Loading…
Loading…
Tender Value
₹25.8 Cr
EMD Value
₹25.8 L
Closing Date
29 Sept 2026, 5:00 pm2d left
DIRECTOR, PORTS AND IWT, ODISHA, BHUBANESWAR
DIRECTORATE OF PORTS AND INLAND WATER TRANSPORT, GROUND FLOOR, ZONE-A, FORTUNE TOWERS, CHANDRASEKHARPUR, BHUBANESWAR-751023
CIVIL CONSTRUCTION WORK
2026_PIWT_139971_1
DPIWT-06/2026-27
Open Tender
Civil Works - Others
Percentage
540 days
Chandinipal in Bhadrak District
PLEASE REFER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹10,000
₹25.8 L
Yes
DIRECTORATE OF PORTS AND INLAND WATER TRANSPORT, G
3 Sept 2026
3 Sept 2026
30 Sept 2026
3 Sept 2026
29 Sept 2026
3 Sept 2026
3 Sept 2026 - 10 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reclamation: Filling with Good earth and spreading the lower area of reclamation zone to acheive the design formation level of R.L. + 3.60m with using hydraulic excavator, tipper & dozer to spreading and compaction with vibratory roller & OMC condition till the desired density is attend inclduing hire charges etc. complete as per direction of Engineer-in-charge. Including cost, conveyance, royalties and taxes of all labour, labour cess, T&P required for the work complete in respect as per the direction of Engineer in charge.
D. Wall, Reclamation | 24,174 | Cum | 560.2 | ₹1,35,42,274.8 |
| 2 | Providing, transporting, bringing to site, unloading, setting up, assembling, and installing in position all necessary machinery, plant, rigs, crane, bentonite mixing plants, pumps, tremie pipes, tools, and accessories required for the execution of cast-in-situ bored piling works; including subsequent dismantling and demobilization from the site upon completion, all complete as per technical specifications and directions of the Engineer-in-Charge.
D. Wall | 1 | Nos | 1,20,000 | ₹1,20,000 |
| 3 | Sand Filling in Foundation & Plinth: Earthwork in filling foundation trenches and plinth with approved quality sand, including supplying, cost, conveyance, loading, unloading, royalties, statutory levies, labour cess, and all applicable taxes; spreading in layers not exceeding 150mm thick, watering, compacting, and ramming to achieve maximum density; including all tools, plant (T&P), equipment, and incidentals necessary for the complete execution of work in all respects, as per technical specifications and directions of the Engineer-in-Charge.
A.Hall, Net Mending Shed, Gear Shed, Community Toilet, Septic Tank & Soakpit, Reclamation, ETP, Surface Drain, Fish Drying Yard | 2,160 | Cum | 1,830 | ₹39,52,800 |
| 4 | Earth work in excavation of foundation trenches in all kind of soil including moorum stony earth and earth mixed with boulders except sheet rock and boulders requiring blasting including dressing of sides and levelling the bed up to 1.50M depth and depositing the excavated materials away from the work site with all leads and lifts .Including cost, conveyance, royalties and taxes of all labour, labour cess, T&P required for the work complete in all respect as per the direction of Engineer in charge.
A.Hall, Net Mending Shed, Gear Shed, Community Toilet, Over Head Tank / U.G Sump, Septic Tank & Soakpit, ETP, Surface Drain, Fish Drying Yard | 1,013 | Cum | 489.3 | ₹4,95,660.9 |
| 5 | Providing, transporting, bringing to site, unloading, setting up, assembling, and installing in position all necessary machinery, plant, rigs, crane, bentonite mixing plants, pumps, tremie pipes, tools, and accessories required for the execution of cast-in-situ bored piling works; including subsequent dismantling and demobilization from the site upon completion, all complete as per technical specifications and directions of the Engineer-in-Charge.
D. Wall | 1 | Nos | 1,20,000 | ₹1,20,000 |
| 6 | Shifting & Setting Up Piling Rig per Location: Shifting, moving, positioning, leveling, and setting up the complete piling plant, rig, heavy equipment, tools, and accessories at each individual pile location within the site premises; including initial rigging, alignment, site preparation, path/ground stabilization for rig movement, supplying all necessary labor, tools and plant (T&P), and meeting the cost of conveyance, royalties, labour cess, statutory levies, and all applicable taxes required for the complete execution of work in all respects, as per technical specifications and directions of the Engineer-in-Charge.
D. Wall | 45 | Nos | 21,124.1 | ₹9,50,584.5 |
| 7 | Providing, fabricating, rolling, bending, circular-welding, transporting, delivering, and fixing/sinking in position at site 6mm thick Mild Steel (MS) plate liners of 300mm outer diameter for bored cast-in-place concrete piles, conforming to Grade E250 (Fe 410) of IS: 2062. The work shall include the cost of all primary MS steel plates, rolling to cylindrical shape, shop/field electric arc welding of continuous longitudinal and circumferential joints, fabrication, supply, loading, unloading, freight, cartage, handling, storage, site delivery, all statutory taxes, GST, duties, octroi, and royalties; all labor, tools, plants, machinery, crane/derrick operations, positioning, guide frames, driving, lowerings, alignment, trimming, waste/scrap cut-offs, along with all incidental operational and safety expenses complete in all respects, as per approved structural drawings, technical specifications, and to the complete satisfaction of the Engineer-in-Charge.
A.Hall, Net Mending Shed,Gear Shed, Community Toilet, Over Head Tank / U.G Sump | 626.12 | Qntl. | 9,579 | ₹59,97,603.48 |
| 8 | Providing, fabricating, rolling, circular welding, transporting, and delivering to site 6mm thick Mild Steel (MS) plate liners of 600mm nominal/outer diameter for bored cast-in-place concrete piles, conforming to IS: 2062 (Grade E250 / Fe 410 W). Rate shall be inclusive of the cost of raw MS steel plates, rolling to cylindrical casing shape, continuous shop/field full-penetration welding of longitudinal and circumferential butt joints, cleaning of welds; all raw material supply, conveyance, freight, loading, unloading, handling, storage, site delivery, all applicable royalties, statutory taxes (including GST), octroi, and duties; all labor, high-strength electrodes, tools, plants, machinery, cranes, cutting waste, scrap allowances, and all incidental operational and safety expenses complete in all respects, as per approved structural drawings, technical specifications, and to the complete satisfaction of the Engineer-in-Charge.
D. Wall | 639.38 | Qntl. | 9,579 | ₹61,24,621.02 |
| 9 | Driving, sinking, and positioning of 450 mm nominal diameter Mild Steel (MS) liners/casings for bored cast-in-situ concrete piles to specified depths below working ground level, including precise positioning and pitching of liners using GPS / total station instrument, full-penetration field welding, jointing, extension of liners as per site requirements, and trimming/cutting down extra length of liner above the required cut-off level; utilizing specialized pile driving rigs, vibro-hammers, cranes, and other necessary mechanical equipment and machinery; including all cost of operations, conveyance, loading, unloading, handling, site shifts, electric welding consumables, all statutory taxes, GST, duties, royalties, labor cess; all labor, skilled operators, tools, tackles, plants (T&P), testing for alignment/plumbness, and removing/disposing of cut-off steel scrap complete in all respects, as per approved drawings, technical specifications, and to the complete satisfaction of the Engineer-in-Charge
D.Wall | 63.94 | Ton | 9,337.5 | ₹5,97,039.75 |
| 10 | Temporary Cofferdam Construction: Providing, constructing, maintaining, and removing temporary cofferdam using driven wooden Bullah piles (sal/hardwood of required diameter and length) driven deep into the bed, interconnected with waling pieces/runner braces, along with double-line or single-line sand bag protection stacked securely; including supply, filling, tying, and placing sound sand-filled gunny/HDPE bags to seal seepage; maintaining structural stability against water flow and wave action, continuous dewatering during Toe Wall construction, and final dismantling and site clearance after completion; including all costs, conveyance, labor, labor cess, tools & plant (T&P), royalties, statutory taxes, and incidentals complete in all respects as per technical specifications and directions of the Engineer-in-Charge.
D. Wall, Gabbion Box | 342.4 | Rmt | 9,454.1 | ₹32,37,083.84 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 16.34 MB
DTCN.pdf
Tender Documents • 3.43 MB
BOQ_607900.xls
BOQ • 0.68 MB
Chandinipal.pdf
PDF • 5.73 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .