Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAdmitted-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | ₹1.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹2.8 L (1.84%)Admitted-Finance 128 37 S BLOCK YASHODA NAGAR KANPUR U P | FATEHPUR | UTTAR PRADESH | 208001 | ₹1.6 Cr+₹2.8 L (1.84%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹4.5 L (2.94%)Admitted-Finance HARIDWAR | ₹1.6 Cr+₹4.5 L (2.94%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S R. B. ELECTRICALS L1 | Sagar Engineering Company L3 | DHRUV ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | STAY CLAMP WITH N&B SP-72 (75X8mm) | 14 | NOS | 5,600 ₹5,600 Lowest | 5,768 ₹5,768 | 5,712 ₹5,712 |
| 3.00 | Bracing Clamp Top SP-55 with N/B | 67 | NOS | 26,800 ₹26,800 Lowest | 27,604 ₹27,604 | 27,336 ₹27,336 |
| 4.00 | LT Clamp(50x6mm) for SP-72 with N&B | 2 | NOS | 800 ₹800 Lowest | 824 ₹824 | 816 ₹816 |
| 5.00 | Bottom Bracing clamp 33KV for SP-72- N&B | 4 | NOS | 1,800 ₹1,800 Lowest | 1,856 ₹1,856 | 1,836 ₹1,836 |
| 6.00 | E/WIRE CLAMP FOR SP-72 WITH N&B 65X6 | 14 | NOS | 6,300 ₹6,300 Lowest | 6,496 ₹6,496 | 6,426 ₹6,426 |
| 7.00 | LT CLAMP WITH N&B ST POLE SP-55 | 10 | NOS | 4,500 ₹4,500 Lowest | 4,640 ₹4,640 | 4,590 ₹4,590 |
| 8.00 | EARTH WIRE CLAMP FOR SP-55 WITH
N/B | 76 | NOS | 34,200 ₹34,200 Lowest | 35,264 ₹35,264 | 34,884 ₹34,884 |
| 9.00 | PP & CLAMP WITH N&B ST POLE SP-55 | 210 | NOS | 94,500 ₹94,500 Lowest | 97,440 ₹97,440 | 96,390 ₹96,390 |
| 10.00 | Stay Clamp for SP-55 With Nut & Bolt | 48 | NOS | 21,600 ₹21,600 Lowest | 22,272 ₹22,272 | 22,032 ₹22,032 |
Tender Value
Refer Docs
EMD Value
₹3.1 L
Closing Date
21 Apr 2025, 2:00 pmClosed
SE
EDC TEHRI
Replacement of ACSR Dog Conductor with 33KV AAAC AL-59, 241sqmm covered conductor and installing poles from Dhalwala to Bhadrakali Temple under EDD Tehri .
2025_UPCL4_82591_1
94/EDCT/ 2024-25
Open Tender
Miscellaneous Services
Item Wise
90 days
Dhalwala
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Yes
EE TEST
₹3.1 L
Yes
6 Jun 2025
8 Apr 2025
22 Apr 2025
8 Apr 2025
21 Apr 2025
8 Apr 2025
Electrical Items :
STAY CLAMP WITH N&B SP-72 (75X8mm)
Bracing Clamp Top SP-55 with N/B
LT Clamp(50x6mm) for SP-72 with N&B
Bottom Bracing clamp 33KV for SP-72- N&B
E/WIRE CLAMP FOR SP-72 WITH N&B 65X6
LT CLAMP WITH N&B ST POLE SP-55
EARTH WIRE CLAMP FOR SP-55 WITH N/B
PP & CLAMP WITH N&B ST POLE SP-55
Stay Clamp for SP-55 With Nut & Bolt
PG CLAMP ALU ALLOY PANTHER TO PANTHER
PP & CLAMP WITH N&B ST POLE SP-72
SHACKLE INSULATOR 100X115 mm WITH N&B
BRACING CLAMP BOTTOM WITH N&B SP-55
Bolt & Nuts off Size
Top Bracing clamp 33KV for SP-72 withN&B
33 KV Tension clamp with Bail & IPC
33 KV Cable ties for Pin insulator
33 KV IPC for covered to covered conduct
33 KV IPC for covered to Bare conductor
33 KV Mid span jointing kit
IPC with aluminium bail for earthing
33 KV Disc insulator for AAAC conductor
33KV Polymer Pin Ins.(For Convered Cond)
33KV AAAC COVERED COND. AL-59,241 SQ.MM.
LABOUR(SERVICES)
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 33 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SINGLE SP-72 POLE
ERECTION OF SP-55 DOUBLE POLE
ERECTION OF SP-72 DOUBLE POLE
ERECTION OF SP-55(11KV/33 KV) FOUR POLE
ERECTION OF SP-72(11KV/33 KV) FOUR POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF SP-55 SINGLE POLE
DISMANTLING OF RAIL SINGLE POLE
DISMANTLING OF SP-55 DOUBLE POLE
DISMANTLING OF 11 KV LINE(DOG)
DISMANTLING OF GUARDING IN 11 KV LINE
DISMANTLING OF GUARDING IN 33 KV LINE
FIXING OF FUSE SET
ERECTION OF BRACKET IN 11 KV LINE
ERECTION OF BRACKET IN 33 KV LINE
LAYING OF DOG CONDUCTOR IN HT LINE
GUARDING OF LT/11 KV LINE
GUARDING OF 33 KV LINE
T-OFF CONNECTION COMPLETE 11 KV LINE
T-OFF CONNECTION COMPLETE 33 KV LINE
CONST.,INST.OF DANGER BOARD/ NUMBER PLATE
CARTAGE SP-55 POLE, 0-20 KM
CARTAGE SP-72 POLE, 0-20 KM
CARTAGE OF PETTY MATERIAL,0-20 KM
HEADLOAD CARTAGE SP-55 POLE(0-1 KM)
HEADLOAD CARTAGE SP-72 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
DISMANTLING OF 33 KV LINE(PANTHER/DOG)
DISMANTLING OF SP-55 TRIPOLE STRUCTURE
Dismantling of AB Cable
DISMAN LT XLPE ABC 3X120+1X95 +1X16 Sq.mm
Tightening of Stay Set
Resagging of 33 KV Line
Resagging of LT AB Cable
Laying Earth wire for Earth on 33KV Line
BACK CARTAGE OF PETTY MATERIAL,0-20 KM
Dismantling of ACSR Dog
FIXING OF 33 KV TENSION CLAMP WITH IPC
FIXING OF 33 KV IPC FOR CC TO CC COND.
FIXING OF 33 KV IPC FOR CC TO BARE COND.
FIXING OF 33 KV MID SPAN JOINTING KIT
FIXING OF IPC WITH AL. BAIL FOR EARTHING
BACK HEAD LOAD CART. OF PETTY MAT. 0-1KM
FIXING OF 33KV CABLE TIES
DISCONN & RECONN. OF SERVICE CONN. 1PH.
DISCONN & RECONN. OF SERVICE CONN. 3PH.
Fixing of PG Clamp 120-120 sqmm
LAYING SPREADING,STRINGING AAAC CONDUCT.
RELAYING RESAGGING 3x120 SQ.MM AB CABLE
LOOPING AND CHOPPING OF TREE BRANCHES
DHRUV ENTERPRISES (BID ID -375532)
Sagar Engineering Company (BID ID -374819)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .