of issue of Letter of Acceptance (LOA), the successful bidder shall
a. Security Deposit cum Performance Guarantee.
b. Additional Guarantee
c. Bar Chart with timelines for commencement of work etc.
d. After the issuance of Work Order to the successful bidder, a formal Contract will be
signed between Successful Bidder and the Port Authority subject to compliance of
12. Memorandum of Settlement:
The Bidder/ Contractor shall not sign any memorandum of settlement with any agency such
as Trade Unions etc. in any form at any level without the prior approval of Deendayal Port
Authority in relation to any work under taken by him in the Port premises.
DPA shall not be liable / responsible for any connectivity / internet problem either with user
side / NSIC /Bank. It is in the own interest of the bidders; bidders may get it verified from
Bank that the requisite money has been received by DPA for the NIT in which they are
13. Eligible Bidders:
The invitation for bid is open to all bidders including an individual, proprietorship firm,
partnership firm, company or a Joint Venture/Consortium having eligibility to participate as
per eligibility criteria stipulated in Tender Notice.
Bidders who have been debarred / terminated by the employer because of non-
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
performance during the last 7 years shall not be allowed to participate in this tender.
The bidder (in case of JV must produce documentary evidence in support of handling
Million MT of cargo per annum in any Port / any other organization consecutively for three
years during the last five years ending on 31st March, 2025. In case of Consortium or Joint
Venture, cargo handling of all the JV partners per annum in any Port / any other organization
consecutively for three years during the last five years ending on 31st March, 2025, will be
considered collectively.
In case of association in the form of Consortium or Joint Venture agreement, the members
of the association shall use the prescribed format for JV / Consortium agreement and
nominate one of the members as “lead partner” for participating in the tender and signing
all the documents related therewith up to signing of agreement and execution of all the
contractual obligations there after (in case of Grant of Contract).
Companies/Contractors may jointly undertake contract/contracts. The number of partners
in JV/Consortium shall be limited to maximum of three. Each entity would be jointly and
severely responsible for completing the task as per the contract, however declaration of the
Lead member (JV has to designate one partner as Lead Member in their MOU) to be
indicated by bidders. The firms with at least 26% equity holding each are allowed to jointly
meet the eligibility criteria.
One of the partners, who is responsible for performing key function in the contract
management or is executing major component of the proposed contract, shall be nominated
as being in charge during the bidding period and in the event of a successful bid, during
contract execution. The partner in charge shall be authorized to incur liabilities and receive
instructions for and on behalf of any and all partners of the joint venture, this authorization
shall be evidenced by submitting registered power of attorney signed by legally authorized
signatories of all the partners.
All partners of the joint venture shall be liable, jointly and severally, during the bidding
process and for the execution of the contract in accordance with contract terms, and a
statement to this effect shall be included in the authorization as above. The bid shall be
signed so as to legally bind all partners, jointly and severally.
Joint ventures must comply with the following requirements:
The joint venture must satisfy collectively the eligibility criteria as described in this section.
For this purpose, the following information of each member of the joint venture may be
added together to meet the collective eligibility criteria:
i. Average Annual Turnover
ii. Particular Bulsk Material Handling Experience.
iii. Capacity of key Personnel
iv. Ability to own / lease relevant equipment
v. Financial capacity
Each JV partner including the lead partner shall meet not less than 26% of the following
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
i. Average Annual Turnover
ii. Particular Bulk Material Handling Experience
iii. Financial capacity
The definition of the Financial capacity shall mean the Net worth at the close of the
Preceding Financial years and positive Net case accruals for the last 5 financial years
preceding the bid due date.
All the partners together shall satisfy 100% of the criteria.
A copy of the joint venture agreement (JVA) specific to this project, if entered into by the
partners shall be submitted with the Bid. Alternatively, a letter of intent to execute a JVA in
the event of successful bid shall be signed by all partners and submitted with the bid. In any
case, it is mandatory that a JV agreement is entered into before award of the work.
Pursuant to the foregoing, the JVA shall include among other things, the joint venture’s
objectives, the proposed management structure, the contribution of each partner to joint
venture operation, the commitment of the partners to joint and several liability for due
performance, recourse / sanctions within the joint venture in the event of default or
withdrawal of any partner and arrangements for providing the required indemnities. (The
Format of the letter of Acceptance by each member in case of Joint Venture is attached at
a. A legally binding Joint venture / Consortium Agreement signed by authorized
signatories of all the partners of the JV/Consortium, as per the Performa shall be
enclosed with the bid.(Appendix-VII)
b. Power of attorney duly executed and signed by legally authorized signatories of all
the partners, authorizing the Lead Partner (a) to submit bid, negotiate and conclude
contract and incur all liabilities therewith on behalf of the partner(s) of the
JV/Consortium during the bidding process; and (b) in the event of a successful bid,
to incur liabilities and receive instructions for and on behalf of the partner(s) of the
JV /Consortium and to carry out the entire execution of the contract including
payment, exclusively through Lead Partner, as per the Performa, which shall be duly
authenticated by a notary public or equivalent certifying Authority, shall be enclosed
with the bid. (Appendix-VIII)
c. The bid and in the case of the successful bidder, the Agreement, shall be signed
and / or executed in such a manner for making it legally binding on all partners
(including operative parts of the ensuing Contract in respect of Agreement of
Arbitration, etc.). The Contract shall be signed by legally authorized signatories of
d. The Lead Partner shall be authorized to receive instructions for and on behalf of the
partners of the Joint venture and entire execution of the Contract including payment
shall be carried out exclusively through the Lead Partner. A Statement to this effect
should be included in the Joint Venture Agreement.
e. All partners of the Joint Venture shall be liable jointly and severally for the execution
of the Contract in accordance with the Contract terms, and a Statement to this effect
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
should be included in the Joint Venture Agreement.
f. Bid Security as required shall be furnished by Lead Member of Joint venture.
g. Performance Guarantee, as required, will be furnished by Lead Member of Joint
h. Participation by a firm in more than one JV /Consortium is not permissible. A firm
who submits bid on individual capacity is not eligible to be a partner of a JV
/Consortium. In case a firm's name appears in more than one bid then both
applications may be rejected.
i. Each partner must submit the complete documentation, or portions applicable
thereto, required qualifying the firm for bidding.
j. All the partners of the JV/Consortium shall be jointly and severally liable for due
performance, recourse/sanctions within the joint venture in the event of default of
any partner and arrangements for providing the required indemnities.
k. Notwithstanding demarcation or allotment of work among the partners, each partner
shall be liable for non-performance of the whole contract irrespective of their
demarcation or share of work.
l. The Lead Partner shall be authorized to act on behalf of the JV/Consortium.
m. All the correspondences between the Employer and the contractor shall be routed
through the Lead Partner.
n. In the event of default by the Lead Partner, it shall be construed as default of the
Contractor; and Employer will take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
o. An undertaking that all the partners are jointly and severally liable to the Employer
for the performance of the contract shall be enclosed with the bid.
p. In the event of any partner leaving the JV, it shall be intimated to the Employer within
30 days by other partner(s). Failure to do so shall be construed as default of the
contractor and the Employer may take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
q. The contractor shall not alter its composition or legal status without the prior written
permission of the Employer. Failure to do so shall be construed as default of the
contractor and the Employer may take action under relevant clause(s) of the Bid
Document and/or General Terms and Conditions of Contract.
r. One of the partners of JV/Consortium should have downloaded the bid documents.
14. Cost of Bidding:
The Bidder shall bear all the costs associated with the preparation and submission of its
Bid and Deendayal Port Authority will in no case be responsible or liable for those costs
regardless of the conduct or outcome of the bidding process.
15. Site Visit:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
a. Bidders are advised to inspect and assess the site conditions and its surroundings
and satisfy themselves before submitting their bids. In general, they shall
themselves obtain all necessary information as to risks, contingencies and other
circumstances which may influence or affect their bid. A Bidder shall be deemed to
have full knowledge of the site whether he inspects it or not and no extra charges
consequent on any misunderstanding or otherwise shall be allowed.
b. Submission of a bid by a bidder implies that he has read the Tender document and
has made himself aware of the terms & conditions and scope and specifications of
the work to be done and local conditions and other factors having a bearing on the
execution of work.
16. Contents of bid Documents:
The bidder is required to download all the documents for preparation of his bid. The bidders
are strongly advised to examine all the instructions, forms, terms and specifications in the
Bidding documents. The Notice Inviting Tender and the Signed Tender documents
uploaded. Failure to furnish all the information required by the Bidding Documents or
submission of a Bid not techno-commercially responsive, in every respect, will be at the
Bidder’s risk and shall result in the rejection of its Bid.
17. Clarification on Bid Documents:
A prospective Bidder requiring any clarification on the Bidding Documents may request
Deendayal Port Authority during Pre-BID meeting. Reply to clarifications shall be sent by
DPA only if the clarifications requested for, are considered appropriate by DPA. The
clarifications given by DPA will be visible to all the bidders intending to participate in the
website. DPA in its sole discretion may reject the bid without providing any justification to
18. Amendment to Bid Documents:
At any time prior to the last date for submission of Bids, Deendayal Port Authority may, for
any reason, whether at its own initiative or in response to a clarification sought by any
prospective bidder, modify the bidding documents by issuing Corrigendum and / or
Any addendum thus issued shall be part of bidding documents and shall be notified in the
website of DPA and n-procure portal. Bidders intending to participate in the tender shall be
solely responsible to check the n-procure Portal and website of DPA for the amendment
issued in shape of Corrigendum and / or Addendum.
In order to afford prospective bidders, reasonable time to take the amendment into account
in preparing their bids, Deendayal Port Authority may at its discretion, extend the last date
for the submission of bids.
19. Preparation of Bids:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
a. Language of Bid:
The Bid prepared by the Bidder and all correspondences and documents relating to the Bid
exchanged by the Bidder and Deendayal Port Authority shall be written in English
language, provided that any printed literature furnished by the Bidder may be written in
another language so long as it is accompanied by an English translation of its pertinent
passages in which case for purpose of interpretation of the Bid, the English translation shall
be considered. The English translation shall have to be certified to be the true copy by the
bidder or the person who has translated the same.
The amount quoted, i.e., % royalty per ton for carrying out the subject work in the BOQ shall
be taken for evaluation purpose to arrive at the Lowest (L1) bidder. The bidder shall note
that the percentage royalty on HMCs Tariff is only payable by DPA.
c. Bid Validity:
The Bids shall be valid for a period of 120 days from the last date of opening of Technical
Bids. A Bid valid for a shorter period shall be rejected as non-responsive. The validity of the
bids may be extended by Mutual consent of the respective bidders and the Authority.
d. Bid Currencies.
The amounts specified in the Tender are in Indian Rupee (INR) only.
20. Earnest Money Deposit (EMD):
The bidders shall furnish the prescribed EMD in accordance with the terms and conditions
of the tender. The EMD shall be returned to all the unsuccessful bidders. The EMD shall be
forfeited under the following circumstances:
a. If the Bidder withdraws its Bid (either Technical Bid and/or Financial Bid) during the
period of bid validity, after bid opening (or)
b. If the Bidder revises its price offer after opening of the price bid (or)
c. If the Bidder submits fraudulent documents and / or wrong information in support of
its eligibility/qualification (or)
d. If the Bidder, having been notified of the acceptance of its bid by Deendayal Port
Authority during the period of Bid validity,
i. Fails to sign the Agreement (or)
ii. Fails to submit the required initial security deposit and/or does not agree to
carry out the work as per the tender conditions.
e. In case if any amendment/circular issued by MoPSW and/or Any Government
Authorities regarding EMD at the time of Hoisting the Tender document, the same
will be applicable.
21. Security Deposit (SD):
The Successful Bidder shall have to furnish a Security Deposit (i.e.10% of Estimated cost
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
put to tender) in the form of a Bank Guarantee (BG) of a Nationalised/scheduled Bank
(except for co-operative banks) having its branch at Gandhdham in the prescribed format
or Insurance Surety Bond as per form 8A or Digital Mode or FDR within 21 days from the
date of issue of Letter of Award (LOA). It shall be returned to the Bidder within 60 days of
successful completion of Contract period. The BG must be extended from time to time and
shall be valid till 60 days after the expiry of the Contract period. Deendayal Port Authority
reserves the right to encash the Bank Guarantee in case of any default of the Contractor.
On furnishing the Security Deposit, the EMD shall be returned.
22. Documents Comprising the Bid:
All the volumes / documents of Tender shall be provided in the n-Procure portal by the
“Officer Inviting the Bid”. The bidder shall carefully go through the document and
prepare the list of required documents those are asked for submission including cost of Bid
document & Bid Security (EMD). The bid shall be technical bid and financial bid. The bid
shall be prepared and stored in the system for uploading the same through n-Procure Portal
online and digitally signed by the authorized representative of the bidder as follows:
23. Technical Bid shall comprise:
i. Cost of Bid Document (Tender Fee)
ii. Bid Security (EMD)
iii. Goods & Service Tax (GST) Registration Certificate
iv. Permanent Account Number [PAN] & Income Tax Return of preceding three
v. Eligibility information as per ANNEXURE-01 filled in all respects.
vi. The supporting documents of details of works/projects executed to meet similar
works experience as per the eligibility criteria indicated in the Tender.
vii. Information regarding Annual Average Turnover as per Annexure – 01A
viii. The supporting documents related with financial capabilities duly notarized shall be
Affidavit / Certificate from Charted Accountant mentioning turnover of last 3 (three)
years ending on 31st March
ix. Technical proposal comprising of the scope of work, detailed specifications, the
offered equipment / system [wherever applicable] conforming to the technical
requirements in consonance with the tender document and the commercial terms.
Techno-Commercial information as per ANNEXURE-IV filled in all respects.
24. Price proposal by the Bidder:
i. In the n-procure portal, the Bill of Quantity shall be made available to the bidder.
ii. The amount quoted, i.e., % royalty per ton by the bidder for carrying out the subject
work in the BOQ shall be taken for evaluation purpose to arrive at the Lowest (L1)
bidder. The bidder shall note that the percentage royalty on HMCs Tariff is only
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
payable by DPA.
iii. The Bidder shall be deemed to have satisfied himself/herself as to the correctness
and sufficiency of the Tender and the percentage quoted in the Bill of Quantities, all
of which shall cover all his/her obligations under the Contract and all matters &
things necessary for the proper execution and completion of the work and the
remedying of any defects therein.
Bidders shall submit offers that fully comply with the requirements of the Tender
documents. Conditional offer or alternative offers will not be considered in the process of
bid evaluation.
The bidders are required to upload the documents in PDF format related to their fee / pre-
qualification or eligibility information/ Techno-commercial proposal and Bill of Quantities
duly filled in. The bidders should upload only the documents those are asked in the
preceding clauses.
25. Format and Signing of Bid:
The Price Bid to be submitted on-line shall be signed digitally by a person or persons duly
authorized to sign on behalf of the Bidder. All pages of the bid where entries or amendments
have been made shall be initialed by the person or persons signing the bid.
The Bid shall contain no alterations or additions, except those to comply with instructions
issued by the Employer, or as necessary to correct errors made by the bidder in which case
such corrections shall be initialed by the person or persons signing the bid.
The bidder shall ensure correctness of the bid prior to uploading and take print out of the
system generated summary of submission to confirm successful submission/ uploading of
bid. The bidder should also ensure clarity/legibility of the document up loaded by him/her
in the portal especially the scanned documents by taking out sample printing. Non-
submission of legible documents may render the bid non- responsive. However, the Officer
inviting the Bid, if so desires, can ask for legible copies or original copies of scanned
documents and statements uploaded in the portal within specified period for verification
provided such document in no way alters the Bidder’s price bid. If the Bidder fails to submit
the original documents within the stipulated date, his Bid Security (EMD) shall be forfeited.
26. Payment of Bid Security (EMD) and Cost of Tender Document:
Earnest money Deposit (EMD) should be 2 % of the estimated cost of work.
“In case of Micro and Small Enterprises (MSEs) holding valid certificate issued by any
agencies/ organization under The Ministry of Micro, Small and Medium Enterprises
indicating the list of activity related to the subject tender as per National Industrial
Classification-2008 mentioned in the table below only shall become eligible for exemption
from payment of Tender Fee/EMD. Such bidder shall upload the scanned copy of valid
certificate in Technical bid stage” as well as duly filled in and signed ‘Bid Securing
Declaration’ as per format provided in the tender document (Appendix -IX), failing which
the bid shall be considered non-responsive
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
NIC codes regarding related activity are mentioned below:
SECTION H Transport & Storage
Division 52 Warehousing and support activities for
Group & Class 522 &
52242 Cargo handling incidental to water transport
A. The EMD upto Rs. 5 lakhs be payable either by online transfer. EMD beyond Rs.5
lakhs is also payable either by online transfer or in the form of Insurance Surety
Bond Bank Guarantee for the entire amount from any Nationalized Bank /
Scheduled Bank except Co-operative Bank having its branch at Gandhidham. Bank
Guarantees submitted as Earnest Money shall be valid for 28 days beyond the
validity of the bid. Bank Guarantee shall be verified independently by the Port with
the bank before finalization of technical offer. In the event of lack of confirmation of
issue of the Bank Guarantee by the Bank, the bid shall stands disqualified.
EMD of amount: Rs. 1,01,72,205/-
Bank Guarantee in favor of “Board of Deendayal Port Authority”, issued by any
Nationalized/Schedule (Except Co-operative) Bank only having Its branch at Gandhidham
as per enclosed format valid for 28 days beyond bid validity ).
B. The bidders registered with Micro and Small Enterprise (MSME) in appropriate
category mentioned under 16(A) above are exempted for submission of EMD and
Tender Fee. Scanned copy registration may be uploaded.
C. EMD of unsuccessful bidders other than L1 and L2 is refunded immediately after
ranking of price bids. Earnest money of L2 is refunded immediately after entering in
to agreement with L1 and acceptance of performance Guarantee from L1.
D. EMD shall be refunded suo-motto without any application from the bidders.
E. The bid security of the successful bidder will be discharged after he has signed the
Agreement and furnished the required Performance security.
F. The Bid security may be forfeited, if
a. The bidder withdraws the bid after bid opening during the period of bid validity.
b. The bidder does not accept the correction of the Bid price, pursuant to Clause
c. The successful bidder fails within the specified time limit to
i. Sign the Agreement or
ii. Furnish the required Performances security.
iii. EMD If L-1 bidder failed to justify the abnormal % of royalty quoted by them
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
offer of the L-1 bidder shall be rejected, EMD shall be forfeited and they will
be liable for debarring future tender from the DPA bidding for a period of
Strict confidentiality is observed during the bid processing. The system shall require all the
mandatory forms and fields to be filled up by the bidder during the process of submission
of the bid/tender.
The bidder must ensure that all the information required in the tender document is furnished
appropriately, failing which the bid shall be rejected.
28. Last date for submission of the Bids:
The online bidding will remain active till the last date and time of the bid submission. Once
the date and time (Server date and time) is over, the bidder will not be able to submit the
bid. The date & time of bid submission shall remain unaltered even if the specified date for
the submission of bids is declared a holiday for the Officer inviting the Bid.
The officer inviting the Bid may extend the last date for submission of bids by issuing an
Amendment. The new date after extension shall be available in the website of n-procure
and website of DPA.
The system shall reject submission of any bid through n-procure. For all purposes, the
server time displayed in the n-procure portal shall be the time to be followed by the bidder
and concerned officers.
30. Modification and Withdrawal of Bids:
In the n-Procure portal, it is allowed to modify the bid any number of times before the final
date and time of submission. The bidder shall have to log on to the system and resubmit
the documents as asked for by the system including the price bid. In doing so, the bids
already submitted by the bidder will be removed automatically from the system and the
latest bid only will be admitted. But the bidder should avoid modification of bid at the last
moment to avoid system failure or malfunction of internet or traffic jam or power failure etc.
If the bidder fails to submit his/her modified bids within the designated time of receipt, the
bid already in the system shall be taken for evaluation.
31. Opening and Evaluation:
Bid opening dates are specified during hoisting of Tender and can be extended vide
corrigendum. These dates are available in Tender document as well as home page of
portal. The bids shall be opened on the specified date and time only. The bidders who
participated in the online bidding can witness opening of the bid from any system logging
on to the portal. In the event of the specified date of bid opening being declared a holiday
for Deendayal Port Authority, the bids shall be opened at the appointed time on the next
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
The bids with appropriate tender document cost and EMD will be taken up for evaluation
as per the information furnished by the Bidders with respect to the eligibility/pre-
qualification, Information and Techno-commercial & other information in accordance with
the Tender conditions. But evaluation of the bid does not exonerate the bidders from
checking their original documents. Deendayal Port Authority reserves the right to verify the
authenticity of the documents / information submitted by the bidder.
At the time of opening of “Financial Bid”, the bids of those bidders who are found technically
qualified shall only be opened. The remaining bids will be rejected. The system shall auto
generate the Comparative statement.
The bidder will get the information regarding the status of their financial bid and ranking of
their bids on Website.
32. Clarification on Bids:
To assist in the examination, evaluation and comparison of the technical bids, Deendayal
Port Authority may, at its discretion, ask the Bidder for a clarification on its Bid documents.
The request for clarification and the response shall be in writing and no change in
percentage or substance of the Bid shall be sought, offered or permitted. If required, the
Deendayal Port Authority reserves the right to ask the bidders to submit supplementary
documents to support the documents already submitted by the bidder.
33. Evaluation and Comparison of Bids:
Conditional bids may be rejected by Deendayal Port Authority. The technical evaluation
shall be made strictly on the basis of the documents submitted by the bidders in support of
the eligibility, the technical and commercial response. The amount quoted, i.e., % royalty
per ton for carrying out the subject work in the BOQ shall be taken for evaluation purpose
to arrive at the Lowest (L1) bidder. The bidder shall note that the percentage royalty on
HMCs Tariff is only payable by DPA. Conditions, if any, on any document enclosed with
Price Bid shall not be considered for any purpose.
34. Contacting Deendayal Port Authority:
Bidder shall not contact Deendayal Port Authority on any matter relating to its Bid from the
time of the Bid Opening to the time the contract is awarded. Any effort by any Bidder to
influence Deendayal Port Authority in the Bid Evaluation, Bid Comparison or Contract
Award decision shall result in disqualification of the bidder and forfeiture of the EMD.
35. Award of Contract:
DPA will award the contract to the bidder whose bid is techno-commercially responsive and
the amount quoted, i.e., % royalty per ton for carrying out the subject work in the BOQ shall
be taken for evaluation purpose to arrive at the Lowest (L1) bidder. The bidder shall note
that the percentage royalty on HMCs Tariff is only payable by DPA.
36. DPA’s Right to Accept or Reject any or all the Bids:
Deendayal Port Authority reserves the right to accept or reject any bid and to annul the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
bidding process at any time prior to award of Bidder without thereby incurring any liability
to the affected Bidder or Bidders on the grounds of Deendayal Port Authority’s action.
37. Undertaking by the Bidders:
The bidders shall give an undertaking that they have not made any payment or illegal
gratification to any person / Authority connected with the bid process so as to influence the
bid process and have not committed any offence under the Prevention of Corruption Act
(PC Act) in connection with the bid.
38. Disclosure by the Bidder:
The bidder shall disclose any payment made or proposed to be made to any intermediaries
(agents etc.) in connection with the bid. Further, the bidders shall give an undertaking in
respect of the following:
a. The bidder is not Black listed / Suspended in any PSU/Government/PPP Projects.
b. The documents submitted by the bidders for getting qualified in the bid are genuine.
If any fake/ forged documents are submitted, DPA has the right to ban their
business dealings
39. Integrity Pact:
The potential bidders shall download and print the IP Agreement signed by the Employer
(Appendix-VI) and their witness and affix his/her signature on the IP Agreement in the
presence of a witness from his/her side, who shall also affix his/her signature thereof.
Having completed the signing procedure, the potential Bidder shall upload the duly filled
and signed IP Agreement on n-procure portal along-with the EMD and tender free in
Technical bid as per the format provided in tender document.
The procedure mentioned above regarding signing of Integrity Pact Agreement by both the
parties (Employer and Potential bidders) shall be completed online. However, in case of
any technical glitch due to which if any potential bidder is unable to upload the IP
Agreement, then he/ she shall submit the hard copy duly filled, signed IP Agreement to the
XEN (H), Nirman Building, New Kandla within a period of 07 (Seven) days and prior to
opening of technical bid, failing which bid of potential bidder shall be treated as disqualified.
If the Bidder JV firm IP agreement must be signed by all and all the parties of JV need to
stamp and sign the Agreement., failing which bid will be considered as non-responsive.
Bidders are required to sign the integrity pact (as per given below with the tender
document), failing which their bid shall be liable for rejection. The “Principal” means
“Deendayal Port Authority” and “Counter Party” means “Bidder”. If a Counter party commits
a violation of its Commitments and Obligations under the Integrity Pact Program during
bidding process, their entire Earnest Money Deposit, would be forfeited and in addition,
they may be blacklisted from the DPA business in future.
In case of violation of the Integrity Pact by Counter party after award of the Contract, DPA
shall be entitled to terminate the contract. DPA would forfeit the Security Deposits; encase
the Bank Guarantee(s) and other payments to counter party in such cases.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
GENERAL DESCRIPTION AND SCOPE OF WORK
1. Terminal Background
The existing berths CB-09 and CB-10 (from Panel 69 in Berth 09 upto end of Berth 10), with
a combined length of 365 meters, are proposed to be utilized for Operational and
Maintenance (O&M) activities related to the “Operation & Maintenance of existing Cargo
Berths 09 and 10 (from Panel No. 69 to end of Berth No.10) for carrying out cargo handling
operations by deploying Harbour Mobile Cranes (Minimum HMCs 1+1 Nos.) and other
associated equipment including management and marketing” to Private Agency/Contractor
for a period of Five years, plus extendable to another 1 (one) year at the discretion of the
Port Authority.
The existing berth structure is a continuous quay extending from Berth-01 to Berth-10. The
berth is constructed as a reinforced cement concrete (RCC) framed structure, comprising
an RCC deck system supported by longitudinal and transverse beams. The structural
components are integrally connected to ensure overall stability and load distribution under
operational conditions.
The proposed berth segment, with a length of 365 meters, with an allowable draft is
meters below CD. The berth is accessible via the navigational channel through Kandla
Creek, providing safe approach from outside the port limits.
2. Brief details of the Scope of Work:
Deendayal Port Authority invites the following scope of work.
a. Operation & Maintenance of existing Cargo Berths 09 and 10 (from Panel No. 69 to
end of Berth No.10) for carrying out cargo handling operations by deploying Harbour
Mobile Cranes (Minimum HMCs 1+1 Nos.) and other associated equipment
including management and marketing. The entire Project facilities and services
include the CB 09 & 10 berth (365 m length).
b. During this operational period, common user facilities like backup areas, storage
areas, covered godowns/sheds, other utilities etc. will be provided by DPA upon
receipt of an advance request intimation from the Contractor subject to availability,
on chargeable basis as per prevailing SOR of DPA.
c. Common user road and rail connectivity required for cargo movement will be made
available by the Port Authority. While using these common facilities, the Contractor
shall ensure that their operations do not cause any obstruction, delay, or
inconvenience to other port users or operators or contractors. The Contractor must
coordinate and conduct activities in a manner that allows uninterrupted and safe
usage of shared infrastructure by all stakeholders within the port area and cooperate
with other port users.
d. The Contractor is responsible for Planning and Marketing of Cargo,
loading/unloading through the Mechanical system, storage of Cargo and evacuation
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
of the Cargo through the Port.
e. The Contractor is responsible for regular maintenance of
Civil/Mechanical/Electronic infrastructure at the dedicated Cargo Berth 9 &
along with all the associated facilities/infrastructure provided by the Port Authority
and used by the Contractor for the performance of subject work.
f. DPA will provide such common user facilities anywhere inside the Custom bond
areas on chargeable basis (i.e at prevailing SOR Rates).
g. The scope includes Operations & Maintenance of the HMCs and associated
machinery for carrying out cargo handling operations including replacement of
spares and consumables from time to time to ensure that the Terminal is operated
round the clock uninterruptedly and in a trouble free manner.
h. To ensure no breakdowns of HMCs and maintain the health of the HMCs in good
working condition so as to carryout trouble free operations.
i. Evacuation of Cargo through Road/ Rail is permitted.
j. The Standard Operating Procedure (SOP) for operating the Terminal:
1. The Annual Throughput for the Terminal is taken as 5.08 Million MT. This is for
estimation purpose only.
2. The Minimum Guaranteed Throughput (MGT) is 4.5 Million MT per annum on
the Contractor. The Contractor has to handle a minimum of 4.5 MMTPA, failing
which, the contractor shall make payment to DPA within 30 days for the deficit
volumes of cargo, i.e., ----% royalty per ton for carrying out the subject work in
the BOQ by the successful contractor x deficit volume (--- MMTPA less Actual
volumes handled) = Rs.--- . The MGT shall be calculated annually, post
completion of one Year from the date of Award of contract for the 1st year of
operations and so on for the subsequent years.
Besides the above the Contractor shall also make payment to DPA within
days for the deficit volumes of cargo, the corresponding Wharfage Charges (As
per prevailing SOR of DPA for the major commodity handled in the Terminal in
that corresponding year) and Stevedoring Royalty charges as notified by DPA
3. As per the procedure in vogue, the Agent of the vessel declares the vessel and
cargo details to the Port in advance.
4. If berthing is sought at the current facility, the same shall be considered by the
Port, on payment of the following charges in advance and submission of
necessary documents as per practice in vogue.
5. Handling Charges of HMCs as applicable on per Tonne basis.
6. Vessel Related Charges including Berth hire Charges are collected as per
prevailing Scale of Rates (SOR) of DPA.
7. Cargo Related Charges including Wharfage, Pollution Charges and Stevedore
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Royalty as applicable per Tonne basis.
8. Any other charges applicable as per the existing procedure and norms of DPA.
9. Irrespective of whether the cargo is evacuated by rail or road, handling charges
as applicable per Tonne shall be payable by the concerned to the Port.
10. Cargo Handling Charges will be notified for the above facility. The same shall
be part of DPA-SOR and necessary annual escalations shall be applicable for
11. Cargo Handling Charges will be payable either by the
Exporter/Importer/CHA/Vessel Agent/ Contractor, etc. in advance to the Port.
12. After berthing of the vessel, the contractor shall co-ordinate with all concerned
agencies for ensuring that the cargo handling operations commence at the
13. Since the facility is provided with HMCs, the GBO norms are to be furnished for
different cargoes and for different category of Vessels, when operated with
HMCs and when operated with Ship Cranes.
14. Based on the above norms fixed by Traffic Department the permissible stayal of
the vessel shall be arrived at and if the stayal of the vessel is beyond the
permissible stayal, necessary penal berth hire charges as per the DPA-SOR
shall be levied.
15. Upon completion of the cargo handling operations, the contractor shall ensure
immediate display of Sailing / Shifting Flag in co-ordination with the vessel agent
for sailing / shifting of the vessel from the berth.
16. The contractor shall ensure safety and security of the berth as well as the cargo
handling equipment during the vessel and cargo handling operations and any
damage to the berth due to the negligence of the contractor, necessary charges
shall be levied.
17. The Contractor shall co-ordinate with the Exporter/Importer / Handling agents
for registering sufficient number of wagon demands commensurate to the stocks
available and shall co-ordinate with the Indian Railways for ensuring sufficient
number of railway rakes are made available for evacuating the cargo.
18. Wagon haulage shall be the Open Terminal Haulage charge as notified by the
Indian Railways from Time to Time, since the above facility is Port Operated
19. Wagon haulage (Open Terminal charges), Terminal Charges, AIEHC charges
as notified by the Indian Railways from time to time shall be payable by the
Exporter/Importer / CHA / Contractor, etc.
20. Wagon demurrage charges and Wagon damage & deficiency charges are
payable by the Contractor as per the rates notified by the Indian Railways and
DPA from time to time.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
21. Wagon Weighment Charges are also to be payable by the Contractor /
Exporter/Importer / CHA, as per the Rates notified in the DPA SoR, in respect of
the Railway Wagons weighed at the Port Owned In Motion Weigh Bridges
22. Storage charges shall be levied on the Contractor / Exporter/Importer /
CHA/Agents as per the prevailing SOR of DPA
23. All cargoes for which Customs Out Of Charge (OOC) is not received shall be
kept in the above transit area and the traffic staff posted at the facility shall
ensure collection of necessary transit dues as per DPA-SOR and the cargo shall
be delivered only on receipt of Customs Out Of Charge.
24. The area with in the terminal other than that demarked for transit storage shall
be allotted for the vessels handled at the above facility under license basis by
the Traffic Department, as is being done at the other DPA operated berths.
25. In respect of any other issues there may arise during operations, the decision of
DPA is final and binding on the Contractor and/or its Representatives/Agents.
26. Tariff applicable i.e. the DPA’s Scale of Rates in force.
27. Charges for use of 120 MT capacity Harbour Mobile Crane to be installed by the
Contractor as a part of Project.
a. For Dry Bulk Cargo:
Average daily crane performance (in Metric Tonne) Ceiling rate per Tonne (in Rs.)
Foreign Coastal
Note: To calculate the incremental ceiling rates as shown above the base rate was
enhanced to 105% for first thousand tonnes and for the 2nd thousand tonnes the rate was
enhanced to 110% of the base rate. The same methodology shall also be adopted to
calculate the rate beyond 17,000 Tonnes. The Contractor shall refer to the prevailing SOR
of DPA time to time and get themselves appraised of the same and the above rates will
change according to the applicable SOR of DPA.
b. For Break Bulk Cargo:
Average daily crane performance (in Metric Ceiling rate per Tonne (in Rs.)
Foreign Coastal
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Note: To calculate the incremental ceiling rates as shown above, the base rate was
enhanced to 105% for first thousand Tonnes. The same methodology shall also be adopted
to calculate the rate beyond 9,200 Tonnes. The Contractor shall refer to the prevailing SOR
of DPA time to time and get themselves appraised of the same and the above rates will
change according to the applicable SOR of DPA.
c. For Project Cargo:
Average daily crane performance (in Ceiling rate per Tonne (in Rs.)
Foreign Coastal
Note: To calculate the incremental ceiling rates as shown above, the base rate was
enhanced to 105% for first thousand Tonnes. The same methodology shall also be adopted
to calculate the rate beyond 6,500 Tonnes. The Contractor shall refer to the prevailing SOR
of DPA time to time and get themselves appraised of the same and the above rates will
change according to the applicable SOR of DPA.
i. In case, the successful Bidder seeks permission to use the existing facility for
handling cargo during the period from the date of issue of LOA to the date of
installation and commissioning of HMCs, the same % of royalty quoted above shall
ii. For financial evaluation, the amount quoted, i.e., % royalty per Tonne for carrying
out the subject work in the BOQ shall be taken for evaluation purpose to arrive at
the Lowest (L1) bidder. The bidder shall note that the percentage royalty on HMCs
Tariff is only payable by DPA.
3. PRE-QUALIFICATION CRITERIA:
1. The Bidder must have handled an average of 2.54 Million Metric Tonne of Dry Bulk
Cargo and/or Break Bulk Cargo in any Port or in any other organization
consecutively for three years during the last five years ending on 31st March,
2. The Bidder must have an average Annual Turnover of 30% of put to tender amount
i.e Rs. 15,25,83,070/- or more during last three financial years ending on 31st March
3. Bidders who have been debarred/ terminated by any principal because of breach of
contract during the last 7 years are not allowed to participate in this tender
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
4. The Bidder must have handled an average of 2.54 Million Metric Tonne of Dry Bulk
Cargo and/or Break Bulk Cargo in any Port or in any other organization
consecutively for three years during the last five years ending on 31st March,
In case of Consortium or Joint Venture, cargo handling of all the JV partners per
annum in any port/ any other organization consecutively for three years during the
last five years ending on 31st march 2025, will be considered collectively to qualify
for the 2.54 Million MT of cargo handling per annum criteria. In case of work
experience issued by private organization, the bidder has to submit the TDS
Certificate, if any, in addition to the work experience certificate, failing which the bid
shall not be considered.
5. The existing PPP/BOT Operators (Including their associates) of DPA are not eligible
for the present Tender.
6. The bidder should have a minimum of 05 years’ experience in Stevedore and
possess a valid Stevedore License.
7. The bidder should have a valid custom house agent license.
8. Joint venture is acceptable subject to meeting the criteria as per the Tender
9. Cost of tender document and EMD shall be deposited as per the instructions given
to the bidders in the Tender document. A self-signed copy of acknowledgement
should be uploaded by the bidder in the Portal in the designated place of the
technical bid while submitting the bid in respect of documents regarding EMD and
tender document cost.
10. The Bidder must have Goods & Service Tax (GST) Registration Certificate.
11. The Bidder must submit PAN & Income Tax Returns of preceding three years.
Similar nature of works means:
Similar Nature of Works mean works similar to the one intended for the particular job as
i. Similar Works / Contracts shall mean (a) Operation and Maintenance of Dry Bulk
cargo and/or Break bulk cargo Terminals/Terminals in Port Sector and/or (b)
Stevedore & cargo handling activities.
i.e. End to End Logistics providers in Port Sector (right from vessel nomination to the
discharge of cargo through rail/road.)
ii. The Bidder should be aware of the Port Operations and Facilities and capable of
handling Rail / Road Loading Operations for participating in the Bid.
Turnover: The tenderer has to submit details of average annual turnover of not less than
30% of amount put to tender during the last 3 years ending 31st March, 2025 of the previous
financial year issued by any Chartered Accountant, otherwise their tender will not be
The tenderer will be short listed based on the information regarding qualification criteria
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
such as experience in similar nature of works, turnover, etc. submitted by the tenderer
along with their tender. Accordingly, price bids of the tenderer those are short listed by
Tender Committee will be opened.
Conditions for participation of Joint Venture (JV) firms. (Applicable to the tenders with
estimated cost put to tender is more than Rs.10.0 Crores. (The Format of the letter of
Acceptance by each member in case of Joint Venture is attached at Appendix-II).
4. Details of Cranes
a. Harbour Mobile Cranes to be installed:
The old Harbour Mobile Cranes (i.e less than 5 years old with prescribed technical
specifications) has to be Supplied, Installed, Tested, and Commissioned within 4 (four)
months from the date of issue of Work Order. The 2nd Harbour Mobile Crane needs to be
supplied, installed, tested, and Commissioned within 4 (four) months after commissioning
of 1st Harbour Mobile Crane (HMC) as per the requirement of DPA. In case, the bidder
intends to supply new Harbour Mobile Cranes, the same is to be Installed, Tested, and
Commissioned within 9 (nine) months from the date of issue of Work Order. The Bidder
shall arrange to supply, install, test & commission the Cranes within the stipulated period.
The Bidder shall submit the documentary evidence such as relevant certificates from DG
FASLI and all other statutory bodies towards the readiness of the HMCs for
commencing the operation.
The Contractor shall diligently make sure that the operations commences on or before
(four) months from the date of receipt of Work Order.
During the above 4 months’ period (or earlier to initial 4 months) or till the Contractor
commences operations, DPA will operate the Terminal for its regular cargo operations and
for which the Contractor shall not claim any amounts from DPA.
b. Performance of the Cranes:
The Cranes should always be available on demand with 4 hrs. prior notice. Additional
time will be given if, the Cranes required to travel from one berth to another berth as
per the rated traveling speed.
c. Maintenance:
Maintenance of Harbour Mobile Cranes is the responsibility of the Bidder for efficient &
reliable operating conditions so as to ensure maximum availability and productivity of the
The Bidder shall deploy an effective maintenance team comprising of engineers &
technicians to take up preventive, predictive and corrective maintenance activities during
the Contract period.
d. Preventive maintenance of HMCs:
It covers the maintenance activities to be done as per preventive maintenance schedule
(PMS) which is related to time like daily/weekly/monthly/quarterly/half yearly/ yearly basis
or equipments running hour as per the recommendation of OEM. The Bidder shall prepare
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
a routine maintenance plan as per the recommendation of OEM and ensure timely
maintenance of the system. The work which cannot be taken up as per schedule for some
reason can be taken up at a deferred schedule. PMS record should be maintained by the
Bidder which can be produced to Officer In-charge (OIC) for verification on demand.
For routine preventive maintenance, each crane will be allowed one & half hours daily and
three days in a month. The HMCs provider may avail three days for the crane maintenance
in consultation with Traffic Department with written clearance from them.
e. Penalty in case of breakdown of HMCs :
1st 30 days – Rs.4,000/- per hour or part thereof.
From 31st day to 45th day (fifteen days) – Notice will be issued on the 31st day to the Bidder
to rectify the breakdown within fifteen days or to replace the HMC with another HMC duly
meeting all the pre-Qualification Criteria in the Tender.
In case, the Bidder fails to rectify or replace the HMC, termination notice will be issued as
per terms and conditions of the Contract on the 46th day (after 1½ month from the date of
initial breakdown). However, penalty will be levied @ Rs.4,000/- per hour or part thereof till
the date of termination.
In case shifting of a vessel becomes necessary due to breakdown/non- performance of
HMC, the shifting charges of the vessel from the berth to anchorage or any other convenient
location at the discretion of DPA will be recovered from the Contractor in addition to a
penalty of Rs.1,00,000/-. The shifting charges so recovered will be refunded to the vessel’s
Agent while the penalty will be retained by the Port.
f. Non-payment of penalty amount:
The penalty arising out of any reason shall be deposited by the Bidder within 30 days from
receipt of such intimation from Licensor. Non-deposit of penalty within the specified time
will attract interest as per SOR from the date of default and shall be resulted in one or any
combination of following actions which will be taken by Licensor.
For any outstanding dues, DPA is at liberty in adjusting from Security Deposit by encashing
the Security Deposit (SD). The balance amount of Security Deposit shall be refunded after
submission of new BG having validity as of earlier BG.
And also temporary suspension of Contract of HMCs for operation with immediate effect
besides recovery of the due amounts by DPA, if any, from any other contract under
execution by the Bidder in DPA.
It may also attract Fore-Closure / Termination of Contract, purely at the discretion of DPA.
g. Maintenance of contemporary records:
The Bidder shall maintain requisition and supply records, cargo handling records etc. with
timings for compilation to ascertain the monthly performance of the crane. The format for
such records and other necessary operational records shall be finalized in consultation with
the Officer In-charge and the representative of the Traffic Department. Also, these formats
or new formats shall be revised / derived if required during the Contract period. For this
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
purpose, the Bidder shall have to provide a set of latest computers with a printer in the
control room of the crane for generation of records pertaining to operation and maintenance
h. Flexibility in operation:
If required, multi-operation of HMCs can be undertaken by DPA for vessel loading/
unloading operations at Berth No9 &10. If the berth 09 & 10 are kept idle (due to lack of
cargo or vessels calling in at berth 9 & 10) continuously for more than 24 Hrs. by the
Contractor, DPA is at liberty to use the berths for berthing of DPA vessels and commence
cargo handling for the cargoes accounted for DPA. In such case the Contractor shall not
be eligible for any payments from DPA except for 50% of their share of Crane hire charges
(50% of BoQ royalty %).
The Contractor shall note that the Bollard No.69 & 85 are used as common user facility for
mooring purpose by other adjoining operators at DPA.
Note: All types of bulk cargoes and break-bulk cargoes are permitted to be handled by
the Harbour Mobile Cranes.
i. Details of Harbour Mobile Cranes to be installed as a part of Project:
The Harbour Mobile Cranes to be deployed shall meet the following requirements:
a) Maximum reach (Greater than) ≥ 48 mtrs
b) Lifting Capacity of the Crane equal to 120 T
c) Load bearing capacity of Quay should not exceed 5 T/m2
d) Age of the Crane: Less than 5 (five) years old from the date of first commissioning
e) Deployment of Liebherr Make and Model: LHM 400 shall not be allowed.
The bidder may please note that the specifications mentioned above are indicative only.
Subject to the prior approval of the Port Authority, the bidder may adopt its own design so
as to fully meet the functional requirements in all respects without sacrificing the safety,
quality, efficiency and reliability in any manner. The HMCs must be suitable for cargo
handling operation in vessel with beam up to 40 meters. All the material, equipment offered
and used in the execution of the work shall be suitable for sustained service in a marine
atmosphere and cyclone prone environment.
All Bulk and Break Bulk Cargoes are permitted to be handled by the HMCs and other
associated equipment’s. The proposed HMCs are intended for use at CB 09 & 10 Berth
(from panel no.69 upto end of Berth 10).
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
PREAMBLE TO BILL OF QUANTITIES – BOQ
1. GENERAL INSTRUCTIONS:
a. This bill of quantities (Schedule “B”) must be read in conjunction with the Scope of
the work including Standard Operating Procedures, General conditions, additional
and special conditions and all other terms & conditions of contract and the
contractor(s) shall be deemed to have examined the Scope of the work including
Standard Operating Procedures, General conditions, additional and special
conditions and all other terms & conditions of contract and acquainted himself with
the detailed descriptions of the work to be done, and the way in which they are to
be carried out.
b. The contractor(s) shall be deemed to have visited the site ‘’Cargo Berth No. 09 &
10 which includes Civil / Mechanical / Electrical infrastructure, common user
facilities like backup areas, storage areas, closed sheds, road & rail connectivity etc.
before preparing his tender and to have examined for himself the conditions under
which the work will proceed and all other matters affecting carrying out of the works
and cost thereof.
2. RATES AND PRICES TO BE INCLUSIVE:
a. Rates and prices of the work are to be the full value of the Scope of the work
including Standard Operating Procedures and are to cover the cost of provision of
the entire Operation & Maintenance Operations (O & M) including Marketing (end-
to-end operations) including all required skilled Material Handling Equipment,
HMCs, manpower and non-skilled manpower, officers, supervision, materials,
spares, insurance, maintenance, marketing, managing, overheads and profits and
every incidental and contingent cost and charges whatsoever obligations under the
Contract and all matters and things necessary for the proper completion and
operation and maintenance of the works.
b. The Contractor shall indicate in the prescribed Bill of Quantity tender document, the
% royalty per tonne towards fulfilling all obligations under the contract
“Operation & Maintenance of existing CB 09 & 10 Terminal (Panel No.69 Upto end
of Berth No.10) for carrying out Cargo Handling Operations by deploying Harbour
Mobile Cranes ( Minimum HMCs 1+1 Nos.) and other associated equipment
including Management and Marketing (end to end operations)’’ and including
electricity consumption charges, STP charges, fresh water charges, transport
charges, custom duties, octroi/entry tax, excise duty, sales tax, works contract tax,
turnover tax, all types of cess, any other duties, taxes or incidentals, insurance,
compliance with statutes & regulations, retrenchment benefit etc. and applicable
GST whatsoever payable for satisfactory performance of the contractor’s
obligations under this contract.
c. In order to prepare a realistic and competitive bid, the bidders are advised to assess
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
the site conditions at “CB 09 & 10 Berths and Civil / Mechanical / Electrical
infrastructure, common user facilities like backup areas, storage areas, closed
sheds, road & rail connectivity etc. cargo prospects, contract modalities, nature and
quantum of the work to be done correctly before submission of the bid.
d. For financial evaluation, the amount quoted, i.e., % royalty per ton for carrying out
the subject work, in the BOQ shall be taken for evaluation purpose to arrive at the
Lowest (L1) bidder. The bidder shall note that the percentage royalty on HMCs
Tariff is only payable by DPA.
The tenderer shall be required to quote O&M Rate per Metric Tonne.
Sl. No Description Quantity % of Royalty per Metric Tonne
(exclusive of GST) to be quoted by
1 “Operation & Maintenance of existing 1 Metric
Cargo Berths 09 and 10 (from Panel Tonne % of royalty required by the Bidder
No. 69 to end of Berth No.10) for has be quoted only in the n-Procure
carrying out cargo handling operations Portal in Financial Bid. Any bidder
by deploying Harbour Mobile Cranes quoting the % royalty in the
(Minimum HMCs 1+1 Nos.) and other Technical Bid shall not be
associated equipment including considered by DPA.
management and marketing” as per the
Scope of work including SOP and all
other terms & conditions in the
i. For financial evaluation, the amount quoted, i.e., % Royalty per ton for carrying out
the subject work specified in the BOQ shall be taken for evaluation purpose to arrive
at the Lowest (L1) bidder.
ii. The bidder shall note that the % of Royalty quoted by the bidder on HMCs Tariff
shall only be payable to the Contractor by DPA and no other monies will be paid to
the Contractor by DPA.
iii. For the purpose of calculation for the entire period of Contract, SOR Rate of DPA of
HMCs prevailing on the date of Bidding with a fixed annual escalation of 2% will only
be considered, irrespective of any subsequent change of SOR of DPA. There shall
not be any discounts applicable on HMCs Rates, only the rates stated above will be
iv. All the charges under this O&M Contract shall be collected only by DPA and the
corresponding % Royalty per ton for carrying out the subject work specified in the
BOQ will be paid to the Contractor as per the terms and conditions of the Contract.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
PRE-BID MEETING
It is proposed to hold a Pre-bid meeting in order to clarify and discuss issues with respect
to the Project, or any other related issues. The meeting shall be held as per Schedule date
in the Board Room at Administrative Office Building (AOB), Deendayal Port Authority,
Gandhidham -370201 or Through Video Conference at the same date and time.
Pre-bid meeting will be held in the presence of the tenderers/their representatives who may
wish to present. Any claim or query on any issue, at a later date will not be entertained.
Tenderers are advised to forward their queries, if any, on before the Schedule date duly
indicating their intention to attend the Pre-bid meeting to:
EXECUTIVE ENGINEER (H)
Deendayal Port Authority,
Nirman Bhavan, Kandla – 370
District –Kutch, State - Gujarat
E-mail: [email protected]
1. All the queries raised in the pre-bid meeting along with clarifications will be uploaded
in the web site.
2. All enquires shall be addressed to the above address in writing by letter or facsimile
transmission and mail:
3. No interpretation, revision, or other communication from the Port Authority regarding
this solicitation is valid unless in writing and is signed by the Executive Engineer
(H), Nirman Bhavan, Deendayal Port Authority, Kandla, Gujarat - 370210 written
copies of the Port Authority responses, including a description of the enquiry but
without identifying its source will be sent to all the Tenderers.
4. During the Pre-Bid meeting, the queries received in advance would be clarified first,
followed by those raised during the meeting. The Deendayal Port Authority’s
response would be uploaded in the web site.
5. The Tenderer (s) has to make a complete & careful examination and independent
evaluation of the tender notice, Scope of the project, site, local conditions, Project
facilities including berth and Civil / Mechanical / Electrical infrastructure in the
terminal, terms and conditions of the tender, Electrical charges applicable, STP
/Fresh water charges, prevailing Handling charges, Standard operating procedures,
physical qualities of ground and all information provided by the Deendayal Port
Authority in the tender and has to determine to his satisfaction the accuracy, nature
and extent of difficulties, risks that are likely to be faced by him during the course of
performance of its obligations as per contract. Any clarifications ambiguities and
inconsistencies in the tender shall be raised by the tenderer along with other
tenderers in the pre bid meeting or during the process of bidding only but not after
opening of the bids. No claim on this account will be entertained.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
SPECIAL CONDITIONS OF CONTRACT
1. Site Visit, Pre-Bid Meeting and Clarification to Bidders:
The prospective bidders are strongly advised to depute their technical experts at their cost
with authorization letter to visit the site to assess and examine the site conditions,
requirement, the nature and quantum of work so as to prepare a realistic and competitive
bid for the execution of the work. It is the responsibility of bidders to collect all information
to their satisfaction in order to fulfil the obligations under the contract.
In the pre-bid discussion, maximum 02 members from each firm are allowed to participate.
Consolidated list of queries by the bidders and response of DPA will be issued by DPA as
addendum subsequently in the website.
3. Retrofit Activities of Berth No.10 (Panel No.77 to Panel No.85):
The bidders shall note that currently DPA is undertaking the work of retrofitting of Berth
No.10 (Panel No.77 to Panel No.85). Therefore, the Contractor (Successful Bidder) will be
given the suitable berth length for carrying out operations as per availability and the
convenience of DPA, without hindering the proposed retrofitting work.
a. The contract shall be for the whole works as described, based on the required % of
Royalty from the HMC charges (Applicable & prevailing SOR of DPA ) submitted by
the bidder, as per the Scope of work including SOP and all other terms & conditions
in the Contract” is applicable for the contract period.
b. The Contractor shall consider all costs towards required skilled manpower and non-
skilled manpower, officers, supervision, HMCs, other material handling equipment,
materials, spares, insurance, maintenance, marketing, managing, overheads and
profits and every incidental and contingent cost and charges whatsoever obligations
under the Contract and all matters and things necessary for the proper completion
and operation and maintenance of the works. Further, to consider fulfilling all
obligations under the Scope of Work of the Contract including all electricity
consumption charges, STP charges, fresh water charges (if only available),
transport charges, custom duties, works contract tax, turnover tax, all types of Cess,
any other duties, taxes or incidentals, insurance cost, compliance with statutes &
regulations, retrenchment benefit etc and applicable GST whatsoever payable for
satisfactory performance of the contractor’s obligations under this contract.
c. DPA may reject any bid which is priced in violation of the above requirements.
The evaluation and comparison of bids by DPA shall be made accordingly.
d. Works/Items not specially listed in the Bill of Quantity but required to be executed
for satisfactory compliance with the bid requirements as specified, shall not be
separately paid by DPA when executed and shall be deemed to be covered under
royalty contained in bidder’s Financial bid. In order to prepare a realistic and
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
competitive bid, the bidders are advised to assess the site conditions, nature and
quantum of the work to be done, material and manpower requirements etc. correctly
before submission of the bid.
e. Harbour Mobile Cranes (Minimum HMCs 1+1 Nos.) are to be supplied to handle all
bulk and break bulk cargoes. Hence bidders are advised to quote their royalty
considering the O & M cost arising out of handling normal/oversized/big size bulk
materials and break bulk cargoes.
f. The royalty quoted for is applicable for entire Operation & Maintenance including
marketing (end to end service) of the facility for 05 (five) years of the Contract. The
% of royalty quoted by the Bidder shall hold good and shall be binding on the bidder,
notwithstanding any increase in the prices of materials & labour, fuel & power,
Taxes, Duties or any other charges whatsoever and the bidder shall not be entitled
to claim any increase over the % of royalty quoted by him during the period of the
Contract. The % royalty for item at Sl. no.1 of BOQ for 6th year (if only extended at
the sole discretion of DPA) will remain the same, subject to satisfactory
5. Bid Validity:
The bids shall be valid for a period of 120 days from the date of opening of Financial Bid.
6. ADDITIONAL GUARANTEE:
The Successful Bidder shall furnish Additional Guarantee for an amount of
Rs.5,08,61,024/- (Rupees Five Crore Eight Lakhs Sixty-One Thousand and Twenty Four
Only) in the form of a Bank Guarantee (BG) of a Nationalised/scheduled Bank (except for
co-operative banks) having its branch at Gandhdham in the prescribed format or Insurance
Surety Bond as per form 8A or Digital Mode OR FDR within 21 days from the date of issue
of Letter of Award(LOA). Such Additional Guarantee will be towards DPA’s infrastructure
i.e. berth and Civil / Mechanical / Electrical Infrastructure available as a part of Project,
Safety, Security, repairs, maintenance and to ensure proper running condition during
contract period. The BG should bear the Tender No. and name of the work for future
references. The BG should be valid till completion of the Contract Period. The Bank issuing
the BG should send the same in original to Deendayal Port Authority in the address
as given in the Tender so that it reaches Deendayal Port Authority on or before the
stipulated date.
The Additional Guarantee shall be returned to the Bidder within 60 days of successful
completion of Contract period. The BG must be extended from time to time and shall be
valid till 60 days after the expiry of the Contract period. Deendayal Port Authority reserves
the right to encash the Bank Guarantee in case of any default of the Contractor.
7. Minimum Guarantee Cargo/Throughput (MGC):
The Successful Bidder shall make no attempt at any time to revoke the BG executed in
favour of DPA before completion of all the contractual obligations. The Contractor has to
handle a minimum of 4.5 Million Tonnes Per Annum (4.5MMTPA), failing which, the
contractor shall make payment to DPA within 30 days for the deficit volumes of cargo, i.e.,
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
% royalty per ton (i.e DPA’s % of Share) x deficit volume (4.5 MMTPA less Actual volumes
handled by the Contractor) = Rs. .
Besides the above the Contractor shall also make payment to DPA within 30 days for
the deficit volumes of cargo, the corresponding Wharfage Charges (As per prevailing
SOR of DPA for the major commodity handled in the Terminal in that corresponding
year) and Stevedoring Royalty charges as notified by DPA time to time.
8. Liquidated Damages:
a) LD Clause for delayed commencement of work:
If the Contractor has not commenced the work on or before 4 (four) months from the date
of receipt of Work Order, 0.5% LD will be levied for each week on % royalty per ton (i.e %
of DPA share) on total Capacity of 4.5 MMTPA.
If the Contractor has not commenced the work even after 4 (four) month from the date of
imposing LD, the Contract will be cancelled.
9. Performance Parameters (OSBD):
The parameter deals with the productivity of the terminal (Gross Berth Output) for different
types of cargo. In case of dry bulk and steam coal cargo, the capability of the terminal
(mechanization, method of handling) and parcel size will determine the Gross Berth Output.
Higher terminal capability and greater parcel size will lead to high productivity.
The Gross Berth Output shall be calculated as the total cargo handled (either
loaded/unloaded) from the ship during the quarter, divided by the number of working days
of the ship at the working berth. While determining the number of working days / hours,
delays not attributable to the Contractor shall be excluded i.e pre- commencement delays,
post completion delays and delays due to bad weather are excluded from the Vessel total
stay at the berth in hours for calculating OSBD.
Cargo Category Indicative norms
DRY BULK CARGO 20,000 Tonnes per day
BREAK BULK CARGO 7,000 Tonnes per day
Note: The above norms are only indicative, DPA has the liberty to revise/change the above
indicative norms based on the nature of cargo and specifications of vessels handled at the
Based on the above norms fixed, the permissible stay of the vessel shall be arrived at and
if the stay of the vessel is beyond the permissible stay, necessary penal berth hire charges
as per the DPA-SOR shall be levied.
The Contractor shall ensure the above standards for all the vessels handled by it at all
times (PWWSHINC: Per weather working day Sundays and Holidays Included). Calculation
of average berth day output shall be as per the notes given above.
Performance evaluation will be made for every vessel upon completion of cargo handling
basing on the reports furnished by the Contractor confirmed by the Port Authority.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Liquidated damages of 1% shall be levied for every shortfall of 10% in the performance
standards for each of the commodity group separately. The liquidated damages so
collected shall be paid to the Port Authority. The Contractor shall be responsible and make
good of any demurrages /damages/penalties claimed by the Vessel Owner/Agents/Port
users towards the default of the Contractor.
The Contractor shall warrant the Port Authority that the Terminal and machinery along with
project facilities handed over by the Port Authority to the Contractor under this Contract,
will comply strictly with the Contract, shall diligently comply all terms and conditions of the
Contract and keep the Port Authority free from any
demurrages/defects/penalties/liabilities/disputes/claims/damages. The Contractor shall
further warrant the Port Authority that all materials, equipment and the supplies handed
over by DPA will be made use for their intended purposes and shall be handed over in good
working condition post completion of the contract period.
The Port Authority shall promptly notify the Contractor in writing of any claim arising under
this Warranty. Upon receipt of such notice, the Contractor shall promptly repair or replace
the defective goods and/or services at no cost to and liabilities on DPA.
If the Contractor, having been notified, fails to remedy the defects in accordance with the
contract, DPA may proceed to take such remedial action as may be necessary, at the
Contractor’s risk and cost, duly encashing the Additional Guarantee of Rs. 5,08,61,024 /-
submitted by the Contractor towards replacement / repairs/ maintenance of the damaged
DPA infrastructure along with the Project facilities.
11. Payment Terms:
The payment to the Contractor shall be carried out by DPA and will be made as per the
following terms:
The contractor shall be paid for the overall comprehensive services rendered by them on
monthly tonnage basis i.e., the amount quoted % royalty per ton for carrying out the subject
work in the BOQ shall be taken for evaluation purpose to arrive at the Lowest (L1) bidder.
The bidder shall note that the percentage royalty on HMCs Tariff is only payable by DPA,
as per the certification of the Traffic Department along with certification of the monthly
i. Payment shall be released on submission of Tax Invoice as per GST Rules on
certification of the volumes by Traffic Department.
ii. “The rates quoted by the contractor shall be deemed to include all expenses in
handling bulk cargo and break bulk cargo in the terminal (end to end services, right
from vessel nomination, handling of cargo in the Terminal to the discharge of cargo
through rail/road including railway charges) including payment of applicable wages
rates to the labour as and when revised in compliance with the statutory regulation”
2. Contract Period:
The Contract period is for 5 (Five) years and extendable by another 1 (One) year subject to
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
satisfactory performance and at the sole discretion of DPA.
3. Date of Commencement of Work:
The date of commencement of work will be 4 (four) months from the date of receipt of Work
4. Facilities to be Provided on part of DPA’s Obligation:
a. Cargo Berth No. 9 & 10 are provided by DPA to the Contractor on the date of award
of contract on “as is where is basis”, for carrying out end to end logistics, i.e.,
operation and maintenance of the CB 09 & 10 Berth along with Marketing and
Administration of the Terminal. The Contractor shall be responsible to ensure safe
and efficient operations of the Terminal without causing any hindrance to DPA and/or
Other Port Users.
b. Electricity for execution of the work shall be provided on chargeable basis to the
c. Subject to availability, common user storage facility/land, covered godowns and
backup yard and other common facilities for execution of the work may be provided
on payment of applicable tariff (prevailing SOR) notified by DPA from time to time.
The Contractor shall ensure that the land is used for the purpose of handling cargo
for this Terminal only. Any misuse or unauthorized use of the land allotted for any
other purpose shall lead to cancellation of the plots / land allotted by DPA.
d. All office equipment including PCs, Telephone, Internet etc. required for the
Contractor’s establishment shall be arranged by the contractor at his own cost.
However, all infrastructure provided by DPA at the time of taking over of the berth
shall be handed over by DPA shall be taken care of by the Contractor and return the
same in good working condition (except for normal wear and tear) post completion
of the contract. Damages if any may be rectified accordingly at his own cost.
e. Medical facility will not be provided by the DPA to the Contractor. However the
contractor’s personnel can be provided with medical facilities at DPA Hospital in
emergency cases only on payment basis.
f. Issuance of RFID Gate passes by DPA to Contractor’s personnel for entering into
the prohibited area shall be governed by the policies of DPA which is notified by DPA
from time to time from security angle.
g. Administrative support only, for obtaining clearance from any statutory authority,
shall be provided by Deendayal Port Authority.
5. Spares Required:
The Contractor shall maintain the minimum spares required time to time for running the
HMCs trouble free. Maintaining the spares is the responsibility of the Contractor to keep
the HMCs in good running condition. All the consumables required are to be maintained by
the Contractor. The Contractor is required to maintain the Maintenance Schedules as
required for operating the HMCs. The damaged spare or machinery shall be replaced
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
within short period of time to ensure trouble free and uninterrupted operations.
6. Drawings and Manuals of the HMCs and Associated Equipment:
Drawings, specification and manuals of the HMCs and Associated Equipments deployed
by the Contractor for carrying out cargo handling operations are to be maintained by the
Contractor. The records of the same shall be available round the clock for inspection of
any DPA official at any point of time. It is the responsibility of the Contractor to keep the
above in the safe custody with satisfactorily indexed. Photos of important activities may
also be kept. The Contractor is also responsible for preparing drawings afresh for missing
drawings or non-available drawings and updating the HMCs drawings on a regular basis to
ensure that they are always maintained in a current state.
7. Deduction on Default:
Availability factor of machines, equipment and systems as per norms on demand,
maintaining the rated Terminal capacity, up keeping of proper cleanliness/housekeeping,
carrying out proper maintenance, attending breakdown in time (rectification of faults),
inventory management and following the safety aspects, statutory norms and regulations
are the essence of this contract. Therefore the Contractor shall meet the performance
parameters / norms / obligations pursuant to the contract. Failure on the part of the
Contractor to comply with the requirements shall attract a deduction on account of under
performance. All the deductions on account of under performance is effective from the date
of commencement of the work.
Unless specified by the vessel, the contractor shall guarantee to maintain the
unloading/Loading rate (excluding the stoppages beyond contractor’s control) as desired
operational rating of the equipment. However, the unloading/loading rate below the desired
rating as asked by the vessels shall be maintained by the Contractor.
9. Termination of the Contract:
In pursuant of General Directions and Conditions of the Contract, Clause-26, the Port
Authority will be entitled to foreclose and terminate the Contract, at any time, should, in the
Port Authority’s opinion, the cessation of works becomes necessary, owing to paucity of
funds or due to court orders or from any other cause whatsoever. Notice in writing from the
employer, of such termination and reasons thereof, shall be conclusive evidence thereof
and be binding on the Contractor.
In view of operational requirement, DPA has right to cancel or pre-close the work without
assigning any reason duly giving a notice period of one month.
In the event of non-performance, poor performance or lack of diligence by the contractor,
the contract will be liable for termination by serving one month notice, and in that event,
the performance Guarantee (Security Deposit) which is in the form of Bank Guarantee (BG)
will be encashed by Deendayal Port Authority.
10. Spares Maintained and Taking Over:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Any Insurance / Spares / Machinery other than consumables procured by the prospective
bidder during the contract period for the use of HMCs to meet the exigencies and are not
consumed in the said period by the Contractor are taken back by the Contractor after
completion of the contract period.
11. Requirement of Pay-Loaders, Hydra Cranes, Maintenance Vehicles, Loaders,
Trailers/dumpers, Trucks etc.:
The Contractor shall deploy and maintain the required adequate number of Pay-Loaders,
Hydra Cranes, Maintenance Vehicles, Loaders, Trailers/dumpers, Trucks etc. to ensure
trouble free & uninterrupted operations for carrying out unloading and loading operations.
12. Responsibility to Rectify Loss or Damage:
If any loss or damage happens to the works/property, or any part thereof due to negligence
of the Contractor for which the Contractor is supposed to take care thereof during the period
of the contract, the Contractor shall, at his own cost, rectify such loss or damage to the
works/property to the satisfaction of the DPA. The Contractor shall also be liable for any
loss or damage like damage to Trucks/vessels / Railway wagons/Any other Port assets
and/or Third Party assets, in the course of any operations carried out by him and rectify the
same in a time bound manner for the purpose of complying with his obligations under the
In the event of an emergency where, in the judgment of DPA, delay would cause serious
loss or damage, repairs or adjustments may be made by DPA or a third party chosen by
DPA without advance notice to the Contractor and the cost of the work shall be paid by the
13. Handing Over of DPA Assets (i.e., Berth and Civil / Mechanical / Electrical Infrastructure):
The Contractor is responsible for handing over of the DPA assets along with Project
Facilities in good working conditions post completion of the Contract Period. The Contractor
should ensure that the handed over equipment are free of any damages/repairs. Any
repairs/breakdowns noticed/observed in the DPA assets post completion of the contract
period and not rectified by the Contractor, the cost for the same shall be recovered duly
encashing the Additional Guarantee submitted.
The Contractor has to handover the assets of DPA duly conducting condition survey in
presence of DPA personnel / DPA appointed consultant, after completion of the contract
14. Site Safety & Environment Protection:
The Contractor, during the execution of the work, shall be solely responsible for complying
all the statutory requirements of Government Bodies or any statutory bodies with respect
to site health, safety, security and environment.
15. Quality Assurance Plan, Inspection and Testing:
The Contractor shall submit Quality Assurance Plan for acceptance of the DPA before
commencement of work. This shall contain the list of Tests and Inspections proposed to be
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
done by the bidder during execution of the contract period and also the standards followed.
The bidder shall permit DPA representative for periodic inspection and the condition
assessment of the HMC along with Project Facilities. The 3rd Party inspection personnel
engaged by DPA shall be allowed to inspect and assess the condition of the Terminal. Any
hindrance in this issue shall not be acceptable by DPA.
12. Time is the Essence of the Contract:
Time is the essence of the Contract and the Contractor shall ensure that all the obligations
under the Contract are completed satisfactorily within the agreed time schedule. The
Contractor shall be solely responsible for all the d e m u r r a g e s , delays including the
delays caused by its vendors, damages of equipment, non-availability of staff, operational
issues, withholding of payments. In case of delay in the progress of the works, DPA
reserves the right to withhold the payment, cancel the Contract unilaterally or complete the
work departmentally or by engaging any other agency at the cost and risk of the bidder.
13. Contractor’s Obligation:
The Scope includes the responsibility of the bidder for running the HMCs at the CB 09 &
Berth along with Project Facilities, commencing from marketing of cargo,
loading/discharging through the semi mechanical system (HMCs) available at the facility,
storage of cargo and evacuating the cargo through the Road / Rail, etc.
All the materials and works including labour required for operation and maintenance of the
HMCs Terminal including loading and unloading of cargo from ship to dispatch / loading of
rakes / trucks. The bidder has to follow the Standard Operating Procedure prescribed by
Deendayal Port Authority without any deviation. Any deviation in this regard shall be treated
as default on the part of the bidder.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
ADDITIONAL CONDITIONS OF CONTRACT
14. Site of Work:
The work site is situated on the Inner Harbour which is a restricted area; The Contractor(s)
shall obtain necessary passes for himself, his workmen and vehicles, machinery etc., from
the Commandant, C.I.S.F of Deendayal Port Authority and ensure that the passes are kept
in force till the completion of the work. The Contractor or its Personnel including labor shall
abide by all the safety precautions and security regulations to be observed in restricted
areas of the Port as per the rules in force from time to time. No Claim whatsoever on account
of delay in obtaining or renewing the entry passes will be entertained by DPA.
15. Sub Contracts:
The Contractor shall not sub-contract all or any part of this contract without getting DPA’s
prior approval in writing and the Contractor shall guarantee that the Sub-Contractor, for any
part of the work under this contract will comply fully with the terms and conditions of the
Contract. The Contractor shall clearly indicate the purpose for which the Sub- Contractor is
to be deployed. The Contractor shall ensure that:
i. The Sub-Contractor has not been de-barred to participate in any tender either by
DPA or any other Govt. Organization and
ii. The Sub-Contractor is competent to undertake the work assigned to him.
16. Payment to Sub-Contractors:
The Contractor shall ensure that timely payment is made to their sub-contractors. In case
of dispute between the Contractor and its sub-Contractor, DPA shall have the right to
withhold adequate money from the dues of the Contractor till the Contractor settles the
dispute with its sub-Contractor and submits documentary evidences in support of such
settlement. DPA shall also have the right to make payment to the sub-Contractor directly
for that part of the claim which has been Certified for payment by the Contractor but not
17. Resolution of Dispute / Jurisdiction of Courts:
a. Amicable Settlement:
If any dispute or difference or claims of any kind arises between the DPA and the Contractor
in connection with construction, interpretation or application of any terms and conditions or
any matter or thing in any way connected with or in connection with or arising out of this
Agreement, whether before or after the termination of this Contract, then the Parties shall
meet together promptly, at the request of any Party, in an effort to resolve such dispute,
difference or claim by discussion between them.
b. Conciliation:
In case any dispute is not resolved amicably as provided in Clause 4.1, the Contractor may
agree to refer the matter to conciliation & settlement Committee established by the DPA as
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
per provisions contained in Part-III of the Arbitration & Conciliation (Amendment) Act,
(the “Conciliation & Settlement Committee”). The standard operating procedures for
conciliation and settlement of disputes through the conciliatory process and the constitution
of the committee shall be contained in the policy guidelines issued by the DPA on the
subject, which shall be in alignment with the provisions contained in Sections 63 and 64 of
the Arbitration & Conciliation (Amendment) Act, 2015. In case there
commendations/decision of the committee is not acceptable to the Contractor, it shall be
free to refer the dispute to arbitration in accordance with the provisions of Clause 4.3.
c. Arbitration:
Any Dispute which is not resolved amicably as provided in Clause 4.1 and/or 4.3 shall be
finally settled by arbitration as set forth below:
i. The Dispute shall be referred to the Society for Affordable Redressed of Disputes -
Ports (hereinafter called as SAROD - Ports). The dispute shall be dealt with in terms
of Rules of SAROD - Ports. The detailed procedure for conducting Arbitration shall
be governed by the Rules of SAROD - Ports and provisions of Arbitration &
Conciliation Act, 1996, as amended from time to time. The Dispute shall be governed
by Substantive Law of India.
ii. The constitution of Arbitral Tribunal, code of conduct for Arbitrators and fees and
expenses of SAROD - Ports and Arbitral Tribunal shall also be governed by the
Rules of SAROD - Ports as amended from time to time. The rules of SAROD – Ports
are placed at Annexure-XI
iii. The seat of Arbitration shall be New Delhi, or a place selected by the Governing
Body of SAROD - Ports and the language for all documents and communications
between the parties shall be English.
iv. The expenses incurred by each party in connection with the preparation,
presentation, etc., of arbitral proceedings shall be borne by each party itself.
v. Any Award made in any arbitration held pursuant to the Article 19 shall be final and
binding on the Parties as from the date it is made, and the Contractor and the DPA
agree and undertake to carry out such Award without delay.
vi. The Contractor and the DPA agree that an Award may be enforced against the
Contractor or the DPA, as the case may be, and their respective assets wherever
vii. In the event that the Party against whom the Award has been granted, challenges
the Award for any reason in a Court of law, the other Party, subject to the order of
the Court, shall be entitled to seek an interim relief as per the provisions of the
Arbitration and Conciliation Act or rules made there under. The Parties acknowledge
and agree that the Arbitration proceedings shall be video recorded and one copy
each of the video recording shall be provided to both the parties. (The SAROD
Conditions are attached at Annexure-XI).
d. Adjudicatory Board
In the event of constitution of a statutory Adjudicatory Board or such other forum with
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
powers to receive and adjudicate upon disputes between the DPA and the Contractor, all
disputes not settled Conciliation & Settlement Committee, can alternatively be referred to
the Adjudicatory Board or such other forum with mutual consent of the parties in accordance
with the applicable laws. For avoidance of doubt, parties hereto agree that notwithstanding
anything contained herein above, after adjudication by the statutory Adjudicatory Board or
such other forum, the parties cannot refer the dispute, difference or controversy of
whatsoever nature again under Arbitration and the adjudication hereunder shall be final
e. Force Majeure:
Conditions beyond control of either parties like war, hostility, acts of public enemy, civil
commotion, sabotage, serious loss or damage by fire, explosions, epidemics, strikes,
lockouts or acts of God come under the legal concept of Force Majeure (FM). Delays in
performance of contractual obligations under influence of FM conditions are condonable,
provide, notice of happening of such event is given by the affected party to the other within
30 days from the date of occurrence. Works under the contract shall be resumed as soon
as practicable after such event has come to an end or ceased to exist. However, if such
event exceed 120 days, either party, may at its option terminate the contract by giving notice
to the other party.
18. Insurance (Insurance covers shall be taken before commencement of the Operations):
All the staff/workers to be deployed by the Contractor for performing the contract shall be
insured against /injury/ accidents/death, by the Contractor at his own cost as per prevailing
The Contractor shall take required & adequate Insurance Policies for the replacement value
of the assets handed over by the Port Authority duly covering Material Damage, Machinery
Break Down, Third Party Liabilities and Loss of Revenue covers at his own cost and time.
Copies such Insurance Policies shall be submitted by the Contractor to the Port Authority
after issuance of LOA and before commencement of Operations under the Contract.
The Contractor shall indemnify DPA against all losses and claims in case of property
damages, machinery breakdowns, Third party liabilities and death or injury caused to any
person by him/her during the execution of the work.
19. Compliance with Statutory Regulations:
The bidder shall comply in all respects, with all statutory regulations as may be necessary,
including clearance from State/Central Govt. authorities, Pollution Control Boards, labour
enforcement and local authorities. The bidder shall, at all times during the continuance of
the contract, so far as it may be necessary, comply with all the existing enactments
including Central and State legislation as well as any by-laws of any local authorities
regarding labour, particularly the Minimum wages Act, Factories Act, Workmen’s
Compensation Act, Employees’ Provident Fund and Family Pension Fund Act, Employees’
State Insurance Act, Contract Labour (Regulation and Abolition) Act, Payment of Wages
Act, Maternity Benefit Act, National and Festival Holidays Act, Shop and Establishment Act,
the Apprentice Act or any other applicable acts as required and to keep the Bidder /
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Contractor indemnified against any loss or claim arising out of contravention of the
provisions of the above said enactments by the bidder.
The FIRM rate quoted by the Contractor in the Bill of Quantity shall be deemed to include
all expenses whatsoever the bidder may be required to incur for the compliance with the
provisions of the above said legislation. The Contractor shall make necessary
arrangements for the DPA to witness the payment made by the Contractor to his staff and
20. Indemnification:
The Contractor shall indemnify, protect and defend at its own cost, Deendayal Port
Authority and its agents and employees from and against any / all actions, claims, losses
or damages directly or indirectly arising out of
a. any violation by the Contractor in course of its execution of the Contract of any legal
provisions or any right of third parties;
b. Contractor’s failure to exercise the skill and care required for satisfactory execution
of the Contract.
c. Any loss or damage to the property / assets / Terminal/Third Parties/personnel and
Machinery handed over by DPA to the Contractor on the Date of Award.
21. Deductions:
Deendayal Port is empowered:
a. To recover any dues against this contract in any bills / Security Deposit / etc. due to
the contractor either in this contract or any other contract with Deendayal Port.
b. To recover any dues against any other contract of the contractor with Deendayal
Port, with the available amount due against this contract.
c. Income Tax will be deducted at source from the bills of the contractor as per
the provisions of the Income Tax Act as and when payments are effected
d. All penal charges levied by the Indian Railways due to improper loading, enroute
detention, load adjustment charges, etc shall be borne by the Contractor.
22. Engaging of Experts:
The Contractor shall also engage experts in the field of Bulk material handling equipment,
Environment, Safety and Hydraulic systems at his own cost. The Contractor shall ensure
that all Environmental issues / concerns are addressed time to time as per the prevailing
Environmental Laws and applicable measures to be taken to mitigate dust pollution, water
pollution, noise pollution etc. The Contractor shall also depute Safety Personnel to ensure
all the measures required to maintain safety and security issues are addressed in the
terminal and remedial actions along with preventive actions are implemented as required
under the prevailing Regulations applicable. Similarly Hydraulic Specialists are also to be
engaged to address Hydraulic issues prevailing in the Terminal time to time.
The Contractor shall ensure that expertise people in all fields required for Operation and
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Maintenance of the Terminal are engaged.
23. Personal Protective Equipment: (PPE)
The Contractor shall be solely responsible, at his own cost, for the supply of required PPE
to his workers and staff and he shall also ensure the use of PPE such as helmets, nose
masks, hand gloves etc. by his staff at site.
The Contractor, at all times during execution of the contract, shall take all measures to
prevent any unlawful, riotous or disorderly conduct by or amongst his staff at the site and
for the preservation of peace and protection of persons and property at the work site as well
as in the neighborhood of the works.
The Contractor shall, report immediately and within 24 hours of the occurrence of any
accident/incident at or about the work site or in connection with execution of the contract,
report such accident/incident to DPA giving all the details. The Contractor shall also provide
additional information about the accident/incident as requested by the DPA and other
statutory authorities.
26. Idling of Terminal:
DPA shall make use of the Terminal and machinery along with Project facilities, waterfront
and Berth in the event the Terminal is idling for more than 24 hours. The labour charges
along with applicable electricity charges shall be borne by the DPA for the said period of
operations by DPA and the maintenance charges will be borne by DPA only limited to the
extent berth utilization (hours basis & number of vessels handled by DPA) by DPA.
27. Watch and Ward:
During the execution of the contract, it shall be the responsibility of the Contractor to
arrange watch and ward of the work round the clock, including the man power, HMCs,
materials, machine / equipment / system used for the work at his own cost. The Contractor
shall ensure proper security and safety of the Berth and Project Facilities, Manpower
engaged for O & M operations in the Terminal and other personnel at his own cost.
28. Contract Copy:
The Contract shall be made in two sets, one original and one copy. One copy of the Contract
shall be given to the bidder.
29. Undertaking by the Contractor:
Having understood all the terms and conditions of the tender document and having
assessed the site conditions, we hereby confirm that the firm Rate offered by us is a firm
price and includes all the taxes, duties, fees, cess etc. and all incidental charges, etc.
30. Assignment and Subletting:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Assignment and/or Subletting and/or Transferring the work to any 3rd party either by way of
sub-license, assignment or any other means by the Contractor is strictly prohibited by DPA.
Deendayal Port, on request of the bidder may provide entry permits to the bidder’s staff.
1. Taxes, Levies Etc:
The Contractor shall pay all lawful taxes including Goods & Service Tax (GST), duties,
cess, assessments, charges etc which may be levied by any Govt. Authority or Tax levying
agencies from time to time.
32. Insurance, Etc:
The Bidder shall take all necessary insurance covers as required by law and ensure that
these are valid throughout the contract period.
33. No Nuisance / Annoyance to Others:
The Bidder shall not indulge or allow anybody else to indulge in anything which may be or
may become nuisance or annoyance to the Port or any other agency in the vicinity of the
Contract Jurisdiction.
34. Banning of Business:
In case, the successful bidder fails to execute after issue of work order, the business
dealings with the bidder will be banned by DPA and the same will circulated to all Major
Ports of India.
2. Inspection of Terminal:
The Nodal Officer/Chief Engineer/Chief Mechanical Engineer/Traffic Manager or any
Authorized Representatives of DPA// consultants or authorized Committee members shall
have full rights to inspect the Berth/ machinery while in idle condition or in operations during
the Contract period.
35. Fore-Closure:
In view of operational requirement, DPA has right to cancel or pre-close the work without
assigning any reason duly giving a notice period of one month as per Clause 26 of the
General Directions and Conditions of Contract.
36. Claims and Disputes:
Any claims or disputes arising out of the contract should be promptly submitted in writing to
the Engineer-in-Charge within one month from the date of cause of action so that the points
at issue could be immediately verified at site by DPA Officials facts ascertained and a
prompt decision given. Claims raised beyond this time limit will not be entertained. The
tenderers shall carefully note this stipulation.
37. Sub-Letting:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Engaging of labour on piece work basis shall not be deemed to be sub-letting.
38. Excepted Risks:
The “excepted risks “ are war hostilities between Indian and any other country (whether war
be declared or not) invasion, act of foreign enemies, rebellion, revolution, insurrection or
Military usurped power, Civil war (otherwise then among the contractor (s)’s own
employees) or riot, commotion, or disorder or use or occupation by the Employer of any
portion of the works in respect of which certificate of completion has been issued or a
cause proven to be solely due to the Engineer-in-charge decision or any such operation
of the forces of nature as reasonable foresight and ability on the part of the contractor (s)
could not foreseen or reasonably provide against ( all of which are herein collectively
referred to as to as the excepted risks”).
39. Insurance of Works Etc:
The contractor (s) shall insure in the joint names of the Board and the contractor (s) against
all risks of whatever nature viz., all losses or damages from whatever cause arising (other
than the except risks) for which he is responsible under the terms of the contract and in
such manner that the Board and contractor (s) are covered during the period of execution
of the works for any loss or damage, occasioned by the contractor (s) in the course of any
operation carried out by him for the purpose of complying with his obligations. The said
insurance shall cover the following:
a. The works and the temporary works to the full value of such works executed from
b. The materials, berths, HMCs, Material handling equipment, constructions on the
Terminal and other things brought on to the Terminal by the contractor (s) to the full
value of such materials, berths, HMCs, Material handling equipment, constructions
on the Terminal and other things brought on to the Terminal , such insurances shall
be effected with an insurer and in terms approved by the Board (which approval shall
not be unreasonably withheld) and the contractor (s) shall whenever required
produce to the Engineer-in-charge or his representative the policy or policies of
insurance and the receipt for payment of current premiums provided always that
without limiting his obligations and responsibilities as aforesaid nothing in this
clause contained shall render the contractor (s) liable to insure against the necessity
for the repair or reconstruction of any work constructed with materials or
workmanship not in accordance with the requirements of the contract.
c. If the insurance policies do not take care of any of the risks identified or part of the
work involved, the contractor (s) shall indemnify the Board suitably against such risks
40. Damage to Persons and Property:
The contractor(s) shall (except if and so far as the specification provides otherwise)
indemnify and keep indemnified DPA against all losses and claims for injuries or damages
to any person in the employment of DPA or any property of DPA whatsoever (other than
surface other damage to land or crops being in the site suffered by tenants or occupiers)
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
which may arise out of or in consequence of the construction and maintenance of work and
against all claims, demands, proceedings, damages, costs, charges and expenses
whatsoever in respect of or in relation thereto. Provided always that nothing herein
contained shall be deemed to render the contractor(s) liable for or in respect of or to
indemnify DPA against compensation or damages for or with respect to:
a. The use or occupation of land by the works or any part thereof or (save as hereinafter
provided) surface or other damage as aforesaid.
b. The right of DPA to construct the works or any part thereof on / over/ under / in or
through any land.
c. Interference whether temporary or permanent with any right of Airway or water or
other easement or quasi easement which is the unavoidable result or the
construction of the works in accordance with the contract.
d. Injuries or damage to persons or property resulting from any act of neglect done or
committed during the currency of the contract of DPA his agents, servants or other
contractor (s) (not being employed by the contractor (s)) or for in respect of any
claims, demands, proceedings, damages, costs, charges and expenses in respect
thereof in relating thereto.
e. Provided further that for the purpose of this clause the expression “the site” shall be
deemed to be limited to the area defined in the specification or shown on the
drawings in which land and crops will be disturbed or damaged as an inevitable
consequence of the carrying out of the works.
1. Before commencing the execution of the works the Contractor (s) (but without limiting his
obligations and responsibilities under Clause-9 hereof) shall insure against any damage
loss or injury which may occur to any property (including that of DPA) or to any person
(including any employee of DPA) by or arising out of the execution of the works or
temporary works in the carrying out of the Contract (i.e. including maintenance period).
2. Such insurance shall be effected with an insurer and in terms approved by the Chief
Engineer save and except any accident injury resulting from any act of default of the
Board, his agents or servants and for at least the amount stated in the tender and the
contractor (s) shall, whenever required, produce to the Engineer-in-charge or his
representative the policy or policies of insurance and the receipts for payment of the
current premiums.
3. DPA shall not be liable for in respect of any damages or compensation payable at Law
in respect or in consequence of any accident or injury to any workmen or other persons
in the employment of the Contractor (s). The Contractor (s) shall indemnify
and keep indemnified D P A against all such damages and compensation (save
and except) as aforesaid and expenses whatsoever in respect of or in relation thereto.
4. The Contractor (s) shall insure against such liability with an insurer approved by the
Engineer-in-Charge (which approval shall not unreasonably withhold) and shall continue
such insurance during the whole of the time and any persons are employed by him on the
works and shall when required produce to the Engineer-in-Charge or his representative
such policy of insurance and the receipt for payment of the current premium.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
5. If the Contractor (s) shall fail to effect and keep in force the insurance referred to in Clause-
7 to 10 hereof any other insurances which he may be required to effect under the terms of
the contract then and in any such case the Board may effect and keep in force any such
insurance pay such premium or premiums as may be necessary for that purpose and from
time to time deduct the amount so paid by the Board as aforesaid from any monies due or
which may become due to the Contractor (s) or recover the same as a debt due from the
Contractor (s).
6. The Security Deposit will be released on satisfaction of maintenance period. The Authority
for release of Bank Guarantee is Executive Engineer (H).
7. Notwithstanding anything contained in the contract.
i. The Contractor (s) shall be under no liability whatsoever whether by way of indemnity
or otherwise for or in respect of destruction of or damage to the works or temporary
works or to property whether of DPA or third parties or for in respect of injury of loss
of life which is the consequence whether direct or indirect of war hostilities (whether
war be declared or not) invasion act of foreign enemies rebellion revolution
insurrection of military or usurped power civil war (otherwise than among the
Contractor (s)’s own employees or riot, commotion or disorder (hereinafter
comprehensively referred to as “the said special risks”).
ii. If the works or temporary works or any materials (whether for the former or the later)
on or near shall sustain destruction or damage by reason of any of the said special
risks, the Contractor (s) shall nevertheless be entitled to payment for any permanent
work already certified.
iii. Destruction, damage, injury or loss of life caused by the explosion or impact
wherever and whenever occurring of any mine, bomb, shell, grenade or other
projectile, missile, ammunition or explosive of war shall be deemed to be
consequence of the said special risks.
iv. The Port Authority shall repay to the Contractor (s) any increased cost of the
incidental to the execution for the works (other than such as may be attributable to
the cost of reconstructing work condemned by the Engineer-in-Charge due to faulty
specification and improper workmanship prior to the occurrence of any special risk
which is however attributable to or consequent on or the result of or in any way
whatsoever connected with the said special risks (subject however to the provision
in the clause hereinafter contained in regard to outbreak of war). But the Contractor
(s) shall as soon as any such increase of cost shall come to his knowledge forthwith
notify the Engineer-in-Charge thereof in writing.
v. If during the currency of the contract there shall be an outbreak of war (whether war
is declared or not) in any part of the work which whether financially or otherwise
materially affects the execution of the works the Contractor (s) shall unless and until
the contract is terminated, under the provisions contained in this Clause use his best
endeavours to complete the execution of the works provided always that the Board
shall be entitled at any time after such outbreak of war to terminate this contract by
giving notice in writing to the Contractor (s) and such notice being given this contract
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
shall (save as to the right of the parties under this clause and to the operation of
arbitration clause) terminate but without prejudice to the rights of either partying
respect of any antecedent break thereof.
vi. If the Contract shall be terminated under the provisions of the last proceeding sub
clause, the Contractor (s) shall with all reasonable dispatch remove from the site all
constructional Terminal.
vii. If the contract shall be terminated as aforesaid the Contractor (s) shall be paid by
DPA (in so far as such amounts or items shall not have already been covered by
payments on account made to the Contractor (s) for all work executed prior to the
date of termination at the rates and prices provided in the contract and in addition:
viii. The amounts payable in respect of any preliminary items so far as the work or serve
comprised therein has been carried out or performed and proper portion as certified
by the Engineer-in-Charge of any such items the work of service comprised in which
has been partially carried out or performed.
ix. The cost of materials of good reasonably ordered for the works or temporary works
which shall have been delivered to the Contractor (s) or of which the Contractor (s)
is legally liable to accept delivery (such materials or goods becoming the property of
DPA upon such payment being made by him).
x. A sum to be certified by the Engineer-in-Charge being the amounts of any
expenditure reasonably incurred by the Contractor (s) in the expectation at
completing the whole of the works in so far as such expenditure shall not have been
covered by the payments in this sub clause before mentioned.
xi. The reasonable cost of removal under sub-clause (6) of this clause and (if required
by the Contractor (s)) return thereof to the Contractor (s)’s main Terminal yard or to
any other destination at no greater cost.
xii. The reasonable cost of repatriation of all the Contractor(s)’s staff and workmen
employed on or in connection with the works at the time of such termination.
Provided always that against any payments due from the Board under the sub clause
the Board shall be entitled to be credited with any outstanding balances due from
the Contractor (s) for advance in respect of Terminal and materials and any such
previously paid by the Board to the Contractor (s) in respect of the execution of the
The bidder may please note that the specifications mentioned in the tender document are
indicative only. All the material, equipment offered and used in the execution of the work
shall be suitable for sustained service in a marine atmosphere and cyclone prone
In the event of repeated failure of any component or material or fitting, within the warranty
period , it shall be treated as failure on the part of the Contractor and the Contractor shall
have to promptly rectify the same at his own cost failing which DPA shall have the right to
recover the cost from any other outstanding amount of the Contractor lying with DPA and /
or any amount that may become due to the Contractor and the Contractor shall be debarred
to participate in any of the tender of DPA in future.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
All the manuals shall be sufficiently informative so as to smoothly carry out operation and
maintenance after the work is completed and accepted by DPA. Two sets of draft manuals
shall be submitted by the Contractor, within 15 days of acceptance of the work, for approval.
DPA may make observations to improve the standard of the manual and the Contractor,
after incorporating the changes in the manuals, shall submit 4 sets of the final copy for
acceptance by DPA. Two set of soft copies of the accepted version of the manuals shall be
supplied by the Contractor in CDs. The following guide lines may be followed by the
Contractor for preparation of the manuals.
Operation Manual: The manual must cover, inter alia, the principal features of the machine
/ equipment / system, as applicable, the control philosophy used, pre-starting checks,
starting procedures, checks to be made during operation, stopping procedures, DO’s and
DON’T’s, trouble shooting, emergency procedures, safety trips etc.
Maintenance Manual: The manual must include, inter alia, important maintenance
procedures, preventive maintenance schedule, Lubrication Chart, various tolerance limits
and list of special tools. The maintenance manual must contain dismantling and assembling
procedures of important components clearly showing positioning of special tools, fixtures,
measuring instruments etc. with diagrams.
Spare Parts Manual: The manual must contain, inter alia, spare parts details such as
drawing no., part no, specifications of all the assemblies. For bought out items, the cross
sectional drawings giving details of parts, dimensions etc. has to be supplied to DPA. The
bearing nos and oil seal nos of all the bearings and oil seals used in the work must be listed
clearly giving their make and the location where used.
42. Site Safety & Environment Protection:
The Contractor, during the execution of the work, shall be solely responsible for complying
all the statutory requirements of Government bodies or any statutory bodies with respect to
site health, safety and environment.
43. Quality Assurance Plan, Inspection and Testing: Quality Assurance Plan:
The Contractor shall submit a quality assurance plan (QAP) for acceptance by the
Purchaser before commencement of the work. The QAP shall, contain:
List of the tests and inspections proposed to be done to ensure quality.
List of the standards to be followed for execution of the work as well as tests and
One set of the standards to be followed for the execution of the work / test and
inspection shall have to be submitted, by the Contractor along with the QAP for
reference, to DPA within 30 days of issue of LOA.
44. Inspection & Test:
1. The Contractor shall submit an inspection plan compatible with the QAP. The test
and inspection report shall contain the description of the part / component /
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
equipment, the date and place of testing, the standard followed for conducting the
test, the actual test result recorded and the allowable limits, the name and
designation and signature of the Contractor’s representative, DPA’s representative
and Third Party representative who witnessed the test. The test report shall be
forwarded to DPA within 15 days of completion of the test for record and reference.
2. DPA reserves the right to subject any part / component / equipment for re-test and
on written instruction from DPA, the Contractor shall arrange for the re-test and the
cost shall be reimbursed by DPA as per actual, only if the test results are satisfactory.
In case of unsatisfactory test results, the part / component / equipment shall be
rejected and the Contractor shall be responsible for replacement of the item at his
own cost and also bear the cost of the re-test.
3. The Contractor shall inform DPA, at least 7 days in advance, about the inspection /
tests planned for and assist DPA in witnessing the same, if so desired by DPA.
4. DPA’s right to inspect, test and, where necessary, reject the Goods after the Goods’
arrival in DPA’s premises shall in no way be limited or waived by reason of the Goods
having previously been inspected, tested and passed by DPA or its representative
prior to the Goods’ shipment from the place of origin.
5. The Contractor shall submit an Inspection and Test Plan (ITP) before
commencement of the work and it should inter-alia cover the following:
a. Identifications of tests/inspections to be conducted during execution of the
b. Hold points and witness points.
c. The list of records to be maintained.
6. Hold Points: Means a position in the execution beyond which work shall not proceed
without mandatory verification and acceptance by DPA or his representative.
7. Witness Points: Means a position in the execution where DPA may exercise it’s
option to witness some tests for acceptance.
45. Third Party Inspection:
The Contractor shall avail the services of a third party, acceptable to DPA, if required as
per the contract, and bear the cost of the Third Party inspection. The responsibility of the
third party shall, inter alia, be to ensure and certify that the work is being executed as per
the relevant standards as given in the approved QAP. DPA reserves the right to replace the
Third party during the execution of the Contract if the third party inspection is not
satisfactory. Additional cost, if any, for such change shall have to be borne by the
In case of any technical dispute between the purchaser and the contractor in connection
with design, construction, erection, testing etc, the matter shall be referred to the third party
for a reasoned decision which shall be reviewed by DPA.
46. Time is the Essence of the Contract:
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Time is the essence of the contract and the Contractor shall ensure that all the obligations
under the contract are completed within the agreed time schedule. The Contractor shall be
solely responsible for all the delays including the delays caused by it’s vendors. In case of
delay in progress of the works, DPA reserves the right to withhold the payment, cancel the
Contract unilaterally or complete the work by DPA or by engaging another
Contractor/Agency at the cost and risk of the Contractor.
47. Contractor’s Obligation:
1. All the materials and works, including labour, required to complete the work
satisfactorily is covered under the scope of the Contractor.
2. It shall be the responsibility of the Contractor to ensure that the persons engaged
for the work are clear from Security angle.
3. Contractor shall nominate an Authorised Representative for carrying out all the
transactions with DPA including receipt of payment.
4. The Contractor, at his own cost, shall be solely responsible for the following:
a. To pay all the taxes, duties, cess, fees, levies and all other dues imposed by
any authority in India or abroad as the case may be.
b. To execute the work with due diligence, efficiency and in conformity with
sound engineering, administrative and financial practices to protect the
interest of the Purchaser.
c. To follow metric system and follow the latest design criteria and ensure that
the design is suitable for the intended purpose, even though the GA Drawings
are approved by DPA.
d. To co-ordinate with outside agencies for obtaining permission / approval /
clearances etc. that may be required to execute the work.
e. To extend all reasonable opportunities to other Contractors employed by the
Purchaser for carrying out their work.
f. To keep the work site free from obstruction.
g. To maintain site account of materials, including the departmental supply,
clearly indicating relevant information such as description of the material,
source, date of delivery at site, date of consumption at site. The Contractor
shall forward a copy of monthly site account of materials to the Engineer in
Charge at the end of every month. On completion of the work under the
contract, the Contractor shall submit to the Engineer in Charge a copy of the
site account of the materials from the date of commencement to date of
acceptance. The Contractor shall also maintain hindrance register, site
instructions register, complaint register and daily progress monitoring register
and the EIC shall verify the registers as and when required and sign the same,
duly recording his remarks.
h. To arrange for transport, RFID passes, gate pass, accommodation, medical
facility etc. for the work men deployed under this contract at his own cost.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
48. Vendor List:
The Contractor, must submit a vendor list of reputed makers for various components /
bought out items which is going to be followed for execution of the work.
49. Scrap Disposal:
Unless otherwise specified, scope of the contractor for the scrap disposal is as under: In
case of repair and/or replacement and /or maintenance contracts/or operation/or
maintenance/ scrap generated during execution shall be the property of DPA.
50. Undertaking by the Bidders:
The bidders shall give an undertaking that they have not made any payment or illegal
gratification to any person / authority connected with the bid process so as to influence the
Process and have not committed any offence under the Prevention of Corruption Act (PC
Act) in connection with the bid.
51. Disclosure by the Bidder:
The bidder shall disclose any payment made or proposed to be made to any intermediaries
(agents etc.) in connection with the bid.
52. Integrity Pact:
For every work / procurement / contract the value of which is Rs.5 Crores and above, the
integrity pact agreement format as given at Appendix-VI shall form a part of the tender
document. The filled in & signed Integrity pact as per Appendix-VI shall be prepared in Non-
judicial stamp paper and submitted in original along with Technical bid in case of
conventional tender by all the participating bidders . In case of e-tendering, scanned copy
of filled in & signed Integrity pact as per Appendix-VI prepared in Non-judicial stamp paper
shall be uploaded along with technical bid and the original shall be submitted to Notice
Inviting Tender Authority within 7days of opening of tender by all the participating bidders.
The Integrity pact signed by the Purchaser and the bidder (successful bidder- Contractor)
shall be made part of contract agreement.
53. Electrical Works:
Since this being a combined work of Mechanical, Civil and Electrical, the electrical portion
of the works shall be executed through a person / contractor holding a valid A or B grade
electrical license issued by Electrical Licensing Board or any other Statutory Authority to
work in Gujarat.
a. Execution of Work:
a. The work executed by the firm shall be in adherence to Electricity rules framed by
State Govt. / Central Govt. / or any other Statutory authority from time to time.
b. The works shall be executed with skilled workmen, under the supervision of qualified
supervisors. During the execution period, the Contractor should produce such
evidence of qualifications of his workmen/supervisors on demand by the Engineer-
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
c. The Substations shall be equipped with qualified Supervisions, Electricians as per
the site requirement as directed by Engg-in-charge.
d. All the equipment’s in the Terminal should have qualified supervisors and electricals
and technicians.
1. Submission of Daily Log sheets: The contractor should submit the daily log sheets to the
Engineer-in-Charge for approval. No work shall be allowed to commence without proper
knowledge and approval.
2. Programme of Work: The programme of work, commencement and Completion Report
shall be submitted.
3. Material Packing: The principle equipment shall be brought to the site by the contractor
in original packing with the seal intact and shall not be installed unless approved by the
Engineer-in-Charge.
4. Clarification: The decision of Engineer-in-Charge is final in case of any technical
clarifications.
5. Quantity: The quantities indicated in the Tender Schedule are tentative and may very
according to the prevailing site conditions.
6. Awarding of Work: The entire work may be awarded in full or in part, at the discretion of
the Engineer-in-Charge.
7. Cancellation of Item: The department reserves the right to cancel the execution of some
items of works at any time during the execution period. No claim by the contractor on this
account and due to variation of any particular items will be entertained.
8. Damage to Property: Any damage to the Port property shall be rectified by the contractor
at his own cost and time
9. Brands of the Materials: The brand of materials offered in the tender should be clearly
specified by the contractor and shall be bought from the manufacturer/authorized dealer
only. The Dealership certificate / delivery challan is to be submitted on demand.
10. Obstruction to Working Staff: The contractor should see that no obstruction is caused to
the normal working staff, consumers, etc., in the vicinity.
11. Security Arrangements: The contractor should make his own security arrangements till
the work is handed over to the department.
12. Arrangements Pertaining to the Contract Work: The firm has to make his own
arrangements for erection, dismantling, transportation of heavy materials (viz.,
structures, equipments) pertaining to the contract work.
13. Tools & Terminals: The contractor has to bring the required tools and Terminals for the
execution of work.
14. Safety Measures: The contractor is responsible for taking precautionary measure for the
safety of workmen working under him. In this direction, the contractor has to engage an
Engineer/Supervisor with adequate knowledge and experience for ensuring safety of the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
workmen and also for himself while executing the subject work. In case of occurrence of
any mishap/accidents, the entire responsibility lies with the contractor only, towards
treatment of the injured or/and for payment of any compensation to the injured/deceased
employee of the contractor.
15. Working of Extra Hours: The Contractor should apply in writing well in advance for
carrying out the work beyond Port working hours to arrange port supervision.
16. Supply of Indigenous Materials: All materials shall be of indigenous make, meeting the
specifications for the particular works.
17. Position of Fixtures: The position of fixtures shall be indicated by the Engineer-in-
18. Rectification of Defects: All defective works observed / pointed out by the Engineer-in-
charge shall be rectified free of cost during the guarantee period.
19. Issue of Power Shut-Down: Shut-down of power/supply can only be given on written
requisition at the convenience of the department.
20. Cost of Labour and Materials: The rates quoted by the contractor should be inclusive of
the cost of all labour and materials etc., unless and otherwise specified.
21. Non-Payment for Increased Rates: No claim for any increase in rates of the materials will
be entertained by the department.
22. Stacking of Materials: The materials shall be stacked in such a way that no obstruction
is caused to the movement of traffic in those areas.
23. Inspection of Works: the SE(E/M)/AXE (E/M) or any other authorized representative shall
have the right to inspect the electrical works in progress during the contract period.
24. New Taxes: Any new taxes imposed by the Government related to this work (O&M
Services) during the contract period will be reimbursed upon claim, by the firm subject to
submission of evidence.
54. Clearance for Excavation:
Service lines such as Electricity Cables, Fibre Optic I.T. Cables, water supply lines, sewage
& drainage pipes, Tele-communication cables etc. are embedded in the port roads, road
side berms, hard surface areas, pavements, etc. The Fibre Optic I.T. Cable is very costly
and if damaged, required replacement of full length. The contractor, therefore, before
commencing excavation, shall seek the specific clearance of the locations proposed for
excavation. Notwithstanding such approval, he shall be responsible to take necessary
precautions by way of deploying suitable means and restraint to avoid damage to any of
the service lines. In case of any damage caused during excavation or subsequently during
the progress of the work, he should replace/ repair the cables/service pipelines, etc., as
required at his cost, failing which a recovery as evaluated by the E.I.C. would be made from
55. The tenderers shall return all the drawings issued along with the Tender schedules, duly
signed, in token of having studied them.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
56. Applicable Laws:
Contractor has to comply with QMS (ISO9001-2015), EMS (ISO 14001-2015), OHSMS
(ISO 45001-2018 and ISPS norms 2007 of DPA.
The contractor shall comply with the provisions of all the Acts, Laws, any regulation or Bye-
Laws of any Local or other Statutory Authority applicable in relation to the execution of the
works, such as but not limited to:
i. Payment of Wages Act, 1936 (Amended).
ii. Minimum Wages Act, 1948 (Amended).
iii. The Contractor Labour (Regulation & Abolition) Act, 1970 with Rules framed
there under as amended.
iv. Workmen Compensation Act, 1923, as amended by Amendment Act No.65 of
v. Purchaser’s Liability Act, 1938 (Amended).
vi. Maternity Benefit Act, 1961 (Amended).
vii. The industrial Employment (Standing Orders) Act, 1946 (Amended).
viii. The Industrial Disputes Act, 1947 (Amended).
ix. Payment of Bonus Act, 1965 and Amendment Act No.43 of 1977 and No.48 of
1978 and any amendments thereof.
x. Employees Provident and Misc. Provision Act, 1952 including FPS- 71/EPS-95.
xi. The statutes, rules, regulations as may be prevalent in the State of Gujarat.
xii. The Personal Injuries (Compensation Insurance) Act, 1963 and any
modifications thereof and rules made there under from time to time. The
contractor shall take into account all the above said financial liabilities in his quoted
rates and nothing extra, whatsoever, shall be payable to him on this account.
57. Legal Requirements / Acts:
The contractor should comply with the following legal requirements/ Acts (wherever
i. The Environment (Protection) Act & Rules 1986 as amended up to
ii. The Hazardous Waste (Management & Handling) Rules 1989 as amended up to
iii. Manufacture, storage and import of Hazardous Chemicals Rules 1989 as
mentioned up to
iv. The Noise Pollution Regulations & Control Rules 2000 as amended up to
v. The Batteries (Management and Handling) Rules
vi. Factories Act – 1948 & Factory Rules as amended up to
vii. Motor Vehicle Act1988 and Motor Vehicle Rules 1989 as amended up to
viii. The Petroleum Act 1934 and the Petroleum Rules
ix. The Gas Cylinder Rules
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
x. The Gandhidham Municipal Corporation Act-1979 as amended
xi. Fire Protection Facilities for Port Oil Terminals OISD (Oil industry Safety
Directorate) guidelines
xii. DPA (Transport, Handling& Storage of dangerous goods) Regulations 1992 as
amended up to 1999).
xiii. The Water (Prevention & Control of Pollution) Act 1984 & Rules1975 as amended
xiv. The Air (Prevention and Control of Pollution Act 1981) and Rules 1982 as
xv. Railway Regulations
xvi. Indian Railway Track Design & Manufacture.
xvii. South Indian Railway Accident manual
xviii. The Radiation Protection Rules 1971 as mentioned upto
xix. Explosives Act- 1884 as amended up to
xx. Electricity Act 2003 with the rules.
xxi. Solar Regulations 1974 as amended up to
xxii. Marpol Regulations 73/78 with the Annexure (I, II, III, V & VI) as amended up to
58. Workmanship:
Standard: A high standard of workmanship in all trades will be required. The contractor(s)
shall ensure that Senior Officers, Engineers, Workman (skilled and unskilled)
including Marketing Staff and experienced trade men are employed.
Terminal: The contractor (s) shall be responsible for Operating and Maintenance of the
entire in the Terminal including the berth and its accessories for trouble free operations.
The Engineer-in-charge may direct that Terminal which is not efficient and prejudicial; to
the quality of the work be removed from the site and replace by Terminal to his satisfaction.
Supervision: The contractor (s)’s supervisory staff shall be fully experienced in the type of
work being carried out under their supervision and capable of ensuring that it is done well
and efficiently.
Temporary Works: Where required, the contractor (s) shall furnish such details of his
temporary works as may be called for by the Engineer-in-charge and the contractor (s) shall
satisfy the Engineer-in-charge as to their safety and efficiency. The Engineer-in- charge
may direct that temporary works which he considers unsafe or inefficient shall be removed
and replaced in satisfactory manner.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
GENERAL DIRECTIONS AND CONDITIONS OF CONTRACT
1. All works proposed for execution by the contract will be notified in the form of invitation
to tender posted in DPA website and n-procure and signed by the Executive Engineer
(H), Deendayal Port Authority. This form will state the work to be carried out, as well as
the date for submitting and opening tenders and the time allowed for carrying out the
work also the amount of earnest money to be deposited with the tender and the amount
of the Security Deposit is to be deposited by the successful tenderer and the percentage
if any to be deducted from bills, copies of the specifications, designs and drawings and
any other documents equipped in connection with the works signed by for the purpose
of identification by the Executive Engineer (H) Deendayal Port Authority shall also be
open for inspection by the Contractor at the Office of the Executive Engineer (H),
Deendayal Port Authority during office hours.
2. In the event of the tender being submitted by a firm, it must be signed separately by each
member, thereof, or in the event of the absence of any matter it must be signed on his
behalf by a person holding a power of attorney authorizing him to do so, such power of
attorney to be produced with the tender and it must disclose that the firm is duly
registered under Indian Partnership Act.
3. The Board shall have the right of rejection all or any of the tenders and will not be bound
to accept the lowest tender.
4. On completion of the work, the Contractor shall be responsible for handing over of the
Project Facilities & Services including berth and connected Infrastructure and Associated
berth along with all Civil / Mechanical / Electrical Infrastructure in good working conditions
post completion of the Contract Period. The Contractor should ensure that the handed
over equipment are free of any damages/repairs. Any repairs/breakdowns
noticed/observed in the Terminal and machinery post completion of the contract period
and not rectified by the Contractor, the cost for the same shall be recovered duly
encashing the Additional Guarantee submitted.
The Contractor has to handover the assets of DPA duly conducting condition survey in
presence of DPA personnel / DPA appointed consultant, after completion of the contract
period. The Contractor shall be furnished with a certificate by the Engineer-in-Charge of
such completion but no such certificate shall be given nor shall the work be considered
to be completed until the Contractor hand overs the entire Project Facilities & Services
in good working condition.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
CLAUSE 7: Payment Terms:
The payment to the contractor shall be carried out by CIVIL Engineering Department and
will be made as per the following terms:
i. The contractor shall be paid for the overall comprehensive services (end to end
services) rendered by them on monthly tonnage basis, i.e., rate per tonne quoted,
as per the certification of the Traffic Department along with certification of the
monthly reports.
ii. Payment shall be released on submission of Tax Invoice as per GST Rules on
certification of the volumes by Traffic Department.
iii. “The rates quoted by the contractor shall be deemed to include all expenses in
handling bulk cargo in the terminal (end to end services, right from vessel
nomination, handling of cargo in the Terminal to the discharge of cargo through
rail/road including railway charges) including payment of applicable wages rates to
the labour as and when revised in compliance with the statutory regulation”.
CLAUSE 8: BILLS TO BE SUBMITTED
A bill shall be submitted by the Contractor every month on or before the date fixed by the
Executive Engineer (H) for the work executed.
CLAUSE 9: BILLS TO BE PRINTED FORMS
The Contractor shall submit bills on the printed forms to be had on application at the Office
of the Executive Engineer (H)and the charges in the bills shall always be entered at the
rates specified in the tender.
CLAUSE 10: DELETED
CLAUSE 11: WORKS TO BE EXECUTED IN ACCORDANCE WITH THE SCOPE OF WORK
INCLUDING STANDARD OPERATING PROCEDURES, SPECIFICATION AND DRAWINGS
The Contractor shall execute the whole work as per the scope of the tender including all
terms & conditions in the most substantial and workmen like manner and both as regards
materials and otherwise in every respect in strict accordance with the specifications.
CLAUSE 12: DELETED
No compensation for alteration or restriction of work to be carried out:
If at any time after the commencement of the work the board shall for any reason what– so-
ever, not required the whole there of as specified in the tender to be carried out the
Engineer-in–charge shall given notice in writing of the fact to the contractor who shall have
no claim to any payment or compensation whatsoever on account of any profit or advantage
which might have derived from the execution of the work in full, but which he did not derive
in consequence of the full month of the work not having been carried out neither shall be
have any claim for compensation by reason of any alternations have been made in the
original specifications, drawings designs, and instructions which shall involve any
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
curtailment of the work as originally contemplated.
It shall appear to the Executive Engineer (H) or his subordinate in-charge of the work, that
any work has been executed with unsound imperfect or unskillful workmanship or with
materials/Equipment if any, inferior description or that any materials/Machinery/Equipment
of articles provided by him for the execution of the work are unsound or of a quality inferior
to that contract, the contractor shall on demand, in writing from the Executive Engineer (H)
specifying the work materials, or articles complained of notwithstanding that the same may
have been inadvertently passed, certified and paid for, forthwith rectify or remove the
materials/Machinery/Equipment as specified and provided other proper and suitable
materials/Machinery/Equipment at his own proper change and cost, and in the event of his
failing to do so when a period to be specified by the Executive Engineer (H) his demand
aforesaid then the contractor shall be liable to pay compensation at the rate of 1% on
the amount of estimate for every day to exceeding 10 days, while his failure that Executive
Engineer (H)s may rectify with others, the materials/Machinery/Equipment complained of
as the case may be at the risk or expense in all respects of the contractor.
Works be open to inspection contractor or responsible agent to be present. All works under
or in course of execution of executed in pursuance of the contract shall at all times be open
to the inspection and supervision of the Executive Engineer (H) and his subordinate and
the contractor shall at all times during the usual work hours and at all other times at
which reasonable notice of the intention of the Executive Engineer (H) or his subordinate
to visit the works shall have been given to be contractor, either himself be present or
receive orders and instructions or have a responsible agent duly accorded in writing,
present for that purpose. Order given to the contractor’s agent shall be considered
to have the same a force as if they had been given to the contractor himself.
CLAUSE-16: DELETED
The Contractor is liable for any damages done to the assets handed over by the Port
Authority for carrying out of Operations & Maintenance work as specified more clearly under
the scope of the Contract.
In the contract his work people or servants shall break, injure or destroy any part of
Structure, in which they may be working or any building road, road curbs, fence,
enclosures, water pipes, cables, drains, electric or telephone posts or wires, trees, grass or
grass land or cultivated ground continuous to the premises in which the work or any part of
it is being executed or if any damage shall happen to the work while in progress, from any
cause whatever or any imperfections become apparent. After a certificate final or
other of its completion shall have been given by the Executive Engineer (H) as aforesaid,
the contractor shall make the same good at his own expense, or in default, the Executive
Engineer (H) may cause the same to be made good by the other workmen and deduct the
expense (of which the certificate of the Executive Engineer (H) shall be final) from any sums
that may be then, or at a time there after may become due to the contractor, or from his
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
security deposit or the proceeds of sale, thereof or of a sufficient portion thereof, the
security deposit of the contractor shall not be refunded before the expiry of twelve months.
Contractor to supply Terminal ladders scaffoldings etc.
The Contractor shall supply at his own cost materials (except such special materials if any,
as many in accordance with the Contract be supplied from the stores, cordage, Terminal,
tools appliances implements, ladders, tackle, scaffolding and temporary works requisite or
proper for the proper execution of the work whether original altered or substituted and
whether including in the Specification or other documents forming part of the contract
preferred to in these conditions, or not, on which may be necessary for the purpose
satisfying or complying with the requirements of the Executive Engineer (H) as to any matter
as to which under these conditions he is entitled to be satisfied or which he is entitled to
require together with carriage therefore, to and from the work. The contractor shall also
supply without charge the requisite number of persons with the means and materials
necessary for the purpose of setting out work, and counting weighting and assisting in the
measurement or examination at any time and from time to time of the work or materials.
Failing his so doing the same may be provided by the Executive Engineer (H) at the purpose
of the contractor and the expenses, may be deducted from any money due to the contractor
and the contract or from his security deposit of the proceeds of same thereof, or of a
sufficient portion thereof. The Contractor shall also or vide all necessary facing and lights
required to protect the public from accidents and shall be found to be a the expenses of
defense of every suit, action or other proceedings at law that may be brought by any person
for injury sustained owing to neglect of the above precautions and to pay any damages and
costs which may be awarded in any such suit, action or proceedings to any such persons
of which may with the consent of the contractor be paid to compromise any claim by any
CLAUSE –18 ‘A’:
In every case in which by virtue of the provision of section-12 sub-section (1) of the
workmen’s Compensation Act, 1923 Government is obliged to pay Compensation to
workmen employees by the contractor in execution of the works Board will recover from
the contractor the amount of the Compensation so paid, and without prejudice to the rights
of Board under section12, sub-section-2 of the said Act Board shall be at liberty to recover
such amount of the Part there of by deducting it from the Security deposit or from any time
due to or otherwise Board shall not be bound to contest any claim made against it under
section-12, sub-section (1) or the said Act, except on the written request of the contractor
and upon his giving to board full security for almost for which Board might become liable in
consequences of contesting such claim.
CLAUSE –19 (1):
The contractor shall provide all facilities as provided under contract labour (Regulation and
Abolition Act) 1970 and other Central / State enactments and shall be responsible for
violation of any of the same.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
CLAUSE –19 (a):
a. In respect of all labour directly or indirectly employed in the works for the
performance of the contractor’s part of this agreement the Contractor Labour
(Regulation and Abolition) Act, 1970 and (herein after called the said Act) and
Central rules made there under by Government of India and any other Act, Rules
and Regulations made by the Central or State Government and such other rules and
regulations made applicable by the Board from time to time in regard to payment of
wage, wage period deductions from wages, recovery of wages not paid and
deduction unauthorisedly made, maintenance of wage registers, wage cards,
publication of scale of wages all terms returns and the maintenance of necessary
health and sanitary arrangements.
b. The contractor shall obtain the necessary licence for employing the Contract labour
for executing the work, now contracted upon as per the said Act and rules within
days from the date of work order and shall ensure to maintain the same effective
throughout the period of this contract at his own cost. The decision of the Board and
or Asst. Labour Commissioner (Central) regarding the applicability of the Act is final
and binding on the contractor.
c. The contractor shall in no case, commence the work, unless be obtained and
produce the licence under the Act and the time for completion of work as given in
the tender is inclusive of the time required to obtain produce the said licence.
d. If the Port is caused to pay reimburse or incur such amount as may be necessary to
cause or to observe for non-observance of the provisions stipulated in Clause-19(a)
mentioned above, on the part of the contractor the Executive Engineer (H) shall have
the right to deduct from any moneys due to the Contractor his security deposit or
recover from the Contractor personally any sum required or estimated to be
recovered for making good the loss or damages suffered by the Board.
It shall be the duty of the Contractor to obtain a license under the Act for such number of
workmen as may be necessary for the completion of the work within the prescribed time
and any recommendation regarding the number of workmen made by the Executive
Engineer (H) shall not absolve the Contractor from his responsibility in completing the work
within the prescribed time.
i. The contractor shall also observe the following conditions:
a. No labour below the age of 12 years shall be employed.
b. The Contractor shall pay not less than minimum wage to labourers
engaged by him on the work.
“Minimum Wage” means whether for time or piece work notified by the Ministry of Labour
Employment and Rehabilitation (Replacement of labour and Employment). New Delhi as
made applicable for works under this organization and the minimum wage act and where
such wages have not been so notified the wages prescribed by the Central Public Works
Department for the District in which the work is done or such rates as would be notified by
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
the Board from time to time.
i. The Contractor shall not withstanding the provision of any contract to the contrary,
cause to be paid minimum wage to labourers indirectly engaged on the above work
including any labour engaged by his sub – contractors in connection with the said
works as if the labourers had been immediately employed by him.
ii. Vis-à-vis the Board, the Contractor shall be primarily liable for all payments to be
made under area for the observance of the Act Rules and Regulations aforesaid
without prejudice in his right to claim indemnity from his Sub-contractor.
iii. The Contractor shall at his own expenses provide or arrange for the provision of foot-
wear for any labour doing cement mixing work (The Contractor has undertaken to
execute under this contract) to the satisfaction of the Engineer-in- charge and on his
failure to cost thereof from the Contractor.
iv. The Contractor shall submit by the 4th and 19th of every month to the Executive
Engineer (H), as true statement showing respect of the second half of the preceding
month and first of the current month respectively (1) the number of labourers
employed by him on the work (2) their working hours, (3) the wages paid to them,
v. (4) the accidents that occurred using the said fortnight showing the circumstances
under by them and (5) the number of female workers who have been allowed
maternity benefit according to Clause-19-C and the amount paid to them failing
which the Contractor shall be liable to pay to the Board, sum not exceeding Rs.50/-
for each default or materially incorrect statement. The decision of the Executive
Engineer shall be final in deducting from any bill due to the Contractor the amount
levied as fine.
CLAUSE – 19 (C):
Work on Sundays work not to be sublet contract may be rescinded
and security deposit for sub-letting bribing of the contractor become insolvent. Act, Rules
and Regulations aforesaid shall be deemed to be a part of this contract and any breach
thereof shall be deemed to be a break of this contract.
The Contract shall not be assigned or subject without the written approval of the Executive
Engineer (H), and if the Contractor shall assign or sublet this contract or attempt so to do,
or becomes insolvent or commence any insolvency proceedings or make any composite or
with this creditors or attempt so to do or it any bribe, gratuity, gift lead perquisite reward for
advantage, precautionary and otherwise shall either directly or indirectly be given promised
or offered by the contractor, or any of his servants of agents, to any public office or person
in the employ of Board in any way relating to his office or employment or if any such officer
or person shall become in any way directly or indirectly interested in the contract, the
Executive Engineer (H) may thereupon by notice in writing rescind the contract and the
Security Deposit of the Contractor shall thereupon stand forfeited and be absolutely at the
disposal of Board and the same consequences shall ensure as if the contract had been
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
rescind hereof and in addition the Contractor shall not be entitled to recover or be paid for
any work thereto for actually performed under the contractor.
Sum payable by way of compensation to be considered as reasonable compensation
without reference to actual loss changes in constitution of firm works under direction of the
C.E. settlement of dispute.
All sums payable by way of compensation under any of these conditions shall be
considered as reasonable compensation to the applied to the use of Board without
reference to the actual loss or damage sustained and or not any damage shall have been
In the case of a tender by partners any change in continuation of the firm shall be forthwith
notified by the Contractor to Executive Engineer (H) for his information.
All works to be executed under the contract shall be executed under the direction and
subject to the approval in all respects of the CHIEF ENGINEER, Deendayal Port Authority
for the time being who shall be entitled to direct at what point or points and on what manner
they are to be commenced and from time to time carried on.
CLAUSE-25: ACTION TO RESCIND THE CONTRACT:
In the event of failure on the part of the contractor to carry out the work as per the scope of
work and SOP including performance and other terms & conditions in NIT, DPA shall be
entitled to rescind the contract and to following is the action to be taken:
Levy of LD for under performance and delay in commencement of work.
Forfeit Security Deposit
Banning of business with the Contractor
CLAUSE–26: FORE-CLOSURE OR TERMINATION OF CONTRACT
The Employer shall be entitled to foreclose and terminate the Contract, at any time, should,
in the Employer’s opinion, the cessation of works becomes necessary, owing to paucity of
funds or due to court orders or from any other cause whatsoever. Notice in writing from the
employer, of such termination and reasons thereof, shall be conclusive evidence thereof
and be binding on the Contractor.
In view of operational requirement, Employer has right to cancel or pre-close the work
without assigning any reason duly giving a notice period of one month.
In the event of non-performance, poor performance or lack of diligence by the contractor,
the contract will be liable for termination by serving one month notice, and in that event, the
performance Guarantee (Security Deposit) which is in the form of Bank Guarantee (BG)
will be encashed by Deendayal Port Authority.
CLAUSE -28: BANNING OF BUSINESS DEALINGS (BLACKLISTING):
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
A. Change in terminology:
“Blacklisting” is now termed as “Banning of Business Dealings” in view of Court
B. Grounds for Banning:
a. If the security considerations including questions of loyalty of the company/party to
the State, so warrants.
b. If the Director of the company, proprietor or partner of the firm,
manger/representative of the company/party is convicted by the Court of Law for
offences involving moral turpitude in relation to its business dealing with the
Government or any other PSU or DPA.
c. If there is a strong Justification for believing that the Directors, Proprietors, partners,
managers or the representatives of the Company/party have been guilty of
malpractices such as bribery, corruption, fraud, substitution of tenders,
interpolations etc.
d. If the Company/Party employs a public servant dismissed/removed or employs a
person convicted for an offence involving corruption or abutment of such offence.
e. If the business dealings with the Company/Party have been banned by the Govt. or
any other Public Sector Enterprise/Undertaking or CBI, courts etc.
CLAUSE-29: Procedure
1. Proposal for banning of business should be first put up to the Competent Authority,
through the Law Section, setting out all the facts of the case and the justification for
the action proposed with all relevant papers and documents.
2. Upon approval by the competent Authority, a Show Cause Notice needs to be issued
in the required format in consultation with the Law Section, with reasonable time for
Appeal by the Company/Firm.
3. The Appeal filed by the Company/ firm shall be examined and further action taken.
4. The Orders of the Competent Authority shall be communicated to the Company/Firm.
5. In case of banning of business with a Company/ firm, depending upon the gravity of
the misconduct established, the name of the Company/Firm with whom business
dealings have been banned should be circulated to the Govt. Departments and
PSUs for their information.
CLAUSE–30: DELETED
CLAUSE- 31: Action where no specification.
In the case of any class of work for which there is no such specifications as in mentioned
in Rule-I such work shall be carried out in accordance with the district specification and in
the event of there being so strict specification then in such cases the work shall be carried
out in all respects in accordance with the instructions and requirement of the Engineer-in-
CLAUSE- 32: Definition of work.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
The expression “work” where used in these conditions shall unless there be something
either in the subject context repugnant to such Operation & Maintenance of existing Cargo
Berths 09 and 10 (from Panel No. 69 to end of Berth No.10) for carrying out cargo handling
operations by deploying Harbour Mobile Cranes (Minimum HMCs 1+1 Nos.) and other
associated equipment including management and marketing to be executed whether
temporary or permanent and whether original, altered, substituted or additional.
Interpretation Clause:
The Board means the Members of the Board for Deendayal Port Authority and its
successors. Works importing the singular number only include the plural number and vice-
CLAUSE-33: Care to be taken for underground cables/pipelines.
Service lines such as electricity cables, fibre optic I.T cables, water supply lines, sewer
and drainage pipes, telecommunication cables etc., are embedded in the port roads, road
side berms hard surfaced areas, pavements etc. The fibre optical I.T. cable is very costly
and if damaged requires replacement for full length as jointing would be ineffective. The
contractor, therefore, before commencing any excavation shall seek the specific clearance
of the route proposed for excavation from the Executive Engineer (H). Not-
withstanding such approval he shall be responsible to take necessary precautions by way
of deploying suitable means and restraint to avoid damage to any of the service lines. In
case of any damages caused during excavation or subsequently during progress of the
work, the contractor should replace the same forthwith to original design with material
procured from manufacturers approved by D.P.A. as required, at his cost, failing which,
recovery of cost thereof including cost of down time of the facility as evaluated by the
Executive Engineer (H), would be effected from the bill amounts payable to the contractor.
Further, earth work excavation in such areas should not be undertaken with mechanical
means such as Proclaimer/JCB/Earth mover etc., it should be carried out by the contractor
manually taking proper precautions.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
SAFETY, HEALTH, ENVIRONMENT & QUALITY POLICY
Port of Deendayal is committed to provide prompt, efficient and safe services to
ensure quick turn round of sea, rail and road borne cargo by:
a. Implementing and continually improving the performance of Quality management
systems, Environment and Occupational Health & Safety by eliminating hazards
and reducing OH&S risks.
b. Complying with the applicable statutory and regulatory requirements.
c. Preventing – injury, occupational ill health and pollution.
d. Setting qualities, environmental and OH&S objectives.
e. Addressing risk and opportunities.
f. Enhancing customer satisfaction.
g. Ensuring the promotion of awareness among the workers and the interested parties
on quality, Environment, occupational health and safety through consultation and
Make available this policy to the public, all persons working under the control of the
organization and the interest parties.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
SECURITY POLICY
(I.S.P.S. CODE)
Deendayal Port Authority is committed to provide a safe and secure working
environment to all its employees, Port users, ships and the personnel. This will be
achieved in the Port by establishing and maintaining the required security measures to
prevent unlawful acts against personnel, cargo and marine assets.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Name of the Work: - Operation & Maintenance of existing Cargo Berths 09 and 10 (from
Panel No. 69 to end of Berth No.10) for carrying out cargo handling operations by deploying
Harbour Mobile Cranes (Minimum HMCs 1+1 Nos.) and other associated equipment
including management and marketing
FORMAT FOR POWER OF ATTORNEY
Power of Attorney
To Whomsoever it May Concern
Mr. _____________________________(Name of the Person(s), domiciled at
as____________________________(Designation and name of the firm), and whose
signature is attested below, is hereby authorised on behalf
of_______________________(Name of the Applicant) to provide information and respond
to enquiries etc. as may be required by the employer or any governmental authority for the
_______________________.” and is hereby further authorised to sign and file relevant
documents in respect of the above.
(Attested signature of Mr. ___________)
For (Name of the Applicant)
For (Name of the Applicant)
CONTRACTOR CHIEF ENGINEER
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
LETTER OF ACCEPTANCE
(On letterhead paper of the Port)
(Name and address of the contractor)
Ref. : Your bid dated
And [list the correspondence with the bidder]
This is to notify you that your bid dated___________________ for execution of the
________________________(name of the contract and identification number, as given in
the instructions to bidders) for the contract price of rupees ___________________(amount
in words and figures as corrected and modified in accordance with the tender document is
here by accepted by the employer/Board).
You are hereby requested to furnish performance security, in the form detailed in tender
document for an amount of Rs.______________ within {________} days of the receipt of
this letter of acceptance valid upto 28 days from the date of completion obligations expiry
of taking over certificate subject to removal of defects period i.e. upto ________ and also
sign the contract agreement within{_________} days of the receipt of this letter of
acceptance , failing which action as stated in the tender document will be taken.
Detailed letter of acceptance will follow.
Please acknowledge receipt.
Yours faithfully,
Deendayal Port Authority
CONTRACTOR CHIEF ENGINEER
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
SPECIMEN BANK GUARANTEE PERFORMANCE
GUARANTEE/ SECURITY DEPOSIT
(To be executed on Rs.300/- non-judicial Stamp Paper)
[The bank, as requested by the successful Tenderer, shall fill in this form in accordance
with the instruction indicated]
In consideration of the Board of Deendayal Port Authority incorporated by the Major Port
Authorities Act , 2021 (hereinafter called “The Board” swhich expression shall unless
excluded by or repugnant to the context or meaning thereof be deemed to include the
Board of Deendayal Port Authority, its successors and assigns) having agreed to exempt
___________________________________________ (hereinafter called the “contractor”)
(Name of the contractor/s)
from the demand under the terms and condition of the contract, vide from the demand under
the condition of the contract, vide ____________________________’s letter
(Name of the Department)
Date _____________ made between the contractors and the Board for execution of
__________________________________ covered under Tender
No.____________________________ dated _____________ (hereinafter called “the said
contract”) for the payment of Security Deposit in cash or Lodgment of Government
Promissory Loan Notes for the due fulfillment by the said contractors of the terms and
condition of the said contract, on production of a bank Guarantee for
) only we, the (Name of the Bank and Address)
_(hereinafter referred to as “the Bank”) at the request of the contractors do hereby
undertake to pay to the Board an amount not exceeding Rs. ________________
(Rupees_____________________________________) only against any loss or damage
caused to or suffered by the Board by reason of any breach by the contractors of any of the
terms and conditions of the said contract.
(Name of Bank) (Name of Branch)
Undertake to pay the amount due and payable under this guarantee without any demur
merely on a demand from the Board starting that the amount claimed is due by way of loss
or damage caused to or which would be caused to or suffered by the Board by reason of
the contractors failure to perform the said contract. Any such demand made on the Bank
shall be conclusive as regards the amount due and payable by the Bank under this
Guarantee. However, our liability under this guarantee shall be restricted to any amount not
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
exceeding Rs. _____________ (Rupees________________________) only.
3. We, ______________________________, undertake to pay to the
(Name of Bank and Branch)
Board any money so demanded notwithstanding any dispute or disputes raised by the
contractor(s) in any suit or proceeding pending before any Court or Tribunal relating thereto
our liability under this present being absolute and unequivocal. The payment so made by us
under this bond shall be a valid discharge of our liability for payment there under and the
Contractor(s) shall have no claim against us for making such payment.
4. We, ______________________________ further agree with the Board that the
(Name of Bank and Branch)
guarantee herein contained shall remain in full force and effect during the period that would
be taken for performance of the said contract and that it shall continue to be enforceable till
all the dues of the Board under or by virtue of the said contract have been fully paid and its
claims satisfied or discharged or till the ______________________________________
(Name of the user department)
of the said certifies that the terms and conditions of the said contract have been fully and
properly carried out by the said Contractors and accordingly discharge this guarantee.
PROVIDED HOWEVER that the Bank shall be the request of the Board but at the cost of
the Contractors, renew or extend this guarantee for such further period or periods as the
Board may require from time to time.
5. We, _____________________________ further agree with the Board that the (Name of
Bank and Branch)
Board shall have the fullest liberty without our consent and without affecting in any manner
our obligations hereunder to vary any of the terms and conditions of the said contract or to
extend the time of performance by the said contract or to extend the time of performance
by the said Contractors from time to time or to postpone for any time or from time to time
any of the powers exercisable by the board against the said Contractors and to forebear or
enforce any of the terms and conditions relating to the said contract and we shall not be
relieved from our liability by reason of any such variation or extensions being granted to the
contractors or for any forbearance, act or omission on the part of the Board or any indulgence
shown by the board to the Contractors or by any such matter or thing whatsoever which
under the law relating to sureties would, but for this provision, have effect of so relieving us.
6. This guarantee will not be discharged due to the change in the constitution of the Bank or
the Contractor(s).
7. It is also hereby agreed that the Courts in Gandhidham would have exclusive jurisdiction in
respect of claims, if any, under this Guarantee.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
8. We, ____________________ Bank lastly undertake not to revoke this guarantee during its
currency except with the previous consent of the Board in writing.
9. Notwithstanding anything contained herein:
(a) Our liability under this Bank Guarantee shall not exceed Rs. ___________ (Rupees
(b) This Bank Guarantee shall be valid upto _____________ ; and
(c) We are liable to pay the guarantee amount or any part thereof under this Bank Guarantee
only and only if you serve upon us a written claim or demand on or before
_____________________ (date of expiry of Guarantee).”
For (Name of Bank)
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Specimen EMD (Bank Guarantee Format)
[The Bank shall fill in this Bank Guarantee Form in association with the instructions indicated. To be executed on
Rs. 100/- non Judicial Stamp Paper]
(Bank’s name and address of Issuing Branch or Office)
Beneficiary: ________________ (Name and Address of Employer/Board)
Tender Guarantee No.: ___________
We have been informed that [name of the Tenderer] (hereinafter called “the Tenderer”) has submitted to you its
Tender dated (hereinafter called “the Tenderer”) for the execution of [name of contract] under Invitation for Tenders
No.[Number]. Furthermore, we understand that, according to your conditions, Tenders must be supported by an
At the request of the Tenderer, we [name of Bank] hereby irrevocably undertake to pay you any sum or sums not
exceeding in total an amount of [amount in figures] ([amount in words]) upon receipt by us your first demand in
writing accompanied by a written statement stating that the Tenderer is in breach of its obligation(s) under the
Tender conditions, because the Tenderer:
(a) Has withdrawn its Tender during the period of tender validity specified by the Tenderer in the Form of
(b) Having been notified of the acceptance of its Tender by the Employer/Board during the period of
Tender validity, (i) fails or refuses to execute the Form of Agreement, if required, or (ii) fails pr refuses
to furnish the performance guarantee, in accordance with the Instructions to Tenderers.
This guarantee will expire unless other ise extended or informed by the Employer/ Board:
(a) If the Tenderer is the successful Tenderer, upon our receipt of copies of the contract signed by the
Tenderer and the performance guarantee issued to you upon the instruction of the Tenderer; or
(b) If the Tenderer is not the successful Tenderer, upon the earlier of
(i) Our receipt of a copy of your notification to the Tenderer of the name of the successful
(ii) Twenty-eight days after the expiration of the Tenderer’s tender or any extended period thereof;
Consequently, any demand for payment under this guarantee must be received by us at the office on or before
[Authorization letter from the issuing bank that the signatory of this BG is authorized to do so should also
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
DECLARATION No. 1 (Not Applicable)
The conditions contained in the NIT were perused and it was understood that
is the condition relating to GST is concerned it was mentioned as follows:
“According to GST ACT every dealer is liable to be registered whose aggregate
turn over exceeds Rs.20 lakhs for supply of goods/services/executing any work contract
accordingly GSTIN is to be provided for participation in tender and to award the
I the authorized signatory of the bidder do, hereby declare and confirm that I
have read and understood the NIT conditions as such I am conscious about the
consequences and implication of GST on the subject work. I further declare that I am
well aware of the guidelines being issued by the Govt. of India regarding GST from time
to time and also the applicability of the rates and the likely variation of the same in future
either upwards or downwards under the GST regime in respect of the works in DPA. I
am also aware that I am bound by the policy of the Govt in this regard.
I therefore hereby undertake and declare that I shall be liable to pay any amounts
payable towards GST unconditionally without any demur and in this regard I hereby
authorize DPA to recover or deduct such sum of GST from the amounts as per rules
payable to Me/Our firm. I declare that the authorization hereby given is irrevocable and
shall be binding on me as well as my successors, agents or person claiming any amount
SIGNATURE OF THE CONTRACTOR/ FIRMS
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Deendayal Port Authority (DPA) hereinafter referred to as "The Principal"
........................................................... (Name of The bidders and consortium members)
hereinafter referred to as "The Bidder / Contractor"
The Principal intends to award, under laid down organizational procedures, contract(s) /
concession(s) for Tender No. ............................. The Principal values full compliance with
all relevant laws of the land rules, regulations, economic use of resources and of fairness /
transparency in its relations with its Bidder(s) and / or Contractor(s).
In order to achieve these goals, the Principal will appoint Independent External Monitors
(IEMs), who will monitor the tender process and the execution of the contract for compliance
with the principles mentioned above.
Section 1 - Commitments of the Principal
(1) The Principal commits itself to take all measures necessary to prevent corruptionand
to observe the following principles:-
(a) No employee of the Principal, personally or through family members, will in
connection with the tender for, or the execution of a contract, demand,take a
promise for or accept, for self or third person, any material or immaterial benefit
which the person is not legally entitled to.
(b) The Principal will, during the tender process treat all Bidder(s) with equity and
reason. The Principal will in particular, before and during the tender process,
provide to all Bidder(s) the same information and will not provide to any
Bidder(s) confidential / additional information through which the Bidder(s)
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
could obtain an advantage in relation to the tender process or the contract
(c) The Principal will exclude from the process all known prejudicial persons.
(2) If the Principal obtains information on the conduct of any of its employees whichis a
criminal offence under the IPC / PC Act, or if there be a substantive suspicion in this
regard, the Principal will inform the Chief Vigilance Officer andin addition can initiate
disciplinary actions.
Section 2 - Commitments of the Bidder(s) / Contractor(s)
(1) The Bidder(s) / Contractor(s) commits themselves to take all measures necessary to
prevent corruption. The Bidder(s) / Contractor(s) commits themselves to observe the
following principles during participation in the tenderprocess and during the contract
a. The Bidder(s) / Contractor(s) will not, directly or through any otherperson or
firm, offer, promise or give to any of the Principal's employees involved in
tender process or the execution of the contract or to any third person any
material or other benefit, which he / she is not legally entitled to, in order to
obtain in exchange of advantage of any kind whatsoever during the tender
process or during the execution of the contract.
b. The Bidder(s) / Contractor(s) will not enter with other Bidders into any
undisclosed agreement or understanding, whether formal or informal. This
applies in particular to prices, specifications, certifications, subsidiary
contracts, submission or non-submission of bids, or any other actions to
restrict competitiveness or to introduce cartelization in the bidding process.
c. The Bidder(s) / Contractor(s) will not commit any offence, under the relevant
Prevention of Corruption Act / Indian Penal Code / PC Act; further the
Bidder(s) / Contractor(s) will not use improperly, for purposes of competition,
or personal gain, or pass on to others, any information or document provided
by the Principal, as part of the business relationship, regarding plans, technical
proposals and business details, including information contained or transmitted
electronically.
d. The Bidder(s) / Contractor(s) of foreign origin shall disclose the name and
address of the Agents / Representatives in India, if any. Similarly, the Bidder(s)
/ Contractor(s) of Indian Nationality shall furnish the name and address of the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
foreign principals, if any. Further details as mentioned in the "Guidelines on
Indian Agents of Foreign Suppliers" shall be disclosed by the Bidder(s) /
Contractor(s). Further, as mentioned in the Guidelines all the payments made
to Indian agent / representative have to be in Indian Rupees only. Copy of the
"Guidelines on Indian Agents of Foreign Suppliers" is placed at (page Nos. 7-
e. The Bidder(s) / Contractor(s) will, when presenting their bid, disclose any and
all payments made, is committed to or intends to make to agents, brokers or
any other intermediaries, in connection with the award of the contract.
f. Bidder(s) / Contractor(s) who have signed the Integrity Pact shall not approach
the Courts while representing the matter to IEMs and shall wait for their
decision in the matter.
(2) The Bidder(s) / Contractor(s) will not instigate third persons to commit offences
outlined above or be an accessory to such offences.
Section 3 - Disqualification from tender process and exclusion from future contracts.
If the Bidder(s) / Contractor(s), before award or during execution has committed a
transgression through a violation of Section-2 above, or in any other form, such as to put
their reliability or credibility in question, the Principal is entitled to disqualify the Bidder (s) /
Contractor(s), from the tender process, or take action as per the procedure mentioned in the
"Guidelines on Banning of business dealings". Copy of the "Guidelines on Banning of
business dealings" is placed at (Page No. 7-20).
Section 4 - Compensation for Damages
(1) If the Principal has disqualified the Bidder(s), from the tender process prior to the
award, according to Section 3, the Principal is entitled to demand and recover the
damages equivalent to Earnest Money Deposit / Bid Security.
(2) If the Principal has terminated the contract according to Section 3, or if the Principal
is entitled to terminate the contract according to Section 3, the Principal shall be
entitled to demand and recover from the Contractor, liquidated damages of the
Contract Value or the amount equivalent to Security Deposit / Performance Bank
Guarantee, whichever is higher.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
(3) The Bidder(s) agrees and undertakes to pay the said amounts, without protest or
demur, subject only to condition that, if the Bidder(s) / Contractor(s) can prove and
establish that the termination of the contract, after the contract awardhas caused no
damage or less damage than the amount of the liquidated damages, the
Bidder/Contractor shall compensate the principal, only to the extent of the damage in
the amount proved.
Section 5 - Previous transgression
(1) The Bidder declares that, no previous transgressions occurred in the last three years
with any other company in any country confirming to the anti-corruption approach or
with any other Public Sector Enterprises in India, that could justify his exclusion from
the tender process.
(2) If the Bidder makes incorrect statement on this subject, he can be disqualified from
the tender process or action can be taken as per the procedure mentioned in
"Guidelines on Banning of Business dealing".
Section 6 - Equal treatment of all Bidders / Contractors
(1) In case of a Joint Venture, all the partners of the Joint Venture should sign the integrity
(2) In case of sub contract the principal contractor shall be solely responsible for the
adherence to the provision of IP by the sub-contractor.
Section 7 - Criminal charges against violating Bidders / Contractors
If the principal obtains knowledge of conduct of a Bidder or Contractor or of an employee, or
a representative, or an associate of a Bidder or Contractor, whichconstitutes corruption, or
if the Principal has substantive suspicion, in this regard, the Principal will inform the same to
the Chief Vigilance Officer (CVO) and the CVO will takefurther necessary action as deemed
fit in accordance with the CVC Manual.
Section 8 - External Independent Monitor
(1) The Principal appoints competent and credible Independent External Monitor for this
Pact after approval by Central Vigilance Commission. The task of the Monitoris to
review independently and objectively, whether and to what extent the parties comply
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
with the obligations under this agreement.
(2) The Monitor is not subject to instructions by the representative of the parties and
performs his / her functions neutrally and independently. The Monitor would have
access to all Contact documents, whenever required. It will be obligatory for him / her
to treat the information and documents of the Bidders / Contractors as confidential.
He / she reports to the Chairperson of the Board of the Principal.
(3) The Bidder(s) / Contractor(s) accepts that the Monitor has the right to access without
restriction to all Project documentation of the Principal including that provided by the
Contractor. The Bidder / Contractor will also grant the Monitor, upon his / her request
and demonstration of a valid interest, unrestricted and unconditional access to the
project documentation. The Monitor is under contractual obligation, to treat the
information and documents of the Bidder / Contractor with confidentiality.
(4) The Monitor is under contractual obligation to treat the information and documents of
the Bidder(s) / Contractor(s) with confidentiality. The Monitor has also signed
declaration on "Non-Disclosure of Confidential Information" and of "Absence of
Conflict of Interest". In case of any conflict of interest arising at a later date, the IEM
shall inform Chairman, DPA and recues himself / herself fromthat case
(5) The Principal will provide to the Monitor sufficient information about all meetings
among the parties related to the Project provided such meetings could have an impact
on the contractual relations between the Principal and the Bidder / Contactor. The
parties offer to the Monitor the option to participate in such meetings.
(6) As soon as the Monitor notices, or believes to notice, a violation of this agreement,
he / she will so inform the Management of the Principal and request the management
to discontinue, or take corrective action. The Monitor can inthis regard submit non-
binding recommendations. Beyond this, the Monitor has no right to demand from the
parties that they act in a specific manner, refrain from action or tolerate action.
(7) The Monitor will submit a written report to the Chairperson of the Board of the
Principal, within 8 to 10 weeks from the date of reference or intimation to him bythe
Principal and, should the occasion arise, submit proposals for correcting problematic
(8) If the Monitor has reported to the Chairperson of the Board of the Principal, a
substantiated suspicion of an offence under relevant IPC / PC Act and the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Chairperson of the Board of the Principal has not, within reasonable time taken visible
action to proceed against such offence or reported it to the Chief Vigilance Officer,
the Monitor may also transmit this information directly to the Central Vigilance
Commissioner, Government of India.
(9) The word "Monitor" would include both singular and plural.
Section 9 - Pact Duration
9.1 This Pact shall be operative from the date of signing of IP by both the parties till the
final completion of contract of successful bidder and for all other bidders six months
after the contract has been awarded. Issues like warranty, guarantee, etc. should be
outside the purview of IEMs.
9.2 If any claim is made / lodged during this time, the same shall be binding and continue
to be valid despite the lapse of this pact, as specified above unless it is discharged /
determined by the Chairperson, DPA.
Section 10 - Other Provisions
(1) This agreement is subject to Indian Law. Place of performance and jurisdictionis
the Registered Office of the Principal, i.e. Gandhidham, Gujarat.
(2) Changes and supplements as well as termination notices need to be made in
writing. Side agreements have not been made.
(3) If the Bidder / Contractor is a partnership or a consortium, this agreement must be
signed by all partners or consortium members.
(4) Should one or several provisions of this agreement, turn out to be invalid, the
remainder of this agreement remains valid. In this case, the parties will strive tocome
to an agreement to their original intensions.
(5) Issues like Warranty / Guarantee etc. shall be outside the purview of IEMs.
(6) In the event of any contradiction between the Integrity Pact and its Annexure, the
Clause in the Integrity Pact will prevail.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
(7) In case of JV firm, IP agreement need to be executed and submitted in the name of the
JV and all the parties of JV need to sign and stamp the agreement.
(For & on behalf of the Principal) (For & on behalf of the
Bidder/Contractor)
(Office Seal) (Office Seal)
Signature of Witness: Signature of Witness:
(Name & Address) (Name & Address)
Place : Gandhidham
Note : The bidder has to execute Integrity Pact agreement with Deendayal Part Authority (as
per Bid Response Sheet No. 10 and Shri Amiya Kumar Mohapara, IFoS, (Retd.)
and Dr. Gopal Dhawan, Ex-CMD, MECL have been appointed by DPA as
Independent External Monitors and whose address are as under :-
Shri Amiya Kumar Dr. Gopal Dhawan, Ex-CMD, MECL
Mohapatra, IFoS, (Retd.)
House NO 120, Jal Shakti Vihar
Qrs. No 5/9, Unit-9, Bhoi Nagar,
(NHPC Society) P4, Builders Area,
Bhubaneshwar-751
Greate Noida Gutam Budh Nagar,
Uttar Pradesh- 201
email: [email protected]
email:[email protected]
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
PROFORMA OF JOINT VENTURE/CONSORTIUM AGREEMENT
(To be submitted on Non-judicial Stamp Paper of appropriate value)
This Joint Venture / Consortium Agreement is made and entered into on this
…….. day of ……..2026 by and between (i) M/s. (Name of the firm to be filled-in)………….,(ii)
M/s……(Name of the firm to be filled-in)
………….., primarily for the work under the Deendayal Port AUTHORITY.
All the partners of the Joint Venture /Consortium hereinafter individually referred to as the
parties and collectively as the Joint Venture/Consortium‘.
1. Formation of Joint Venture/Consortium
(i)M/s______________________________(Name of the firm to be filled in) is engaged
in ______________________(Details of the works undertaken by the party)
(ii)M/s______________________________(Name of the firm to be filled in) is engaged
______________________(Details of the works undertaken by the party)
1.1. On behalf of Board of Deendayal Port Authority (hereinafter referred to as
―Employer‖), the Chief Engineer, DEENDAYAL Port AUTHORITY ha s invited bids from the
experienced, resourceful and bonafid Developers with proven technical and financial
capabilities of executing the work ____________________________].
1.2. The parties have been exploring together the ways and means of collaboration for the
purpose of an offer to be made for the said project of the Deendayal Port AUTHORITY and have
mutually agreed to enter into a Joint Venture/Consortium Agreement to submit a common bid
for the project and to carry out the project works in the event of award of the contract, in
association with each other and (……Name of Partner to be filled in………) shall be the Lead Partner
and (i) (……Name of Partner to be filled in………), (ii) (……Name of Partner to be filled in………),……. shall
be the other partner(s).
NOW THEREFORE IT HAS BEEN AGREED TO BETWEEN THE PARTIES AS
1.3. The Joint Venture/Consortium will be known as…(……Name of JV to be filled in………)
…………………and shall consist of (i) (……Name of the firm to be filled in ………), (ii) (……Name of the
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
firm to be filled-in………),
parties to the present agreement.
1.4. The recitals are true and correct and form an integral part of this agreement and are
representations of the parties to which they relate and have been relied upon by the parties to
enter into the present agreement.
1.5. Notwithstanding the date of signature of this agreement, its effective date will be the date
of submission of bid.
1.6. All costs incurred by the parties before the date of award of contract will be borne by the
parties concerned. All costs in implementation of this Joint Venture/Consortium Agreement after
award of contract till the expiry of this agreement will be borne by the parties as here in after
1.7. The Joint Venture/Consortium will be dissolved and this agreement will cease to have
effect on completion of this project, maintenance and fulfilment of all other conditions under the
contract, upon receipt of payment of all amounts from the Employer and on settlement of
accounts between the parties as hereinafter provided.
1.8. The contract, if awarded by the Employer, Letter of Acceptance shall be issued in the
name of (….Name of JV/Consortium to be filled in…..) and the Contract shall be signed by legally
authorized signatories of all the parties.
1.9. All the parties of the JV/Consortium shall be jointly and severally liable during the bidding
process and the bid document shall be signed by legally authorized signatory of all the parties.
1.10. The financial contribution of each partner to the JV/Consortium operation shall be :
(i) M/s……… (Name of the partner to be filled-in) - ……..
(ii) M/s……… (Name of the partner to be filled-in) - …………
1.11. All the parties of the JV/Consortium shall be jointly and severally liable for the execution
of the project in accordance with the Contract terms, in the event of award of contract. The
delineation of duties, responsibilities and scope of work shall be:
a) The Lead Partner shall provide suitable experienced personnel at site, for general
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
planning, site management and equipment operations, during entire period of contract
b) (……Name of Partner to be filled-in ) shall carry out the following
c) (……Name of Partner to be filled-in………) shall carry out the following
1.12. The parties hereto agreed that each of them shall duly and properly perform all the
functions and all costs related to their respective works.
1.13. The parties hereto shall be at liberty to enter into liaison work/correspondence with
statutory and local authorities as the circumstances warrant individually or collectively.
1.14. It is hereby agreed and undertaken that, all the parties are jointly and severally liable to
the ―Board of Port of Deendayal for the performance of the contract.
1.15. Notwithstanding demarcation or allotment of work between JV/Consortium partners,
JV/Consortium each partner shall be liable for non-performance of the whole contract
irrespective of their demarcation or share of work.
1.16. The Lead Partner shall be authorized to act on behalf of the JV/Consortium.
1.17. All the correspondences between the Employer and the JV /Consortium shall be routed
through the Lead Partner.
1.18. The Lead Partner is authorized: (a) to submit bid, negotiate and conclude contract and
incur all liabilities therewith on behalf of the partner(s) of the JV /Consortium during the bidding
process; and (b) in the event of a successful bid, to incur liabilities and receive instructions for
and on behalf of the partner(s)of the JV/Consortium and to carry out the entire execution of the
contract including payment, exclusively through Lead Partner.
1.19. In the event of default of the Lead Partner, it shall be construed as default of the
Developer/Contractor; and Employer shall be entitled to take action under relevant clause(s) of
the Department Bid Document and/or Conditions of Contract.
1.20. All the parties of the JV/Consortium shall be jointly and severally liable for due
performance, recourse/sanctions within the joint venture in the event of default of any partner
and arrangements for providing the required indemnities.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
1.21. The JV/ Consortium shall have a separate JV/Consortium Bank account (distinct from the
Bank account of the individual partners) to which individual partners shall contribute their share
capital / or working capital. The financial obligation of the consortium shall be discharged
through the said JV/ Consortium Bank account only and also all payment received by consortium
from the Deendayal Port AUTHORITY shall be through that account only.
The parties hereto have mutually agreed to the terms and conditions set forth herein
above and have assured each other to duly perform the reciprocal promises and
obligations on either side for effective implementation of the JV/Consortium for proper
and due completion of the works envisaged, in the event of award of contract to the
JV/Consortium and have affixed their signature in this indenture on this the ……….day
(i) Signature Name
Designation seal & Common seal of the firm
(ii) Signature Name
Designation seal & Common seal of the firm
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
PROFORMA OF POWER- OF-ATTORNEY FOR LEAD MEMBER OF JV/
((To be submitted on Non-judicial Stamp Paper of appropriate value)
By this Power-of-Attorney executed on this ….day of …..(month) of 2023S, we,
(i) (……………………………….Name of legally authorized signatory of first partner to be filled in………),
(ii) (………………………..Name of legally authorized signatory of second partner to be
……………………………………………………………… hereby jointly authorize and
agree the Lead Partner, M/s (… Name of the lead partner to be filled in………………………), (a)
to submit bid, negotiate and conclude contract and incur all liabilities therewith on behalf of
the partner(s) of the JV /Consortium during the bidding process; and (b) in the event of a
successful bid, to incur liabilities and receive instructions for and on behalf of the partner(s)
of the JV /Consortium and to carry out the entire execution of the contract including payment
for the work of―______________________________________ exclusively through Lead
(i) Signature Name
Designation seal &
Common seal of the firm
(ii) Signature Name
Designation seal &
Common seal of the firm
Signature, name and seal of the certifying Authority/Notary Public
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
FORMAT OF BID SECURITY DECLARATION FROM BIDDERS
(On Bidders Letter head)
Bid Security Declaration Form
(insert complete name and address of the Employer/Purchaser)
I/We, the undersigned, declare that :
I/We understand that, according to your conditions, bids must be supported by a
Bid Securing Declaration.
I/We accept that I/We may be disqualified from bidding for any contract with you
for a period of three year from the date of notification if I am /We are in a breach of any
obligation under the bid conditions, because I/We
a) have withdrawn/modified/amended, impairs or derogates from the tender, my/our
Bid during the period of bid validity specified in the form of Bid; or
b) having been notified of the acceptance of our Bid by the purchaser during the
period of bid validity (i) fail or reuse to execute the contract, if required, or (ii) fail
or refuse to furnish the Performance Security, in accordance with the Instructions
I/We understand this Bid Securing Declaration shall cease to be valid if I am/we are
not the successful Bidder, upon the earlier of (i) the receipt of your notification of the name
of the successful Bidder; or (ii) thirty days after the expiration of the validity of my/our Bid.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Signed: (insert signature of person whose name and capacity are shown)
in the capacity of (insert legal capacity of person signing the Bid Securing Declaration)
Name: (insert complete name of person signing the Bid Securing Declaration)
Duly authorized to sign the bid for an on behalf of (insert complete name of Bidder)
Dated on _____________ day of ___________________ (insert date of signing)
Corporate Seal (where appropriate)
“Note: In case of a Joint Venture, the Bid Securing Declaration must be in the name of all partners to the Joint
Venture that submits the bid.”
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
NAME OF THE COMPANY / FIRM
Experience: Works completed.
Please fill information about the works completed over the past seven years.
Sl.No. Name of the Name of the Contract price Target date of
Organization work and its and Date of completion
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
Turnover of the Firm/ JV
Attachments : Financial reports for the last three years; balance sheets, profit and loss
statement, auditors’ reports (in case of companies/ corporation) etc., list them below and
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
NAME OF THE COMPANY / FIRM
RESOURCES: List of Engineers / Supervisors proposed to be engaged on the work
Sl. No. Name & Designation Qualification Experience in relevant filed.
DEENDAYAL PORT AUTHORITY
CIVIL ENGINEERING DEPARTMENT
CHECK LIST TO THE TENDER SCHEDULE
(For documents to be submitted by the tenderers for acceptance of the tender)
Whether submitted
Sl. No. Description
1 EMD Submitted / NA
2 Cost of tender schedule Submitted / NA
3 Proof of experience as per Pre-qualification criteria Submitted / NA
Proof of average Annual Turnover should be not less than
4 Submitted / NA
30% of the estimated cost during last 3 years.
Proof of GST Registrations.
7 Submitted / NA
(For works costing more than Rs.5.00 lakhs)
8 GST Declaration -
9 Annexure - VI
Signature of the Tenderer
NOTE: (1) The Check List should be signed and submitted by the Tenderers along with
their Tenders, duly confirming that they submit the above mentioned documents.
(2) The tenders received without Check List duly signing & enclosing and required
documents as per the Check List will be liable for rejection.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
drawing.pdf
tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .