Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12 LAccepted-AOC | ₹12 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.9 L+₹1.9 L (15.4%)Rejected-AOC 804 HUBTOWN VIVA SHANKRWADI WESTERN EXPRESS HIGHWAY JOGESHWARI EAST MUMBAI MAHARASHTRA 400060 | MUMBAI SUBURBAN | MAHARASHTRA | 400060 | ₹13.9 L+₹1.9 L (15.4%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Technically Rejected |
| Sl No | Description | Qty | Unit | RLAC Private Limited L2 | Modern Hiring Service L1 |
|---|---|---|---|---|---|
| 2.00HIRING OF 04 NOS MOBILE AC PLANT (CHILLER) FOR 60 DAYS 1. 04 Nos - 20 Ton mobile chilled AC plant to be provided. 2. Firm to install, run and maintain the AC plant for the duration of the contract. 3. Time period: - 60 days on extendable basis. | |||||
| 3.00 | HIRING OF MOBILE AC PLANT (20 TON) 4 SET | 60 | Days | 18,667 ₹11,20,020 | 17,500 ₹10,50,000 Lowest |
| 7.00 | Mobilisation & demobilisation Charge
The vendor is required to submit gate entry details, along with the e-way bill, delivery challan, and return challan for both mobilisation and demobilisation, in order to claim payment. | 1 | SET | 2,65,000 ₹2,65,000 | 1,50,000 ₹1,50,000 Lowest |
Tender Value
Refer Docs
Closing Date
13 Jul 2026, 2:00 pmClosed
DGM SRM
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
HIRING Of MOBILE AC PLANT (CHILLER) FOR THE VESSEL RM.0834
2026_CSL_283256_1
CSL/SR1/834/49504
Open Tender
Marine Services
Works
60 days
CSL KOCHI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
3 Sept 2026
7 Jul 2026
14 Jul 2026
7 Jul 2026
13 Jul 2026
7 Jul 2026
7 Jul 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2 | HIRING OF 04 NOS MOBILE AC PLANT (CHILLER) FOR 60 DAYS
1. 04 Nos - 20 Ton mobile chilled AC plant to be provided.
2. Firm to install, run and maintain the AC plant for the duration of the contract.
3. Time period: - 60 days on extendable basis. | - | - | - | - |
| 3 | HIRING OF MOBILE AC PLANT (20 TON) 4 SET | 60 | Days | - | - |
| 7 | Mobilisation & demobilisation Charge
The vendor is required to submit gate entry details, along with the e-way bill, delivery challan, and return challan for both mobilisation and demobilisation, in order to claim payment. | 1 | SET | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
TD.pdf
Tender Documents • 1.35 MB
BOQ_330467.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .