| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-AOC HAVELI FALIYA NALIYA KUTCH 370 655 | KACHCHH | GUJARAT | 370655 | ₹11.8 L | L1 | Accepted-AOC LOWEST BIDDER |
| 2 | L2₹15.1 L+₹3.3 L (27.6%)Rejected-Finance NAYA BASS MAHAMANDIR JODHPUR RAJASTHAN 342006 | JODHPUR | JODHPUR | RAJASTHAN | 342006 | ₹15.1 L+₹3.3 L (27.6%) | L2 | Rejected-Finance NOT LOWEST |
Tender Value
₹12.0 L
EMD Value
₹24,000
Closing Date
29 Nov 2023, 6:00 pmClosed
CWE (AF) BHUJ
CWE (AF) BHUJ KHAVDA ROAD BHUJ KACHCHH PIN 370001
COMPREHENSIVE ANNUAL MAINTENANCE AND REPAIR OF CHILLERS AT CERTAIN UNIT INSIDE TECH AREA AT AF STN NALIYA
2023_MES_619555_2
85251/E8
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
NALIYA
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE (AF) NALIYA
₹24,000
Yes
29 Dec 2023
1 Nov 2023
1 Dec 2023
1 Nov 2023
29 Nov 2023
15 Nov 2023
Amount
Comprehensive annual maintenance contract services for one year of 12 months for including following Items:- (i) Water Cooled Scroll Chillers 03 Qty Blue Star XWC3S-039AR2, Refnigerant:- R407C, 26 KG ,No. of Compressors:-3 Nos, Compressors Dantoss :- 03 Nos, Model of Compressors:- Scrol, (ii) Chilled water pump, CT Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 HP, CHW Pumps :- 5HP 3 Qty, Kirloskar monoblock pump 5 HP (iii) Delta make cooling towers 40 TR (iv) AIRHANDLING UNIT AND FANCOIL UNIT 02 Oty of Zeco, Model:- ZDS 80, CFM:-7100 CFM 5.5 KW Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as under for complete serviceability of all units throughout the year all as specified and directed.
Comprehensive annual maintenance contract services for one year of 12 months for including following Items:- (i) Air Cooled Scroll Chillers 03 Qty of Blue Star XACS3036MA-36TR, Refnigerant:- R22, CHARGE :-27 KG ,No. of Compressors:-3 Nos, Compressors Dantoss :- 03 Nos, Model of Compressors:- Scroll, SM18554RC, DX type chiller with 03 circuit, 03 Nos Condenser fan motor in one Unit (ii) Chilled water pump, CHW Pumps:-5HP 2W+1S=3 Qty Crompton monoblock pump 5 HP (iii) AIRHANDLING UNIT AND FANCOIL UNIT 01 Oty of ,Zeco, Model :- DHVW-220-C. CFM:-12904 CFM 10HP Motor including replenishment of refrigerent gas and carrying out preventive maintenance as per standard practice four times in a year with scope of work as under for complete serviceability of all units throughout the year all as specified and directed.
Notes:- (i) Inspecting the plant system and carry out preventive maintenance as per the standard practice four times a year (Each quarter -First Month). (ii) Checking the refrigeration system, motor and starters and ensuring healthy condition of the plant. (iii) Checking the system for any leaks and rectification of leaks if found (iv) Taking set of readings and evaluating to ensure satisfactory performance of the plant during First month of each quarter. (v) Checking the Refrigeration control system for operation and adjusting the settings.(vi) Descaling the condensers for water-cooled units if found necessary (Twice in a year) (vii) Checking the functioning of compressor and its accessories. (viii) Cleaning the evaporator / condenser coils if found necessary. (twice in a year) and cleaning of chiller once a year. (ix) Lubricating the bearings of motors, & fans once a year. (x) Quarterly inspection of belts adjusting the tension and replacing the worn out belt as and when found required. (xi) In-case of Screw/Scroll Compressor failure maximum lead time for repairing of the compressor will be 2 to 4 weeks. (xii) Replenishment of refrigerant gas as a result of fare wear and tear.(xiii) Annual checking of compressor oil and changing once a year. (xiv) Overhauling/repairing of the components of the equipment at site or in service station as and when required. (xv) Checking of the microprocessor controller for its proper functioning and repair/ replacement of the same if found necessary. (xvi) Attending to the plant immediately when called upon. (xvii) Attending to complaint / breakdown calls whenever required (Max four times a year for outstation jobs). (xviii) Reporting the healthiness of the plant and suggesting improvements if any complete all as specified and directed by Engr-In-Charge. (xix) Contractor shall depute qualified experienced team for comprehensive annual maintenance as specified in CA. If any defects arise or serviceability of chiller plant is effected in between the periodicity of checking, contractor shall depute his team immediately for rectification on intimation. If contractor fail to send his team for rectification action, the penalty of Rs.5000/- per day for delay beyond 48 hrs of intimation by Engr-In-Charge shall be imposed.
Anil Builders
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .