Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.8 CrAdmitted-Finance | ₹10.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹10.8 CrAdmitted-Finance 56 ARUNACHALAM MAIN ROAD AMBAL NAGAR PORUR CHENNAI TAMIL NADU 600116 | THIRUVALLUR | TAMIL NADU | 600116 | ₹10.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹10.8 CrAdmitted-Finance | ₹10.8 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | K K Rao Engineering Works Pvt Ltd L3 | SHREE ABIRAMI ENGGINEERING WORKS L2 | ABIRAMI ENGINEERING L1 |
|---|---|---|---|---|---|---|
| 1.00ABSTRACT | ||||||
| 1.10 | Supply of materials & Labour Charges for 50 MVA 230 KV class Auto/Power Transformer | 1 | Nos. | 67,55,563.13 ₹67.6 L | 67,54,973.13 ₹67.5 L | 67,54,964.87 ₹67.5 L |
| 1.20 | Supply of materials & Labour Charges for 100 MVA 230 KV class Auto/Power Transformer | 1 | Nos. | 78,23,458.41 ₹78.2 L | 78,23,399.41 ₹78.2 L | 78,23,339.23 ₹78.2 L |
| 1.30 | Supply of materials & Labour Charges for 160 MVA 230 KV class Auto/Power Transformer | 1 | Nos. | 1,00,24,252.81 ₹1.0 Cr | 1,00,24,134.81 ₹1.0 Cr | 1,00,24,127.73 ₹1.0 Cr |
| 1.40 | Supply of materials & Labour Charges for 200 MVA 400 KV class Auto/Power Transformer | 1 | Nos. | 1,38,21,343.66 ₹1.4 Cr | 1,38,21,225.66 ₹1.4 Cr | 1,38,21,218.58 ₹1.4 Cr |
| 1.50 | Supply of materials & Labour Charges for 315 MVA 400 KV class Auto/Power Transformer | 1 | Nos. | 1,54,35,807.86 ₹1.5 Cr | 1,54,35,689.86 ₹1.5 Cr | 1,54,35,676.88 ₹1.5 Cr |
Tender Value
₹20 Cr
EMD Value
₹20 L
Closing Date
5 Apr 2023, 2:00 pmClosed
CE/TP-II/Trichy
Chief Engineer, Transmission Projects-II, Periyamilaguparai, Trichy-1
Repairing and reconditioning of 400KV 230 KV class sick healthy Auto power transformers of various capacities available within the region of TP-II Trichy for a period of two years.
2023_EB_292722_1
CE/TP-II/TRY/E-40/22-23
Open Tender
Electrical related work
120 days
Trichy
As per tender speciification
4 documents required · 4 mandatory
₹0
₹20 L
Yes
24 Apr 2023
3 Mar 2023
6 Apr 2023
3 Mar 2023
5 Apr 2023
3 Mar 2023
ABSTRACT
Supply of materials & Labour Charges for 50 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 100 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 160 MVA 230 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 200 MVA 400 KV class Auto/Power Transformer
Supply of materials & Labour Charges for 315 MVA 400 KV class Auto/Power Transformer
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
K K Rao Engineering Works Pvt Ltd
SHREE ABIRAMI ENGGINEERING WORKS
SHREE ABIRAMI ENGGINEERING WORKS
K K Rao Engineering Works Pvt Ltd
Charges for transporting transformer along with accessories from the site to the firm's works
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
HV coil with insulation (HV/LV coil rate will be taken as base rate for arriving at actual HV/LV coil rate based on IEEMA circular and formula given in cl.no. 2.3 of sec. V)
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
Core bolt with insulation
Dismantling the accessories and drain Oil upto the required level
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_347538.xls
BOQ • 0.93 MB
Download all tender documents and submit your bid