Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 66 2 48A SRIRAMNAGAR SRIHARIPURAM SRIHARIPURAM VISAKHAPATNAM ANDHRA PRADESH 530011 | VISAKHAPATANAM | ANDHRA PRADESH | 530011 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
Closing Date
16 Aug 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Works on Air bottle, Fuel Oil Heaters, Condenser and LT Cooler on MV Swaraj Dweep
2021_HSL_86982_1
20/21997/058/2021-22
Open Tender
Miscellaneous Services
Service
15 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
20 Aug 2021
9 Aug 2021
16 Aug 2021
9 Aug 2021
16 Aug 2021
9 Aug 2021
120 days
Amount
Auxiliary Air Receiver (Emergency Air Bottle): Auxiliary Air Receiver (01no) to be overhauled, manhole door (no of bolts 20, bolt size 28mm) to be opened up and internal cleaning to be done (pipe line degutting and refitting including) , all mountings (32mm dia valves - 09nos) including relief valve (01no) to be dismantled, cleaned, overhauled and presented for survey, defects to be rectified, relief valve to be rectified as per surveyor recommendations. after survey, relief valve setting to be shown to the surveyor. then all mounting including relief valve to be fitted back in place with new gaskets and fasteners. manhole door to be boxed back with special type gasket. finally, satisfactory trial to be shown to ship staff (air receiver size dia 397mm/length 1700mm, design pressure 32kg/cm2, test pressure 48 kg/cm2.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material like valve seat and valve lid, valve spindles, gland packing, MS valve sheels, gland bolts, gland followers, gaskets, O-rings, copper washer, SS bolts & nuts, flange bolt & nuts, relief valve springs, pressure gauge lines and cocks with connectors (copper line) etc., mentioned at S.No. 1 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (1.1) against third party/OEM invoice.
Aux. Engine Fuel Oil Heaters- 02Nos: (Shell & Tube type) both heaters to be removed from place and taken to workshop. High pressure washing and chemical cleaning of heaters to be done. Heaters to be pressure tested to 10 bar. Leaky tube to be plugged. Pressure test shown to ship staff and same to be fitted in place to show satisfactory trial. heater relief valves - 2nos to be overhauled, pressure setting to be done and same to be fitted back in place. (pipe line degutting and refitting including) (Heater length 1700mm dia 220mm)
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material like chemical, joints, O-rings, copper plugs, SS fasteners, heat resistance paint, drain cock, zinc anodes, end cover etc., mentioned at S.No. 2 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (2.1) against third party/OEM invoice.
Condenser-01No: (Shell & Tube type) Condenser to be removed from place and taken to workshop. Condenser to be cleaned, pressure tested to 5 bar, leaky tubes to be plugged, pressure test shown to ship staff and same to be fitted in place to show satisfactory trial. condenser vent plug stub piece 1nos (3/4 inch dia and 1.5 inches height found holes and leaking same to be renewed. clean condenser to be fitted in place to show satisfactory trial. (pipe line degutting and refitting including) (condenser lenght 910mm, dia 170mm, no fo tube 30Nos approx)
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material like chemical, joints, O-rings, copper plugs, SS fasteners, heat resistance paint, drain cock, zinc anodes, end cover, vent plug stub pieces etc., mentioned at S.No. 3 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial (3.1) against third party/OEM invoice.
Fitment of New LT Cooler: New LT Cooler assembly (plate type cooler - approx weight: 1860kgs) to be shifted to engine room from jetty, while shifting of cooler consider all obstructed items like pipe lines, deck hatches, hatch doors, ladders and railings to be degutted and refitted ( if required new LT Cooler to be dismantled, shifted to position, assembled, pressure tested and fitted in postion). Existing inboard LT Cooler to be removed and new cooler to be fitted in place. necessary pipe lines and foundation modification to be done to fit new cooler in place and satisfactory that to be shown to shipstaff.
Consumables / Components / Items / Spares / Material: For executing of the above mentioned jobs, Contractor has to procure, supply all items and fitted in its place. Contractor has to quote lumpsum cost for required Consumables / Components / Items / Spares / Material like end connection pipe lines, seals, SS fasteners and gaskets (for cooler and degutting items) etc., mentioned at S.No. 4 for above scope of work. The taxes will be paid as per actuals. The cost of spares quoted by the contractor will be considered " on not exceeding basis of total lumpsum cost mentioned in the BOQ for this line item'' for satisfactory completion of the specified SoW. Payment will be made at actuals on not exceeding quoted cost of this Serial 4.1 against third party/OEM invoice.
avisan engineering enterprises
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .