Tender Value
₹31.8 L
EMD Value
₹63,665
Closing Date
22 Apr 2026, 6:00 pmClosed
DC(WORKS)
FTR HQ BSF KMR
111/NIT/BSF/FTR-KMR/2025-26
2026_BSF_905364_1
111/NIT/BSF/FTR-KMR/2025-26
Open Tender
Civil Works
Works
180 days
UNDER SHQ BSF BARAMULLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹63,665
14 Apr 2026
14 Apr 2026
24 Apr 2026
14 Apr 2026
22 Apr 2026
14 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydrautio excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge, Ordinary rock For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head | - | Cum | - | - |
| 2 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m, All kinds of soil. For 13 Nos FDLs which are located upto 1.00 Km from road head | - | Sqm | - | - |
| 3 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m, All kinds of soil. For 11 Nos FDLs which are located above 1.00 Km up to 4.00 Km from road head | - | Sqm | - | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 0.20 KM upto 1.00 KM from road head. | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1.2.4 (1 cement: 2 coarse sand (zone-III) derived from natural sources 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head | - | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level. 1:2:4 (1 cement. 2 coarse sand (zone-III) derived from natural sources 4 graded stone aggregate 20 mm nominal size derived from natural sources). For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head | - | Cum | - | - |
| 7 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 6 Nos FDLs which are located above 0.20 Km up to 1.00 Km from road head | - | Sqm | - | - |
| 8 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 5 Nos FDLs which are located above 1.00 Km up to 2.50 Km from road head | - | Sqm | - | - |
| 9 | Centering and shuttering including strutting, propping elc and removal of form for, Foundations, footings, bases of columns, etc for mass concrete. For 6 Nos FDLs which are located above 2.50 Km up to 4.00 Km from road head | - | Sqm | - | - |
| 10 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work. For 7 Nos FDLs which are located up to 0.20 Km from road head | - | Sqm | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_951625.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .