Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹52,000
Closing Date
25 Mar 2021, 2:00 pmClosed
The Admiral Superintendent
NSRY, Kochi
RRC for Repair/Renewal of System Pipes and Valves onboard IN Ships, YardCrafts including INS Sagardhwani
2021_NAVY_428020_1
PP/01/1000/RRC/PIPES VALVES/21 24
Open Tender
Marine Services
Item Rate
1095 days
Kochi
The firm should have suitable facility and sufficient infrastructure setup at Kochi and manpower for 24x7 support for undertaking the repairs under this RRC
9 documents required · 9 mandatory
₹0
₹52,000
Yes
NSRY, Kochi
23 Apr 2021
4 Mar 2021
26 Mar 2021
4 Mar 2021
25 Mar 2021
19 Mar 2021
5 Mar 2021 - 10 Mar 2021
12 Mar 2021
Amount
Overhauling of SD/SDNR Valves
250 MM and above
Removal & Re fitment of SD/SDNR Valves (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
250 MM and above
Overhauling of BUTTERFLY/BALL/FLAP/STORM VALVE
250 MM and above
Removal & Re fitment of BUTTERFLY/BALL/FLAP/STORM Valves (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
250 MM and above
Overhauling of REDUCERS / RELIEF / SAFETY VALVE
250 MM and above
Removal & Re fitment of REDUCERS / RELIEF / SAFETY Valves (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
250 MM and above
Overhauilng of GLOBE/GATE/SLUICE VALVE
250 MM and above
Removal & Re fitment of GLOBE/GATE/SLUICE Valves (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
250 MM and above
Overhauling of FIRE HYDRANT
250 MM and above
Removal & Re fitment of FIRE HYDRANT (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
250 MM and above
Overhauling of QUICK OPERATING VALVES/PILOT OPERATING VALVES
Less than 50 MM
201 MM and above
Removal & Re fitment of QUICK OPERATING VALVES/PILOT OPERATING VALVES (including fasteners, gaskets, regutting /degutting, lagging & transportation, pressure testing & trials etc)
Less than 50 MM
201 MM and above
Specification of pipes Cupronickel Pipes- Mandatory Work
Removal of pipe and blanking of both sides of system, transportation of pipe to workshop, pressure testing of pipe( 1.5) times of working pressure (test equipments are to be provided by contractor), fitment of pipe and proving the system.
REPAIR WORK of Cupronickel Pipes- Cleaning of internal parts for removal of biological growth and foreign particles by carrying out d-scaling with reputed de-scaling solvent, visusal inspection and pressure testing.
Repair of pipe/flanges by building up of material/Machining.
RENEWAL WORK- Renewal of pipe including gaskets/clamps, if pitting or crack/hole in excess
Renewal of Flanges of pipe diameter given below:-
Renewal of adaptor and nipple
Renewal of existing zinc plugs/rings with cap
Renewal of pressure gauge line (copper)
Mandatory work - MILD STEEL (MAT:MS) PIPES Removal of pipe and blanking of both sides of system, transportation of pipe to workshop, pressure testing of pipe (1.5t) times of working pressure (test equipments are to be provided by contractor), fitment of pipe and proving the system.
REPAIR WORK - Cleaning of internal parts for removal of biological growth and foreign particles by carrying out descaling with reputed descaling solvent, visual inspection and pressure testing.
Repair of pipe/flanges by building up of material/Machining
Renewal work - Renewal of pipe including gaskets/clamps, if pitting or crack/hole in excess
Renewal of flanges pipe diameter given below:-
Renewal of adaptor and nipple.
Renewal of existing zinc plugs/rings with cap
Renewal of pressure gauge line (copper)
GALVANISED IRON (G.I) PIPES- Mandatory Works for Removal of pipe and blanking of both sides of system, transportation of pipe to workshop, pressure testing of pipe (1.5t) times of working pressure (test equipments are to be provided by contractor), fitment of pipe and proving the system.
REPAIR WORK - Cleaning of internal parts for removal of biological growth and foreign particles by carrying out descaling with reputed descaling solvent, visual inspection and pressure testing
Repair of pipe/flanges by building up of material/Machining. Diameter of pipe given below:-
Renewal Work - Renewal of pipe including gaskets/clamps, if pitting or crack/hole in excess
Renewal of flanges of diameter given below:-
Renewal of adaptor and nipple
Renewal of existing zinc plugs/ rings with cap
Renewal of pressure guage line (copper)
Renewal of Cu-Ni pipe bends
Less than 30 mm
Above 200 mm
Renewal of MAT:MS pipe bends
Above 200 mm
Renewal of GI pipes bends
Above 200 mm
Renewal of SS pipes grade 321, 316 seamless
Renewal of SS pipes bends grade 321, 316
Renewal of SS adaptors and nipples
Renewal of Brass adaptors and nipples
DELCO ENGINEERING WORKS
MY ENTERPRISES
SEABLUE SHIPYARD LTD
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .