Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-Finance IST FLOOR PLOT NO L 289 PRASANTA KUMAR NAYAKCHINMEYEE NAYAK AT L 289 BARAMUNDA HOUSING BOARD COLONY BARAMUNDA HOUSING BOARD COLONY BARAMUNDA | ₹5.9 L | L1 | Accepted-Finance Responsive |
| 2 | L1₹5.9 LAccepted-Finance | ₹5.9 L | L1 | Accepted-Finance Responsive |
| 3 | L2₹5.9 L−₹352.92 (0.06%)Accepted-Finance | ₹5.9 L−₹352.92 (0.06%) | L2 | Accepted-Finance Quoted 3.78 percentage which is less than the minimum service charge 3.85 percentage |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
| Sl No | Description | Qty | Unit | M/s. Shantiram Agency L2 | ACTIVE SECURITY AND INTELLIGENCE SEVICES L2 | Swarna Prava Mahakud L2 | KALIA CONSTRUCTION L1 | A K R TRADERS L2 | BLACK DIAMOND SECURITY AND PLACEMENT SERVICE L2 | M/S NIRAKAR PATRA L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing unskilled labour for operation and maintenance of Dam,Spillway , canal system for smooth water supply , dewatering of Spillway gallery water, recording reservoir level, operation of head regulator,canal oulet gates, sweeper for office and rest shed etc of Rukura Irrigation Project including E.P.F,E.S.I , service charges and labur cess for Rukura Irrigation Project for the year 2026-27 etc complete as per direction of Engineer-in-Charge | 1,038 | Mandays | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest | 472 ₹4,89,936 Lowest |
| 1.01 | EPF Charges @ 13% on Item No-1 ( fixed, cannot be changed) | 1,038 | Mandays | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest | 61.36 ₹63,691.68 Lowest |
| 1.02 | ESI Charges @ 3.25% on item No-1 ( fixed, cannot be changed) | 1,038 | Mandays | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest | 15.34 ₹15,922.92 Lowest |
| 1.03 | Service/Supervision Charges @ 3.85% on Item No-1 ( Variable, can be changed as per rate quoted by bidder) | 1,038 | Mandays | 18.17 ₹18,860.46 | 18.17 ₹18,860.46 | 18.17 ₹18,860.46 | 17.84 ₹18,517.92 Lowest | 18.17 ₹18,860.46 | 18.17 ₹18,860.46 | 18.17 ₹18,860.46 |
| 1.04 | Labour cess @ 1% on item No(1 +1.01+1.02+1.03) | 1,038 | Mandays | 5.67 ₹5,885.46 | 5.67 ₹5,885.46 | 5.67 ₹5,885.46 | 5.66 ₹5,875.08 Lowest | 5.67 ₹5,885.46 | 5.67 ₹5,885.46 | 5.67 ₹5,885.46 |
Tender Value
₹5.9 L
EMD Value
₹6,000
Closing Date
18 Aug 2026, 5:30 pmClosed
Superintending Engineer
Superintending Engineer, Raurkela Irrigation Division, Raurkela
Operation of Spillway gates, canal system gates, water pump, watch and ward etc at Spillway site of Rukura Irrigation Project for the year 2026-27
2026_CEBBS_138469_2
SERIDRKL-04-2026-27
Open Tender
Miscellaneous Services
Item Rate
1038 days
Bonai
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,000
₹6,000
Yes
1 Sept 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
12 Aug 2026 - 17 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing unskilled labour for operation and maintenance of Dam,Spillway , canal system for smooth water supply , dewatering of Spillway gallery water, recording reservoir level, operation of head regulator,canal oulet gates, sweeper for office and rest shed etc of Rukura Irrigation Project including E.P.F,E.S.I , service charges and labur cess for Rukura Irrigation Project for the year 2026-27 etc complete as per direction of Engineer-in-Charge | 1,038 | Mandays | 472 | ₹4,89,936 |
| 1.01 | EPF Charges @ 13% on Item No-1 ( fixed, cannot be changed) | 1,038 | Mandays | 61.36 | ₹63,691.68 |
| 1.02 | ESI Charges @ 3.25% on item No-1 ( fixed, cannot be changed) | 1,038 | Mandays | 15.34 | ₹15,922.92 |
| 1.03 | Service/Supervision Charges @ 3.85% on Item No-1 ( Variable, can be changed as per rate quoted by bidder) | 1,038 | Mandays | 18.17 | ₹18,860.46 |
| 1.04 | Labour cess @ 1% on item No(1 +1.01+1.02+1.03) | 1,038 | Mandays | 5.67 | ₹5,885.46 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_605724.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 0.32 MB
Rukura.pdf
Tender Documents • 0.77 MB
BOQ_605724.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .