Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.7 Cr+₹7.1 L (4.41%)Admitted-Finance NO 5 1ST FLOOR CITY PLAZA DABA GARDEN DABA GARDEN VISAKHAPATNAM ANDHRA PRADESH 530020 | VISAKHAPATANAM | ANDHRA PRADESH | 530020 | ₹1.7 Cr+₹7.1 L (4.41%) | L2 | Admitted-Finance |
| 3 | L3₹3.0 Cr+₹1.4 Cr (84.3%)Admitted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | ₹3.0 Cr+₹1.4 Cr (84.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.8 Cr+₹2.2 Cr (135.0%)Admitted-Finance | ₹3.8 Cr+₹2.2 Cr (135.0%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED L3 | YEOMAN MARINE SERVICES PVT. LTD. L1 | Patel Engineering Works Vizag L2 | MAYURI ENGINEERING WORKS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Clean storage drums/ tanks for storing oil/ fuel while cleaning ship's tanks and transferring facility. Qty: 60 kl | 1 | LS | 3,45,000 ₹3,45,000 | 2,10,000 ₹2,10,000 | 1,25,000 ₹1,25,000 Lowest | 3,25,089 ₹3,25,089 |
| 2.00 | Adequate tarpaulin sheet to be provided for covering of opening on weather deck fittings specially during sand blasting. | 1 | LS | 42,000 ₹42,000 | 15,750 ₹15,750 | 15,000 ₹15,000 Lowest | 1,12,518 ₹1,12,518 |
| 3.00 | The Contractor has to arrange Gas free certificate for all Fuel/Lube oil tanks prior commencing hot work. For this purpose provision of blowers and visit of Inspector of Explosive are to be catered for. | 1 | LS | 1,65,000 ₹1,65,000 Lowest | 2,89,800 ₹2,89,800 | 1,75,000 ₹1,75,000 | 2,79,117 ₹2,79,117 |
| 4.00DOCKING HULL & APPENDAGES & UNDER WATER FITTINGS/UNDER WATER WORK PACKAGE | |||||||
| 5.00 | U/W hull and Boot Top area including appendages to be high pressure washed with fresh water (3000 psi) to remove salt, dirt, oil contamination and leached layers of anti-fouling paint. The areas
wherein high pressure washing is not feasible due to presence of delicate equipment /dielectric shield to be hose down with low pressure mopping with fresh water should be carried out to remove all the contaminates. Approx, Area 2182 sq. Mtrs | 1 | LS | 65,460 ₹65,460 Lowest | 1,75,269 ₹1,75,269 | 1,30,920 ₹1,30,920 | 2,55,294 ₹2,55,294 |
| 6.00 | Survey of 100% underwater hull and boot top area including 500 mm above Boot top area for structural defect and submit report. Where ultrasound scanning is not feasible the same to be surveyed by ultrasonic thickness gauging. Also ultrasonic thickness gauging (UTG) survey of area graded critical and those considered suspect based on scan survey also to be carried out. Specific attention to be given on plate adjacent to sea chests, wind water (boot top) and astern transom along with propellers and brackets. Scanning reports and UTG reports to be inspected by class surveyor and submitted to ship in triplicate. Contractor to cater for 1500 UTG points . Contractor to undertake renewal of hull plate if thickness reduced more than 20% as per surveyor recommendation. Yard to cater for 5 Tons of steel renewal steel grade - ABS Grade-B
(Visual survey procedure, ultrasonic survey procedure and extent of hull survey should be as per guidelines of Survey and Maintenance Manual for Steel Hull Ships CGBR 386 Issue-1.) Contractor to submit survey report as per CGBR 386 Appendix A, Annexure I Part -and Part- II
(A) UTG, (B) ENDOSCOPIC SURVEY & (C ) STEEL RENEWAL | 1 | LS | 7,65,000 ₹7,65,000 | 4,07,873 ₹4,07,873 Lowest | 4,56,875 ₹4,56,875 | 27,18,234 ₹27,18,234 |
| 7.00 | Care and maintenance of UW hull and fittings against corrosion and
fouling. Complete underwater hull including boot top, appendage, sea tubes, inlets and discharge and 500 mm above upper boot top to be abrasive blasted to SA 2.5 and full paint scheme to be
applied on the entire surface area including boot top area (Approximate surface area 2182 Sq. mtrs). Complete underwater paint is Contractor supply. Paint scheme as follows: Paints liability - Contractor supply.
Paint scheme with Qty. for underwater hull, upto lower boot top area: 1 F/C Interguard269 epoxy primer EGA 088/A Red-50 micron
1 F/C Inter Tuf262 KHA 304/A Black-125 micron 1 F/C Inter Tuf262 KHA 303/ A Red- 125 micron
1 F/C Inter Guard 263 FAJ 034/A Light Grey- 75 micron 1 F/C Inter-Swift 6800 HS BMA 688 Brown- 125 micron
1 F/C Inter-Swift 6800 HS BMA 684 Red - 125 micron
Thinners list as per annexure 3C (refer to para 3.1 (c) of chapter 3 of CGBR 382) Paint scheme forexterior hull between lower and upper boot top:
1 F/C Interguard 269 epoxy primer EGA 088/A Red-50 micron 1F/C Inter Tuf 262 KHA 304/A Black-125 micron
1 F/C Inter Tuf 262 KHA 303/ A Red- 125 micron
1 F/C Inter Guard 263 FAJ 034/A Light Grey- 75 micron
2 F/C Interswift 6800 HS Black- BMA 689-250 micron (125 micron each | 1 | LS | 22,65,000 ₹22,65,000 | 1,70,463 ₹1,70,463 Lowest | 7,85,508.01 ₹7,85,508.01 | 93,52,269 ₹93,52,269 |
| 8.00 | 24 sea tubes/chest and 02 fins are to be surveyed visually to the extent feasible after surface preparation for structural defect. Fasteners to be renewed and sealed.
(a) All sea chest gratings to be opened, cleaned, painted and refitted. All eddy plates to be abrasive blasted for surface preparation and full scheme painting to be restored by airless spray.
(b) Sea tube to be cleaned and painted | 1 | LS | 3,85,000 ₹3,85,000 | 53,550 ₹53,550 | 32,500 ₹32,500 Lowest | 1,73,232 ₹1,73,232 |
| 9.00 | Examine 52 sacrificial anodes fitted on sea chest/sea tube/rudder/SKEG/fins/BT Plating. Renew completely. Anodes Contractors supply.Qty as follows:
Description : Aluminium Alloy Anodes NCML MK
III 3912010008- 06 Nos. (Rudders/SKEG)
Dimension of Anode: Length - 255+8mm Height/Thickness - 25 +2mm Length with Insert -458 + 14mm Width with Insert -150+5mm nsert Thickness - 8 + 2mm
Description: Zinc Anodes Type-B Anode NCML, 3911010003-16Nos.
(Fins/BT Plating)
Dimension of Anode: Length - 250 mm Height - 20 mm
Length with Insert - 350 mm Width - 30 mm
Anode Insert - (15x5) mm
Description: Type "A" Zinc Anode- 30Nos (Sea Tube/Chest).
Dimension of Anode: Length - 125 mm
Diameter - 25 mm Lug - MS Galvanised Taping - M-18 Thread | 1 | LS | 2,68,000 ₹2,68,000 | 1,68,683 ₹1,68,683 | 1,40,736 ₹1,40,736 Lowest | 3,28,536 ₹3,28,536 |
| 10.00 | All under water storm valves to be overhauled, pressure tested and refitted - 17 Nos, Dia - 65 mm) | 1 | LS | 79,900 ₹79,900 | 75,863 ₹75,863 Lowest | 88,400 ₹88,400 | 1,99,359 ₹1,99,359 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
19 Apr 2021, 11:00 amClosed
Manager SRC-Com
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Hull Works on ICGS Shaunak
2021_HSL_85655_1
20/20013/002/2021-22
Open Tender
Miscellaneous Services
Turn-key
90 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
Yes
HSL
₹1 L
Yes
HSL Visakhapatnam
23 Apr 2021
6 Apr 2021
19 Apr 2021
6 Apr 2021
19 Apr 2021
10 Apr 2021
6 Apr 2021 - 8 Apr 2021
8 Apr 2021
Amount
Clean storage drums/ tanks for storing oil/ fuel while cleaning ship's tanks and transferring facility. Qty: 60 kl
Adequate tarpaulin sheet to be provided for covering of opening on weather deck fittings specially during sand blasting.
The Contractor has to arrange Gas free certificate for all Fuel/Lube oil tanks prior commencing hot work. For this purpose provision of blowers and visit of Inspector of Explosive are to be catered for.
DOCKING HULL & APPENDAGES & UNDER WATER FITTINGS/UNDER WATER WORK PACKAGE
U/W hull and Boot Top area including appendages to be high pressure washed with fresh water (3000 psi) to remove salt, dirt, oil contamination and leached layers of anti-fouling paint. The areas wherein high pressure washing is not feasible due to presence of delicate equipment /dielectric shield to be hose down with low pressure mopping with fresh water should be carried out to remove all the contaminates. Approx, Area 2182 sq. Mtrs
Survey of 100% underwater hull and boot top area including 500 mm above Boot top area for structural defect and submit report. Where ultrasound scanning is not feasible the same to be surveyed by ultrasonic thickness gauging. Also ultrasonic thickness gauging (UTG) survey of area graded critical and those considered suspect based on scan survey also to be carried out. Specific attention to be given on plate adjacent to sea chests, wind water (boot top) and astern transom along with propellers and brackets. Scanning reports and UTG reports to be inspected by class surveyor and submitted to ship in triplicate. Contractor to cater for 1500 UTG points . Contractor to undertake renewal of hull plate if thickness reduced more than 20% as per surveyor recommendation. Yard to cater for 5 Tons of steel renewal steel grade - ABS Grade-B (Visual survey procedure, ultrasonic survey procedure and extent of hull survey should be as per guidelines of Survey and Maintenance Manual for Steel Hull Ships CGBR 386 Issue-1.) Contractor to submit survey report as per CGBR 386 Appendix A, Annexure I Part -and Part- II (A) UTG, (B) ENDOSCOPIC SURVEY & (C ) STEEL RENEWAL
Care and maintenance of UW hull and fittings against corrosion and fouling. Complete underwater hull including boot top, appendage, sea tubes, inlets and discharge and 500 mm above upper boot top to be abrasive blasted to SA 2.5 and full paint scheme to be applied on the entire surface area including boot top area (Approximate surface area 2182 Sq. mtrs). Complete underwater paint is Contractor supply. Paint scheme as follows: Paints liability - Contractor supply. Paint scheme with Qty. for underwater hull, upto lower boot top area: 1 F/C Interguard269 epoxy primer EGA 088/A Red-50 micron 1 F/C Inter Tuf262 KHA 304/A Black-125 micron 1 F/C Inter Tuf262 KHA 303/ A Red- 125 micron 1 F/C Inter Guard 263 FAJ 034/A Light Grey- 75 micron 1 F/C Inter-Swift 6800 HS BMA 688 Brown- 125 micron 1 F/C Inter-Swift 6800 HS BMA 684 Red - 125 micron Thinners list as per annexure 3C (refer to para 3.1 (c) of chapter 3 of CGBR 382) Paint scheme forexterior hull between lower and upper boot top: 1 F/C Interguard 269 epoxy primer EGA 088/A Red-50 micron 1F/C Inter Tuf 262 KHA 304/A Black-125 micron 1 F/C Inter Tuf 262 KHA 303/ A Red- 125 micron 1 F/C Inter Guard 263 FAJ 034/A Light Grey- 75 micron 2 F/C Interswift 6800 HS Black- BMA 689-250 micron (125 micron each
24 sea tubes/chest and 02 fins are to be surveyed visually to the extent feasible after surface preparation for structural defect. Fasteners to be renewed and sealed. (a) All sea chest gratings to be opened, cleaned, painted and refitted. All eddy plates to be abrasive blasted for surface preparation and full scheme painting to be restored by airless spray. (b) Sea tube to be cleaned and painted
Examine 52 sacrificial anodes fitted on sea chest/sea tube/rudder/SKEG/fins/BT Plating. Renew completely. Anodes Contractors supply.Qty as follows: Description : Aluminium Alloy Anodes NCML MK III 3912010008- 06 Nos. (Rudders/SKEG) Dimension of Anode: Length - 255+8mm Height/Thickness - 25 +2mm Length with Insert -458 + 14mm Width with Insert -150+5mm nsert Thickness - 8 + 2mm Description: Zinc Anodes Type-B Anode NCML, 3911010003-16Nos. (Fins/BT Plating) Dimension of Anode: Length - 250 mm Height - 20 mm Length with Insert - 350 mm Width - 30 mm Anode Insert - (15x5) mm Description: Type "A" Zinc Anode- 30Nos (Sea Tube/Chest). Dimension of Anode: Length - 125 mm Diameter - 25 mm Lug - MS Galvanised Taping - M-18 Thread
All under water storm valves to be overhauled, pressure tested and refitted - 17 Nos, Dia - 65 mm)
All drain plugs to be removed, cleared and checked for condition of threads and refitted. All drain plugs to be hose/vacuum tested post fitment. Qty. 44 Nos. approx.
Check the condition of bow thrusters fasteners, anodes and tunnel plating.
Carry out hydro testing of rudders (P&S), Fixed fin (P&S), Fin Stabiliser(P&S) and Skeg. Refill bituminous paint and drain. Refit drain plugs
SHIPSIDE, SUPERSTRUCTURE, EXPOSED DECKS AND MASTS
Carry out survey of exposed decks/weather decks, ship side and super structure including Mast, internal hull paying particular attention to weld seams/butt, scupper area, stress concentration areas, bimetallic joints, foundation welding of all load bearing fittings such as bollards, chocks, towing pads etc. by class surveyor. Bollards (11 Nos.), chocks/fairlead (26 Nos.), cleats (14 Nos.), stag horn (12 Nos.), towing pads (03 Nos.). Yard to submit survey report in triplicate as per CGBR 386 Appendix A, Annexure II Part - I and Part -II
Carry out UT gauging of complete external shell plating,Weather decks,Superstructure. Undertake repairs wherever necessary, renew steel plate wherever plate thickness reduced beyond the limit, as per recommendation of class surveyor. UTG points -1500 for ship side/super structure 2000 for weather decks. 03 tons of steel renewal to be catered as per surveyor recommendations. (A) UTG (B) STEEL RENEWAL
Surface preparation and touch-up scheme painting (full scheme for 30 % area with one full coat final coat on 100% area using airless spray methods) on Shipside. Super structure, and Mast to be undertaken as pei Paint Manua (CGBR 382). Paint ship supply. Paint scheme - M/s Akzo Nobel and total area - 2360 SQM Quantity of paints: 1 Interguard269 Epoxy Primer EGA 088/A RED - 160Ltrs. 2 Intertuf262 KHA 303/A Red - 360Ltrs. 3 Interguard263 FAJ 034/A Light Grey - 200Ltrs. 4 nterthane990 PHB 000/A White -410 Ltrs.
Ship's name, band, CG crest on funnel deck, miscellaneous markings, NBCD markings and draught mark to be painted.
40 in no. Stanchions along with shoe, drop nose pin with keep chain, butterfly nuts (Mat-SS). eye and earthing bond to be renewed as per sample inway jobs includes removal of coming/panelling below deck and refitment.
EXPOSED DECKS /WEATHER DECKS , AREA - 1050 SQM Surface preparation, spot blasting for 30% area and touch-up scheme painting (full scheme for 30 % area with one full coat final coat on 100% area using airless spray methods) on weather deck/exposed deck to be undertaken as per paint manual (CGBR 382). Paint ship supply (Paint Scheme - M/S Akzonoble and total area -1050 M2. Quantity Of Paints: (i) Interguard269 Red - 60Ltrs (ii) Interguard262 Red -120Ltrs (iii) Interguard263 Light Grey -200Ltrs (iv) Interthane990 Signal Green -160 Ltrs
HELP DECK AND HELP HANGER DECK (AREA 410 SQM) Surface preparation and touch-up scheme painting (full scheme for 30 % area with one full coat final coat on 100% area using roller methods) on hanger deck to be undertaken as per Paint Manual (CGBR 382). Abrasive blasting and full paint scheme to be applied on helo deck Paint scheme - M/s Akzonoble and total area -410 SQM. Paints ship supply. Quantity of paints: (i) Interguard269 Epoxy Primer EGA 088/S Red - 52 Ltrs (ii) Intertuf262 KHA 304/A Black - 83Ltrs (iii) Intertuf262 KHA 303/A Red - 83Ltrs (iv) Interguard561 EKA562/A (approved as per NMRL SPEC) - 360 Ltrs
Helo securing deck rings to be thoroughly examined. If worn out more than 10% of diameter of ring, to be renewed
Carry out load testing of helo safety frames/nets and helo lashing sockets/securing rings. Helo lashing sockets/deck ring - Quantity-52 Nos.+ 04 Nos. (RLHTS), test load -2.75 T. load testing as per CGAIS guidelines.
Inspect the entire Helo hangar shutter system and specific defect, if any to be undertaken by Contractor Shutter to be painted. Paint CG supply.
HARPOON GRID, MAKE - M/S L & T MUMBAI
Load testing of Helo landing grid (harpoon grid) to be carried out as per Aviation guidelines and under supervision of class surveyor. Test load-6.5 T
GENERAL COMPARTMENTS ON No. 1 DECK
Carry out visual survey of all decks, and Dados of internal compartment by class surveyor.
ENGINE / MACHINERY ROPMS & BILGES (ENGINE RGPM BILGES 2000 m2 AND DECK GF AUXILIARY MACHINERY RCPM 200 m2)
Clean bilges thoroughly and carry out complete visual survey of all internal areas and structures of ship side, plating, all welded joints, etc paying particular attention to weld seam and butt joints intersection, bilges suction area, sea tube/sea chest area and stress concentration area by class surveyor.
Surface preparation and painting on bilge area to be undertaken as per Paint Manual (CGBR 382). Touch up scheme to be catered. Surface preparation -condition of paint to be inspected and damaged coating upto 30% area to be mechanically power tooled to a surface preparation standard of ST 2.5 Painting - full scheme to be applied on the 30 % prepared surface followed by : one full coat final coat on 100 % area. (Paint scheme- M/s Akzonoble, total area -2000 SQM + 200 SQM AMR Deck/bilge.) Paint CG Supply. Quantity of paints : (i) Interguard 269 Red EGA088/EGA089 - 100 Ltrs (ii) Interguard 403 KBA 406/A Red AL - 240 Ltrs (iii) interguard 403 KBA 402/A Grey - 740 Ltrs
ACCOMMODATION PANTRIES (COs PANTRY, WARD ROOM PANTRY, SOs PANTRY AND JR RATING DINING HALL
Carryout visual inspection of dry and wet areas in the compartments paying particular attention to drain scupper areas and deck boundaries by class surveyor
Water seepage observed from Junior sailor dining to main lobby. To be surveyed by class surveyor and rectified.
Crack observed ;i light weight epoxy deck covering system at following wet places: Sl Name of Compartment Approximate floor area Approximate dado area 1 Jr. Rating Wash (Fr. 32-42) main deck 16.4 18.54 2 Galley (Fr 73-Fr.87) Main deck 49.4 12 3 Officer's wash (Fr. 105-Fr.111) 01 Deck 14.5 18 4 Jr Rating Wash (Fr42-51) 17.7 19.2 5 CO's Pantry 02 Deck 6.1 2.5 6 Scullary (Jr Rating Dining) 2.016 7 SO wash 13.6 12.2 The cracked area deck covering to be removed by power tooling, surface to prepared ST3 grade and full scheme light weight epoxy deck covering system to be restored as follows: Primer - EXLEP 111 PR (DFT 35 to 50 Micron) Underlay -EXLEP 113 UL (8 mm approx.) Topcoat - EXLEP 333 TC (2 mm thick) Make - M/sExcel India Protective Paints Pvt Ltd, Mumbai
WCs AND BATHROOMS (FWD AND AFT JR RATING WASH, SO'S WASH, SR RATING WASH, SICKBAY WASH, OFFICERS WASH, HODs WASH (04 NOS.), FO AND CO WASH, BRIDGE WASH) TOTAL, -13
Carry out visual survey of wet compartments by class surveyor Total Area 205 SQM.
WC standing panel base channel observed corroding/uprooting. The base channels to be renewed and suitable water proof coating applied on SS Panel/wall to prevent stagnation of water spilI. Qty - 14 WC compartrnents.
Remove 100 Mtrs of drain pipes, chemically clean, pressure test and refitted. Cater for 10 mtr pipe renewal. Full scheme painting and colour coding restored. Mat. GL Dia- 50 mm.
WASHING MACHINE / LAUNDRY ROOM, MAKE- STEFAB, CAPACITY- 30 KGS
Dismantle and overhaul the washing machine and drying tumbler drive mechanism, renew defective parts if any.
Check the condition of roller bearings for drying tumbler and washing machine (Renewjf defective.)
Carry out visual survey of deck, bulkhead, deck head dados, etc. in the laundry room.
ANCHORED CHAIN CABLE ARRANGEMENT
Anchor chain cable to be ranged on jetty/ dock floor & shot blasted. Survey by class surveyor to be carried out & gauging to be recorded for any wear & tear. If dia of common link is reduced more than 10% of its original dia, same to be replaced with new one. Deck clench also need to inspected by surveyor
Remove and dismantle joining shackles, pins and stopper, anchor shackles, swivel pieces, grease and replace, if defective. All joining shackle pins to be secured with lead pellet as per CGO 06/10.
The entire chain cable to be painted as per Paint Manual (CGBR 382). Marking on lugless joining shackle be undertaken and chain cable to be interchanged end to end. Paints liability - CG supply. Quantity of paints: (i) Intertuf16 Black-40 Ltrs (ii) Intertuf16 Black-40Ltrs
Remove Blake slip, bottle screw slip and riding slip, carry out gauging and overhauling. If gauging dia of common link found below permissible limit (10 %of dia), to be renewed. Renew all pins alongwith chains. Deck eyes/Deck clench to be visually surveyed, and strengthed/renewed, if required.
Scotchman plate, Fishermen plate, bonnet cover, to be removed and visually surveyed by class surveyor and strengthened/renewed if required' as per surveyor recommendation. Naval pipe and hawse pipe to be sand blasted. On completion to be painted completely. Paint: CG Supply
WATER BALLAST06 NOS(630 M2), COFFER DAMS (03 NOS.), VOID SPACES, FORE PEAK, FIN STABILIZER, LOG COMPT, STEERING GEAR, POLLUTION CONTROL ROOM BILGES), FOAM TANK (85 M2),OIL SPILL DISPERSANT TANK,MAGAZINE BILGES (120 M2), AND SHAFT ALLEYS (180 M2). TOTAL;- 3375 M2
Pump out the water from tanks, if any, clean and scrap the loose/peeled off paint. Carry out 100% visual survey by class surveyor paying particular attention to strengthening members and stress concentration area. Carry out repair if any as per recommendation of surveyor.
Touch up paint scheme to be applied. Paint scheme as per Paint Manual (CGBR 382). Paint scheme- M/s Akzonoble. Surface preparation - condition of paint to be inspected and damaged coating upto 30% area to be mechanically power tooled to a surface preparation standard of ST 2 Painting - full scheme to be applied on the 30 % prepared surface followed by one full coat final coat on 100 % area. (Paint scheme- M/s Akzonoble, total area -3375 SQM) Quanity of paints : Paints liability - CG supply (i) Interguard 269 Epoxy Primer EGA088/A Red -136Ltrs (ii) Interguard 403 KBA 406/A Red AL - 300 Ltrs (iii) InterguardI403_KBA 402/A Grey -1000 Ltrs
Pump out OSD from OSD tanks, clean and scrap the loose/peeled off paint. Carry out 100% visual survey by class surveyor paying particular attention to strengthening members and stress concentration area. Carry out repair if any as per recommendation of surveyor. Touch Scheme to be applied as per paint rep's recommendations.
FUEL OIL TANKS INCLUDING FORUTANKs, (1650 SQM), QTY - 10 NOS.( 06 Nos. FOTs + 04 Nos FORUTs), AVCAT (155 SQM), DIRTY OIL TANK (28 SQM), LUBE OIL TANKS (105 SQM), QTY - 02 NOS., LOOSE TANKS (SLUDGE TANK FOR INCINERATOR, FUEL OIL SERVICE TANK FOR EMERGENCY DG SET, FUEL OIL DRAIN TANK, AVCAT SERVICE TANK, AVCAT DRAIN TANK, STEERING GEAR HYD OIL STORAGE TANK(45 SQM) MEFW TANK (28SQM) TOTAL- 2010 SQM
Open manhole covers, ventilate tanks for 24/48 hours as required for making it gas free and suitable for man entry. Contractor to obtain gas free certificate from explosive department/inspector for man entry. Clean the tanks: carryout visual inspection by class suryeyor^Renew manhole joints if any.
Carry out painting as per Paint Manual (CGBR 382). Paint scheme - M/sAkzonoble. Surface preparation - condition of paint to be inspected and damaged coating upto 30% area to be mechanically power tooled to a surface preparation standard of ST 2. Painting - full scheme to be applied on the 30 % prepared surface followed by one full coat final coat on 100 % area. (Total area -20 10 SQM). Paints liability - CG supply Quantity of paints: (i) Interline 850 TLA 850/A Grey -180Ltrs (ii) Interline 850 TLA 850/A White -580Ltrs
FRESH WATER TANKS (415 SQM) , QTY -05 NOS.
The fresh water tanks to be cleaned, sludge removed and ventilated. Carryout visual inspection by class surveyor paying particular attention to strengthening member.The FWTs to be flushed before boxing up.
Surface preparation and touch up paint scheme to be undertaken as per paint manual CGBR 382. Surface preparation - condition of paint to be inspected and damaged coating upto 30% area to-be mechanically power tooled a surface preparation standard of ST 2.5 Painting - full scheme to be applied on the 30 % prepared surface followed by one full coat final coat on 100 % area. (Total area-415 SQM) Quantity of paints: (i) Interline 850 TLA 851/A Grey - 40 Ltrs (H) Interline 850 TLA 851/A White - 120Ltrs Paints liability - CG supply. Surface prior to application of paint/temp./ substrate temp./humidity/ paint preparation/WFT/DFT etc. to be certified by paint rep, paint scheme - M/s Akzonoble
FRESH WATER TANKS (415 SQM) , QTY -05 NOS.
Accommodation ladder winch and gear box to be overhauled and refitted. Wire rope to be renewed as per sample. Renew defective parts. Gear box oil Servomesh 40 or equivalent, qty- 4.3 Ltrs each. Material and spares - Contractor Supply. Dia of wire rope - 12 mm, length - 16 Mtrs each.
Carryout survey and load test of the accommodation ladder and all associated fittings associating class surveyor.
PORTABLE RADIAL DAVITS
All fittings, associated winches, bearing and brakes, etc to be overhauled. Defective parts to be renewed. Wire rope to be renewed as per sample. Davits to be load tested. Qty - 02 nos.. SWL 250 Kgs, static load 500 Kgs and running load 375 Kgs. Dia. of wire rope -10 mm. length of wire rope foxle davit -18mtr, Quarter deck davit - 12mtr
GUARD RAIL AND AWNING ARRANGEMENTS
Crimping of guard rail to be undertaken at a pressure of 200 bar by use of a hydraulic crimping machine as per NCD 5905. PVC coated guard rail CG supply. SS end fittings/tulips- Contractor Supply. End fittings/tulips DS CAT No. 3940000964. Stainless steel grade SS 316 Quantity - 126 Nos. 20 in no. bottle screw to be renewed
Load testing of guard rails with end fittings to be carried out
WATER TIGHT DOORS, HATCHES, SCUTTLES AND ESCAPE PORTS
Carryout 100% visual survey by class surveyor for all W.T. doors, hatches, scuttles and escape ports. (a) WT Doors - 46 nos. (b)WT hatches - 29 nos. (c) Emergency escape hatches - 08 nos. (d) Scuttles - 50 nos.
Check condition of plating in vicinity for any undulation/bulging. Undertake repairs as required.
Renew rubber beading of water tight doors (46 nos.). water tight hatches (29nos.), ventilation flaps (66 nos.) to be carried out. For external EPDM and internal neoprene rubber. Undertake chalk test/hose test on completion and prove. Mat specification to be in compliance with CGHQ Letter FM/0305/CGWO/Gen dated 20 Nov 2012 and 29 Jan 2014. Rubber quality certificate to be produced to ship.
Water tight hatches on weather deck are to be inspected for water tight integrity and proved through hose test.
Rubber packing of scuttles deteriorated. To be renewed and hose tested inway job includes removal and refitment of glass panel. Quantity - 50 Nos
VENTILATION SYSTEM / AIR CONDITIONING
Inspect all ventilation including funnel exhaust and AC trunking. Clean ventilation and AC trunking by blowing through with compressed air Total Length - 250mtrs. In-way job include removal and re-fitment of ceiling panelling as applicable.
Overhaul AC diffusers and cabin units (Quantity - 248 nos. make- M/s Henin and Hopeman).
Mushroom hoods (Qty- 06 nos.) to be dismantled & overhauled, recirculation flaps (Qty- 66 nos.). and damper closing mechanism (Qty-28 nos.) in the ventilation system to be overhauled and refitted. Scope of work incudes marking of mushroom hood/recirculation flaps/ dampers with identification tallies/operation tallies, renewal of grease nipple and damaged nets.
42 in nos. breather pipe on weather deck to be opened, cleaned, painted and wire mesh (mat - SS) to be renewed with SS nut bolts. Breather flaps to be renewed and to be secured with the breather pipe by SS nut bolts. Gland packing (Mat- Neoprene) to be pasted on the flaps Nut & bolts (Mat-SS) for closing the flaps also to be renewed.
AIR HANDLING UNITS
Water due to condensation gets accumulated in 02 AHU compartment and increases the risk of corrosion. Deck of 02 AHU compartments needs to be surveyed by class surveyor by taking 100 UTG points. Areas below the AHU unit to be specifically surveyed. Complete area to be chipped to bare metal, cleaned and painted with full paint scheme (Akzonobel Paints Scheme). Base mounting of plant to be also surveyed
SCUPPER AND DRAINS
Remove all drain pipes, chemically clean and refit. Length 250mtrs, dia- 60mm/80 mm. Full scheme painting with colour coding/flow marking to be restored as per CGBR 382. Paint liability - CG supply. Quantity of paints: (i) Interguard 269 - 20 ltrs Remaining coat as per compartment painting - 20 ltrs approx
CABLE LOCKER COMPARTMENT, HAWSE PIPES/NAVAL PIPES (270 SQM)
Clean out sump and see that suction strainer and box is clear. Examine structure, paying particular attention in vicinity of cable clench, ships side behind protection plates and bars, junction between plating and horizontal stiffeners by class surveyor.
Thoroughly clean the cable lockers after removing the bottom perforated plates and surface preparation and touch up paint scheme to be under taken as per paint manual CGBR 382 Naval pipe and hawse pipe to be blasted, cleaned and painted as per paint scheme Paints liability- CG supply quantity of paints: (i) Intertuf 262 KHA 304/A Grey - 20 Ltrs (ii) Intetuf 262 KHA 302/A Black - 80 Ltrs
VACUUM TOILET SYSTEM, MAKE -EVAC OY, FINLAND, PAC -MIS VACMAN SANITATION SOLUTION PVT. LTD., NAVI MUMBAI
Remove, clean with, chemical pressure test at 02 bar and refit 100% of soil pipes (vacuum pipe lines). Scope of work include renew the gasket of flanges, full scheme painting and colour coding/flow marking Length - 80 Mtrs: Dia-34 mm and 60 Mtrsdia - 42 mm. Total - 140 Mtrs. Mat - GL Quantity of paints: (i) interguard 269 - 20 Ltrs Remaining coat as per compartment painting - 20 Ltrs approx Paint liability -Contractor supply.
MOORING CAPSTAN, MAKE - C- NAUTICAL
Load testing of mooring capstan to be carried out under super vision of class surveyor. SWL- 05 Tons
ANCHOR CAPSTAN (P&S), MAKE- GRSE KOLKATA
Warping drum cable lifters to be dismantled, cleaned, check condition of bush and replace if necessary. To be lubricated and refitted
Capstan gear box to be overhauled, check the condition of bush and bearings, if defective to be renewed. Renew Oil seals.
Renew brake lining of band brake shoes. Mat Contractor supply.
SEA BOAT (P & S), MAKE - PALFINGER, FRSQ 600, PAC FIRM - M/S VANSON ENGINEERING , THANE
Check all sealing outside with MS Polymer sealing compound. If leakage is detected same to be repaired.
Annual servicing of offload hook (CAR 35 F) and painter line release hook to be carried out.Qty: - Offload hook -01 no each, painter line release hook 01 no each.
HYDRAULIC PC CRANE (P & S), MAKE -PALFINGER, MODEL - SCTTF 20'40-10/90 S, PAC FIRM M/S VANSON ENGINEERING, THANE
Renewal of hydraulic oil inside power pack and replace the oil filters. Power pack hydraulic oil make- Shell Tellus S2VA46 or equivalent Qty --300 ltrs each: Gear box oil - Omala S4 GX 220, Qty - 1.5 ltrs each, Mat. Contractor supply.
Check the hooks for deformation/free rotation, excessive wear or fracture and wire rope assembly for proper functioning.
Visual inspection of crane structure for deformation, excessive wear. corrosion, damage and fracture by fully extending the booms Scope of work includes greasing of extending booms and guides. Recommended grease. Make - BP Castrol Molub -Alloy 908 SF Heavy or equivalent.
Check all hoses/pins fitted in the system and replace if found defective, check pressure settings and seals.
Check all linkages, joints, bearings, oil seals and guides for play and replace if found defective.
Remove wire rope and examine for serviceability, clean corrosion marks if any, grease and fit back. If the rope found frayed/damaged renew.
Load test of the Cranes to be carried out with safe working load 02 Tonnes at 04 Mtrs and 01 Tonne at 09 Mtrs radius Dynamic load 1.25 time SWL.
BOAT DAVIT PRHJ5 AP (P&S), MAKE- PALFINGER, PAC FIRM- M/S VANSON ENGINEERING, THANE
Open and inspect power pack, overhaul power pack pump. Spare yard supply
Replace return filters, pressure filters and air filters. Qty - 02 Nos each. Mat Contractor supply
Replace the hydraulic oil as recommended. Power pack oil make - Shell Tellus S2VA 46 or equivalent. Qty. - 500 Ltrs each, Gear box oil make -Omala S4 GX 220. Qty. - 03 Ltrs each. Material Contractor supply.
Check and replace (if necessary)- bolted connection, hydraulic oil, change the winch oil, brake functionality, outside of the electrical cabinet, operator console.
Measure and readjust pre fill pressure of accumulator's cylinders. Total qty. 04 : Nos. Accumulator charging adaptor and all spares and consumables Contractor supply. Pre fill pressure of accumulator cylinder; - 90 bar
Check the structural parts of davit and tightness of all fasteners. Renew fasteners, if excessively corroded as per surveyorjeconi^endatiqns.
Remove the wire rope and examine for serviceability, clean corrosion marks if any. greased and fit back. If rope found frayed/ damaged, renew the same. Recommended grease - Molub Alloy 968 SF Heavy, make - BP Castrol or
Load testing of wire rope and davit to be undertaken. SWL - 3.5 Tonnest Dynamic load 1.25 time SWL..
Check pressure and functioning of hydraulic dampers for shock absorber. Recharge damper if necessary. Qty. 03 nos. each.
Manual operating levers hydraulic manifold to be overhauled and refitted.
Port boat davit hoisting speed in automatic speed reduction phase while hoisting (3-4 mtrs below AP Docking head) observed to be dead slow. This lead to extend recovery time of the boat in hanging position To be investigated and rectified.
Limit switches setting observed to be differed in both davits view varying loading condition. The limit switches settings to be tuned with average loading condition.
QRIB (P&S), MAKE - PALFINGER, MODEL - 500, PAC FIRM-M/S VANSON ENGINEERING THANE
Check all sealing:s outside with MS to polymer sealing compound. If leak is detected . repair.
Annual servicing of offload hooks (CAR 35 F) to be carried out. Qty. - offload hook -01 no each boat.
QRIB DAVIT (P&S), MAKE - PALFINGER, PAC FIRM - M/S VANSON ENGINEERING, THANE
Check all bolted connections, condition of hydraulic oil and brake functionality renew defective parts if any
Functional check the accumulator unit for operation adjust if necessary Renew defective parts if any. Qty of accumulator cylinders.- 03 nos. each.
Check condition of wire ropes for FWT (fray, wear and tear), replaced if Castrol or equivalent required. Scope of work include wire to be removed, cleaned, greased and refitted. Recommended grease type - Molub Alloy 968 SF heavy, make - BP Castrol or equivalent
Overhaul complete Boat davit including power packr all cylinders and winch assembly. Scope of work includes replacing the hydraulic oil and winch oil, cylinder seals. Power pack oil make -Shell Tellus S2VA 46 or equivalent. Qty.500 Ltrs each. Gear box oil make - Omala S4 GX 220, Qty.- 03 Ltrs each. Mat yard supply
Boat davit to be load tested. The load test includes static load test and dynamic load test as per INBR 1552 SWL - 2.5 tonnes. Dynamic load - 1.25 time SWL.
RAIL LESS HELO TRAVERSING SYSTEM, MAKE- GRSE
Functional test as per the procedure mentioned in the maintenance manual carried out.
Load testing of steel wire ropes and Hydraulic winch to be carried out. Qty.-05 Nos. SWL 02T
Load test of towing gears to be carried out. (a) Chaffing chain assembly (ø 34 mm x 6.5 M) - 02 Nos. (Test load- 468KN) (b) Chain stopper assembly - 02 Nos. (Test Load - 468KN) (c) Shackle (ø 43 mm) -12 Nos. (Test Load - 15 Ton) (d) Towing bridle - 01 No (Test Load - 360KN) e) Towing pendant - 03 in no. (Test Load - 15 Ton)
Load test of RAS/FAS gears to be carried out. (a) Snatch Block type - 04 Nos (SWL - 04 Tone, test load -08 T) (b) Straight Shackle - 12 Nos (SWL - 4.6 Tone) (c) Rigging Slip - 02 Nos (SWL- 04 Tone, test load - 06 T) (d) Light Traveller block - 01 No (SWL - 0.25 T, test load - 0.5 T. both eye to be load tested to 1.5 T) (e) D Shackle (JW-40) - 04 Nos (SWL - 3.27 Tone) (f) D Shackle (JW-34) - 04 Nos (SWL - 2.5 Tone) (g) D Shackle (JW-32) - 04 Nos (SWL - 2 Tone) (h) Pad eye - 04 Nos (SWL - 2.5 Tone) (j)Spring Hook - 02 Nos (SWL - 0.75 Tone, test load - 1.5 T, shacklers SWL 1.8T. test load 3.6 T) (k)Strop 610 mm long 65 mm circ - 02 Nos (2.5 T/As applicable for break load 23.4T) (l )Hose line pendant 20 mm dia X 20 m long - 02 Nos. (As applicable for break load 23 4T'i (m) Recovery line 1 2 mm dia 150 m long - 01 No (As applicable for break load 8.41T) (n) Snatch block with swivel oval eye - 04 Nos (SWL - 04 Tone, test load -08T) (p) Slip - 01 No (SWL - 04 Tone, test load - 06 T) (q) Shackle - 02 Nos (SWL - 3.03 Tone) (r) Ring - 01 No (SWL - 4.85 Tone.) (s) Pad eye for messenger - 08 Nos (SWL - 2.5 Tone) (t) Turning eye-02Nos (SWL-2.5Tone)
Deck covering top/finish coat at following dry compartments places deteriorated due to wear & tear. Surfaces of the deck covering top/finish coat to be prepared and applied with fresh coat of the top coat of deck covering scheme. Total area -542 m2, Colour: Grey, Thickness of top coat - 2 mm. 10% area cracked, to be repaired and complete scheme to be applied. Material Contractor Supply. Firm: M/s Excel India Protective Paints Pvt Ltd, Mumbai. Ser Compartment Name Approx.area (m2) 1 Dry Compartment Platorm Deck - Lobby 34.7 Dry Compartment Main Deck 2 DCHQ 8.2 3 DC Store 8.2 4 Regulating Office 8.2 5 Gunnery Office 7.8 6 Sr. Rating Dinning Hall 32.1 7 Jr. Rating Dining Hall 45.3 8 Fwd DC Store 9.5 9 Lobby 142.3 DC Compartment 01 Deck 10 Flight Office 6.5 11 Sick bay 15 12 4 Training Officer's 12 13 Shipwright Office 14.1 14 Quarter master Post 15.7 15 Lobby Fr.92-Fr.118 & Hatch way 94-100 54.3 Dry Compartment 02 Deck 16 Ops Room 19.2 17 Lobby 26.6 18 MSO 15.4 19 Wheel House 59 20 Lobby 7.4
Survey of anchor watch platform and Bridge top ceremonial post to be carried out by a surveyor and renewed if recommended. Load Test upto 300 kgs to be carried out
12 in nv.; Gangway (Aluminium brow) shoe broken, to be renewed along with 02 in no. roller shoe. The Gangway to be load tested.
200 in Nos. clamps of cable tray corroded and broken/damaged in various places. To be renewed as per sample,. Material Aluminium with SS bolts & nuts and rubber paddling.
02 in nos. each Stbd and port side bulwark winch and pulley arrangement corroded and wire rope kinked/crippled to be renewed as per sample. Qty: 12 Pulley (Mat: Brass), steel wire rope : Quantity - 04 Nos., Dia - 8 mm, length -12 mtr each
Load test of anchor handling arrangement to be carried out. (a) Pulley block -01 No.. SWL 05 T (b) Wire rope sling -01 No.. SWL 05 T (c) Dee shackle - 02 Nos.. SWL 05 T
Load test of lifting beam arrangement in engine room to be carried out. (a) Chain hoist with push pull type trolley - 04 Nos., SWL 01 T (b) Wire rope sling - 04 Nos., SWL 01 T (c) Dee Shackle - 08 Nos.. SWL 01 T
Lagging of ceiling and bulkhead perished/cracked at various places in 32 Junior rating mess, sickbay lobby, gym lobby, shipwright workshop. ASP and PCR. To be renewed with MFMB of thickness 50 mm. Area:300sqft
Load test of RAS/FAS fittings, king post, outrigger assembly, deck eye and brackets to be carried out under supervision of class surveyor. SWL - 04 T. Details as follows: - King post- 2.5 T Outrigger assembly base plate port &stbd -16 T Out rigger assembly eye plate port &stbd - 04 T Deckeyes(04 Nos)-06T
FAS Rollers on foxle (P&S) to be overhauled and refitted.
Ships brow to be tested with PL 2.18 T (Evenly distributed along the length) Qty- 03 Nos.
Helo Hanger Shutter: Remove and overhaul gear box, rod gearing system and drive linkage. Replace defective parts.
Hydraulic Power Pack for PC Equipment: change filter elements, filler breather if found clogged, check quality of oil and change oil if required. Quantity of hydraulic oil-350 ltrs, hydraulic media - ISO VG 46. Oil CG supply.
Hydraulic Power Pack for PC Equipment: Overhaul pump, manifold block, lever operated DC valves, check valve, solenoid valve and relief valve, replace defective part and refit. The hydraulic power pack to be proved on loading condition
SUPPLEMENTARY DEFECT LIST (SR-1) - HULL
Under water tanks and frames name tallies on weather deck to be renewed and fitted. Inway job includes removal & refitment of MFMB (Mineral Fiber Marine Board) lagging, renewal of doubler plate and threading. Qty-124 Nos.
06 in nos. racks, having 03 shelves each for storing electrical/electronic spare boxes to be fabricated and installed (04 in nos. for Electrical store 02 in nos. for Electronic store), per se CGHQ approved A's & A's PIN E/OH-06/2019-B/054. The scope of work is as follows:- (a) The racks as per specifications to be fabricated and fitted in electrical store (Stbd) and Electronic store (Port). (b) Other inway jobs include removal/refitment of lagging. (c) The Electrical store (Stbd) and Electronic store (Pot) are located between frame stn 32 to 42 on platform deck. Fuel tank (P) of capacity 22.3 Ton sand fuel oil tank (S) of capacity 22.24 Tons are located beneath of the Electronic store and Electrical store respectively. These fuel tank need to be emptied, cleaned and ventilated and made gas free prior to any welding jobs.
Patel Engineering Works Vizag
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
MAYURI ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .