Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹6.8 Laccepted-aoc | ₹6.8 L | accepted-aoc |
Tender Value
₹7.5 L
EMD Value
₹3,800
Closing Date
24 Apr 2026, 10:30 amClosed
Dr NTTPS
SE CHP DR NTTPS
Different types of mechanical maintenance works as and when required in MM-IV sub division of CHP-III/ Dr.NTTPS from 01-04-2026 or from the date of commencement of work to 30-09-2026
921104
E-16/26-27 CE/OM/DrNTTPS(SE/OM/CHP)
OPEN - NCB
Annual maintenance works
KRISHNA
8 documents required · 8 mandatory
₹265
₹3,800
9 May 2026
9 Apr 2026
9 Apr 2026
Replacement of tail/take up/snub or bend pulley bearings, any of all 12 Conveyors&2Trippers if necessary (total 58 nos) in MM-IV Sub division/ CHP/ Stage-III/ DR.NTTPS
Replacement of head pulley bearings any of all 12 Conveyors if necessary (total 12Nos pulleys) necessary in MM-IV Sub division/CHP/Stage-III/DR.NTTPS
Replacement of tail/take up/snub or bend pulleys of any of all 12 ,Conveyors&2Trippers if necessary (total 58 nos) in MM-IV Sub ivsion/CHP/Stage-III/DR.NTTPS
Fabrication and arrangement of Double plate scrappers at drive& tail pulley of all conveyors total 12 nos if necessary in MM-IV / CHP/Stage-III/DR.NTTPS
Overhauling of 6 no Sump pumps ( OUT OF 08Nos) at 16A/B,17A/B,23 tail ends&MCC-4 in MM-IV sub-division /CHP/Stage III/DR.NTTPS
Replacement and reconditioning of FCU 14.5/17.75/20/23 Damaged Fluid Coupling of RFC-3/4,16A/B,17A/B,18A/B,19A/B&23 conveyors if necessary in MM-IV/ CHP/STAGE-III/Dr.NTTPS
Replacement and reconditioning of RP Gear box-TE.125 Damaged gear boxes of R.P.Gates (12nos) if necessary in MM-IV sub-division/CHP-III/DR.NTTPS
Replacement of damaged Geared coupling GC-D-1005/GC-D-1006-C /GC-D-1009 including alignment of gear box with motor if necessary in MM-IVsub-division/CHP-III/DR.NTTPS
Replacement of Medium duty (< 75kw)Gearboxes i.e,H2C-180,H3C-180 if necessary in MM-IV/CHP-III/DR.NTTPS
Overhauling of Medium duty (< 75kw)Gearboxes i.e,H2C-180,H3C-180 if necessary in MM-IV/CHP-III/DR.NTTPS
Replacement of Heavy duty ( >= 75kw)Gearboxes i.e, KBN-250,H2C-280,H3C-315,H3C-355 if necessary in MM-IV/CHP-III/DR.NTTPS
Overhauling of Heavy duty ( >= 75kw)Gearboxes i.e, KBN-250,H2C-280,H3C-315,H3C-355 if necessary in MM-IV/CHP-III/DR.NTTPS
Replacement of Damaged tripper rails along with RS Joist beam and supports in unit 5&6 Bunker floor in M-IV sub-division/CHP/Stg.III/Dr.NTTPS
Rerailment of stucked trippers in Unit-5&6 Bunker floor in M-IV sub-division/CHP/Stg.III/Dr.NTTPS
Replacement and strengthening of damaged tripper stopper structure of 19A/B Conveyors in Unit-5&6 of Bunker floor in MM-IV/CHP-III/DR.NTTPS
Overhauling of hoists at JT-7,8,Bunker floor in M-IV sub divn/ CHP-III/Dr.NTTPS
Replacement of Idler frames of any Conveyor in MM-IV Sub division/CHP-III/Dr.NTTPS
Replacement of Drive pulleys of any Conveyor in MM-IV Sub division/CHP-III/Dr.NTTPS
Reconditioning of carrying frames , return frames , impact frames & return self align frames
Replacment of break drum and break shoes for 19A/B trippers units 5&6
Note:1. The firm has to quote their acceptable % excess/less on the above mentioned total amount for carrying out the subject work as & when required during the year 2026-27 as per the scope of work attached to this schedule
2. The statutory appliances EPF , ESI shall be reimbursed subject to production of proof of acquittances and limited to the rates & rules applicable from time to time.GST will be paid extra as per the rates & rules applicable from time to time.
3.If any deviation in quoting the tender by the tenderer will be liable for rejection
4. The standard field quality plan should be enclosed to the tender enquiry by incorporating the clause that ”the contractor should submit the FQP duly signed along with the tender schedule
5. FQP shall be approved by QC wing
6. The contractor should engage sufficient man power for completion of the work within time as instructed by the Engineer In charge without fail or else necessary action will be initiated
CE/O&M/Dr.NTTPS
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
General Conditions- E procurement -2026-27.pdf
TENDER_DOCUMENT • 10.25 MB
Notice.doc
TENDER_DOCUMENT • 0.06 MB
schedule.xlsx
TENDER_DOCUMENT • 0.67 MB
specification.doc
TENDER_DOCUMENT • 0.14 MB
undertaking.docx
TENDER_DOCUMENT • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .