Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st lowest₹1,190Accepted-AOC | 1st lowest | Accepted-AOC The bidder final quoted rate is 1190 per unit for use of the Santirbazar Municipal Council. | |
| 2 | 2nd lowest₹1,200+₹10 (0.84%)Rejected-Finance ASHUTOSH BAIDYA MARKET GROUND FLOOR SANTIRBAZAR SOUTH TRIPURA PIN 799144 | SOUTH TRIPURA | TRIPURA | 799144 | 2nd lowest | Rejected-Finance Rejected as the bidder is not 1st lowest bidder as per DNIT |
| Sl No | Description | Qty | Unit | DEBASISH BHOWMIK H2 | RP INTERNATIONAL H1 |
|---|---|---|---|---|---|
| 1.00 | Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura ( 3rd Call).
(Detention charge per day) | 1 | No | 1,190 ₹1,190 Lowest | 1,200 ₹1,200 |
| 2.00 | Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura ( 3rd Call).
(Per KM running charges) | 1 | No | 10.9 ₹10.9 Lowest | 11 ₹11 |
| 11.00 | Sand | 50 | No | - | - |
| 12.00 | Sand | 50 | No | - | - |
| 13.00 | Sand | 50 | No | - | - |
| 14.00 | Sand | 50 | No | - | - |
| 15.00 | Sand | 50 | No | - | - |
| 16.00 | Sand | 50 | No | - | - |
| 17.00 | Sand | 50 | No | - | - |
| 18.00 | Sand | 50 | No | - | - |
Tender Value
₹3 L
EMD Value
₹30,000
Closing Date
17 Nov 2025, 3:00 pmClosed
Chief Executive Officer
Santirbazar Municipal Council
Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura (3RD Call)
2025_Urban_66806_1
14/CEO/SMC/2024-25
Open Tender
Machineries
Item Wise
10 days
As per DNIT
Please refer Tender documents
6 documents required · 6 mandatory
₹1,000
₹30,000
26 Mar 2026
4 Nov 2025
17 Nov 2025
4 Nov 2025
17 Nov 2025
4 Nov 2025
4 Nov 2025 - 15 Nov 2025
Select, Excess (+), Less (-)
Tender Inviting Authority: Chief Executive Officer, Santirbazar Municipal Council .
Name of Work : -- Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura ( 3rd Call).
DNIT No: e-DT- DNIeT-14/CEO/SMC/2024-25
Name of the Bidder/ Bidding Firm / Company :
Item No. Name of item Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Quoted Rate per unit incl. all taxes & charges (Rs) Excise Duty in Rs. P GST in Rs. P Freight Charges ( Unloading & Stacking) in Rs. P Any Other Taxes/Duties/Levies in Rs. P Other Taxes 2 in Rs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax in Rs. P Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category in Rs. P TOTAL AMOUNT Without Taxes in Rs. P TOTAL AMOUNT With Taxes in Rs. P TOTAL AMOUNT In Words
1 Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura ( 3rd Call). (Detention charge per day) item1 1 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item1 213 Nos
2 Hiring of 1 (One) No BOLERO (BS-6) incl. fuel and driver for use of the Santirbazar Municipal Council, Santirbazar South Tripura ( 3rd Call). (Per KM running charges) item2 1 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
11 Sand item11 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
12 Sand item12 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
13 Sand item13 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
14 Sand item14 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
15 Sand item15 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
16 Sand item16 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
17 Sand item17 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
18 Sand item18 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
19 Sand item19 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 Sand item20 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
21 Sand item21 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
22 Sand item22 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
23 Sand item23 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
24 Sand item24 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
25 Sand item25 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
26 Sand item26 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
27 Sand item27 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
28 Sand item28 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
29 Sand item29 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
30 Sand item30 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
31 Sand item31 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
32 Sand item32 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
33 Sand item33 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
34 Sand item34 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
35 Sand item35 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
36 Sand item36 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
37 Sand item37 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
38 Sand item38 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
39 Sand item39 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
40 Sand item40 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
41 Sand item41 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
42 Sand item42 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
43 Sand item43 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
44 Sand item44 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
45 Sand item45 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
46 Sand item46 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
47 Sand item47 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
48 Sand item48 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
49 Sand item49 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
50 Sand item50 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
51 Sand item51 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
52 Sand item52 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
53 Sand item53 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
54 Sand item54 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
55 Sand item55 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
56 Sand item56 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
57 Sand item57 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
58 Sand item58 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
59 Sand item59 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
60 Sand item60 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
61 Sand item61 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
62 Sand item62 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
63 Sand item63 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
64 Sand item64 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
65 Sand item65 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
66 Sand item66 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
67 Sand item67 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
68 Sand item68 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
69 Sand item69 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
70 Sand item70 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
71 Sand item71 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
72 Sand item72 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
73 Sand item73 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
74 Sand item74 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
75 Sand item75 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
76 Sand item76 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
77 Sand item77 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
78 Sand item78 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
79 Sand item79 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
80 Sand item80 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
81 Sand item81 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
82 Sand item82 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
83 Sand item83 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
84 Sand item84 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
85 Sand item85 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
86 Sand item86 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
87 Sand item87 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
88 Sand item88 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
89 Sand item89 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
90 Sand item90 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
91 Sand item91 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
92 Sand item92 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
93 Sand item93 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
94 Sand item94 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
95 Sand item95 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
96 Sand item96 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
97 Sand item97 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
98 Sand item98 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
99 Sand item99 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
100 Sand item100 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
101 Sand item101 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
102 Sand item102 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
103 Sand item103 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
104 Sand item104 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
105 Sand item105 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
106 Sand item106 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
107 Sand item107 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
108 Sand item108 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
109 Sand item109 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
110 Sand item110 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
111 Sand item111 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
112 Sand item112 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
113 Sand item113 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
114 Sand item114 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
115 Sand item115 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
116 Sand item116 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
117 Sand item117 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
118 Sand item118 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
119 Sand item119 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
120 Sand item120 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
121 Sand item121 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
122 Sand item122 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
123 Sand item123 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
124 Sand item124 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
125 Sand item125 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
126 Sand item126 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
127 Sand item127 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
128 Sand item128 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
129 Sand item129 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
130 Sand item130 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
131 Sand item131 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
132 Sand item132 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
133 Sand item133 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
134 Sand item134 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
135 Sand item135 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
136 Sand item136 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
137 Sand item137 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
138 Sand item138 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
139 Sand item139 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
140 Sand item140 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
141 Sand item141 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
142 Sand item142 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
143 Sand item143 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
144 Sand item144 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
145 Sand item145 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
146 Sand item146 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
147 Sand item147 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
148 Sand item148 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
149 Sand item149 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
150 Sand item150 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
151 Sand item151 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
152 Sand item152 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
153 Sand item153 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
154 Sand item154 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
155 Sand item155 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
156 Sand item156 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
157 Sand item157 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
158 Sand item158 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
159 Sand item159 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
160 Sand item160 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
161 Sand item161 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
162 Sand item162 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
163 Sand item163 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
164 Sand item164 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
165 Sand item165 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
166 Sand item166 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
167 Sand item167 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
168 Sand item168 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
169 Sand item169 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
170 Sand item170 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
171 Sand item171 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
172 Sand item172 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
173 Sand item173 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
174 Sand item174 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
175 Sand item175 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
176 Sand item176 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
177 Sand item177 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
178 Sand item178 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
179 Sand item179 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
180 Sand item180 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
181 Sand item181 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
182 Sand item182 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
183 Sand item183 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
184 Sand item184 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
185 Sand item185 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
186 Sand item186 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
187 Sand item187 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
188 Sand item188 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
189 Sand item189 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
190 Sand item190 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
191 Sand item191 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
192 Sand item192 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
193 Sand item193 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
194 Sand item194 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
195 Sand item195 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
196 Sand item196 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
197 Sand item197 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
198 Sand item198 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
199 Sand item199 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
200 Sand item200 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
201 Sand item201 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
202 Sand item202 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
203 Sand item203 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
204 Sand item204 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
205 Sand item205 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
206 Sand item206 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
207 Sand item207 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
208 Sand item208 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
209 Sand item209 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
210 Sand item210 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
211 Sand item211 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
212 Sand item212 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
213 Sand item213 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
214 Sand item214 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
215 Sand item215 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
216 Sand item216 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
217 Sand item217 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
218 Sand item218 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
219 Sand item219 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
220 Sand item220 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
221 Sand item221 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
222 Sand item222 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
223 Sand item223 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
224 Sand item224 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
225 Sand item225 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
226 Sand item226 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
227 Sand item227 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
228 Sand item228 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
229 Sand item229 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
230 Sand item230 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
231 Sand item231 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
232 Sand item232 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
233 Sand item233 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
234 Sand item234 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
235 Sand item235 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
236 Sand item236 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
237 Sand item237 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
238 Sand item238 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
239 Sand item239 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
240 Sand item240 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
241 Sand item241 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
242 Sand item242 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
243 Sand item243 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
244 Sand item244 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
245 Sand item245 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
246 Sand item246 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
247 Sand item247 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
248 Sand item248 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
249 Sand item249 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
250 Sand item250 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
251 Sand item251 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
252 Sand item252 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
253 Sand item253 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
254 Sand item254 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
255 Sand item255 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
256 Sand item256 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
257 Sand item257 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
258 Sand item258 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
259 Sand item259 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
260 Sand item260 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
261 Sand item261 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
262 Sand item262 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
263 Sand item263 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
264 Sand item264 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
265 Sand item265 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
266 Sand item266 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
267 Sand item267 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
268 Sand item268 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
269 Sand item269 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
270 Sand item270 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
271 Sand item271 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
272 Sand item272 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
273 Sand item273 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
274 Sand item274 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
275 Sand item275 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
276 Sand item276 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
277 Sand item277 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
278 Sand item278 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
279 Sand item279 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
280 Sand item280 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
281 Sand item281 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
282 Sand item282 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
283 Sand item283 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
284 Sand item284 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
285 Sand item285 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
286 Sand item286 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
287 Sand item287 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
288 Sand item288 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
289 Sand item289 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
290 Sand item290 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
291 Sand item291 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
292 Sand item292 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
293 Sand item293 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
294 Sand item294 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
295 Sand item295 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
296 Sand item296 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
297 Sand item297 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
298 Sand item298 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
299 Sand item299 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
300 Sand item300 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
301 Sand item301 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
302 Sand item302 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
303 Sand item303 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
304 Sand item304 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
305 Sand item305 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
306 Sand item306 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
307 Sand item307 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
308 Sand item308 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
309 Sand item309 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
310 Sand item310 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
311 Sand item311 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
312 Sand item312 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
313 Sand item313 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
314 Sand item314 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
315 Sand item315 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
316 Sand item316 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
317 Sand item317 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
318 Sand item318 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
319 Sand item319 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
320 Sand item320 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
321 Sand item321 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
322 Sand item322 50 mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
323 Sand item323 50 mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
324 Sand item324 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
325 Sand item325 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
326 Sand item326 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
327 Sand item327 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
328 Sand item328 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
329 Sand item329 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
330 Sand item330 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
331 Sand item331 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
332 Sand item332 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
333 Sand item333 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
334 Sand item334 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
335 Sand item335 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
336 Sand item336 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
337 Sand item337 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
338 Sand item338 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
339 Sand item339 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
340 Sand item340 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
341 Sand item341 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
342 Sand item342 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
343 Sand item343 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
344 Sand item344 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
345 Sand item345 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
346 Sand item346 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
347 Sand item347 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
348 Sand item348 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
349 Sand item349 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
350 Sand item350 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
351 Sand item351 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
352 Sand item352 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
353 Sand item353 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
354 Sand item354 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
355 Sand item355 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
356 Sand item356 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
357 Sand item357 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
358 Sand item358 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
359 Sand item359 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
360 Sand item360 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
361 Sand item361 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
362 Sand item362 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
363 Sand item363 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
364 Sand item364 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
365 Sand item365 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
366 Sand item366 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
367 Sand item367 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
368 Sand item368 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
369 Sand item369 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
370 Sand item370 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
371 Sand item371 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
372 Sand item372 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
373 Sand item373 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
374 Sand item374 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
375 Sand item375 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
376 Sand item376 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
377 Sand item377 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
378 Sand item378 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
379 Sand item379 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
380 Sand item380 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
381 Sand item381 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
382 Sand item382 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
383 Sand item383 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
384 Sand item384 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
385 Sand item385 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
386 Sand item386 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
387 Sand item387 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
388 Sand item388 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
389 Sand item389 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
390 Sand item390 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
391 Sand item391 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
392 Sand item392 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
393 Sand item393 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
394 Sand item394 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
395 Sand item395 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
396 Sand item396 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
397 Sand item397 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
398 Sand item398 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
399 Sand item399 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
400 Sand item400 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
401 Sand item401 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
402 Sand item402 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
403 Sand item403 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
404 Sand item404 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
405 Sand item405 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
406 Sand item406 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
407 Sand item407 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
408 Sand item408 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
409 Sand item409 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
410 Sand item410 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
411 Sand item411 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
412 Sand item412 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
413 Sand item413 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
414 Sand item414 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
415 Sand item415 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
416 Sand item416 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
417 Sand item417 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
418 Sand item418 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
419 Sand item419 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
420 Sand item420 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
421 Sand item421 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
422 Sand item422 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
423 Sand item423 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
424 Sand item424 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
425 Sand item425 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
426 Sand item426 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
427 Sand item427 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
428 Sand item428 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
429 Sand item429 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
430 Sand item430 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
431 Sand item431 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
432 Sand item432 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
433 Sand item433 50 mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
434 Sand item434 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
435 Sand item435 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
436 Sand item436 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
437 Sand item437 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
438 Sand item438 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
439 Sand item439 50 Mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
440 Sand item440 50 mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
441 Sand item441 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
442 Sand item442 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
443 Sand item443 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
444 Sand item444 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
445 Sand item445 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
446 Sand item446 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
447 Sand item447 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
448 Sand item448 50 kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
449 Sand item449 50 100 gm 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
450 Sand item450 50 100 gm 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
451 Sand item451 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
452 Sand item452 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
453 Sand item453 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
454 Sand item454 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
455 Sand item455 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
456 Sand item456 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
457 Sand item457 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
458 Sand item458 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
459 Sand item459 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
460 Sand item460 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
461 Sand item461 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
462 Sand item462 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
463 Sand item463 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
464 Sand item464 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
465 Sand item465 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
466 Sand item466 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
467 Sand item467 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
468 Sand item468 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
469 Sand item469 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
470 Sand item470 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
471 Sand item471 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
472 Sand item472 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
473 Sand item473 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
474 Sand item474 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
475 Sand item475 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
476 Sand item476 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
477 Sand item477 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
478 Sand item478 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
479 Sand item479 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
480 Sand item480 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
481 Sand item481 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
482 Sand item482 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
483 Sand item483 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
484 Sand item484 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
485 Sand item485 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
486 Sand item486 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
487 Sand item487 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
488 Sand item488 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
489 Sand item489 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
490 Sand item490 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
491 Sand item491 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
492 Sand item492 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
493 Sand item493 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
494 Sand item494 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
495 Sand item495 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
496 Sand item496 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
497 Sand item497 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
498 Sand item498 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
499 Sand item499 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
500 Sand item500 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
501 Sand item501 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
502 Sand item502 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
503 Sand item503 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
504 Sand item504 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
505 Sand item505 50 Pair 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
506 Sand item506 50 pair 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
507 Sand item507 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
508 Sand item508 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
509 Sand item509 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
510 Sand item510 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
511 Sand item511 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
512 Sand item512 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
513 Sand item513 50 Lt 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
514 Sand item514 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
515 Sand item515 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
516 Sand item516 50 Kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
517 Sand item517 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
518 Sand item518 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
519 Sand item519 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
520 Sand item520 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
521 Sand item521 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
522 Sand item522 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
523 Sand item523 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
524 Sand item524 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
525 Sand item525 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
526 Sand item526 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
527 Sand item527 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
528 Sand item528 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
529 Sand item529 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
530 Sand item530 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
531 Sand item531 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
532 Sand item532 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
533 Sand item533 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
534 Sand item534 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
535 Sand item535 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
536 Sand item536 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
537 Sand item537 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
538 Sand item538 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
539 Sand item539 50 Kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
540 Sand item540 50 kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
541 Sand item541 50 Kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
542 Sand item542 50 kg 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
543 Sand item543 50 mtr 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
544 Sand item544 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
545 Sand item545 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
546 Sand item546 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
547 Sand item547 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
548 Sand item548 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
549 Sand item549 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
550 Sand item550 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
551 Sand item551 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
552 Sand item552 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
553 Sand item553 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
554 Sand item554 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
555 Sand item555 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
556 Sand item556 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
557 Sand item557 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
558 Sand item558 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
559 Sand item559 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
560 Sand item560 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
561 Sand item561 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
562 Sand item562 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
563 Sand item563 50 No 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
564 Sand item564 50 Pair 1 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select %
Quoted Rate in Words
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.35 MB
DNITBOLERO3rdcall.pdf
Tender Documents • 1.46 MB
BOQ_67982.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .