Tender Value
Refer Docs
Closing Date
17 Oct 2023, 3:00 pmClosed
Regional Officer MoRTH Chandigarh
Regional Office MoRTH Room No 611 6th Floor Kendriya Sadan Sector 9A Chandigarh 160009
PMC for FS Prep of DPR Provid Pre Construction Activts nd Constn Supervn for Constn of Highway Tunnel of 6.12 km inclg approaches across Sadhana Pass betwn Km 79.50 nd Km 102.10 on Rafiabad Kupwara Chowkibal Tangdhar Chamkot Road NH 701 in JK
2023_MoRTH_756834_1
RW/CH/W(37)/JK/2023
Open Tender
Consultancy
EPC Contract
1460 days
Jammu and Kashmir
AS PER TENDER DOCUMENTS
3 documents required · 3 mandatory
₹5,900
RPAO (NH)
Exempted
Regional Office MoRTH Chandigarh
29 Dec 2023
9 Jun 2023
18 Oct 2023
9 Jun 2023
17 Oct 2023
9 Jun 2023
9 Jun 2023 - 19 Jun 2023
19 Jun 2023
Amount
A. For Phase 1 & 2 (DPR and Pre-Construction Activities) I. Remuneration for Local Staff (including per diem allowance) (For Standalone Tunnel Project) Professional Staff
Team Leader cum Senior Tunnel Expert
Tunnel Design Expert
Senior Geophysicist
Senior Geotechnical Engineer
Senior E&M Expert
Senior Geologist
Senior Survey Engineer
Environmental Specialist
Tunnel Engineer
Material Engineer
Highway cum pavement Engineer
Quantity Surveyor cum Documentation Expert
Land Acquisition/Forest Clearance Expert
Utility Expert
Sub-Total-1
SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate)
Horticulture cum Landscaping Expert
Electrical Engineer
Survey Engineer
CAD Expert
Environmental Engineer
Assistant Geological Engineer
Sub-Total-2
Total(Sub Total 1 + Sub Total 2)
II. SUPPORT STAFF
Office Manager
Typist
Office Boy
Night Watchman
Total:
III. Transportation (Fixed Costs)
Innova or Equivalent (not more than 2 years old)
Scorpio or Equivalent 4x4 vehicle (not more than 2 years old)
Bolero or Equivalent 4x4 vehicle (not more than 2 years old)
Total:
IV. Duty Travel to Site(Fixed Costs): Trips
Employers HQ
Other Trips
Total:
V. Office Rent (Fixed Costs) The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month)
Office Rent (Fixed Costs)
Total:
VI. OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs) [Monthly Rate]
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total:
VII. OFFICE FURNITURE AND EQUIPMENT (Rental)
Office Furniture and Ecquipment (LS)
Total:
VIII. REPORTS & DOCUMENTS PRINTING
Monthly report (3 copies per Month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with LA Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment Report & RAP
Final Environmental Assessment Report and RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP.
Final Bidding Documents
Draft 3(a),3(A) and 3(D) notification for land acquisition (3 copies each)
LA & Clearances II Report
Total:
IX. Survey and Investigation: A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile / aerial LiDAR or better Technology
B. Investigation (Fixed Cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffice Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Geophysical investigation
Any other Investigations/Surveys
Sub-Soil Investigation (Boring) Note:*Quantities of boring shall be taken from Financial Proposal Form No.V. for financial evaluation, the sequantities and rates quoted by the consultant will be considered. However, payment shall be made on the actual quantity of boring at rates quoted above by the consultant, which may be substantially more or less than the estimated quantities.
a) Boring in all type of soils (other than hard rock)
b) Boring in all type of soils (including hard rock)
Total:
C. Network Survey and GPR
Network Survey of the existing Highways as a repository for civil works as per directions from Authority.
GPR Survey for detection of under ground utilities
Total:
X. Cost of Supply and Fixing Boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Total:
XI. Land Acquisition Team including support staff and logistics/ transportation. A. Land Acquisition Team including support staff :
Ex-Land Revenue Inspector/ Officer or equivalen
Typist
Number of Land acquisition Teams (One Only)
Grand Total for All Land acquisition Teams(A)
B. Logistics for Land Acquisition Team
Computer including necessary peripherals
Printers
Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km
Number of Land acquisition Teams (One Only)
Grand Total (B)
Grand Total for All Land acquisition Teams and Logistics (A) + (B)
Estimate of Local Currency costs B. FOR PHASE 3 (CONSTRUCTION SUPERVISION AND MAINTENANCE) I. REMUNERATION FOR LOCAL PROFESSIONAL STAFF Normal Highway Project for Standalone Tunnel Project: A. Professional Staff (Construction Period 48 months + DLP 120 months)
Team Leader cum Senior Tunnel Expert
Resident Engineer cum Excavation Specialist
Senior Geotechnical Expert
Tunnel Design Engineer
Tunnel Safety Expert
Senior Geologist
Senior Contract Specialist
Sub-Total(A)
B: Sub Professional Staff (Construction Period 48 months + DLP 120 months)
Survey Engineer
CAD Expert
Environmental Engineer
Assistant Quality cum Material Engineer
E&M Engineer
Quantity Surveyor
Sub-Total (B)
Total (A+B)
II. Support Staff
Office Manager
Accountant cum cashier
Steno cum Computer Operator
Office Boy (1 no)
Total
III. Transportation (Fixed rate on rental basis) The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc., for all complete approx 3000km/month run
Description of Vehicles
Innova or equivalent (not more than 2 years old) (1 nos during Construction Period and 0 nos During Development and O&M Period), (1*48) Rate per month
Scorpio or equivalent 4 x 4 vehicles (not more than 2 years old) (1 nos during Construction Period and 1 nos During Development and O&M Period), (1*48+1*120) Rate per month
Bolero or equivalent 4 x 4 vehicles (not more than 2 years old) (1 nos during Construction Period and 0 nos During Development and O&M Period), (1*48) Rate per month
Total
IV. Duty Travel to Site(Fixed Costs) (for all lengths of projects): Professional and Sub-Professional Staff. *Rate quoted includes Hotel charges, travel cost etc, complete (Trips)
For 40 round trips to Employers HQ
For 40 round trips to Other Trips
Total
V. Office Rent (Fixed Costs)- Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, cleaning, repairs, etc. complete (Rate per Month)
200 sqm (Const.)
50 sqm (Maint.)
Total
VI. Office Supplies, Utilities and Communication (Fixed Costs) Rate per Month
Office Supplies
Drafting Supplies
Computer Running Costs
Domestic and International Communication
Total
VII. Office Furniture and Equipment (Rental) : The cost shall include rental charges towards all such furniture and equipment as required for proper functioning of office. Office furniture shall include executive tables, chairs, visitor chairs, steel almirahs, computer furniture, conference table etc. Office equipment shall include as a minimum of telephone (2external &10 internal lines), photocopier (15ppm, 12000copies per month with A3 & A4 input) fax machine, PCs(5 No., Intel Core 2 Duo E8300, 19’’ colour TFT, Cache-6MB, RAM-2 GB, HDD-250 GB, DVD Writer, Key board, optical scroll mouse, MS- Windows Vista Business, pre-loaded anti-virus etc.), laser printers (2 no., 14 ppm, 266 MHZ, 5000 pages per month, 600x600 dpi or better etc., Engineering Plan printer (1 no.), binding machine (1 no.), plotter A0 size, overhead projector, AC (4 no., 1.5 Ton), Water Coolers (as required)etc.
Office Furniture and Equipment (Rental)
Total
VIII. Reports and Document Printing (Rate as per copy)
Monthly reports (Design and Construction) (88*3)
Half yearly Reports (20*3)
Various others reports as provided in the Concession Agreement such as Completion Report (4*3)
Total
IX. Road Survey Equipment (Rate per Km) The cost shall include carrying out survey using equipment, manpower, software and report processing.
Heliborne Time Domain Magnetic Method.
Electrical Resistivity Imaging/tomography
Total
Estimate of costs for Expatriate consultants (in Indian Rupees) F I. REMUNERATION OF EXPATRIATE STAFF including per diem allowances.
Staff
Sub-Professional-1
Sub-Professional-2
Sub-Professional-3
Sub-Professional-4
Sub-Professional-5
Sub-Professional-6
Sub-Professional-7
Sub-Total-I
F II. Mobiliation and Demobilization
A. International Airfares (Fixed costs)
B. Inland Travel in Home Country (Fixed costs)
C. Other Missc expenses (like DA, internal travel expenses other incidentals)
Sub-Total-II
Total (I+II)
Contigencies
A fixed amount of Indian Rupees ONE MILLION shall be included in the Financial Proposal. The provisions of contingency shall be operated with the specific approval from the Competent Authority in BRO/MoRTH. (Fixed as Rs. 10,00,000) to be entered by bidder.
Total cost net of Goods and service Tax (for all three phases) **Total cost net of Goods and Service Tax(including all the taxes but excluding GST) shall be considered for financial evaluation.
Goods and service Tax
Grand Total including goods and service Tax(for all three phases):
Hexa Co.
Altinok Musavirlik Muhendislik A.S. (Altinok Consulting Engineering Inc.)
TUMAS Turkish Engineering Consulting & Contracting Inc. Co.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .