Loading…
Loading…
Tender Value
₹36.1 L
EMD Value
₹36,200
Closing Date
3 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Anjar Nagarpalika
PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING VARIOUS DIA WATER PIPELINE IN VARIOUS AREA OF ANJAR NAGARPALIKA AT ANJAR-KUTCH
280110
2025-26
Open
Civil - All
Kutch
1 document required · 1 mandatory
₹1,500
Yes
Chief Officer, Anjar Nagarpalika
₹36,200
Yes
24 Feb 2026
24 Feb 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
Name of Work:- PROVIDING, SUPPLYING, LOWERING, LAYING &
JOINTING VARIOUS DIA WATER PIPELINE IN VARIOUS
AREA OF ANJAR NAGARPALIKA AT ANJAR-KUTCH
Tender Cost: Rs 36,11,642/-
NAGAR SEVASADAN
ANNEXURE–II NoticeInvitingOn-LineTender
Details about Tender :-Tender NoticeNo. , 2025-26
(Includingas per Corrigendum)
Department Name :- Nagar Sevasadan,Anjar
IFB No. :- Tender NoticeNo., 2025-26(Includingas per
Name ofProject :- PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING
VARIOUS DIA WATER PIPELINE IN VARIOUS AREA OF
ANJAR NAGARPALIKA AT ANJAR-KUTCH
Name ofWork :- PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING
VARIOUS DIA WATER PIPELINE IN VARIOUS AREA OF
ANJAR NAGARPALIKA AT ANJAR-KUTCH
Estimated Contract Value(INR) :- Rs. 36,11,642/-
Period ofCompletion (in Months) :- 5 MONTHS. (Incld.Monsoon period)
BiddingType :- Open
Bid Call(Nos) :-
Tender CurrencyType :- Single
Tender CurrencySettings :- Indian Rupee(INR)
Joint Venture :- Not Applicable
Rebate :- Applicable
Eligible class ofcontractor E1 AND ABOVE
Bid DocumentFee :- Rs.1500/-
Bid DocumentFeePayable To :- ChiefOfficer, Nagar Sevasadan,Anjar.
Bid Security/ EMD (INR) :- Rs. 36,200/-
Bid Security/ EMD in favourof :- ChiefOfficer, Nagar Sevasadan,Anjar
Bid Document DownloadingStart :- As soon as Publication ofAdvertisement in News
Bid Document DownloadingEnd :- …………….. at time 00.00 hours
Prebid meeting Not applicable
Last Date&Time forReceipt :-
(Submission) ofBids
Bid ValidityPeriod :- 120 daysafteropeningofpricebid
Instruction of Bid
Name of Work:- PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING VARIOUS DIA
WATER PIPELINE IN VARIOUS AREA OF ANJAR NAGARPALIKA AT ANJAR-KUTCH
QUALIFICATIONS OF TENDER
The tender shall be required to submit the enlisted documents online and scan a copy of the EMD
and tender fees. If documents are insufficient or it does not match the necessary
criteriamentioned below, then the price Bid of the tender shall not be opened. In addition, the
tender shall be required to submit the original hard copy of EMD, tender fees, and Necessary
self-attached supporting Documents at a Specified Time.
Mainly tenderer shall fulfill the following criteria for pre-qualification,
• Valid Solvency certificate of 20% Amount of tender amount from bankers of schedule
bank/nationalized bank issued on or current calendar year.
Registered in Class “ E1 “ and Above”
• An attested copy of the pan number should be enclosed
• An attested copy of the GST Number should be enclosed
• Attested Copy of completion Certificate in Form 3A for the
Single work of constructing Similar work amounting to minimum Rs. 80% of the Tender
Amount (Only Government / Semi Government / Nagarpalika / Maha nagarpalika) in last
Five years) must be enclosed.
Two works of constructing Similar work amounting to minimum Rs. 50% of the Tender
Amount (Only Government / Semi Government / Nagarpalika / Maha nagarpalika) in last
Five years must be enclosed.
Three works of constructing Similar work amounting to minimum Rs. 40% of the Tender
Amount (Only Government / Semi Government / Nagarpalika / Maha nagarpalika) in last
Five years must be enclosed
• GST Applicable extra on Contract/bill Amount.
1. Joint Ventures are not allowed.
2. All the securities deposits and bonds will be refunded only after one year from the
completion of all work.
For thepurposeof t h e relationofDD, FDRbidder
shallsendthe originalthroughRPADinphysical
formsoas to reach the officeon the dateshown
above during officehoursatChiefOfficer,Nagar
Sevasadan,Anjar-Kutchonly.Tenderfee EMD &
othervalid documentsreceived earlyorlaterthan
thetimespecifiedwillnotbeacceptedinanycase
&the bid of thatbiddershall be considerednon-
responsive.Penltativeaction fornot submittingDD
/FDR inoriginal to the chiefofficerby the biddershall
be initiated.Anydocumentinsupportingofbidshall
besubmitted inelectronicformatonly
throughonlinebyscanningetc.& hardcopywill notbe
acceptedsaperately
Remarks (1) Tenderfee&EMDshallbescanned&upload
alongwithtechnicaldocuments.
(2) Submission of E.M.D./Tender fee and other
Documents duringofficehourstothe chiefofficer.
atthetimeofTenderopeningorshallbesent
byR.P.A.D/SPEED POST-ChiefOfficer,
NagarSevasadan, Anjarbefore upto07-03-
2026uptoofficehours
PriceBid Opening Date --------------------------- hrs Onwards.
In the officeof the
ChiefOfficer, Nagar Sevasadan,Anjar-Kutch
OfficerInviting Bids :- ChiefOfficer, Nagar Sevasadan, Anjar-Kutch
Bid OpeningAuthority :- ChiefOfficer, Nagar Sevasadan,Anjar-Kutch
Address :- Nagar Sevasadan,Anjar,Gujarat
Contact Details Mobile:
General Terms andConditions
(1) Bidders can download thetender document freeof cost from thewebsite.
(2) BiddershavetosubmitPricebidinElectronicformonlyonnprocurewebsitetilltheLast
Date&time forsubmission.
(3) Offers in physical formwillnot be accepted in anycase.
(4) Thiswork allotted by roadandbuilding dept.fund
(5) FreevendortrainingcampwillbeorganizedeverySaturdaybetween4.0to5.00P.M.at
(n)codesolutions-A Division of GNFCLtd., Bidders are requested to takebenefitof thesame.
Bidderswhowishtoparticipateinonlinetenderswillhavetoprocure/shouldh a legally valid
DigitalCertificateasperInformationTechnologyAct-2000,usingwthey cansigntheirelectronic
bids.Bidderscanprocurethesamefromanyof the licensecertifyingauthoritiesofIndiaorcan
contract(n)codesolutions-AdivisionGNFCLtd,whoarelicensedCertifyingAuthority by Govt.
All bids should be digitallysigned; fordetails regarding digital signature certificate-related
traininginvolved the below-mentioned address should be contacted:
(n)CodeSolutions
A division of GNFC
301, GNFCInfotower,Bodakdev,
Ahmedabad –380 054(India)
E-mail:[email protected]
Web-site: www.rnb.nprocure.com
Toll Free: 1800-233-1010(Ext. 321)
OtherTerms& Conditionsas perdetailedtenderdocuments
NagarSevasadan,
ITEM RATE TENDERAND CONTRACTFORWORKS
SFDMDF8[G]\AFATNZJF/]\8[g0ZVG[SMg8=FS8
PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING
Name of Work: VARIOUS DIA WATER PIPELINE IN VARIOUS AREA OF ANJAR
NAGARPALIKA AT ANJAR-KUTCH
Nagar Sevasadan,Anjar-Kutch
8[g0Zl:JSFZJFGL
E-TenderingSystem E-TenderingSystem
K[<,L TFZLB ANNEXURE-II Notice ANNEXURE-II Notice
Inviting On-Lin Inviting On-Lin
lJEFULICLXFAGLX
OPENEDBY ON DATE
As perdetailedtender
notice onfronttwo pages
ChiefOfficer, Nagar
Sevasadan, Anjar-kutch
MEMORANDUMOF WORKS IN BRIEF
SZJFGFSFDGL8}\SL IFNL
(1)Name ofthe work :- PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING VARIOUS DIA WATER PIPELINE
IN VARIOUS AREA OF ANJAR NAGARPALIKA AT ANJAR-KUTCH
(2)Estimated Cost Rs. 36,11,642/-
(3)EarnestMoney Rs.36,120/-
(4)Validityperiod oftenderoffered 120 days fromthe date ofopeningof price
(4)VMOZ S[8,F lNJ; B]<,LZC[X[ 5|F.;AL0BM<IFGLTFZLBYL !Z_ lNJ;M ;]WL
(5)SecurityDeposite -HFDLGULZLVGFDT5/10%
(i)In the formofsmallsavings or
NarmadaBonds(ofminimumone
yeartime limit) …2.5% Rs
(i) GFGLART~5[VYJFGD"NFlGUDGLAF\WL
D]NTYLYF56:J~5[sVMKFDF\VMKLV[S
JQF"GLD]NTJF/Lf ........... w
(ii)To deductedfrombills …2.5% Rs
(ii)RF,] AL,MDF\YLSZJFGLS5FT ........... wë.
(iii)Performance bond ofSchedule
(iii)VG];}lRTA[gSG]\ 5OM"Dg; AMg0 ........... wë.
Total V[S\NZ[ …...5./10% Rs
(6) Time allowedforcompletion ofthe work
fromthe dateofwrittenorderto commence 5 MONTHSMonths
SFDX~SZJFGFC]SDD?IFTFZLBYLSFD5]~\SZJFDF8[GM (Incld.Monsoonperiod)
(7)Otherdetails–
(i) Date on orbefore whichthetender
mustreach the office
(1)SR[ZLDF\8[g0Z5CM\RT]SZJFGLTFZLB
(ii)Modeofsendingthetender E-TenderingSystem
(2)8[g0ZDMS,JFGL5wWTL As perAnnexure-IINoticeInviting
(b)Tenders sentbyordinarypostwillbe On-LineTender
Outrightrejected.
(iii)Description essentialtobe madeon
(3)DCMZA\WSJZ5Z NXF"JJFGLH~ZLlJUT
(iv)Mode ofquotingratein Schedule 'B'
(4)VG];}lRBDF\EFJEZJFGLZLT
Note:ThenormalrateofSecurityDepositis5percentforworksuptoRs.15lacsandfurther5%as performancebond-
forworksaboveRs.15 lacs.Outof5 %ofSecurity Deposit50% isPayable at the time
to acceptanceoftenderand thebalancebydeductionfromprogressbills.
1. NOTICEINVITING TENDERS
2. ADDITIONAL INSTRUCTIONS TO PERSONSTENDERING
3. BANKGUARANTEE
4. DECLARATIONFORM
5. DECLARATIONCERTIFICATE
6. GENERALRULES AND DIRECTIONS FOR THEGUIDANCE OFCONTRACTORS
7. TENDER FOR WORK
9. TERMS&CONDITIONSOFCONTRACT
Clause 1 Securitydeposit
Clause 2 Compensation for delay
Clause 3 Action in when securityDeposit is fofeited
Annexure forperformancebond
Clause 4 Action when the progress of anyparticular portion ofthe work is unsatisfactory
Clause 5 Non exerciseof powers underclause3 not awaiver
Clause 5-APowerstoseizetools,plants,machineries,materialsandstoresofthecontractoron invocation
Clause 6 Extension of Timelimit
Clause 7 Final Measurementsand Final bill on completion ofwork
Clause 8 Intermediateand Final payments
Clause 9 Payment at reduced rates
Clause10 Bills to besubmitted monthly
Clause11 Bills and rates payable
Clause12 Materials to besupplied bythe Department
Clause12-a Materials supplied bythe Department
Clause12-BSafecustodyofmaterials supplied bythe Department
Clause 13 Drawings,Designs,InstructionsoftheEngineer-in-chargeandspecifications,order
ofprecedencein caseofdiscrepancies
Clause14 Excess over TenderQuantities, ExtraItems and Variations
Clause15 No claimto anypaymentorcompensationforalterations orforrestrictions ofwork
Clause15-A No claim fordelayin supplyof materials bytheGovernment
Clause16 Claims under the contract
Clause17 Remedies for inferiororbad work, materialorworkmanship and maintenanceclause
Clause17 -A Defect liabilityclause
Clause18 Workto be openfor inspection-Contractor's responsible agentto be present
Clause19 Notice tobe given before workis covered up
Clause20 Damage to contractwork-in-progress and damages tosurroundingproperties
Clause20-A Damagesdue toacts ofGod and unprecedented floods
Clause21 Contractortosupplyplant,ladders,scaffoldingetc.andisliablefordamagearisingfrom non
provision oflights,fencingetc.
Clause21-A Regulations forscaffolds, workingplatforms,gangways andstairways
Clause21-B Regulations forhoisting appliances
Clause22 Measuresforpreventionof fire
Clause23 Liabilitiesto contractors foranydamagesdone in oroutside work
Clause24 Deleted
Clause25 Deleted
Clause26 Worknottobesublet,consequencesforunauthorizedsubletting,bringingandbecoming insolvent.
Clause27 Sumspayablebywayofcompensationtobeconsideredasreasonablecompensation
withoutreferenceto actualloss
Clause28 Changes intheconstitutionoffirmto benotified
Clause29 Works tobe underdirections ofSuperintendingEngineer
Clause30 SettlementofDisputesandArbitration
Clause31 Deleted
Clause32 Lump sums in estimates
Clause33 Actionwhere no specifications
Clause34 Definitions ofwork
Clause35(B-1) Contractors percentage whetherapplies to netor
grossamount ofthebill
Clause36(B-1)/35(B-2) Royalties
Clause37 (B-1)/36B(B-2) Compensationunder the Workmen's Compensation Act
Clause37A(B-1)36A(B-2) Liabilityofthe contractorin case ofaccidents
Clause3 (B-1)36A(B-2) Arrangements forpersonalsafetyrequirements andfirstaid
Clause37(B-1)36A(B-2) Quantitiesinthetendertobeconsideredapproximateandtheyaresubject to
Clause38(B-1)36A(B-2) Employmentof famine orotherlabour
Clause39(B-1)36A(B-2) Claimforcompensationfordelayinstartingthe work Clause40
(B-1)36A(B-2) Claimforcompensationfordelayintheexecution ofwork Clause41 (B-
1)36A(B-2) Enteringupon orcommencinganyportion ofwork
Clause42 (B-1)36A(B-2) Minimumage of persons employed
Clause42(i)(B-1)36A(B-2) Thepaymentof fair wagesetc
Clause43(B-1)36A(B-2) Method ofpayment
Clause43A(B-1)36A(B-2) Setoffclause
Clause44(B-1)36A(B-2) Deleted
Clause45 (B-1)36A(B-2) EmploymentofScarcitylabour
Clause46 (B-1)36A(B-2) Deleted
Clause47 (B-1)36A(B-2) Ratesinclusive ofSalesTax
Clause48 (B-1)36A(B-2) Employment through EmploymentExchange andlocallabour
Clause49 (B-1)36A(B-2) Fairwages
Clause50 (B-1)36A(B-2) Deleted
Clause51 (B-1)36A(B-2) ListofMachinery
Clause52 (B-1)36A(B-2) Liabilitiesofcontractor foridleness ofRoadRollers deployedbytheDepartment
Clause53 (B-1)36A(B-2) Locallabouron normal rates
Clause54 (B-1)36A(B-2) Land on Hireandrentalcharges
Clause55 (B-1)36A(B-2) Vaccinationtolabour
Clause56 (B-1)36A(B-2) Camp facilitiesto workers
Clause57 (B-1)36A(B-2) Gun boots, hand gloves, masks etc., tolabourers
Clause58 (B-1)36A(B-2) No distinction between Harijans and otherworkers
Clause59 (B-1)36A(B-2) Price Escalation clause
Clause60 (B-1)36A(B-2) Fencingand Lighting
Clause61 (B-1)36A(B-2) Liabilitiesforaccidents topersons
Clause62 (B-1)36A(B-2) Accesstosite and workonsite
Clause63 (B-1)36A(B-2) Reports RegardingLabour.
Clause64 (B-1)36A(B-2) Treasuretrove
Clause65 (B-1)36A(B-2) Indemnity
Clause66 (B-1)36A(B-2) Insurance oflabour
Clause67 (B-1)36A(B-2) Settingout
Clause68 (B-1)36A(B-2) CementRegister
Clause69 (B-1)36A(B-2) MaterialsandworkTestRegister
Clause70 (B-1)36A(B-2) ProgressSchedule
Clause71 (B-1)36A(B-2) SecuredAdvance
Clause72 (B-1)36A(B-2) Advance Payment
Clause73 (B-1)36A(B-2) Advanceagainstmachineries
Clause74 (B-1)36A(B-2) MobilizationAdvance
Clause75 (B-1)36A(B-2) Licenseforcontractlabour
Clause76 (B-1)36A(B-2) RecoveryofTestingchargesandhandingoveremptycementbags
Clause77 (B-1)36A(B-2) Recoveryofsalestax
Annexure-I Declarationregardingincometaxaddressetc.
Annexure-II BasicRateconsideredbythecontractor
Annexure- IIIPerformanceBond
Annexure- IV Listofworkalreadycompletedbythetender
Annexure- V ListofplantandMachinery
Annexure- VIDeclarationregardingworksonhand
GUJARAT STATE ROADS &BUILDINGDEPARTMENT
INTEMTENDER ANDCONTRACT FOR WORKS SFDM
DF8[G]\AFATvNZJF/]\8[g0ZVG[ S\8=FS8
ADDITIONAL INSTUCTIONSTO PERSONSTENDERING8[g0ZEZGFZG[JWFZFGL ;]RGFVM
1. CompetencyofTender–Nocontractwillbeawardedexcepttoresponsiblebidderscapableof performing
theclassofworkscontemplated.Beforetheawardof thecontract,any biddermaybe
requiredtoshowthathehasthenecessary facilities,experience,ability andfinancialresourcesto
performtheworkinsatisfactorymannerwithininthetimestipulated.Contractormayberequired to
furnishthe departmentwiththestatementas to theirexperienceand theirfinancialstatus.
2. Tenderwillbedeemedtohaveinspectedthesiteandtohavesatisfiedastothenature ofallworks,
allexistingroads,water-wayandothermeansofcommunicationandaccesstoandfromthesite
andworkandthebuildingthatmayberequiredfortemporarypurposeinconnectionwiththe
construction ,completion andmaintenanceoftheworksandmustmakehisowninquiriesasto
work,yardsitesanddepot, anddumpsandastoacquisitionofsuchadditionalsitesandareasas maybe
necessaryfortemporarypurposeforconstructing, completingand maintainingthe works .
2.1 Thetendersshallbereceivedonlyunder“ONLINETHROGHE-tendering”Noothersystem,
namelyreceivingoftendersbyHandDelivery„or‟byExpressDelivery„or‟inperson,shouldbe adopted
underanycircumstances.
I:Latetenders(i.e.tenderreceivedafterthespecifiedtimeofopening ),delayedtenders(i.e.
tendersreceivedbeforethe timeofopening butafterduedateandtimeofreceiptoftenders)and posttenders
offers shallnotbe opened and consideredatall.
II:Thetendersreceivedafter time&thedatespecifiedinthetendernoticeshallnotbereceived bythe
concerned office,
III:Necessaryrecordsshouldbemaintainedforrefusalofsuchtendersintheregistersfor
receivingtendersand should be initialedbythe concerned Executive Engineer.
3 Payment:-Thetendermustunderstandclearlythattheratesquotedareforcompletedworksand
includeallcostsdue tolabour,scaffolding plant,supervision, serviceworks,power,royaltiesand
octroietc.,andtoinclude allextrastocover thecostofnightwork ifandwhen requiredandno
claimforadditionalpaymentbeyondtheprice/ratesquotedwillbeentertainedandthetenderer
willnotbeentitledsubsequently tomakeanyclaim onthegroundofmisrepresentationoronthe
groundthathewassuppliedwith informationgivenby anyperson(whetherthememberisthe
employeeofPublicWorks Departmentornot).Any failureonhisparttoobtainallnecessary
informationforthepurposeofmakinghistenderandfillingtheseveralpricesandratestherein
shallnotrelieve himfromanyrisks or liabilitiesarisingout. Oforconsequentupon the submission of the
#P R]SJ6Lv8[g0ZEZGFZ[ V[JFT;DHL ,[JFGL ZC[X[S[T[6[8F\S[,F NZ5]ZF\YI[,F SFD DF8[GF K[VG[T[DF\ D\H]ZL45F,B4%,Fg84
N[BZ[B4;lJ¶;vSFDULZL4JLH/L4 ZMI<8LVG[VMS8=MIJU[Z[V\X[TDFDBR"GMTYFH~ZLH6FI TM VG[tIFZ[ZFT5F/LGF
SFDG[VFJZL,[JFAWFHJWFZFGFBR"GM;DFJ[XYX[VT[8F\S[,FEFJS[NZSZTFJWFZFGLSM.R]SJ6LV\U[GFT[DGFSM.
NFJFwIFGDF\,[JFX[GCLVG[8[g0ZEZGFZBM8LZH]VFTG[SFZ6[VYJFSM.jIlSTV[s5KLT[AF\WSFDlJEFUGMSD"RFZL
CMIS[GCMIfT[DG[VF5[,LDFCLTLGFVFWFZ[5FK/YLSM.NFJFZH]SZJFCSNFZZC[X[GCL\PT[DG]\8[g0ZEZJFTYFT[DF\
H]NFH]NFEFJVG[NZEZJFDF8[H~ZLV[JL TDFDDFCLTL 5FTFGF 51F[GD[/JL XSJFG[ SFZ6[ 5MT[8[g0ZZH] SZJFG[,LW[ VYJF T[DFYL
pEF YTFSM.HMBDS[HJFANFZLVMDF\YLK8SL XSFX[ GCLP
4. TenderForms–Every„blank‟intheformofthetenderandintheschedulemustbefilledupby
thetendererand mustreturn the documentsentherewith.
$P 8[g0ZOMD"v8[g0Z OMD"VG[NZ[SNZ[SBF,L HuIF 8[g0Z EZGFZ[EZLG[ VF ;FY[DMS,[,N:TFJ[H5ZTSZJFGFZC[X[P
5. Bidderscanprepareandedittheiroffersnumberoftimesbeforetendersubmissiondateandtime.
Aftertendersubmissiondateandtime,biddercannotedittheirsubmittedoffer inany case.No
writtenoronlinerequestinthis regard shallbe granted.
5P ;]WFZMJWFZMov 8[g0ZEZGFZG[H6FJJFDF\VFJ[K[S[TV [ M 8[g0Z VMG,F.G;ADL8SZJFGL K[<,LTFZLBTYF ;DI;]WL
T[DGLAL0VMOZRFC[T[8,LJFZ;ADL8SZL;]WFZLXS[K[P8[G0Z;ADLXGGL TFZLB TYF;DIlJtIFAFNT[VMT[DGL
VMOZDF\SM.565|SFZGM;]WFZMSZLXSX[GCLVG[VFAFAT[T[VMGLSM.56,[lBTS[VMG,F.GlJG\TL U|FCI ZFBJFDF\ VFJX[GCLP
Contractors to pleaseread thisCarefully :SMg8F=S8ZMV[GLR[GLAFATMSF/HL5]J"SJF\RJF lJG\TL K[P
1. ThepercentageinSchedule„B‟mustbegiveninwordsandfigures.Amountthusworkedoutmust
alsobe enteredin column and grand totalofamountmustbe struckoutbythetenderer.
alsobe enteredin column and grand totalofamountmustbe struckoutbythetenderer.
!P JW]S[VMKFGL8SFJFZLGFNZXaNMT[DHVF\S0FDFVF5JFP8[g0ZEZGFZ[VFZLT[AGTLZSD56BFGFDF\GM\WJLVG[ ZSDGM S],;ZJF/M
2. Ifthetenderistakeninfavourofthecompany,apowerofattorneyinfavourofthepersonwho
mayhave signed thetenderforthecompany mustaccompanythe tender.
ZP SM.S\5GLG[GFD[8[g0Z,[JFDF\VFjI]\CMITMS\5GLJTL8[g0Z5Z;CLSZGFZjIlSTG[VlWS'TSZT]\D]BtIFZGFD]\8[g0Z;FY[ ZH] SZJFG]\
3. Solvencycertificate ofa Bankwillhave to be producedbythe contractor.
#P [A\[SG]\] 5|DF65+SMg8=S8Z[ZH] SZJFG]\ ZC[X[P
Challanforearnestmoney@1%oftheestimatedcostmustaccompanythetender.Tenderermay
payearnestmoneyuptoRs.50,000incashorintheformofCrossedDemandDraftorfixed
depositoffixeddepositat-callreceiptswithavalidityperiodofnotlessthansixmonthsof
Nationalised or Scheduledor Co-operative Bankhaving5 year standingdrawn infavourof
ExecutiveEngineer/Divisional Officerconcerned.Earnestmoneybycheque&BankGuarantee
shallnotbeaccepted.vide R&BDG.R.No. TNC/1090/(100) (4)-Cdated4-11-2000)Howeverin
respectof theworksestimated to costaboveRs.50 lacs,theamountofearnestmoney inexcessof
Rs.50,000 canbeofferedbythecontractor,athischoice,intheform ofBankGuaranteeofthe
ScheduledBank orNationalisedBank only. TheBankGuarantee in suchcases willbe furnished in
thefollowingform.Insuchcasesalso,theamountofearnestmoneyfirstRs.50,000willpaidonly intheform
ofcashorcrosseddemanddraftsorfixeddepositreceiptsordepositatcallreceipts
worththevalidityperiodofnotlessthan6monthsofthenationalisedorScheduledorCo- operative Banks
having five years standing.
TheContractorswhohavesecuredexemptioncertificate forpaymentofearnestmoney by
depositingLump Sumearnest moneyDeposit neednot payearnest money, but producethe
certified copyoftheexemptioncertificate alongwith the tender.
IfthecontractordonotturnuptopaytheSecurity Depositandexecutecontractagreement
withinspecified(orextended)timeafterintimationtohimaboutacceptanceofthisoffer,the
earnestmoneypaidforthiswork willbeforfeitedandaccording toclause-1ofthistenderform
tenderer‟stendershallberejectedandthenaccording toaforesaidprovisionoftender,actionto
blacklistthecontractorwillbe initiated withoutDelay.
WhereasM/s. (hereinaftercalledtheTenderer)is
desirousandpreferredtotenderforworksinaccordancewiththeterms andconditionsoftenderfortheworkof
andwhereasWe, Bankagreeto givethetenderera guaranteefortheEarnestMoney.
1.Therefore, we herebyaffirmthatweare guarantorsonbehalfoftheTendereruptototalrupees
inWords)Rs. (infigures)andweundertaketopay
toExecutiveEngineer Division DepartmentofGovernmentofGujaratthe
(nameofGovt.previousnoticeofjudicialortobespecified).Uptohisfirst
written demand, without demur, without delay and without the necessityof a previous notice of judicial or
administrativeproceduresandwithoutthenecessitytoprovetotheBankthedefects orshortcomingsordebits ofthe
contractoranysum withinthelimitofRs. .
2. WefurtheragreethattheGuaranteehereincontained,shallremaininfullforceandeffectduringtheperiodthat wouldbetaken
fortheacceptanceoftender.
However, unlessa demandofclaimunderthisguaranteeismadeonusinwritingonorbeforethe
(Datetobespecified–willnotbelessthan 180days fromthedateof openingthetender)weshall
bedischargedformallliabilitiesundertheguaranteethereafter.
3. WeundertakenottorevoketheguaranteeduringitcurrencyexceptwiththepreviousconsentoftheExecutive
Engineer Division inwriting
4.Welastlyundertakenottorevokethe guaranteeforanychangeinconstitutionoftheTendereroroftheBank.
Date Signature &SealofGuarantor
5. The contractorshallhave to furnish Income Tax Clearance Certificate before his tenderis accepted
and intimateassessmentnumberand ward underwhich he is assessed.
5P 5MTFG]\8[g0Z:JLSFZFIT[5C[,FSMg8=S8Z[VFJSJ[ZF[R]ST[SIF"G] \5|DF65+ZH]SZJ]\50X[VG[VFSFZ6LG\AZVG[H[C[9/
VFSFZ6LSZF.CMI T[JF[0"V\U[GLHF6 SZJFGLZC[XP[
6. Copiesofcertificate asregards previousexperience, ifany,mustaccompanythe tender.
&P VUFpGMSM. VG]EJCMI TMT[V\U[GF 5|DF65+GL GS,M8[g0ZM;FY[ZH]SZJFGLZC[X[P
7. DeclarationshowingallworksonhandwiththeContractorandthevalueofworksthatremainsto be
executed in each casemustaccompanythe tender.
*P NZ[SS[;DF\ SMg8=S8ZGFCFY5ZGFAWF SFD VG[SZJFGFAFSLCMI T[JF SFDGFD]<I V\U[GM V[SZFZ8[g0Z;FY[SZJFGMZC[X[P
8. AllpagesofSchedule„A‟and„B‟andspecificationsshouldbeinitialedbytheContractor.
(P VG];]lR cScVG[cBcGF TDFD5FGF VG[ lJUTM5ZSMg8=S8Z[8]\SL ;CLSZJLP
9. Allcorrections, erasures and overwritingshouldbe initialed bythe Contractor.
)P TDFD ;]WFZF4 K[SKFSVG[W]\8[,F ,BF6 5ZSMg8=S8Z[8]\SL;CL SZJLP
10 Discrepanciesand adjustmentofErrors:S;}ZV\U[ lJ;\UlT VG[lC;FAHMUo
AnyerrorinquantityoramountinSchedule‟B‟ showingitemsof workstobecarriedoutshallbe
adjustedinaccordancewiththefollowingrules.
CFYWZJFGFSFDMGLAFATNXF"JTLVG];}lRcBcDF\GFHyYFVYJFZSDGLSM.56E],R]SGLR[GFlGIDMVG];FZ;ZEZ SZJFDF\ VFJX[P
a)Intheeventofadiscrapancybetweendescriptioninwordsandfiguresquotedbyatendererin
theratescolumn, thedescription in wordsshallprevail.
sSf8[g0Z EZGFZ[NZGFBFGFDF\H6FJ[,XaNMVG[VF\S0FJrR[SM.V;\UlTGFS[;DF\XaNMDF\H6FJ[, ZSDDFgIZFBJFDF\ VFJX[P
b)Inthe eventofan erroroccuring in the„amount‟coloumnoftheSchedule„B‟showingitemsOf
work,asaresultofwrongmultiplicationoftheunitrateandquantity;theunitrateshallbe regardedasfirmand
multiplication shallbe amended on the basis of the rate.
sBfV[SDNZVG[HyYFGFBM8FU]6FSFZGFSFZ6[SFDGLAFATMNXF"JTLVH];}lRccBccGFBFGFDF\YLZSDDF\E],H6FITM V[SD NZDFgI
ZFBJFDF\VFJX[VG[NZGF VFWFZ[U]6FSFZ;]WFZJFDF\VFJX[P
(c)Allerrorsintotallingin„amount‟columnincarryingforwardtotalsshallbecorrected.
sUf ZSDGFBFGFDF\YLT[DHVFU/B[\RTF ;ZJF/FGL TDFDE],M;]WFZJFDF\VFJX[P
(D)Anyroundingofamountagainst“items”orin“totals”shallbeignored.
sWf ccAFATMccVYJFcc;ZJF/Fcc;FD[5]Z[VF\S0[SZ[, SM.56 AFATwIFGDF\,[JFDF\VFJX[GCLP
Thetenderedsumsoalteredshallforthepurposeofthetenderbesubstitutedforthesum originallytendered
and consideredforacceptance.
8[g0Z DF8[ 8[g0ZDF\ NXF"J[,ZSDDF\ SZJFDF\VFJ[, VF5|SFZGFO[ZOFZ 8[g0ZDF\ EZ[, ZSDG[ AN,[ D]SL:JLS'TLDF8[
lJRFZJFDF\ VFJX[P
10.i)Itmaypleasebenotedthatthetenderwill beconsideredasinvalid,especially,ifthe requirements asper
instructionNo.1 to10 abovearenotcompliedwith beforesubmitting the tender. Alsopleaseread
carefullythefacesheet and „GeneralRules and Directions for the guidanceofcontractor‟softhisform.
!_P!P8[g0ZZH]SZTF5C[,FBF;SZLG[p5ZGL;]RTFG\!YL!_DF\GLH~ZLIFTMG]\5F,GSZJFDF\VFjI]GCLCMITM
8[g0ZVDFgIU6JFDF\VFJX[T[GLGM\W,[JFlJG\TLK[PJ/LVFOMD"G]\D]B5'Q8VG[SMg8=S8ZGFDFU"NX"GDF8[;FDFgIlGIDM VG[;]RGFVM
56SF/HL5]J"SJF\RJF lJG\TL K[P
10. ii)Rightisreserved to rejectanyoralltender(s)withoutassigninganyreason(s)therefore.
!_PZPSM.56SFZ6 NXF"jIF l;JFISM.56S[AWF8[g0ZMV:JLSFZSZJFGM CSVAFlWTZC[K[P
10-A thetenderdocuments shallhave to befilledin.
11. In additiontotheabove, the tenderwillalso be liableto be rejected outrightit-
!!P p5ZGL AFATM p5ZF\T8[g0ZGLR[GF ;\HMUMDF\ TZTVDFgI 9ZJFG[5F+YX[P
i)Thetendererproposes anyalteration inthe workspecified or inthe time allowed forcarryingout
theworkoranyconditionorcorrectionmade in anycode ormodeorSchedule „B‟ or specifications.
!f8[g0ZEZGFZ4lGITSFDVYJFSFDDF8[ D\H]ZSZ[,VYJFVG];}lRBGF SM.SM0VYJF5wWlTVYJFlJUTMDF\D]S[,
XZTVYJF;]WFZFDF\ SM.O[ZOFZ;}RJTFCMIP
ii)Anyof the page ofthetenderis/are removed or replaced
Zf 8[g0ZG]\ SM.5FG]\ S[5FGFSF-LGFbI]qGFbIFCMI S[AN<I]\q AN<IF CMI
iii)Allcorrections, additions orpasted slips are notinitialed bythetenderer.
#f AWF ;]WFZF JWFZF VYJFRM\8F0[,LSF5,LVM p5Z8[g0Z EZGFZ[8]\SL ;CLGSZL CMI
iv)Anyerasure is madebyhimin thetenderand.
$f 8[g0ZDF\ T[D6[SM.K[SKFSSZLCMI4VG[
v)The tendererorin the caseofa firm,eachpartnerorthepersonholding the powerofattorney
thereofdoesnotsignorsignatureis/arenotattestedby awitnessonpage,15ofthetender inthe
spaceprovided forthe purpose.
5f8[g0ZEZGFZVYJF5[-LGLAFATDF\NZ[SEFULNFZVYJFT[V\U[G]\DB ] tIFZGFD]\WZFJGFZjIlST;CLGSZ[VYJF
8[g0ZGF5FGF !5p5ZT[DF8[ZFBJFDF\VFJ[,L HuIFDF\;CLq ;CLVM p5ZSM.;F1FLV[;FB SZLGCMIP
12. Acertificateofregistrationasapproved contractorshould beattached withtender.
!Zf DFgI SMg8=FS8TZLS[GM\W6LG]\ 5|DF65+lGITSZ[, TFZLB[ZH] SZJFG] \ ZC[X[P
Tender documentsforwork
DECLARATION FORM V[SZFZG]\ OMD
(i) I/Wehereby declarethatI/Wehavevisitedthesiteandfully acquaintedmyself/ourselveswiththe
localsituationsregardingmaterials,labourandotherfactorspertainingto theworkbefore
submittingthistender.
!P C]\qVD[VFYLV[SZFZS~K]\qSZLV[KLV[S[VF8[g0ZZH]SZTF\5C[,FD[PqVD[:Y/GLD],FSFT,LWLK[VG[SFDG[,UTF DF,;FDFG4
DH]ZVG[ALÒAFATMG[,UTL :YFlGS5lZl:YTLGLHFTvDFCLTLD[/JLK[P
(ii) I /Wehereby declarethatI/Wehavecarefully studied theconditionsofcontract,specificationsand
otherdocuments ofthis workand agreeforexecutethesame accordingly.
ZP C]\ q VD[VFYL V[SZFZS~K]\q SZLV[KLV[S[VFS\8=FS8ZGL XZTMGLlJUTM VG[8[g0ZG[,UTF N:TFJ[HMSF/Ò5]J"S VeIF; SIM"
K[VG[T[D]HAT[GM VD,SZJF;\DTK]\q KLV[P
(iii) Weagreetoreceivepayments,ifdelayisduetolatereceiptofgrant inaidfromGovernmentfor panchayat
works. (Applicableto panchayatworks Only)
3P lH<,F5\RFITTZOYL9ZFJGFSFDMV\U[;ZSFZzLTZOYL;CFIVG]NFGD/JFDF\lJ,\AYJFGFSFZ6MHMSZ[,SFDMV\U[ R]SJ6]\ SZJFD\
lJ,\A YFITM T[R]SJ6]\ lJ,A\YL ,[JFDF\ VDFZL ;\DTLK[PsOST5\RFITGFSFDM DF8[H,FU] 50X[f
DECLARATIONCERTIFICATE(G.R.date4-2-89asrevisedbyGRNo.TNC.1083/6681/4/C, dated31-
DECLARATION CERTIFICATE (G.R. date 4-2-89 as revised by GR. No.TNC –
(iv) I/Weherebydeclare thatmy/ournear relative are not workingin this Division orin its sub-division
asanEx.Engineer,Deputy ExecutiveEngineer,AssistantEngineer,AdditionalAssistantEngineer,
overseer,DivisionalAccountant,Store,Keeper,ManagerorAtithi/VishramGruhaandinthe
circleasaSuperintendingEngineerinadditionforPanchayatworksnotworkingnorhaving
postingaschairman ofP.Wcommitteeoras incumbuntinJilla Panchayatattoday.
$P C]\qVD[VFYLV[SZFZS~K]\qSZLV[KLV[S[DFZFqVDFZFGHLSGF ;UFVFlJEFULISR[ZLDF\T[DHT[C[9/GL5[8FlJEFULI
SR[ZLVMDF\SFI"5F,S .HG[Z4GFIA SFI"5F,S.HG[Z4DNNGLX .HG[Z4VlWSDNNGLX .HG[Z4 .HG[ZVMJZ;LIZ4
lJEFULIlC;FAGLX:8MZSL5Z4VlTlYqlJzFDU'CGFD[G[HZTYFJT]"/SR[ZLDF\VlW1FS.HG[ZzLTZLS[TYFT[p5ZF\T
5\RFITGF\SFDMDF8[lH<,F5\RFITDF\AF\WSFD;lDlTGF\R[ZD[GS[lH<,F5\RFITGVgI5NFlWSFZLTZLS[CF,8[g0ZEZJFGL
TFZLB[SFD SZTFGYL4S[CM¡M WZFJTFGYLP
GeneralRulesandDirectionsfortheGuidanceofContractors
SMg8=FS8ZMGFDFU"NX"GDF8[ ;FDFgIlGIDMVG[ ;]RGFVM
1. Allworksproposedtobeexecutedbythecontractorshallbenotified inaformofinvitationtotender pasted ona
boardhungupintheofficeoftheExecutiveEngineerandsignedbytheExecutiveEngineer.
!P SMg8=FS8Z wJFZFSZJFlJRFZ[,TDFD SFDGLHFC[ZFT SFI"5F,S .HG[ZGLSR[ZLDF\,8SFI[,AM0"5ZRM\8F0[,SFI"5F,S .HG[ZGL;CLJF/F
8[g0ZD\UFJTFOMD"wJFZFSZJFDF\VFJX[P
. Thisformwillstateworktobecarriedoutaswellasthedateof submittingandopeningtendersandthetime
allowedforcarryingout thework, also the amountofearnestmoneytobedeposited withthetenderandthe
amountofthesecurity deposittobepaidbythesuccessfultendererandpercentage, ifany,tobededucted from
bill.Itwillalsostatewhetherarefundofquarryfees,royalties, octroiduesandgroundrentswillbe
granted.Copiesofthespecifications, designs anddrawingandestimated rates, andanyotherdocuments,
requiredinconnection withworkwhich shallbesignedby theExecutive Engineerforthepurposeof identification
shallalsobeopenforinspectionbyContractorattheofficeoftheExecutiveEngineerduring officehours.
CFYWZJFGFSFDGLT[DH8[g0ZDMS,JFGLVG[BM,JFGLTFZLBMVG[SFDM5]Z]SZJFDF8[VF5JFDF\ VFJTLD]NTGLHF6OF[D"DF\SZFX[P
J/L8[g0Z;FY[VGFDTD]SJFDF\AFGFGL ZSDVG[H[G]\8[g0Z:JLSFZFIT[6[HFDLGVGFDT5[8[D]SJFGLZSDVG[lA,MDF\YLS5FT SZJFGL SM.8SFJFZL
CMI TMT[56NXF"JJFDF\VFJX[PJ/L5yYZGL BF6V\U[GLOL4ZMI<8L4VMS8=MIGL,[6LZSDVG[ HDLGvEF0FGL
ZSDZLO\0D/X[S[S[DT[56T[DF\H6FJJFDF\VFJX[PlJUTMl0hF.GM4 0=M.\U VG[ V\NFHLNZ4VG];]lR NZVG[SFDV\U[H~ZCMIV[JF
H[GFp5ZVM/BDFI[SFI"5F,S.HG[Z;CLSZX[V[JFSM.N:TFJ[HMGL GS,MSR[ZLGF;DINZlDIFGSFI"5F,S.HG[ZGLSR[ZLV[
SMg8=FS8ZMG[HM.HJFDF8[ZFBJFDF\VFJX[P
. Wheretheworksareproposedtobeexecutedaccordingtothespecificationsrecommendedbya
contractorandapprovedby acompetentauthority onbehalfof theGovernorofGujarat,such
specifications with designsand drawingshallformpartof the acceptedtender.
SMg8=FS8Z[E,FD6SIF"D]HAGFVG[U]HZFTGFVFJLZFHI5F,JTL;tTFVlWSFZLV[D \H]ZSZ[,lJUTD]HASFDCFY WZJFG]\ lJRFI]"CMI
tIF\l0hF.GMVG[0=M.\U;lCTGL VFJLlJUTM :JLS'T8[g0ZGM EFUAGLZC[X[P
2. Intheeventoftenderbeingsubmittedbyafirm.Itmustbesignedseparatedbyeachpartner
thereoforineventoftheabsenceofanypartneritshallbesignedonhisbehalfbypersonholding
apowerofattorneyauthorisinghimtodoso.DetailsofpartnerwillbefurnishedinAnnexure-I
alongwiththe copyofpartnership.
ZP SM.V[S5[-LTZOYL8[g0ZZH[YI]CMItIFZ[T[GFEFULNFZ[V,UZLT[;CLSZJLVYJFEFULNFZU[ZCFHZCMItIFZ[T[GF JTL
T[GF5Z;CLSZJF VlWS'TSZT]\D]BtIFZGFD]\ WZFJTLSM.56jIlSTV[T[GF5Z;CLSZJFGLZC[X[PEFULNFZMGLlJUT
5lZlXQ8v! DF\EFULNFZLBTGLGS,;FY[VF5JFGLZC[XP[
3. Receipts forpaymentmadeonaccountofany work,whenexecuted by a firm,shallalso be signed
byallthepartnersexceptwheretheContractorsaredescribedintheirtenderasafirminwhich
casethereceiptsshallbesignedinthenameofthefirm byoneofthepartnersorbysomeother person
havingauthorityto give effectualreceipts forthe firm.
#P SM.5[-LV[SFDSZLVF%I]\CMItIFZ[T[SFDSZFI[,R]SJ6LGL5CM\RM5Z56AWFHEFULNFZ[FV[;CLSZJFGLZC[X[P5Z\T]H[8[g0ZDF\ SMg8=FS8ZMG[V[S5[-
LTZLS[ NXF"\jIFCMItIFZ[V[5[-LJTLV[GFSM.EFULNFZ[S[5[-LJTL5FSL5CM\RVF5JFG[VlWS'TV[JL ALHLÒSM.56
jIlSTV[5CM\RM5Z;CLSZJFGLZC[X[P
4. Anypersonwhosubmitsatendershallfilluptheusual printed formincludingthecolumn totalaccordingto
estimatedquantitiesstatingatwhatrateheiswillingtoundertakeeachitemofthework.Tenderwhich
proposesanyalterationintheworksspecifiedinthesaidformofinvitationtotenderorinthetimeallowed
forcarrying outtheworkorwhichcontainanyothercondition ofanysort,willbeliabletorejection.No
singletendershallincludemorethanoneworkbutcontractors whowishtotenderfortwoormoreworks shallsubmit
aseparate tenderforeach,Tendershallhavethenameandthenumber ofthework(towhich
theyrefer)writtenoutsidetheenvelope.
$P 8[g0ZEZGFZSM.56jIlSTV[V\NFÒHyYFVG];FZBFGFGF;ZJF/F;lCTZFA[TFD]HAG] \KF5[,]OF[D"EZJFG]\/ZC[X[T[DF\SFDGLNZ[S
AFATSIFNZ[:JLSFZJF.rK[K[T[T[D6[H6FJJFG] \ ZC[X[P8[g0ZD\UFJJFGFpSTOMD"DF\NXF"J[,SFDDF\ VYJFSFDSZJFVF5[,LD]NTDF\ O[ZOFZ
SZJF.rKTF CMIVYJFH[DF\ALHLSM.565|SFZGLXZTCMIT[JF8[g0ZV:JLSFI",[BFX[PSM.V[S8[g0ZDF\V[SSZTF\JW]
SFDGM;DFJ[XYX[GCLP5Z\T]A[S[T[YLJW]SFDDF\8[g0Z EZJFDFUTFSMg8=FS8ZMV[NZ[SSFD DF8[V,U8[g0Z EZJFGFZC[X[P8[g0ZMJF/F\
5ZAL0LIF\GLACFZGFEFUDF\H[G[,FUTFCMIT[SFDGF\GFDVG[G\AZ,BJFGFZC[X[P
The followingrule shallapplytotheworks havingestimatedcostof Rs.100lacs(RupeesOne Hundredlacs)
andabove.(G.R,R&B.DNo.TNC–1777–281C,dated30-7-1992)
(a) Itisnotdesirabletomakeanyalteration intheworksspecified inthesaidtenderformofinvitationto
tenderorinthetimeallowedforcarryingouttheworkoranyotherconditions ofanysort.However, if
itisfeltnecessarybythe
tenderertohaveanyconditions,heshallhavetosubmitasealedcovercontainingtwoseparatecoversfor
„technicalbid‟and„price-bid‟ dulysuperscribedonthesealedcover.Nosuchtendershallinclude more thanonework
butcontractorswhowishtotenderfortwoormoreworksshallsubmit aseparate tenderfor
each.Tendershallhavethetypeofbidandthe nameofthework(towhichtheyrefer)written.
Outsideenvelopesasunder:
(i) Technicalbidfortheworkof……………
(ii) Pricebidfortheworkof………….
(b) If anyprice-bidcontainsanyconditionsthesame shallhaveto berejectedoutright.Documentofpaymentof earnest
moneyorexemptioncertificateshouldaccompanythetechnicalbidcover.
(c) Thetendersi.e.Price-bidsandtechnicalbidsinseparateshould besubmittedsimultaneouslybethe„Online
throghE-TenderingOnly‟.The„Technical andPrice‟bidsshallcontainadequate crossreferencewherever
necessarytoensureclearand propercorrelationofthemwithtwobidswithoutanyambiguitywhatsoever.
(d) Thebiddersshallclearlyindicate deviation(s)from specificationsorthetenderconditions veryexplicitlyin
theappropriatesectionandsubmita copyofthe samewiththetechnicalbid.Itshouldbeveryclearlyunderstood
byalltendererthatthetechnicalbidshould berestrictedonly totechnical mattersandstipulationsofconditions, ifany
bytenderhavingfinancial implications.Thepriceofmaintendershouldnotbedisclosedinthetechnical bid.
(e) Thetechnicalbidwillbeopenedfirston12/01/2007at12.00AMinthepresenceofthosebidderswho
remainpresent.Thedateandtimeofopening ofpricebidswillbedetermined by theofficerwhoopensthe tender,
andthesamewillbeintimatedtothebiddersifrequiredafter thetechnical-bidproposalsareopened and
analysedandallclarifications/pricevariations,ifanyobtained.
(f) Theconditionsspecifiedintechnical-bid shouldinvariablybeaccompanied byproperfinancialevaluation
withmodeofcalculationspecifyingassumptions,quantities,rateandceilingamountsforeachconditionand
shallalsoaccompany theinformation intheformsating(a)Sr.No(b)Description ofthecondition (c)Financial
evaluation,(d) Ceilingamounttobeaddedinprice-bid,incaseconditionisnotaccepted.
(g) Ceilingamountsshallbebindingonthecontractorsandareliabletobeaddedtothetenderamount.
(h) Itisnecessarythatthecontractororhisauthorisedrepresentative remainspresentatthetimeofopeningof technical-bid
asspecifiedin(e)above,sothatwantingdetails andclarificationsinrespectofconditionscanbe
furnishedbyhimorconditionswithdrawnonthespotbyhim.If thetechnical-bidisincompleteinrespectofany
ofthedetailsreferredtoinsub-clauses 2(f)aboveandthecontractordoesnotfurnishthewantingdetailsas requiredabove
on thespot inthepresenceof otherbiddersafteropeningthetechnical–bid,thetenderwould be liabletorejection.
(i) Theevaluationasgiven bythecontractorasmodifiedbytender openingauthoritywith theceilinglimitwill then
beintimatedtoall the bidders who remainpresentandthen,ifconvenient,theprice-bidshallbe openedon
thesamedayandthecombinedevaluationofthetenderofprice-bidandthetechnical–bidwouldbeworked
out.Notfurtheropportunity shallbegiventothecontractorstomodify/withdrawconditionsatthatstageasthe price-
bidwouldbeknowstoall,Govt.however,reservestherighttonegotiate aboutthetender(s) furtherwith
anyorallthecontractors. IncasethePrice-bidscannotbeopenedonthesameday thenanotherdatewillbe
intimatedtothetendererasinpara(e)above.
5P 8[g0ZBM,TLJBT[OST 8[g0ZEZGFZ.HFZNFZMVYJFT[DGFVlWS"T5|lTlGlWVMG[H CFHZZC[JFN[JFDF\VFJX[PT[l;JFIGFVgISM.
.HFZNFZMG[CFHZZC[JFN[JFDF\VFJX[GlCP
HM 8[g0ZEZGFZV[S56.HFZNFZS[T[DGFVlWS'T5|lTlGlWVMCFHZG CMITM 8[|g0ZBM,GFZVlWSFZLp5ZF\TVMKFDF\VMKFV[SJW]
VlWSFZLS[;\A\lWT;ZSFZLSR[ZLGF\;LGLIZVlWSFZLGLCFHZLDF\8[g0ZBM,JFDF\VFJX[PVFJF5|;\U[8[g0ZGEI]"CMIT[JFVgI
.HFZNFZS[T[VMGF5|lTlGlWVMG[CFHZZC[JF N[JFDF\VFJX[GlCPs5ZL5+S|DF\S8LV[G;Lv!_)#v$v;4TFP&q*q)#fP
8[g0ZBM,GFZVlWSFZLH]NFH]NF8[g0ZMGLZSDIMuIOMD"GFT],GFtDS5+SDF\GM\WX[P8[g0Z:JLSFZTFSMg8=FS8Z[T[GLVM/B;FY[VF
8[g0ZDF\H6FJ[,L lJUTMVG[ALHFN:TFJ[HMGL GS,Mp5Z;CLSZJFGLZC[X[P8[g0Z:JLSFZJFDF\ GVFJ[tIFZ[8[g0ZEZGFZFSMg8=FS8Z
GF6F\5ZTD?IFGL5CM\RVF5[V[8,[V[D6[EZ[,LAFGFGLZSDT[DG[lZO\0SZJF lJEFULIVlWSFZL;\A\lWT lTHMZLVlWSFZLG[VlWS'T SZX[P
6. Theofficercompetenttodisposeoffthetendersshall havetherightofrejectingalloranyofthetenders.
&P 8[g0ZMGMlGSF,SZJFGL;tTFWZFJTFVlWSFZLG[AWF\VYJFSM.568[g0ZGMV:JLSFZSZJFGMVlWSFZZC[X[P
7. NoreceiptforanypaymentallegedtohavebeenmadebyaContractorinregardtoanymatterrelatingto
thistenderorthecontractshallbevalidandbindingonGovernmentunlessitissignedbytheExecutive
*P VF8[g0ZS[ SMg8=FS8ZG[,UTLSM.56AFAT SMg8=FS8ZSZ[,LSC[JFYLSM.R]SJ6LGM5CM\R5ZSFI"5F,S.HG[ZGL;CLGCMITMT[
5CM\RSFIN[;ZVG[;ZSFZA\WGZC[X[GlCP
8. ThememorandumoftheworktobetenderedforandthescheduleofmaterialstobesuppliedbyPublic
WorksDepartment andthereratesshallbefilledinandcompletedbytheofficeoftheExecutiveEngineer
beforethetenderformisissued.Ifaformissuedtoanintending tendererhasnotbeensofilledinand
completed,heshallrequestthe saidofficerto haveitdonebeforehecompletesanddelivershistender.
(P 8[g0ZG]\OMD"VF5TF\5C[,FSFI"5F,S.HG[ZGLSR[ZLG[H[SFDGF8[g0ZDF\UJFDF\VFJ[T[SFDMGLIFNLAF\WSFDlJEFU[5]ZF5F0JFGFDF,
VG];}lRVG[T[GFNZ8F\SLG[T[OMD";\5]6"56[EZLVF5JFG]ZC[X[P8[g0ZEZJFDF\UTFSM.SMg8=FS8ZG[V5FI[,]\VFJ]\OMD"5|DF6[
;\5]6"56[EI]"G CMITM5F[T[5MTFG]\8[g0Z5]Z]5]~EZLG[;M\5[T[5C[,Fp5ZD]HASZLVF5JFGLT[D6[pSTSR[ZLG[lJG\TLSZJFGLZC[X[P
9. Allworksshallbemeasurednetbystandardmeasure&accordingtotherules&customsof thepublic
worksdepartmentwithoutreferencetoanylocalcustom.
)P AW]HSFDSM.56:YFGLSZLJFhG[,1FDF,LWLl;JFIWFZFWMZ6;ZGFDF5D]HAVG[AF\WSFD lJEFU GFlGIDMTYFZLJFHVG];FZ
JF:TJLSZLT[DF5DFVFJX[P
10. UndernocircumstancesshallanyContractorbeentitledtoclaimenhancedrateforanyitemsinthis
!0PP SM.56;\HMUMDF\VFSMg8=FS8DF\GLSM.56AFATMDF8[SM.SMg8=FS8ZG[JW] EFJDF\UJFGMCSSZC[X[GlCP
11. Everycontractshall,unlessexemptedinwritingbytheSuperintendingEngineerconcerned,producealong
withthistenderasolvencycertificateofhisfinancialabilityfromtheCollectorofthedistrictwithinwhich
heresidesoraBanker‟scertificate.Ifhefailstoproducesuchacertificatehistenderwillnotbeconsidered.
!1P ;A\lWTVlW1FS.HG[Z,[lBTD]lSTVF5LCMIT[l;JFI4NZ[SSMg8=FS8Z[5MT[H[lH<,FDF\ZC[TFCMItIFGFS,[S8Z5F;[YLNFZ56FG] \
5|DF65+VYJFT[GLVFlY"S;wWZTFV\UG [ ]\A[\gSZG]\5|DF65+5MTFGF8[g0Z;FY[ZH]SZJFG]\ZC[X[PVFJ]\5|DF65+ZH]SZJFDF\T[
lGQO/HX[TMT[DG]\8[g0ZwIFGDF\,[JFX[GlCP
12. Allcorrectionsandadditionsorpastedslipsshouldbeinitialed.
!2P TDFD;]WFZF4JWFZ[S[RM\8F0[,LSF5,LVM5Z 8]\SL;CLSZJFGLZC[X[P
13. Themeasurementsofworkwillbetakenaccordingtotheusualmethodin useinthePublicWorks
Department andnoproposalstoadoptalternative methodswill beaccepted.TheExecutive Engineer‟s
decisionastowhatisthe usualmethodinuseinthePublicWorksDepartmentwillbefinal.
!# SFDGFDF5AF\WSFDlJEFUMGLZFA[TFD]HAGL5wWTL4VYJF8[SGLS,:5[;LOLS[XGDF\NXF"jIFVG];FZ,[JFDF\VFJX[VG[J{Sl<5S
5wWTLVMV5GFJJFV\U[SM.56NZBF:T:JLSFZFX[GCLS.5wWTLAF\WSFDlJEFUGLZFA[TFD]HATLK[T[V\U[GFSFI"5F,S.HG[ZGM
lG6"IVFBZLU6FX[P
13A TheInsuranceCompany‟sbondwillnotbeacceptedagainstthesecuritydeposit.
!#v JLDF\S\5GLG]\BTHFDLGVGFDT;FD[:JLSFZJFDF\VFJX[GCLP
13B Intheeventofanyerrorordiscrepancy inwriteupto tenderdocumentsthecontractorwillnottakeany
undueadvantagesuch erroror discrepancyandEngineerincharge shall have powertointerpretand decide
correctmeaningofconstructerroneouswriting.
14. Thecontractorshallhavetoattachtohistenderincometaxclearancecertificatetobeobtainedfromthe
incometaxofficer.
!$P SMg8=FS8Z[VFJSJ[ZFVlWSFZL5F;[YLVFJSJ[ZMR]SjIFGM5|DF65+D[/JLT[GF8[g0Z;FY[ZH]SZJ]50X[
15. TheContractorwillhavetoconstructashedforstoringcontrolledandvaluablematerialsissuedtohim
underschedule„A‟oftheagreementatwork-sitehavingdoublelockingarrangement.Thematerialswill
thenbetakenforuseinthepresence oftheDepartmentperson.Nomaterialswillbeallowedtoberemoved fromthe
!5 SZFZGL VG];}lRSC[9/SMg8=FS8ZG[VF5JFDF\VFJ[,lGI\+6VG[lS\DTLDF,;FDFGSFDGF:Y/[ZFBJFDF8[T[D6[A[J0FTF/FTL
jIJ:YFJF/LV[SKF5ZLAF\WJFGLZC[X[P T[5KLlJEFUGLSM.jIlSTGL CFHZLDF\p5IMUDF\,[JFDF,;FDFGT[DF\YLACFZSF-JFGM ZC[X[P
SFDGF:Y/[YLSM.56DF,;FDFGB;[0JFN[JFX[GCLP
16. NoforeignexchangewillbereleasedbytheDepartmentforthepurposeofplantandmachineryrequiredfor
theexecutionoftheworkcontractedfor.
!&P H[G[DF8[SMg8=FS8V5FIMCMIT[SFDSZJFDF8[H~ZL%,F8VG[ I\+;FDU|LDF8[HFC[ZAF\WSFDlJEFUSM.HlJN[XLC}\l0IFD6K]8]\SZX[ GCLP
17. Controlledmaterials(EssentialityCertificate)
!*P lGI\+6DF,;FDFGsVFJxIS5|DF65+f
(i)Asregardcontrolledmaterials, thePublicWorksDepartmentwillhelptoarrangeforthepermitasfaras
possibleandhelptheContractor insecuringthesame.Allincidentalchargesmetwithinprocuring these
materialsshallbebornebytheContractorhimself.ThoughthePublicWorksDepartmentwillhelpto arrangeforthe
permitasfaras possibleandhelptheContractorinobtainingthematerials,itshallnotaccept
anyresponsibilityforanylossonaccountofdelaycausedtothe Contractorwhileobtainingthesame.
!flGI\l+TDF,;FDFG5]ZT]\AF\WSFDlJEFUXSIT[8,LZLT[5ZDL8DF8[GLjIJ:YFDF\ DNNSZX[VG[T[;]lGl`JTSZJFDF\SMg8=FS8ZG[ DNNSZX[P
VFDF,;FDFG D[/JJFDF\YI[,TDFD VFG]\QFF\lUSBR" SMg8=FS8Z 5MT[EMUJX[PAF\WSFDlJEFU5ZDL8 D[/JJFAG[ T[8,LDNN
SZX[VG[DF,;FDFGD[/JJFSMg8=FS8ZG[DNNSZX[4T[KTF\SMg8=FS8ZG[T[D[/JJFDF\SM.lJ,\AYJFG[,LW[SM.lJ,\AS[G]SXFGDF8[
HFC[ZAF\WSFDlJEFUHJFANFZ,[BFX[GCLP
(ii)ThecontractorshallsubmittotheExecutiveEngineeroncloseofeverycalendarmonththemonthlyreturnsinthe
prescribedforms astothe receipts andactualuseofthe controlled materials duringthe month.
ZfNZ[SV\U|[ÒDCLGFG[V\T[SMg8=FS8Z[DCLGFNZdIFGlGI\l+TDF,;FDFGGLVFJSVG[BZ[BZJ5ZFXV\U[lGITOMD"D]HAGFDF;LSlGIT5+SM SFI"5F,S
.HG[ZG[DMS,JFGF ZC[X[P
(iii)ThecontractorshallpermitExecutiveEngineerorhisrepresentativetoinspectthestockofthecontrolledmaterials
stored byhimatanytimewheneverthe Executive Engineer orhis representative so desire (s).
#fSFI"5F,S.HG[ZVYJFT[GF5|lTlGlWVMHIFZ[.rK[tIFZ[SMg8=FS8Z[T[D6[; \U|CLZFB[,MlGI\l+T DF,;FDFGGM:8MSSM. 56 JBT[ T5F;JFDF\N[JFGM ZC[X[P
17A. (ThenewcontractconditionasaddedGRB&cdNo.TNC1083/6811(4)c27thJuly1984Thecontractorshallnotbe
permittedtotenderforthe workinwhich his nearrelative isworkinginthatDivisionas andExecutive Engineer,Deputy
ExecutiveEngineer,AssistantEngineer,Additional AssistantEngineer,Overseer,DivisionalAccountant, storekeeper,
ManagerofAtithi/VishramGruhonthedayonwhichthetenderissubmittedandonthatparticulargrandparents,
children's grandchildren,brotheruncle,aunts & cousins.
18. Thetenderfortheworkshallremainopenforperiod(120*)daysfromtheactualdateofdownloadingofthepricebids
forthisworkandthatthetenderershallnotbeallowedtowithdraw ormodifytheofferonhisownafterdownloadingof
pricebid.Ifanytendererwithdrawsormakeanymodificationsoradditionsinthetermsandconditionsof histendernot
acceptabletotheGovernment(PublicWorksDepartment)thentheGovernmentshallwithoutprejudicetoanyright remedy.Be
atlibertytoforfeitinfullthe saidearnest moneyabsolutely,inthis connectionG.R.R &BD NO.TNC–IIB
–22(10)–C ,dated 24-5-90should be referredto.
!(P VFSFDDF8[G]\8[g0Z.v8[g0ZL\UYLZJFGFSZJFDFVFJ[tIFZAFN8[g0ZGF5|F.;AL0BM<IFGLTFZLBYLs!Z_flNJ;DF8[B]<,] \ZC[X[ VG[VFD]NT
NZlDIFGVF8[g0Z EZGFZG[VFVMOZ:J{rKFV[5FKLB[ \RL ,[JFS[T[DF\O[ZOFZSZJF N[JFDF\VFJX[GlCPVF;DI5C[,FHM
8[g0ZEZGFZT[6[EZ[,F8[g0ZGL XZTMVG[AM,LGM 5FKLB[RL\,[VYJFT[DF\;W] FZMq;]WFZFVMpD[ZMq pD[ZFVMSZ[H[;ZSFZsHFC[ZFT
AF\WSFDlJEFUfG[:JLSFI" GCMI4TMCSSS[.,FHGF5]J"U|CJUZ;NZC] \AFGFGL5]ZLZSDH%TSZJFGL;ZSFZG[;\5]6":JT\+TF
ZC[X[PVFDF8[!$v5v)_GMDFPDPlJEFUGM9ZFJG\P8LPV[GP;LPVF.vVF.vALvZ_s!_fSPH]VMP
18.A Quotedrates intendershall be consideras final.Therewill be no negations onquoted rate ifitis requiredthe powerfor
the sameatBoardTPC only.
!(V[P 8[g0ZDFEZ[,EFJMVFBZLU6JFGFZC[X[8[g0ZDFEZ[,EFJMV\U[SM.56JF8F3F8MYX[GCLVG[T[;tTFOSTAM0"8L5L;LHZ}Z H6FITMSZX[P
19 Thecontractorshallemployonlysuchlaborerwhoshallproducedavalidcertificateofhavingbeenvaccinatedagainst
small poxwithinaperiodoflastthree years.
!)P K[<,F+6 JQF"GLD]NTGLV\NZlXT/FGLZ;L8\SFJLCMJFV\U[G]SFIN[;ZG]5|DF65+ZH]SZGFZDH]ZG[HSMg8=FS8ZSFD[ZFBX[P
20 Thecontractorshouldcompulsoryfurnishedthislatestaddress(es)includingthelatestaddressof hispartner&place(s)
offilling his/thereincometaxreturn(s)alongwiththetenders(intheannexureappointedherewith)any changes if
occursinsuchaddressduringthetenderofcontract thelatestaddress(es)shouldinvariably&forthwithbeintimated bythe
contractortothe concern executive engineerincharge.
Z! 8[g0Z EZGFZSMg8=FS8Z[SZ[,SFDMTYFCFY5ZGFSFDMGLIFNLTYF ;NZ SFD DF8[ RF,]CF,TCMIT[JLDXLGZLlJUTMVR]S EZJLT[DH
8[g0ZOMD";L0I],ALTYF:5[;LOLS[XGGF5FG[P5FG[;CLVR]SSZJLVG[SMg8=FS8Z[8[g0Z>8[g0ZL\UYLlGITD]NTDFEZJFG]ZC[X[P
ZZPSMg8=FS8C[9/GF AF\WSFDGF DSFGMp5IMU>HFZNFZ 5MTFGF DH]ZMq:8FOS[VgISM.C[T]DF8[SZLXSX[GCLVG[HME\USZJFDF VFJX[
TM DFS["8Z[g85|DF6[T[HuIFG]EF0] J;],SZJFG]ZC[XP[
Z#P Z:TF45],M4 DSFGMGFSFDGM JS"vVM0"Z.xI]YIF5KLT]T"H SFDGF:Y/[SZJFGFSFDGF:5[;LOLS[XGS[H[T[ SFDGLV\NFHLZSD4 SFD 5]Z]
SZJFGM;DI4>HFZNFZG]GFDTYF;ZGFD] T[DGF;]5ZJF.hZL:8FOGFGFDVG[;ZGFDFT[DHSM.56HFTGL1FTLN[BFITMSIF
OZLIFNSZJLT[V\U[GLlJUTMV\U[GLAM0"SMg8=FS8Z[5MTFGFBR["D]SJFG] \ZC[X[P
!PSFDG]\GFDovsSFDGM5|SFZf &P;]5ZJF.hZL:8FOGFGFDov
ZPlJEFUG]\GFDov *PSFDX~SZJFGLTFZLBov
#P5[8FlJEFUG]\GFDov (PSFD5]~SZJFGLTFZLBov
$P 8[g0ZGLZSDov )PSFDGF:5[XLOLS[XGov
5P.HFZNFZzLG]\GFDov
v DF8LSFDGLHF0F.PPPPPPPPPPPPPPPP;[PDLP v D[8,GF5|YD:TZGLHF0F.PPPPPPP;[PDLP v
0FDZGL;5F8LG]\SFDPPPPPPPPPPPPPPP;[PDLP v D[8,GFALHF:TZGLHF0F.PPPPPPPP;[PDLP
sPPPPPPPPPPPPPPPPPPPPPS5RLPPPPPPPPPPPPPPPPPPPPPPU|L8VG[PPPPPPPPPPPPPPPPPPPPP0FDZJF5ZJFGF[f
v 0FDZGL;L,L\U;ZO[;G]\SFDPPPPPPPPPPPPPPPP;[PDLP
sPPPPPPPPPPPPPPPPPPPS5RL4PPPPPPPPPPPPPPPPPPU|L8VG[PPPPPPPPPPPPPPPPPPPPPPP0FDZJF5ZJFGMf
v5],GFPPPPPPPPPPPPPPP,\AF.GFPPPPPPPPPPPPPPPUF/F v 5],GF5FIGFSMgS|L8G]\5|DF6PPPPPPPPPPs;LD[g84S5RL4Z[TLf
v5],GFYF\E,FqV[A8D[g8GFSMgS|L8G]\5|DF6PPPPPPPs;LD[g84S5RL4Z[TLfv;]5Z:8=SRZGFSMgS|L8G] \5|DF6PPPPs;LD[g84S5RL4Z[TLf
vVgIlJX[QFHMUJF.
v 5FIFGFSMgS|L8G]\5|DF6PPPPPPPPPPPPPs;LD[g84S5RL4Z[TLf v .\8MGFR6TZDF\;LD[g8qZ[TLG]\5|DF6PPPPPPPs;LD[g8qZ[TLf
v EM\IT/LIFGFSMgS|L8G]\5|DF6PPPPPPPs;LD[g84S5RL4Z[TLf v EM\IT/LI[PPPP;[PDLPHF0F.GLPPPP;[PDLP;F.hGLDMh[S 8F.<;
v AFZLAFZ6Fv ;FUL,FS0FGFq :8L, O|[Dq VgI
VFZP;LP;LPSFDDF\SMgS|L8G]\5|DF6PPPPPPPs;LD[g84S5RL4Z[TLf
VFSFDGFlJUTJFZ:5[XLOLS[XGGFIASFI¶5F,S.HG[ZzLPPPPPPP5[8FlJEFUGLSR[ZLVMVMOL;GF;DINZdIFGSM.56
;DI[HM. XSX[P VFSFDGFDFl,SLHFC[ZHGTFGLK[PVG[ SFDDF\SM.1FlTS[VlGIlDTTFH6FITMT[ AFATDF\;A\lWTVlW1FS.HG[ZzL
PPPPPPPPPPPPPPPPPPPPPPPPJT]¶/S[H[VMGLSR[ZLPPPPPPPPPPPPPP:Y/[K[PT[VMG] \wIFGNMZJFlJG\TLK[P
NagarSevasadan,
SZFZGFDFDF\HIF\HIF\cc A[gScc GMp<,[BK[T[T[cc A[gScc V[8,[S[ccXL0I],ccS[ccZFQ8=LISTA[gScc H ;DHJLP
SMg8=FS8ZC[9/GF\AF\WSFDGF\DSFGMGF[p5IMU.HFZNFZ5FTFGFDH]ZM4:8FOS[VgISM.C[T]DF8[SZLXSX[GlCPGMVFXZTGME\U
SZJFDF\VFJX[TMDFS["8Z[g85|DF6[T[8,LHuIFG] \EF0]J;],SZJFDF\VFJX[P
Z$P 8[g0ZHM0[GFV[G[1FZ5TYF&DF\SMg8=FS8Z[;FRLDFCLTLSF/HL5]J"SVF5JLPVFDFCLTLGFVFWFZ[SMg8=FS8ZGFEFJMGLRFCMJFKTFT[
lJRFZ6FC[9/G]\SFD;DIvDIF"NFDF\SZLXSJF;1FDK[S[S[DVG[T[GLVMOZ;F{YLGLRLVG[H~ZLIFTVG]~5K[S[S[DT[AFATGSSL SZJFDF\VFJX[P
TENDERFORWORK- SFD DF8[G]\8[g0Z
I/ We herebytender for the execution for the Governor ofGujarat ( hereinbefore and hereinafter referred to as
Government)oftheworkspecifiedintheunderwrittenmemorandum withinthetimespecifiedinsuchmemorandum atthe
tenderedratesspecifiedinSchedule„B‟(memorandumshowingitemofworkstobecarriedout)andinaccordanceinallrespects
withthespecifications,designs, drawingsandinstructions inwritingreferredtointhistenderandinClause13 of theannexed conditionsof
contractandagreethatwhenmaterialsfortheworkareprovided byGovernment,suchmaterialsandtheratestobe
paidforthemshallbeasprovided inscheducle„A‟hereto.
VFYLC]\qVD[];G];}lRcBcCFY WZJFGFSFDGL AFATMNXF"JTLIFNLDF\lGlN"Q88[g0ZGFNZYLVFJLIFNLDF\9ZFJ[,D]NTGLV\NZVG[VF8[g0ZGL;FY[HM0[,L SMg8=FS8ZGL XZTMGF
B\0!#DF\H6FJ[,L,[lBTlJUTM4l0hF.GM4 0=M.\U VG[ ;]RGFVMVG];FZ AWL ZFT[4GLR[H6FJ[,L IFNLDF\ NXF"J[,]\SFDSZJF DF8[ U]HZFTGF ZFHI5F,sH[DG[VCL\VUFpVG[
CJ[5KL c;ZSFZcTZLS[H6FJ[, K[PfDF8[ 8[g0ZZH]SZ]K] \qSZLV[KLV[VG[ T[SFDDF8[ ;ZSFZTZOYL DF,;FDFG 5]ZM 5F0JFDF\
VFJ[tIFZ[T[DF,;FDFGVG[T[DF8[R]SJJFGFNZ;FY[GLVG];}lR cSc DF\HMUJF/VMSIF"D]HAGL ZC[X[T[DG[qVDG[SA],K[P
*Strikeoutwhicheverisnotapplicable *,FU]G 50T]\CMIT[K[SLGF\BJ]\
+ Infiguresas wellas words *VF\S0FT[DH XaNMDF\
MEMORANDUM -IFNL
sSf H]NFH]NF5[8FSFDMGM;DFJ[XSZFIMCMITMT[GLlJUT !f;FDFgIJ6"G D]bI5]Q9G\PV[SDDF\NXF"jIF
D]HAV,UIFNLDF\VF5JLP
sUfAFGFGLZSD ! 8SF ~FP
s3f HFDLGVGFDTs5F\R8SFf
s3fs!f;ZNFZ;ZMJZGD"NFlGUDGLV[ST[T[YLJW] JQF"GL D]NTJF/Ls0L5MhL8:J~5[f
VYJFGFGLART:J~5[sS],0L5MhL8ZSDGF5_ 8SF;]WLf ZP58SF ~FP
s3fsZf.HFZNFZGFAL,MDF\YL!_8SF;]WLS5FTZSDsS],0L5MhL85_8SF;]WLH[
ZSD;ZNFZ;ZMJZGD"NFlGUDGLAF\WLD]NTGLYF56DF\0L5MhL8:J~5[S[
GFGLART:J~5[O[ZJLXSX[P ZP58SF ~FP
sRf VG];}lRTA[gSG]\5ZOMD"g;AMg0s~l5IF!5,FBp5ZGFSFDDF\
V\NFHLlS\DTGF5 8SF,[B[f 5 8SF ~FP
vvvvvvvvvvvvvvvv
vvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvvv
Rs!fBR"5|dF6[ DF5,[TFSFDV0W]YFItIFZ[HFDLGVGFDTTZLS[V[JLS],ZSD5]ZFY.ZC[T[DF8[lA,MDF\YLSM. 8SFJFZL
S5FTSZJFGLZC[TLCMITMT[5 8SFZC[X[P
(f)Timeallowedforthecompletionofworkfromdateofwrittenordertocommence 5 M O N T H S Monthe.
sKf SFD X~SZJFGL,[lBTC]SDDF\lGITSZ[,LTFZLBYL5]~\ SZJFDF8[VF5[,LD]NTv6 MONTHSDlCGF
GiveSchedule wherenecessary, showingdates bywhich the various items areto be completed.
H[ TFZLBM;]WLDF\H]NL H]NL AFATM5]ZF SZJFGL CMIT[TFZLBM NXF"JTL VG];}lR H~ZCMI tIF\=VF5JLP
(g) Shouldthistenderbeaccepted,I/Weherebyagreetoabidebyfulfillallthetermsand
provisionsoftheconditionsofthecontractannexedheretosofarasapplicableandin
defaultthereoftoforfeitandpayto GovernmentinOfficethesumsofmoneymentionedin the said
sHf VF8[g0Zl:JSFZJFDF\VFJX[TM,FU]50TLCX[tIF\;]WLVF;FY[HM0[,LSMg8=FS8GLAWLXZTMGLHMUJF.VMG]\5F,GSZJFVG[
T[G[5lZ5}6"SZJFC]\qVD[A\WFp\K]\qA\WF.V[KLV[VG[T[DSZJFDF\S;]ZYI[pSTXZTMDF\NXF"J[,ZSD;ZSFZDF\HDF SZFJJFVG[R}SJJF C]\q
VD[;\DTYFp K]\ q Y.V[KLV[P
([ReceiptNo...............dated........................fromtheGovernmentTreasury orSub-Treasury
herewithrepresentingtheearnestmoney +(a)thefullofvalueofwhichistobeabsolutely
forfeitedtoGovernmentShould1/Wenotdepositthefullamountofsecurity depositspecifiedin
theabovememoranduminaccordancewithClauseIofthe saidcondition,otherwisethesaidSum of
aboveRs. ........................... Shallbe refunded)
Contractor x SMg8=FS8Z x
Address / ;ZGFD]\
Address s;ZGFD]\f
Occupation sW\WMf
Thetender is herebyaccepted beme on behalf oftheGovernor ofGujarat
EXECUTIVE ENGINEER (orhis authorized assistant ......................................... Division
+Strike out(a)ifno cash EarnestMoneyisto betaken Amount to be specifiedinwords and figures. x
Signature ofContractorbefore submission oftender ËõLÍß ßÉ\ ÀßÖëÕèõáëÀùLËÿëÀËßÞíçèí
Note:ThenormalrateofSecurityDepositis5percentforworksuptoRs.15lacsandfurther5%asperformance
boundforworkaboveRs.15Lacs.Outof5 % ofecurityDeposit50%isPlauableat thetimeofacceptanceoftender
andthebalancebydeductionfromprogressbills.
SignatureoftheContractor: SignatureoftheExecutiveEngineer:
SMg8=FS8ZGL ;CL SFI"5F,S .HG[ZGL;CL
TERMS &CONDITIONS OF CONTRACT
CLAUSE1 : Security Deposit:
Theperson/persons whosetenderisaccepted(hereinaftercalledthe“Contractor”whichexpressionshall,
unlessexcludedby,orrepugnanttothecontextincludehisLegalheirs,executors,administratorsand assigns)shall
(a)Deposit with the Executive Engineera sumsufficient to makeup the fullsecuritydeposit
specifiedinthetenderincashorGovernmentsecurities(asmentionedinpara208ofGujaratPublic
WorksDepartmentManual Vol.1)duly transferredinthenameoftheExecutiveEngineerorfixeddeposit
receiptsof Term DepositsofNarmadaProjectinthenameoftheExecutiveEngineerwithinaperiodof10
daysfromthedateofreceiptoftheNotificationofhistender,or(b)(I) depositfiftypercentageofthe
totalsecuritydepositsasspecifiedinthetenderformwiththeExecutiveEngineerinCashorinform of
smallsavingschemesorsecuritiesofSardarSarovarNarmadaNigam orF.D.Rs.Ofscheduledbank,
However,theContractorcandeposittwentyfivepercentageoftotalsecuritydepositin theform ofGovt.
security(asmentioned in para 208 ofGujaratPublicWorks DepartmentManualVol. 1) orTermDeposits
ofNarmadaProjectduly transferred in thenameoftheExecutiveEngineer, or fixeddeposit receipts in the
nameoftheExecutiveEngineerwithinaperiodoftendaysform thedateofreceiptofnotificationof acceptanceofhis
tender. if the security depositisnotpaidwithin the abovespecified time,nowork order willbeissuedtillthe
issueaboutdelay isfinally decidedby thecompetentauthority .(b)(ii)The
Governmentshallbedeemedtohavebeenauthorisedtodeduct thebalance offifty percentageofthe
securitydepositasspecifiedin thetenderform from theamountsthatbecomepayabletothecontractorfor
theworkdoneunderthecontractfrom timetotime,suchdeductionshallnotexceedtenpercentageofthe amountso
payable and the wholeamountpaid incashorbywayofdeduction shallbe held byGovernment by way
ofsecurity deposit.For the workswhoseestimatedamountis morethanrupees fifteen lacs, the
Contractorshallhavetogivetheperformancebondofany schedulebank equivalenttofivepercentageof
theestimatedamountputtotenderalong with the initialsecurity deposits.Allcompensation,Liquidated
damagesorothersumsormoney payableby thecontractor toGovernmentunderthetermsofthiscontract shallbe
deductedfromor recouped bythe realizationofa sufficientpartofhis securitydeposit,orfromthe interestarising
therefrom orperformancebondorfrom anysumswhichmaydueormaybecomedueby Governmentto the
Contractoron any accountwhatsoeverand whetherinrespectof thiscontract, any other
contract,orotherwise.intheeventofhissecuritydepositbeingreducedbyreasonofanysuchdeduction or recipient
as aforesaid, the contractor shall within ten days thereafter, make good in cash or in
Governmentsecuritiestransferredasaforesaidanysum orsumsrequiredto makegoodtheshortfallinthe
amountofthesecurity deposit.Thesecurity deposit,whenpaid asaboveshallatthecostofthedepositor,
beconvertedintointerestbearing GovernmentsecuritiesinthenameofExecutiveEngineerprovidedthat
thedepositorhasexpresslydesired thisinwriting. Thisissubjectto thecondition thattwenty five percentage of
the totalsecuritydepositmustbe held inthe formofsmallsavingSchemesorTermDeposits
ofNarmadaProject.Ifthefullamountofthesecuritydeposittobepaidasabovewithintheperiod
specifiedabove,isnotpaid thetender/contractalready acceptedshallbeconsideredas cancelledandlegal steps
shallbetaken againstthe contractor forrecoveryof the amounts.
Fiftypercentofthesecuritydepositalongwithperformancebondshallbecomerefundablewithin
15daysafterthefinalcompletioncertificateisissued asperclause-7.Allduesunderthiscontractorother
contract,orotherwise,shallberecoveredfromtheaforesaidamountoffifty percentageofthesaidsecurity
depositandthebalanceshallberefundedwithinfifteendaysafterthefinalcertificateisissuedasper
clause7. Theremaining fifty percentageofthesecurity depositshallberefundedaftertheexpiry of the
DefectLiabilityperiodasperclause17and17-Aafterdeductingtherefromtheamountofexpenses,if any, due to
Governmentunderthis contract. (TSNC/10/2002(14)S Date :28/04/2003
CLAUSE2 :Liquidateddamagesfor delay:-
(i)IftheContractorfailstocompletetheworkundercontractbythestipulateddate,heshallpay
liquidateddamagesofattherateof0.1percentageofthecontractvalueperday from thedateofdelaying the said
workuptothedateofcompletionand handing over to the Government.
(ii)HoweveralsoifthecontractorfailstocompleteanypartoftheworkasdesignedinSchedule(c) by
the timeindicatedagainstsuchpart,heshallpay Liquidated damagesperday fromthedateofdelaying the
saidpartoftheworkupto thedateofcompletionofthesaiddesignatedpartatthe ratesshowninthesaid scheduleofthe
contractvalue ofsuch partforsuchfailuretillthesaid designatedpart. iscompleted.
* AS corrected vide B &CD GR No. TNC–1091–1B–10 /(11)–C, dated29-06-92.
(iii)Theaggregatemaximum ofliquidateddamages payableunderclauseNo.2Shallnotexceed0.10Percentage of
contractvalueperdayandshallbesubjecttothemaximum amount oftenpercentageoftheestimatedamount putto tender.
(iv)Delaysrequiringpaymentoftenpercentageliquidateddamagesoftheamountputtotenderforperformanceshall
besufficientcausesforterminationofcontractandforforfeitureof securitydepositincludingamountofperformance
bondinrespectofworksestimatedtocostmorethanRs.15lacs,for.Performance andregistrationofthecontractor
shallalsobe keptinabeyanceforthreeyears fromthedateasfixedinallcases.
Timescheduleforcompletionofdifferentdesignatedpartoftheworkandrateofliquidateddamagestobepaidby
the Contractor,ifhefailstocompletethepartofworkwithinstipulatedtimelimitisasdetailedbelow.
TimeScheduleofcompletion TimeScheduleofcompletion
Percentageof Percentageof Rateof Percentageof Percentageof Rateof
timeofthe total work liquidated timeofthetotal work liquidated
timelimit damagesperday timelimit damagesperday
Earthwork Road work
Buildingwork Bridgework
CLAUSE3 : DefaultbyContractor:
IftheContractorshallneglectonfailtoproceedwiththeworkwithduediligenceorifheviolatesanyofthe
provisionoftheContract,theEngineer–in–charge smallgivetheContractoranotice,identifyingdeficienciesin
performanceanddemandingcorrectiveaction.Suchnoticeshallclearlystatethatitisgivenundertheprovisionof
thisclause.Afterserviceofsuchnotice,thecontractorshallnotremove anyplant,equipment andmaterialfromthe
site.TheGovernment shallhavealien onallsuchplant,equipmentandmaterialfrom thedateofsuchnoticetillthe
saiddeficiencieshavebeencorrectedasmentionedinthe saidnotice.
Ifthecontractorfails to takesatisfactory correctiveactionwithin tendaysafterreceiptofsuch notice, the
Engineer-in-chargeonbehalfofGovernorofGujaratshallterminatethecontractinwhole.Incasethe
entirecontractisterminated,theamountofsecurity depositandperformancebondifany togetherwith the value
ofthe workdone butnotpaid for, shallstand forfeitedto the Government. The plants,equipmentand
materials,heldunder this clauseshallthenbeatthe disposaloftheGovernmentto recover the amount equivalent
to the liquidated damagesandregistration ofthecontractorshallbe keptinabeyance forthree years fromthe date
as fixedin allsuchcases.
TheEngineer-in–charge ifnecessaryshalldirectthatapartorthewholeofsuchplant,equipmentand materialbe
removedfrom thesitewithinastipulatedperiod.IftheContractor failstodoso, theEngineer- in-Charge
shallcausethemoranypartofthemto be sold holdingthe netproceedsofsuchsale tothecredit
oftheContractor.Aftersettlementofaccounts,thelienbytheGovernmentofthecontractor‟sremaining
plantequipmentand balancesofmaterialsshallbe released.
Terminationofthecontractinwholeshallbeanadequateauthority fortheEngineer-in-chargetodemand discharge
ofthe obligationsfromthe guarantors ofthesecurityforthe performance.
IftheprogressofanyparticularportionoftheworkunderContractisunsatisfactory,theEngineer-in-
chargeshall,notwithstandingthatthegeneralprogressoftheworkissatisfactory,inaccordancewith
Clause2beentitledtotakenecessaryactionunderClause3aftergivingtheContractortenday‟snoticein writing
andthecontractorshallhavenoclaim whatsoeverforany compensation forany losscausedtohim due
InanycaseinwhichanyofpowersconferredupontheEngineer-in-charge byclause-3hereofshallhavebecome
exercisableandthesameshallnothavebeenexercised, thenon-exercise thereofshallnotconstituteawaiverofany
oftheconditionshereofandsuchpowersshall notwithstandingbeexercisableatanyfuturedate.
Inthe event ofthe Engineer-in–chargetakingaction underclause 3,hemayifsodesiretakepossessionofallorany
tools,plants,machineriesmaterialsandstoresinorupontheworkorthesitethereoforbelongingtothecontractoror
procuredbyhimandintendedtobeusedfortheexecution oftheworkorany partthereof,bypaying orallowingfor
thesameinaccountatthecontractrateorincaseofcontractratesnotbeingapplicableatsuchreasonablerate,as
maybecomparabletocurrentmarketrateswhereascertainable ofsimilararticlesandcomparablecondition,tobe
certifiedbythe Engineer-in-charge.In the alternativethe Engineer-in-chargemaybynoticein writingto the
contractororhisclerkoftheworksforemanorotherauthorisedagentrequirehimtoremovesuchtools,plants,
machineries,materialsorstores from thepremises withinatimetobespecifiedinsuchnotice andin theeventofthe
contractorfailingtocomplywithanysuchrequisition,theEngineer-in-charge mayremove thematthecontractor‟s expenses
orshallremove thembyauction orprivatesaleattherisk andcostofthecontractor inallrespects,andthe
certificateoftheEngineer-in-charge astotheexpensesofanysuchremovalandtheamountoftheproceedsand
expensesofanysuchremovalshallbefinalandconclusiveagainstthecontractor.
CLAUSE6: Extensionoftime:
Ifthecontractorshalldesireanextensionofthetimeforcompletionoftheworkonthegroundofhishavingbeen
unavoidably hinderedinitsexecution oranyothergroundheshallapply inwritingtotheEngineer-in-chargebefore
theexpirationoftheperiod stipulatedinthetenderor before theexpirationof30days fromthedate onwhich hewas
hinderedwhicheverisearlierandtheEngineer-in-charge may,ifinhisopinion,believethattherearereasonable
groundsforgrantinganextension,grantsuchextensionashethinksnecessary orproper.Thedecisionofthe Engineer-in-
chargeinthis mattershallbefinal
B\0&oD]NTDF\JWFZF[o
SFDSZJFDF\SM.VlGJFI"V\TZFIpEMYJFGFALHFMSM.SFZ6;ZSFD5]~SZJFDF8[SMg8=FS8Z D]NTJWFZMD[/JJFDFUTFCMI4TM
8[g0ZDF\H6FJ[,LD]NT5]ZLYFIT[5C[,FVFU/H6FjIFD]HAT[TFZLB[T[G[ SM.V\TZFIG0IF[CMIT[TFZLBVUZTMD]NT,\AFJL
VF5JFDF8[GLDFU6L SZJFG]\SFZ6p5l:YTYI]\CMI T[TFZLB A[DF\YLH[JC[,LCMI T[TFZLB#_lNJ;5]ZF YTF\5C[,F T[6[ SFDGF
CJF,FGF.HG[ZG[,[lBTVZHLSZJFGL ZC[X[VG[SFDGF CJF,FGF .HG[ZGMVlE5|FIV[JMYTMCMI S[4D]NTJWFZJFJFHAL SFZ6K[
TMT[DG[CJF,FGF .HG[ZG[,[lBTVZHLSZJFGLZC[X[VG[SFDGFCJF,FGF.HG[ZGMVlE5|FIV[JMYTMCMIS[4D]NTJWFZJFJFHAL SFZ6K[TM
T[DG[H~ZLS[IMuI H6FI T[D]HAJWFZLVF5X[PVF AFATDF\ SFDGFCJF,FGF.HG[ZGMlG6"I VFBZLU6FX[P
AssoonastheworkiscompletedthecontractorshallgiveanoticeofsuchcompletiontotheEngineer-in-
chargeandonreceiptofsuchnotice the Engineer-in-chargeshall inspectthework andifheis satisfied that the
workis completed in allrespect then :-
(i)ForallworkscostinguptoRs.50lakhs(amountputtotender)thefinalmeasurements shallberecordedwithin45
daysfromthedateofphysicalcompletionoftheworkandthefinalbillshallbepreparedwithin45daysfromthe
dateofrecordingfinalmeasurement.,Thecompletion certificateshallbeissuedwithinonemonthfromthedateof final
measurementsubjecttothecontractorfulfillinghisobligationasprovidedinthecontractandsubjecttothework
beingcompleteinallrespects.
(ii)Inrespectofworkscosting morethanRs.50 lakhs(amountputontender), the finalmeasurementsshall
berecordedwithin75daysfrom thedateofphysicalcompletionoftheworkandthefinalbillshallbe
preparedwithin75daysfromthedateofrecordingfinalmeasurementssubjecttothecontractorfulfilling
his obligations asprovidedin the contractandsubjectto the workbeingcompletein allrespects.
When separateperiod ofcompletion havebeen specifiedfor itemsorgroupsof items,theEngineer-in- charge
shallissueseparatecompletion certificateforsuch items orgroupsofitems .
Nocertificateofcompletionshallbeissuednorshalltheworkbeconsideredtobecompletetillthe
contractorshallhaveremovedfrom thepremises,onwhichtheworkhasbeenexecuted,allscaffolding,
shedsandsurplusmaterials,exceptsuchasarerequiredforrectification ofdefects;rubbishandallhuts
andsanitaryarrangementsrequiredforhisworkmenonthesiteinconnection withtheexecutionofthe
work,asshallhavebeenerectedbythecontractorfortheworkmenandclearedalldirtform allpartsof
building(s)in,uponoraroundwhichthework hasbeenexecutedorofwhichhemayhavepossessionfor
thepurposeoftheexecutionthereofandcleared floors,guttersanddrains,caseddoorsand sashes, oiled
locksandfasteningslabeledkeysclearlyandhandedthem overtotheEngineer-in-chargeorhis
representativeandmadethewholepremisesfitfor immediateoccupationoruse to thesatisfactionofthe Engineer-
in-charge.ifthecontractorshallfailtocomplywithanyoftherequirementsoftheseconditions
asaforesaid,onorbeforethedateofcompletionoftheworks,theEngineer-in-chargemay,atthe
expensesofthecontractor,fulfillsuchrequirementsanddisposeofthescaffolding,orsurplusmaterials andrubbish
etc.ashe thinksfitand thecontractorshallhavenoclaiminrespectofany suchscaffolding or
surplusmaterialsexceptforanysum actually releasedby thesale thereoflesstheCostoffulfilling the
requirementsandanyotheramountthatmaybeduefrom thecontractor.Iftheexpensesoffulfillingsuch
requirementsismorethantheamountrealisedsuchdisposalasaforesaidthecontractorshallforthwith,on
demand,pay such excess. The Engineer-in-chargeshallalsohavethe rights to adjust the amountofexcess
againstanyamounts thatmaybe payableto the contractor.
Nopaymentshallbemadeforanywork,estimatedtocostlessthanrupeesonethousandtillafterthewholeofthe saidwork
shallhave been completedandacertificateofcompletiongiven. But inthecaseofworksestimatedtocost
morethan rupeesonethousand,thecontractorshallonsubmittingamonthly billtherefore, beentitledtoreceive payment
proportionatetothepartoftheworkthenapprovedandpassed bytheEngineer-in-charge,whosecertificate
ofsuchapprovalandpassingofthesumsopayableshallbefinalandconclusiveagainstthecontractor., Allsuch intermediate
paymentshallberegardedaspaymentsbywayofadvanceagainstthefinalpaymentsonlyandnotas
paymentsforworkactuallydoneandcompletedandshallnotprecludetheEngineer-in-chargefromrequiringgad,
unsound,imperfectorunskilledworktoberemovedandtakenawayandreconstructedorre-erected,norshallany
suchpaymentbeconsideredasanadmission ofthedueperformance ofthecontractororanypartthereforeinany
respectortheaccruingofanyclaims,norshallitconclude,determine,oraffectinanywaythepowerofthe Engineer-in-
chargeastothefinalsettlementandadjustmentoftheaccountsorotherwise orinany otherwayvary or
effectthecontract.Thefinalbillshallbesubmittedbythecontractorwithinonemonthofthecompletionofthework
, otherwisetheEngineer-in-chargescertificateofthemeasurementsandofthetotalamountpayablefortheworkshall
befinalandbindingonallparties.
The ratesforitems ofworks shallbe valid only whenthe items concernedis acceptedas havingbeencompetedfullyinaccordance
withthesectionalspecifications. Incaseswheretheitemsofworkareacceptedasnotsocompleted,theEngineer-in-chargemay
makepaymentonaccountofsuchitemsatsuchreducedratesashemayconsiderreasonableinpreparationoffinaloronaccount bill.
CLAUSE10: Billstobesubmittedmonthly:
AbillshallbesubmittedbythecontractoreachmonthonorbeforethedatefixedbytheEngineer-in-chargeforall works executed
in the previous month and Engineer-in-chargeshall take or cause to be taken the requisite
measurementsforthepurposeof havingthe same verifiedandtheclaim,sofaras itisadmissible,shallbeadjusted,if
possible,withintendaysfromthepresentation ofthebill.Ifthecontractordoesnotsubmitthebillwithinthetime
fixedasaforesaid,theEngineer-in-chargemaydeputeasubordinatetomeasureupthesaidworkinthepresenceof
thecontractororhisduly authorisedagentwhose countersignaturetothemeasurementlistshall besufficientwarrant
andtheEngineer-in-chargemayprepareabillfromsuchlist whichshallbebindingonthecontractorinallrespects.
B\0!_o lA,NZDCLG[ZH]SZJFAFATo
VFU,FDF;DF\SZLVF5[,FAWF SFD DF8[ CJF,FGF.HG[Z[GSSL SZLCMIT[ TFZLB[VYJFT[ 5C[,FNZDCLG[SMg8=FS8Z[AL, ZH] SZJFG]\ZC[X[VG[ V[
SFDGLBZF.SZJFGFp¡[XYLCJF,FGF.HG[ZH~ZLDF5 ,[X[VYJF,[J0FJX[VG[XSI CX[ TMAL, ZH]YIFGFN;lNJ;GL V\NZD/JF5F+ZSDGM
lC;FAD[/SZJFDF\VFJX[Pp5ZH6FjIFD]HAGFlGIT;DIGLV\NZSMg8=FS8ZAL,ZH]GCLSZ[TMCJF,FGF.HG[Z5FTFGFTFAFGFSM.56
VlWSFZLG[SMg8=FS8Z[VlWS'TSZ[,V[Hg8GLCFHZLDF\pSTSFDG]\DF5,[JFDMS,X[VG[T[JLDF5IFNL5ZGLSMg8=FS8ZGLS[T[GFV[Hg8GL;CL4T[GF
VG]DMNGDF8[5]ZTLU6FX[VG[CJF,FGF.HG[ZVFJLIFNLDF\YLAL,AGFJX[4H[SMg8=FS8ZG[AWLAFATDF\A\WGSTF"ZC[X[P
Thecontractorshallsubmit allthebills ontheprintedformstobehadonapplicationattheoffice oftheEngineer-in-
charge. Thechargestobemadeinthebillsshallalwaysbeenteredattheratesspecifiedintheagreement oratthe
partlyreducedratessubjecttotheapproval bytheEngineer-in-chargeinthecaseofitemsnotcompleted/executedas
peragreements orinthecaseofanyextraworkorderedinpursuanceoftheseconditionsandnotmentionedor
providedforinthetender,attheratehereinafterprovidedfor such work.
Ifthespecificationoftheworkprovidesfortheuseofanyspecialdescriptionofmaterialstobesuppliedfromthe
Departmental StoreorifitisrequiredthatthecontractorshallusecertainstorestobeprovidedbytheEngineer-in- charge
(suchmaterials andstoresandthepricestobechargedthereforeashereinaftermentionedbeingsofaras
practicablefortheconvenience ofthecontractorbutnotsoasinanywaytocontrolthemeaningoreffectofthis
contractspecifiedinthescheduleormemorandumheretoannexed)thecontractorshallbesuppliedwithmaterials
andstoresasmaybe requiredfromtimetotime to beusedby himforthepurposeofthecontractonly,andthevalue
ofthefullquantity ofmaterials andstoressosuppliedshallbesetoffordeductedfrom anysumthendeposit,orthe proceedsof
sale thereof,if thedepositisheldin govt.Securities,thesameorasufficientportionthereofshall,inthat
casebesoldforthepurpose.Allmaterials suppliedtothecontractor shallremain theabsolute propertyofGovt.and shallon
noaccountberemovedfromthesiteofthework,andshallatalltime,beopentoinspectionbytheEngineer- in-
chare.Anysuchmaterials,unusedandinperfectlygoodconditionatthetimeofcompletion ortermination ofthe contract,
shallbe returned to theDepartmentalstore if the Engineer-in-chargesorequiresby a notice in
writinggivenunderhishand,butthecontractorshallnotbeentitledtoreturnanysuchmaterialsexcept with
theconsentinwritingoftheEngineer-in-chargeandheshallhavenoclaim forcompensationon accountofany such
materialsuppliedtohimasaforesaidbut remaining unused by him orforany wastage in ordamage thereto.
Formaterialsprovidedinschedule-Aandconsumedinexcessquantities,theratesprovidedinScheduleA
shallbeincreased/executedcorrespondingtotheincreased/decreaseinthenewratepayableforexcess
quantity ascompared tothetender-rates.Therateformaterialsprovident inextraitemswillbetheissue
ratesplusstorage charge rulingon the dateofissue ofsuch quantityofmaterials.
ThecontractorshallbeentitledtousethematerialssuppliedbytheDepartmentonlytotheextentof
quantities of such materials required for execution of the work as per theoretical calculations. The
Engineer-in-chargemayhowever,onbeing satisfiedthata largequantity ofsuch materialsisrequiredfor the
execution of the work, permit the contractor to use such large quantity of the materials, Such permission
shallbe given in writing.
Thecontractorisboundto returningoodconditionsuchmaterialsissuedinexcessoftherequirementsso worked out
or inexcessof the quantitiesso permittedto beusedbytheEngineer-in-charge if the
contractorfailstoreturnsuchextramaterialswithinaperiodof15daysfromthedateofthedemandin
writing ofsuch materialsbeing madeby theEngineer-in-charge,heshallbechargedfor theexcess materials
atdouble the issue-rates forsuch materials specified in Schedule A ofthe contractAgreement.
Allstoresandmaterialssuchascement,iftheconsumptionofwhichexceeds25tonsandsteeletc. supplied to
thecontractorby Governmentshallbe keptby the contractor in separategodownprovided with
adoublelock.ThekeyofoneofthelockshallremainwiththeEngineer-in-chargeorhisagent.The
godownshallbeaccessibletotheEngineer-in-chargeorhisagentatalltimes.Nomaterialsshallbe
allowedtoberemovedfromthesiteoftheworkandanymaterialrequiredfortheexecutionofthework
shallbetakenoutfrom thegodownonlyinthepresenceofadulyauthorisedagentoftheEngineer-in- charge.
(1)The contractorshallexecute the whole andeverypart oftheworkinthe most substantial andworkman-likemannerandbothas
regardsmaterials andinotherrespects instrict accordance withspecifications.
Thecontractorshallalsoconfirmexactly,fullyandfaithfullytothedesign,drawingsandinstructionsinwritingforthework
signedbytheEngineer-in-charge.thedesignandthedrawingsshallwelodgedintheofficeofthesiteEngineer-in-chargeto
whichthe contractorshallbe entitledtohave accessforthe purposeofinspectionatsuch officeduringoffice hours.
Where the instructions referredtoabove are notcontainedinseparate lettersaddressedtothe contractorthe sameshall berecorded
inthework-orderbook,whichshallbemaintainedandkeptonthesiteofthework.Thecontractorshallberequiredtosignsuch
entriesinthework-orderbookintokenofhaving notedtheinstructions.However,ifthecontractorfailstosingthework-order
bookforanyreasonwhatsoever,the entryofthe instructions inthe work-order bookshall be deemedtobe the due notice tohimof
thesaidinstructions.Thework-orderbookshallbeopenforinspectionstothecontractoronthesiteoftheworkduringoffice hours.
(2)Thecontractorwillbeentitledtoreceiveonecopyoftheacceptedtenderalongwiththeworkorderfreeofcostandwillalso
be entitledtoreceive three setsofcontractandworking drawingsaccording tothe progress ofwork asandwhenneeded,free of cost.
(3)Theseveraldocumentsformingthecontractareessentialpartsofthecontractandrequirementsoccurringinoneisbindingas
throughoccurringinall.Theyareintendedtobemutuallyexplanatoryandcomplimentaryandtodescribeandprovidefora
Intheeventofany discrepancyintheseveraldocumentsformingthecontractorinany onedocuments,thefollowingorderof precedence
(a)Dimensionandquantities :(i)Drawings (ii) Schedule-B ofthe Tenderform(iii)specification.
On drawings,figures dimensions,unless obviouslyincorrect,will be followedinpreference toscaled dimensions.
(b)Description:(I) Schedule-Bofthe Tenderform:-(ii)Drawings (iii) Specifications.
Inthecaseof effectivedescriptionorambiguity,theEngineer-in-chargeisentitledtoissuefurtherinstructionsdirectinginwhat
mannertheworkistobecarriedout.Thecontractorcannottakeanyadvantageofanyapparenterrororomissionindrawingsor
specificationsandtheEngineer-in-chargeshallbeentitledtomakecorrectionsandinterpretationsasnecessary tofulfilltheplans
andspecifications.
TheEngineer-in-chargeshallhavepowertomakeanyalterationsinoradditiontotheoriginalspecifications,
drawings,designsandinstructionsthatmayappeartohimtobenecessaryoradvisableduringtheprogressofthe
workandthecontractorshallbeboundtocarryoutthework inaccordancewith anyinstructions inthisconnection
whichmaybegiventohiminwritingsignedbytheEngineer-in-chargeandsuchalternationshallnotinvalidatethe contract
andadditionalworkwhichthecontractormaybedirectedtodointhemannerabovespecifiedaspartofthe
workshallbecarriedoutbythecontractor onthesameconditions inallrespectsonwhichheagreedtodothemain work
andatthesamerateas outbythecontractoron thesameconditionsinall respectsonwhich heagreedto dothe
mainworkandatthe samerateasare specifiedinthetenderforthemainwork.
14.2. Exceptthatwhenthequantityofanyitemexceedsthequantityasinthetenderbymorethan30%the contractor willbe
paidforthequantityinexcessof30% at the rate enteredintheS.O.R.oftheyear duringwhichthe excess
inquantityisfirstexecutedandforthematerials consumedinexcessquantitytherateforthematerialstobe
chargedwouldbethebasicratetakenintoaccountforfixingtheratefortheS.O.R.aboveinsteadoftherate stipulatedinschedule–
14.3. Iftheadditionaloralteredworkincludesanyclassofworkforwhichnorateisspecifiedinthiscontract, then
suchclassofworkshallbecarriedout.
(i)At the ratederived fromtheitemwithinthecontractwhichiscomparabletotheone involvingadditionaloraltered
classofwork,wheretherearemorethanonecomparable items,theitemofthecontractwhichisnearestin comparison
withregardtoclassorclassesoftheworkinvolvedshallbeselectedandthedecision ofthe SuperintendingEngineerastothe
nearestcomparableitemshallbefinalandbindingonthecontractor.
(ii)If theratecannotbederivedinaccordancewith(I)above,suchclassofworksshallbecarriedoutattherateenteredinthe ScheduleofRates
ofthe Divisionforthe yearinwhichthe tenderwas received,increased or decreased bythe percentage bywhich
thetenderamountismoreorlessascompared totheamountarrivedattheratesinthe“ScheduleorRates”oftheDivisioninthe
yearinwhichthetenderwasreceived.iftheScheduleofratesoftheDivisiondoesnotcontainalltheitemsthepercentage
increaseordecreaseofthetendershallbecalculatedconsideringsuchitemswhichwereincludedinthe“ScheduleofRates“ofthe
Divisionfortheyearandformaterialsconsumedonsuchitem the ratetobechargedwouldbe the basicratetakenintoaccountfor
fixingtherateinS.O.R.referredtoaboveinsteadoftherate.Stipulatedinschedule„A‟.
(iii)Ifitisnotpossibletoarriveattheratefrom(I) and(ii)above,suchclassofworkshallbecarriedoutattheratedecidedby
thecompetentauthoritiesonthebasisof detailedrateanalysisafterhearingthecontractorbeforeaCommitteeof two
superintendingEngineers stationedatthe same place orthenearest place.
14.4 Iftheadditional oralteredwork,forwhichnorateisenteredinthe“ScheduleofRates”oftheDivisionisorderedtobe
carriedoutbeforetherateisagreedupon,thenthecontractorshallwithinsevendays ofthedate ofreceiptby him oftheorderto carry
outthework,informtheEngineer-in-chargeoftherate,whichitishisintentiontochargeforsuchclassofworkandifthe
Engineerinchargedoesnotagreetothisrages,heshallbynoticeinwritingbeatliberty tocancelhisordertocarryoutsuchclass
ofworkandarrangetocarry itoutinsuchmannerashemayconsideritadvisable,providedalwaysthatifthecontractorshall
commenceworkorincurany expenditureinregardthereofbeforetheratesshallhavebeendeterminedaslastly hereinbefore
mentioned,theninsuchcasesheshallonly beentitledtobepaidinrespectoftheworkcarriedoutorexpenditureincurredbyhim priortothe
dateofthedeterminationoftherateasaforesaid accordingtosuchrateorratesasshallbefixedby theEngineer-in- charge.Inthe event
ofthedispute,thedecisionofthe SuperintendingEngineer ofthe Circle shallbefinal.
Where, however,the workis tobe executedaccordingtothe designs,drawings and specificationsrecommendedbythecontractor and
acceptedbythecompetentauthority,thealternation abovereferredtoshallbewithinthescopeofsuchdesigns,
drawingsandspecificationsappendedtothetenders.
Thetimelimitforthecompletion oftheworkshallbeextendedintheproportionthattheincreaseinthecost
occasionedbyalternationsbearstothecostoftheoriginalcontractworkandthecertificateoftheEngineer–in-
chargeastosuchproportionshallbefinalandconclusive.
14.5 Forexcessinitemofwellsinkingtheratesforsinkingindepthbeyondthedesigneddepthshallbeasperthe
ratequotedbythecontractorinthestatementofvariation,ifnoratesofvariationinsinkingarequotedtherate
payableshallbethetenderrateforsinkingatdesignedlevelincreasedbythedifferenceofscheduleofratefor
sinkingatdesigneddepthandsinkingatfinaldepth.
CLAUSE15:No claimfor any paymentofcompensationfor change orrestrictionof work
Ifatany timeafterthe executionofthecontractdocumentstheEngineer-in-chargeshallforany reason
whatsoever,requirethewholeorpartofthework,asspecifiedinthetender,bestoppedforanyperiodor
shallnotrequirethewholeorpartoftheworktobecarriedoutatallortobecarriedoutbythecontractor,
heshallgivenoticeinwriting,stating thefact to theContractorwho shall thereuponsuspend orstop the
worktotallyorpartially,asthecasemaybe.Inanysuchcase,exceptasprovidedhereunder,the
Contractorshallhavenoclaim toanypaymentorcompensationwhatsoeverexceptasprovidedhereunder
onaccountofanyprofitoradvantagewhichhemighthavederivedfrom theexecutionofthework in full
butwhichhedidnotsoderiveinconsequenceofthefullamountoftheworknothavingbeencarriedout,
oronaccountofanylossthathemaybeputtoonaccountofmaterialspurchasedoragreedtobe
purchasedorforunemploymentoflabourrequiredbyhim.Heshallnothavealsoanyclaim for
compensationbyreasonofanyalterationhavingbeenmadeintheoriginalspecifications,drawings, designs and
instructions which mayinvolve anycurtailmentof theworkasoriginallycontemplated.
(1)However, thecontractorwillbe entitled forcompensation for loss,ifany onthedateofnotice, forthe
purchasedmaterialsorforthecontractexecutedforthematerialtobepurchasedforsuchwork.Such
compensationwillbepaidonlyforactuallossformaterials,ifsuchmaterialssopurchasedoragreedto
purchaseisofrequiredquantity/quality andwaspurchased/contractedto bepurchasedonly forthesame
work.Butnocompensation shallbegranted tocontractoronmaterialforwhichadvancehasbeengivento
contractorbyGovernment.Theamountoflossforsuchclaim willbedecidedbyinchargeEngineer-in- charge.
(2) Thecontractoralsowillbeentitledforcompensationofunemployedlabourfor7daysfrom thedateof
noticeprovidedthatinthatopinionofEngineer-in-chargesuchlabourworkingfor7dayspriortothe
noticeandwouldnotbeinapositiontogetemploymentelsewherewithin7daysfromthedateofsuch
notice. Thecontractorshouldtrytoemploysuchunemployedlabouratotherplacesfromthedateofsuch notice.
IncasetheContractordoesnotagreewiththedecisionofExecutiveEngineerregardingtheamountof
compensationor loss; itwillbeopen for thecontractortoappeal toSuperintending Engineer-in–charge within
one monthformthedate ofknowledge ofsuchdecision. In such casethe decision ofSuperintending
Engineerwillbefinaland bindingto the Contractor.
TheContractorshallnotbeentitledforloss ofanyexpected profitofsuch work.
(Vide G.R. NO.SSR/1090/IB/247(2) /C, dtd 28-06-1993 as amended by GR of even number dated
B\0!5oSFDGFO[ZOFZS[lGI\+6DF8[SM.R]SJ6LS[J/TZV\U[SM.CSNFJMD\H]ZGSZJFAFATP
5|EFZL.HG[ZG[SZFZGFN:TFJ[HMSIF"5KLSM.56;DI[4SFZ6;Z8[g0ZDF\BF;p<,[BSIF"D]HAGF ;\5]6"S[V\XToAF\WSFDG[SM.56D]NT;]WL
A\WSZJ]H~ZLH6FIVYJF;\5]6"S[V\XToSFD5]Z]SZJFGL H~ZLIFTHGH6FIVYJFSMg8=FS8Z wJFZFSZJFGFSFDGLH~ZLIFTGH6FITMT[JF SMg8=FS8ZG[
CSLSTNXF"JTL,[lBTGM8L;VF5X[VG[SMg8=FS8ZVFGM8L;D?IFAFNTZTHVFSFDG[IYF5|; \U;\5]6"S[V\XTo:YlUTSZX[S[A\W SZX[P
VFJFS[;DF\VCLGLR[SZ[, HMUJF.l;JFISMg8=FS8ZT[6[SFD 5]~SI]¶ CMITMH[GOMS[OFINMT[G[ D/T45Z\T]SFD5]~GYJFGF5ZL6FD[T[ G D?IFYL
YI[,G]SXFGVYJFT[6[BZLNLCMIV[JLS[H[BZLNJFT[;CDTYIMCMIV[JLDF,;FDU|LGL AFATDF\YI[,G]SXFGVYJFT[G[T[GFSFDDF8[G[
DH]ZMGLH~ZCTLT[DH]ZMG[SFDGVF5LXSJFG[SFZ6[YI[,G]SXFGV\U[SM.R]SJ6LS[J/TZGMCSNFJMSZLXSX[GCLPD]/lJUTJ6"G4
VF,[BG4GSXFVG[;]RGFVMDF\SZJFDF\VFJ[,SM.O[ZOFZG[SFZ6[D]/E]TZLT[lJRFZFI[,SFDDF\SM.SF5VFJ[TM56V[JFSFZ6;ZT[SM.
J/TZDF8[CSNFJMSZLXSX[GCLP
!fVFDKTF\VFJFSFDDF8[BZLN[,LDF,;FDU|LG[SFZ6[S[DF,;FDU|LBZLNJFDF8[SZ[,SMg8=FS8G[ SFZ6[HMSMg8=FS8ZG[GM8L;GLTFZLB;]WLDF\
SM.G]SXFGYI]\CMITMT[GFDF8[J/TZD[/JJF T[CSNFZAGX[PHMVFJLZLT[BZLN[, VYJFBZLNJF ;DH]TLYI[,DF,;FDU|L DF\uIF5|DF6[ GF
HyYFDF\VG[U]6JtTFI]STCMIVG[T[OSTV[HSFDDF8[BZLNFI[,L CMIS[BZLNJFSZFZYI[,CMITMT[JLDF,;FDU|LV\U[BZ[BZG]SXFGDF8[H
VFJ]\J/TZR]SJJFDF\VFJX[P5Z\T]H[DF,;FDU|LGL BZLNLV\U[;ZSFZzLTZOYL.HFZNFZGL V[0JFg;VF5JFDF\VFJ[,CMIT[DF,;FDU|Lp5Z
SM.56HFTGFG]SXFGG]\J/TZR]SJJFDF\VFJX[GCLPVFJCSNFJFDF8[G]SXFGGLZSD5|EFZLSFI"5F,S.HG[ZwJFZFGSSLSZJFDF\VFJX[P
ZfGM8L;GL TFZLBYL ;FTlNJ;DF8[SFD[GZFBLXSFI[,DH]ZMGLAFATDF\56SMg8=FS8Z J/TZD[/JJFDF8[CSNFZAGX[P5Z\T]VFDF8[5|EFZL
SFI"5F,S.HG[ZGM V[JMVlE5|FI CMJMHM.V[S[VFJFDH]ZMGMl8;GF;FTlNJ;5C[,F\SFDSZTFCTFVG[pSTGMl8;GLTFZLBYL ;FTlNJ;GL V\NZ
VgI+ZMHDNFZD[/JJFGLl:YlTDF\GCTFP SMg8=FS8Z[VFJL GMl8;GL TFZLBYL;FTlNJ;TLV\NZVgI+ZMHUFZD[/JJFGLl:YlTDF\GCTFP
SMg8=FS8ZVFJLGMl8;GLTFZLBYLVFJSFD[G ZFBLXSFI[,CMIT[JFDH]ZMG[VgI:Y/[SFD[ZFBJFGM5|ItGSZJMHM.V[P
G]SXFGGFJ/TZGLZSDAFATDF\ SFI"5F,S .HG[ZGFlG6"I;FY[SMg8=FS8Z ;\DTGCMIT[JFS[;DF4VFJFlG6"IGLHF6YIFGLTFZLBYLV[S
DCLGFGLV\NZ5|EFZLVlW1FS .HG[ZG[V5L,SZJFDF8[SMg8=FS8ZD]STZC[XP[ VFJFS[;DF\ VWL1FS .HG[ZzLGMlG6"IVFBZL VG[A \WGSTF"ZC[X[P
VFJFSFDGFSM.V5[l1FTOFINFGLG]SXFGLDF8[SMg8=FS8ZCSSNFZAGX[GlCP
CLAUSE 15A:Thecontractorshallnotbeentitledtoclaimanycompensation fromGovt.onaccountofdelayby
Governmentinthesupply ofmaterialsenteredinSchedule„A‟wheresuchdelayiscausedby(I)Non-supplydueto
shortallotmentofquotaincasematerialsavailableunderquotaregulations. (ii)Difficulties relatingtothesupplyof
railwaywagon(iii)Forcemajored.(iv)ActofGod.(v)Actofthecountry‟senemies oranyotherreasonablecause
beyondthecontrolofGovernment.
Inthecase of suchdelayinthesupplyofmaterials, Governmentshallgrantsuchextensionoftimeforthecompletion
oftheworksasshallappeartotheEngineer-in-chargetobereasonableinaccordancewiththecircumstances ofthe case.The
decisionoftheEngineer-in-chargeasfortheextensionoftimeshallbeacceptedasfinalbythecontractors. (As
modifiedVideR&BD.G.R.No.TNC –1096IB–143 (16)–Cdated11-1-99)
CLAUSE16:Timelimitforunforeseenclaims:
Thecontractorshallnotbeentitledtoanycompensation fromGovernmentonanyaccountunlesswhereallowedby
theconditionsofthiscontact.Insuchcasesthecontractor shallhavetosubmitaclaim inwriting totheEngineer-in- charge
withinone monthofthecauseofsuchclaimoccurring.
CLAUSE17: Action&compensationincaseofbadwork:
IfatanytimebeforetheexpireofDefectsLiabilityperiodasdetailedinClause 17-A.Itshallappeartothe
Engineer-in-chargeorhissub-ordinateinchargeofthework that/anyworkhasbeenexecutedunsound,imperfector
unskilledworkmanship orwithmaterials ofinferiorqualityorthatanymaterialsorarticlesprovidedbyhimforthe execution
oftheworkareunsound,orofaquality inferiortothatcontractedfororareotherwisenotinaccordance
withthecontract,itshallbelawfulfortheEngineer-in-chargetointimatethisfactinwritingtothecontractorand
thennotwithstandingthefactthatthework,materials orarticlescomplainedformayhavebeenpassed,certifiedand
paidforthecontractor shallbeboundforthwithtorectify,orremoveandreconstructtheworksospecifiedinwhole
orinpartasthecasemayrequire,orifsorequired,shallremovethematerialsorarticlessospecifiedinwholeorin
partandprovideotherproperandsuitablematerials orarticlesathisownchargeandcost,andintheevent ofhis
failingtodosowithinaperiodtobespecifiedbytheEngineer-in-charge inthewrittenintimationaforesaid,the
contractorshallbeliabletopaycompensation attherateofonepercentontheamountoftheestimateofthe
rectificationforeverydaynotexceedingtendays duringwhichthefailure so.Continuesandinthe event ofanysuch
failureasaforesaidcontinuingbeyondtendays,theEngineer-in-Charge mayrectifyorremove,andre-executethe
workorremoveandreplacethematerials complained ofasthecasemaybeattherisk andexpenseinallrespects of
thecontractor.ShouldtheEngineer-in-chareconsiderthatanysuchinferiorworkormaterialsasdescribedabovemay
beacceptedormadeuse of,itshallbewithinhisdiscretion toacceptthesameatsuchreducedratesashemayfix therefore.
However,thecontractorshallberesponsible fornormalmaintenance oftheworktillthefinalbillfortheworkis
preparedbythedepartmentalOfficer.
Clause17A:Defectliabilityperiod:
Thecoutractorshallberesponsibletomakegoodandremedy athisownexpenses any defectwhichmaydevelopor
maybenoticedbeforetheperiodmentionedhereunderfromthecertifieddateofcompletion. Thechiefofficershall
givethecontractor anoticeinwriting aboutthedefectsandthecontractor shallmakegoodthesamewithinfifteen
daysofreceiptofthenotice.Inthecaseoffailureonthepartofthecontractor theengineerinchargemayrectifyor
removeorreexecucate theworkattheriskandcostofthecontractor.Theengineerinchargeshallbeentitledto
appropriatethewholeorany partoftheamount ofthesecuritydeposittowardstheexpenses, ifany,incurredbyhim
inrectification,removalorreexecution.Thedefectsliabilityperiodshallbeasunder.
(a) ForallworkscostinguptoRs.50,000 (amount puttotender)theperiodshallbethreemonthsfrom the
certifieddateofcompletion.
(b) Forallworksmorethanrs.50,000 andupto Rs.lcrore(amount puttotender) theperiodshallbe36months
fromthecertifieddateofcompletionorone monsoon,whicheverislater.
(c) Formajorprojects costingmorethanRs.1crore,theperiodshallbe36monthsfromthecertifieddateof
completionwhichshouldincludeonemonsoon.Forthepurposeofdecidingthemonsoonperiod,the30th
Septembermaybetreatedasthelastdate.
(d) Forbuildingworks,theperiodspecifiedin(a),(b),or(c)aboveORelapseofmonsoonperiodfollowingthe
certifieddateofcompletion,whicheverislater.Forthepurposeofdecidingthemonsoonperiod,the30th
Septembermaybetreatedasthelastdate
Clause 17A :Defectliabilityperiod:
Thecontractorshallberesponsibletomakegoodandremedyathisownexpensesanydefectinasphalt&rccroadorinterlocking
blockworks(Items)carriedby thecontractorincludingSurfaceworm outwhichmay developormaybenoticedthebeforethe
periodmentionhereunderfromthecertifiedthedateofcompletion.TheEngineer-in-chargeshallgivethecontractoranoticein
writingaboutthe defectsandthecontractorshallmakegoodthesamewithinspecifiedinnoticethecontractorshall immediately
recouptheamountsospentthatanygiventimethesecurity depositshallbemaintainedasintheclause1ofcontractifcontractor
failstorecouptheamountofsecurity depositthentheengineerinchargeshallbeentitledtorecovertheamountspentoverthe
amountofsecuritydepositthedefectliabilityperiodshall bethree yearsfromthe certified date ofcompletionwork.
Clause 17B: RetentionMoney
Aretentionamountingto 2.5%ofthe amounts due as determinedinaccordance withtheprocedure shall be effected bythechief
officerinthe firstandfollowingInterimPaymentCertificates, untilthe amountsoretainedreaches the limit ofretentionmoneyas
statedinthe Appendixtothe Tender.
Clause 17C: Refund ofRetentionMoney
Uponthe expirationofthe 3Years (Free maintenance guaranteeperiod)
CLAUSE18:Worktobeopentoinspections–Contractororresponsibleagenttobepresent.:-
AllWorksunderorincourseofexecution orexecutedinpursuanceofthecontract shall,atalltimesbeopentothe
inspectionandsupervisionoftheEngineer-in-chargeandhissubordinatesandtheContractorshall,atalltimesduring
theusualworkinghours,andallothertimesforwhichreasonablenoticeoftheintimationoftheEngineer-in-charge
orhissubordinatetovisittheworksshallhavebeengiventothecontractor,eitherhimselfbepresenttoreceive
ordersandinstructionsor havea responsibleagentdulyaccreditedinwritingpresentforthatpurpose.Ordersgivento
thecontractor‟sdulyauthorisedagentshallbeconsideredtohavethesameforceandeffect asiftheyhadbeengiven tothe
Contractorhimself.
B\0!(oT5F;DF8[SFDMB]<,FZFBJFAFAToSMg8=FS8ZVYJFT[GFHJFANFZV[Hg8[CFHZZC[JFAFAToSMg8=FS8ZVgJI[CFY
5ZCMIT[JFVYJFY.ZC[,FVYJFYI[,TDFDSFDGLCJF,FGF .HG[ZVG[tIF\T[GFTFAFGFSD"RFZLVMSM.56;DI[T5F;VG[
N[BZ[BZFBLXS[T[JLZLT[AWFJBTDF8[B]<,FZFBJFGFZC[X[VG[SFDSFHGFZFA[TFD]HAGF;DINZdIFGAWLJBTVG[[CJF,FGF
.HG[ZVYJFBFTFGFSD"RFZLVMG[SFDGLD],FSFG,[JFGF4T[DGF.ZFNFG[,UTLJFHALGMl8;VF5LCMIT[JFALHFAWFJBT[
SMg8=FS8Z[5F[T[VYJFT[DF8[,[lBTVG[IMuIZLTVG[VlWS'TSZ[,FT[DGFSM.HJFANFZV[Hg8[C]SDVG[;]RGFVMD[/JJFCFHZ ZC[J]\50X[P
SMg8=FS8ZGFIMuI ZLT[VlWS'TSZFI[,FV[Hg8G[V5FI[,C]SDM HF6[S[SMg8=FS8ZG[ 5FTFG[ VF5JFDF\VFjIF CMI T[D T[DGM
VD,YX[VG[T[V;ZSTF" ZC[XP[
(i) G.R.B. & CD NO. RGN-6090-UO24 (42)-C, dated26-11-90.
EmploymentofaqualifiedsiteEngineerbythe Contractor.TheContractorshallemploy full-time
technicallyqualifiedstaff duringthe executionofthisworkasunder:-
1. TwograduateCivilEngineersandthreediplomaCivilEngineerswhencostoftheworktobeexecuted
is more than Rs.50lakhs.
2. Onegraduate&twoDiploma,CivilEngineerswhenthecostoftheworktobeexecutedismorethan
Rs.15lakhs butless than Rs.50 lakhs.
3. MinimumoneDiplomaCivilEngineerwhenthecostofworkislessthanRs.15lakhsbutmorethan
4. Minimum twoDiplomaCivilEngineersforthework whenthecostofwork tobeexecutedislessthan Rs.
lakhs.The Engineerso employed for the Governmentwork musthave sufficientexperienceto handle
theworkindependently.SuchanEngineershallhavetostayatthesiteofworkandheshallnotbe entrusted with
otherdutyexceptthis work.
IncasethecontractororpartnerofthecontractorfirmisaCivilGraduateEngineer,Employmentof
separateEngineerwillnotbenecessary providedthat theEngineerpartnerhimselfattendstheexecutionof
the workon thesite.
CLAUSE19 :Notice tobe given beforeworkis covered up:
Thecontractor shallgivenotlessthanfiveday‟s noticeinwritingtothe Engineer-in-chare or his
subordinate in charge of the work before covering up or otherwise placing beyond the reach of
measurementanyworkinorderthatthesamemaybemeasuredandcorrectdimensionsthereoftaken
beforethesameissocovereduporplacedbeyondthereachofmeasurementandifanyworkshallbe
covereduporplacedbeyondthereachofmeasurementwithoutsuchnoticehavingandifanyworkshall
becovereduporplacedbeyondthereachofmeasurementwithoutsuchnoticehavingbeengivenor
consentobtained,thesameshallbeuncovered atthecontractor‟s expensesandindefaultthereofno
paymentorallowance shallbe made forsuch workorforthe materials with whichthe same was executed. B\0!)o
SFDR6TZYLVFJZL,[TF\5C[,FGMl8;VF5JFAFATo
SM.56SFDGLR6TZYLVFJZL,[TF\5C[,F S[DF5G,.XSFIT[JLS1FFV[SFD,.HTF\5C[,FSMg8=FS8Z[CJF,FGF.HG[ZGMVYJFSFDGMCJF,M
;\EF/TFT[DGFTFAFGFVlWSFZLG[5F\RlNJ;YLVMKLGCMIT[8,LD]NTGL,[lBTGMl8;VF5JFGLZC[X[PH[YLT[SFDG[R6TZYLVFJZL,[JFI VYJF DF5G,.
XSFIT[JLS1FFV[SFD,.HJFIT[ 5C[,FT[GF DF5 ,.G[T[GF ;FRF5ZL6FDGLGM\W,.XSFI VG[CJF,FGF.HG[ZS[SFDGMCJF,M
;\EF/TFT[DGFTFAFGFVlWSFZLGL,[lBT;\DlTD[/jIFl;JFISMg8=FS8ZSM.56SFDT[R6TZYLVFJZL,[X[GCLS[DF5G,.XSFIT[JLS1FFV[
,.HX[GCLVG[VFJLGM8L;l;JFIVYJF;\DlT D[/jIF l;JFIHM SM.56SFDG[R6TZYLVFJZL,[JFI] \ CX[S[5CM\RL GXSFI TJLVYJF DF5G
,.XSFIT[JLS1FFV[,.HJFI]\CX[TMT[J]\SFDSMg8=FS8ZGF BR["B]<,] \SZFJLGF\BJFDF\VFJX[VG[VFZLT[YI[,LS;]ZAN,VFJFSFDDF8[VYJF
VFJ]SFDH[DF,;FDFGYLYI]CMIT[DF,;FDFG5[8[SM.R]SJ6LSZJFDF\VFJX[GCLS[SM.ZSD DHZ[VF5JFDF\VFJX[GCLP
Ifthecontractororhisworkmen,orservantsshallbreak,deface,injureordestroyanypartofthebuilding
ortheworkinaquestionin/onwhichthey maybeworkingoranybuilding,road,fence,enclosureor
grasslandorcultivatedgroundcontiguous tothepremisesonwhichtheworksorany part thereof isbeing
executedorifanydamageshallbedonetothework from anycauses whateverbeforedamage
occurred/causedduetonormalfloodorrainorifanyimperfectionsbecomeapparentinitwithinthree
monthsfrom thegrantofacertificateofcompletion, finalorotherwise by theEngineer-in-charge,the
contractorshallmakegoodthesameatownexpensesorindefault,theEngineer-in-chargemaycausethe
sametobemadegoodbyothercontractor,anddeducttheexpenses(ofwhichthecertificateofthe Engineer-in-
chargeshallbe final) fromany sumsthatmay thereafterbecomedue tothecontractororfrom his
securitydepositorthe proceedsofsalethereoforasufficient portionthereof.
NeitherpartyshallbeliabletotheotherforanylossordamageoccasionedbyorarisingoutofGod,suchas"Unprecedented
flood",volcaniceruption,earthquakeorotherconvulsionof natureandotheractssuchasbutnotrestrictedtogeneralstrike,
invasion,theactsofforeigncountries,hostilities,orwarlikeoperationsbeforeorafterdeclarationofwar,rebellion,militaryor
usurpedpowerwhich prevent performance ofthe contractandwhichcouldnothave beenforeseenoravoidedbya prudentperson.
Note:“Unprecedentedflood”meansthefloodcrossingtheHighFloodLevel ofthepast........................Year(s) whichisonthe available
(ModifiedVide R&B D.G.R.No/TNC–1096 –IB–143–(16)–C dated11-1-99)
CLAUSE 21:Contractor tosupplyplant,ladders,scaffolding etc.andisliablefordamagearisingfromnon-
provisionoflights,fencingetc.:
Thecontractorshallsupplyathisowncostallmaterials(exceptsuchspecialmaterialsifany,asmay,in
accordancewiththecontracttobesuppliedfrom thePublicWorksDepartmentStores),plant, tools, appliances,
implements,ladders,cordage,tackle,scaffolding,andany temporary workswhichmay be
requiredfortheproperexecutionoftheworkwhetherintheoriginal,alteredorsubstituted form and
whetherincludedinthespecifications,orotherdocumentsformingpartofthecontractorreferredtoin
theseconditions ornotandwhichmay benecessary for the purposeofsatisfying orcomplying with requirements
oftheEngineer-in-chargeasto any matteror towhichunder these conditionshe isentitled to
besatisfiedorwhichheisentitledtorequiretogetherwithcarriagetherefortoandfrom thework.The
contractorshallalsosupply withoutchargetherequisitenumberofpersonswith themeansandmaterials
necessaryforthepurposeofsettingsoutworksandcounting,weighingandassistinginthemeasurement
orexaminationatanytimeandfromtimetotime,oftheworkorthematerials,failingthis,thesamemay beprovidedby
theEngineer-in-chargeat the expenses oftheContractorand theexpensesmay bededucted
fromanymoneyduetotheContractorunderthecontractorfromhissecuritydeposit,orproceedsofsale
thereoforofasufficient portion thereof. Thecontractorshallprovideallnecessary fencing andlights
requiredtoprotectthepublic from accidentandshallalsobebound tobearexpensesofdefenceofevery suit,
actionorotherlegalproceeding, atlaw thatmaybe broughtbyanyperson forinjurysustained. Owing
toneglectoftheaboveprecautionsandtopay any damagesandcostswhichmay beawardedinany such suit,action
orproceedingstoanysuchperson,orwhichmay,withtheconsentoftheContractor,bepaid in
compromisinganyclaimbyanysuch person.
B0Z!o %,Fg84;L0LVM4 5F,BMlJU[Z[SMg8=FS8Z[5]ZF\5F0JFAFATPT[DHNLJFAtTL4JF0 JU[Z[GLHMUJF.GCMIT[G[,LW[YTF
G]SXFGDF8[SMg8=FS8ZCMJFAFAToSMg8=FS8VG];FZsAF\WSFD:8MZDF\YL5]ZM 5F0JFDF\VFJ[T[JFDF,;FDFGl;JFIfD]/S[O[ZOFZ SZFI[,LS[
GJF:J~5GFVYJFSMg8=FS8ZGM V[SEFUAGLZC[TFVUZTMVFXZTMDF\H[GMp<,[B SZFI[,CMIT[JLlJUTMDF\S[ALHF N:TFJ[HMVG[VFXZTM
VgJI[H[SM.AFAT V\U[CJF,FGF .HG[ZGLH~ZTM ;\TMQFFIVYJF 5F,GYFIT[JM VFU|CZFBJFGM T[GM CS
CMIVG[H[G[SFDGF:Y/[S[tIF\YLVgI:Y/[B[\RFD6;lCTZH]SZFJJFGMH[T[CSCMIT[JMAWMDF,;FDFG4%,Fg84VMHFZ4;FDU|L4
;FWGM4;L0LVM4UZU0LVM45F,BM4SFDIMuIZLT[CFYWZLXSFIT[;F~H~ZLV[JFALHFSFDR,Fp;FWGMSMg8=FS8Z[5FTFGFBR["
5]ZF 5F0JFGF ZC[X[PSFDMDF8[GL CNGSSL SZJFDF8[VG[SFDVYJF DF,;FDFGGL SM.56JBT[VG[JBTMJBT4U6TZL SZJFDF\TM,
SZJFDF\VG[DF56LS[T5F;6LDF\DNN~5YJFDF8[H~ZLV[JF;FWGMVG[DF,;FDFG;lCTHM.TL;\bIFDFDF6;M4SM.56BR[" SZFJL
,LWFlJGF4SMg8=FS8Z[ 5]ZF 5F0JFGFZC[X[PVFDGSZTFV[V\U[GLHMUJF.CJF,FGF.HG[ZSMg8=FS8ZG[BR["SZFJL,[X[VG[T[ lJX[BR[",LZSD4
SMg8=FS8C[9/SMg8=FS8ZGL,[6LYTLSM.ZSDDF\YL S[T[GLHFDLGVGFDTDF\YLS[ T[GLVGFDTGFVYJFT[GF5]ZTF EFUGFJ[RF6DF\YLp5H[,L
ZSDDF\YLSF5L,[JFDF\VFJX[PHFC[ZHGTFG[VS:DFTGYFIT[DF8[SMg8=FS8Z[H~ZLJF0VG[NLJFAtTLGL HMUJF.SZJFGL ZC[X[VG[p5ZGL
;FJR[TL ZFBJF V\U[GL A[NZSFZLG[ SFZ6[YI[, .HF V\U[SF[.56 jIlST4H[NFJM DF\04[ 5U,F\,[
VYJFALHLSFG]GLSFI"JFCLSZ[T[GFAFRFJG]\BR"VG[VFJF SM.NFJF45U,F\VYJFSFI"JFCLDF\T[JLSM.jIlSTG[H[SF\.G]SXFGLS[BR"
VF5JFG]\R]SFNFDF\H6FJFIT[VYJFVFJFSM.jIlSTGFSM.56CSNFJFGLSMg8=FS8ZGL;\DlTYL;DFWFGYTF\H[ZSDR]SJJFDF\VFJ[ T[G]\
BR"EMUJJF 56 SMg8=FS8ZA\WFI[,ZC[X[P
CLAUSE21A:TheContractorshallprovidesuitablescaffoldsandworkingplatforms,gangwaysand
stairways, and shallcomplywiththefollowingregulation in connectiontherewith.
B\0Z!PSP SMg8=FS8Z[IMuI5F,BM VG[ SFRF DF\R0F4HJFvVFJJFDF8[GF5Fl8IF VG[ ;L0LGMHMUJF.SZJFGL ZC[X[VG[T[V\U[ GLR[
D]HAGFlGIDMG]\ 5F,GSZJFG]\ ZC[X[P
(a)Suitablescaffoldsshallbeprovided forworkmen forallworksthatcannotbe safely donefromaladder
orbyothermeans.
Sf;L0Lp5ZYLVYJFALHFSM.;FWGwJFZF;,FDTL5]J"SGSZLXSFIT[JFAWFSFDDF8[SFDNFZM;F~IMuI5F,BMGLHMUJF. SZJFGLZC[X[P
(b) Ascaffold shallnotbeconstructed, taken downorsubstantiallyalteredexcept
(i)Under the supervision ofa competentand responsible person.
sBP!fSFI"1FD VG[HJFANFZ jIlSTGL N[BZ[B C[9/T[l;JFI4
(ii)appointedbycontractorandbycompetentworkerspossessingadequateexperienceinthiskindof
ZfSMg8=FS8Z wJFZFlGDFI[,VG[VG]EJWZFJTFSFI"1FDSFDNFZMwJFZFYT] \CMIT[l;JFI4SM.565F,SAF\WJL GCL\4pTFZJLGCL\S[ T[DF\
DCtJGFO[ZOFZSZJFGlCP
(c)Allscaffoldsand appliancesconnected therewith and allladdersshall
sUf AWL5F,BMVG[T[GF;FY[;\S/FI[,;FDU|LVG[AWLH;L0LVM
(i)be ofsound material !PDHA]TRLHJ:T]GLAG[,LCMJLHM.V[P
(ii)be ofadequate strength havingregard totheloadsand strainsto which theywillbe subjected and
Zf T[GF5ZGF VFJGFZF JHG VG[W;FZFG[BDL XS[T[8,L DHA]TCMJL HM.V[VG[
(iii)be maintained in propercondition #fT[G[;FZLl:YlTDF\ ZFBJFGLZC[X[P
(d)Scaffolds shallbeso constructed thatno partthereofcan bedisplacedin consequenceofnormaluse.
s3f 5F,BM V[JL AF\WJFGLZC[X[S[;FDFgI J5ZFXYLT[GM SM.56 EFUK]8M50LGHFIP
(e)Scaffoldsshallnotbe overloaded andso faraspracticabletheloadshallbe evenlydistributed.
sRf 5F,BM 5ZJWFZ[50T]\JHGD]SJ]GlCVG[ XSI CMI tIF\ ;]WLT[JHG ;DU|5F,B 5ZV[S;ZB]\ JC[RLGF\BJ]\
(f)Beforeinstallingtheliftinggearonscaffolds,specialprecautionshallbetakentoensurethestrength
and stabilityofthescaffolds.
sKf 5F,BM5ZDF,pRSJF DF8[GFlUIZUM9JTF5C[,F5F,BMGLDHA]TF.VG[8SFp56FGLBFTZL SZJFGLBF; ;FJR[TL ,[JLP
(g)Scaffolds shallbeperiodicallyinspectedbya competentperson .
sHf SFI"1FDjIlST wJFZFJBTMJBT 5F,BMGL T5F; SZJFGLZC[XP[
(h)Beforeallowingascaffoldtobeusedbyhisworkmen,theContractorshall,whetherthescaffoldhas
beenerectedbyhisworkmenornot,takestepstoensurethatitcompliesfullywiththeregulationherein specified.
shfT[GFSFDNFZMV[5F,BMAF\WLCMIS[GCMITM565F[TFGFSFDNFZMG[T[5F,BGMp5IMUSZJFN[T\5C[,FSMg8=FS8Z[T[JL5F,BM
VCL\H6FJ[,lJlGIDM VG];FZAZFAZCMJF AFATGLBFTZL SZJFGL ZC[X[P
(i)Workingplatforms, gangways shall–
(i)beso constructedthatno part thereofcan dugundulyorunequally.
s8f SFRF DF\R0F HJFvVFJJF DF8[GF 5Fl8IF VG[;L0LVM AF\WTLJBT[GLR[GL AFATMbIF,DF\ ZFBJFGLZC[X[P
!PT[GMSM.56EFUJW]50TM S[ V;DFG ZLT[h]SLGHJM HM.V[P
(ii)be/soconstructedandmaintainedhavingregardtotheprevailingconditionsastoreduceasfaras
practicable risks ofpersons triplingorslippingand
Zf DF6;MUA0L S[,5;L50[T[J]HMBD AG[T[8,] VMK]\ ZFBJFDF8[5|JT"TF ;\HMUMVG];FZT[AF\WJFVG[HF/JJF4VG[
(iii)be keptfreefromanyunnecessaryobstruction.
#PSM.56HFTGF lAGH~ZLVJZMWYL D]STZFBJFP
(j)Inthecaseofworkingplatforms,gangwaysworking placesandstairwaysataheightexceeding2.00
Mtr.(to bespecified)
s9fZP DL8ZYL JW]pRF\.JF/FSFRF DF\R0F4HJFvVFJJF DF8[5Fl8IF SFDGLHuIF VG[;L0LVMGLG[R[D]HAGLHMUJF.ZC[X[P
(i) everyworkingplatformandeverygangwayshallbecloselyboardedunlessotheradequatemeasures aretaken
toensuresafety.
!f ;,FDTLGFALHF5]ZTF5U,F\G,[JFIF CMITM NZ[SSFRM DF\R0MVG[HJF VFJJFDF8[G]\NZ[S5Fl8\I],UM,UH0[,]\ CMJ]\ HM.V[P
(ii) everyworkingplatformand every gangwayshallhave adequate width, and
Zf NZ[SSFRFDF\R0F VG[HJF vVFJJF DF8[GF 5Fl8IF45]ZTL5CM/F.JF/FCMJFHM.V[4 VG[
(iii)everyworkingplatform,gangway, workingplace and stairwayshallbe suitablyfenced.
#f NZ[SSFRFDF\R0F VG[HJFvVFJJF DF8[GF5Fl8IF\SFDGLHuIF VG[;L0LVMG[IMuI S9[ZF CMJFHM.V[P
(k)Everyopening inthefloorofabuildingorinaworkingplatform shall,exceptforthetimeandtothe
extentrequiredtoallow theaccessofpersonorthe transportorshifting ofmaterialsbe providedwith suitable
means to preventthe fallofpersons ormaterial.
s0f DF6;M VFJL H.XS[VYJF DF,;FDFGLC[ZO[ZY.XS[S[V[S:Y/[YL ALH[:Y/[,.H.XSFIT[8,F JBTVG[T[8,F 5]ZTL DSFGGL OZ;
S[SFRF DF\R0F5ZGL5|tI[SB]<,LHuIF 5ZV[JF IMuI ;FWGM D]SL ZFBJF S[H[YLSM.DF6;S[DF,;FDFG 50LGHFIP
(I)Whenpersonsareemployedonaroofwheretheredangeroffallingfromaheightexceeding3.00
Mtr.(to bespecified)meters suitableprecautionshallbe taken to preventthe fallofpersonsormaterial.
s-f HIF\YL 50L HJFGM EICMI T[JL #P sH6FJJLf DL8ZYL JW]p\RF.GF KF5ZF\ 5ZDF6;MG[SFD[ZFBJFDF\VFjIF CMI tIF\YL DF6;M
S[DF,;FDFG50LGHFIT[DF8[;FJR[TLGF IMuI5U,F\ ,[JFGFZC[X[P
(m) Suitableprecautionsshallbetakentopreventpersonsbeingstruckbyarticleswhichmightfallfrom
scaffold orotherworkingplaces.
sTf 5F,BMS[SFDSFHGLALHL HuIFVM 5ZYL50[T[JL RLHJ:T]VMYLDF6;G[ .HFGYFIT[DF8[;FJR[TLGF\IMuI5U,F\ ,[JFP
(n)Safe means ofaccessshallbe providedto allworkingplatforms and otherworkingplaces.
sYf AWF SFRFDF\R0F VG[SFDGLALHL HuIFVMV[;C[,F.YL HJFDF8[;,FDTDFUM"GL HMUJF. SZJFGLZC[X[P
CLAUSE21B: Thecontractorshallcomplywiththefollowingregulationsasregardsthehoisting
appliancesto beusedbyhim
B\0Z!PBPSMg8=FS8ZJHGpRSJFGF;FWGMJF5Z[T[ ;A\WDF\ T[6[GLR[GF lGIDMG]\ 5F,GSZJFG]\ ZC[X[P
(a)Hoistingmachinesandtackle includingtheirattachments, anchoragesand supports shall–
sSf JHGpRSJFGF I\+M VG[UZU0LJF/FI\+4T[DGL ;FY[GFHM0F6M4 ,\UZ DF8[GF ;FDFGVG[8[SFGLR[D]HAGFCMJFHM.X[ov
(i)beofgoodmechanicalconstruction,soundmaterialandadequatestrengthandfreefrompatentdefect, and
s!f;FZLIF\l+SZRFGFJF/F\4DHA]TJ:T]GF T[DH5]ZTLTFSFTJF/F VG[N[BLTLSM.BFDL lJGFGFVG[
(ii)be keptin good repairand in workingorder
Zf ;FZL N]Z:TCF,TFD\F VG[RF,]l:YlTDF\ ZFBJF HM.X[P
(b)Everyropeusedinhoistingorloweringmaterialsorasameansofsuspensionshallbeofsuitable
qualityandadequatestrength andfreefrompatentdefect.
sBfDF,;FDFGG[p\R[R0FJJFS[GLR[pTFZJFVYJF,8STMZFBJFGF;FWGTZLS[J5ZFT]NMZ0]\IMuIHFT]\VG[5]ZTLDHA]TF.JF\/]\ T[DHN[BLTLZLT[
BFDL lJGFG]\ CMJ]\ HM.V[P
(c)Hoistingmachinesandtacklesshallbeexaminedandadequatelytestedaftererectiononthesiteand
before use andbere-examined inposition atintervalsto be prescribed byEngineer-in-charge.
sUfJHGpRSJFGF\I\+MVG[UZU0LJF/FI\+G[SFDGF:Y/[UM9jIFAFNVG[p5IMUDF\,LWF5C[,FT5F;LHM.G[5]ZTF5|DF6DF\ RSF;L ,[JFGF
ZC[X[4 T[DHCJF,FGF .HG[ZlGITSZ[T[JF\;DIF\TZ[4UM9J[,L l:YTLDF\ T[GLO[ZT5F; SZJFGLZC[X[P
(d)Everychain,ring,hook,shackle,swivelandpulley blockusedinhoistingorloweringmaterialsorasa
means ofsuspensionshallbe periodicallyexamined.
sWfDF,;FDFGp\R[R0FJJFGFS[GLR[pTFZJFGFS[,8STMZFBJFGF;FWGTZLS[J5ZFTF5|tI[S;F\S/4ZL\U4VF\S0MS0L4GS]RFVG[
5],La,MSJBTMJBTT5F;JFP
(e)Everycranedriverorhoisting –applianceoperatorshallbeproperlyqualified.
sRf 5|tI[SS|[.Gv0=F.JZS[JHGpRSJFGFI\+GFRF,S IMuI ,FISFTJF/FCMJF HM.V[P
(f)Nopersonwhoisbelowageof15yearsshallbeincontrolofanyhoistingmachine,includingany
scaffolds, norshallgive signalstothe operator.
sKf!5JQF"YLGLR[GLSM.56jIlSTG[SM.5F,S;lCTJHGpRSJFSM.I\+GFlGI\+STZLS[VYJFVM5Z[8ZG[lGXFGLYL;]RGF VF5JF4
SFD[ZFBLXSFX[GCLP
(g)Inthecaseofeveryhoistingmachineandofeverychain,ringhook,shackle,swivelandpulleyblock
usedinhoistingorloweringorasameansofsuspensionthesafeworkingloadshallbeascertainedby adequate means.
sHfJHGpRSJFGF5|tI[SI\\+VG[DF,;FDFGp\R[R0FJJFGFS[GLR[pTFZJFGFS[,8SFJLZFBJFGF;FWGTZLS[J5ZFTL5|tIS[;F\S/4
ZL\U4S0L4 GS]RF VG[ 5],Lva,MSGL ;,FDTZLT[JHGp9FJJFGLXlSTS[8,LK[T[ IMuI ;FWGM J0[ GSSLSZJFG]\ ZC[XP[
(h)Everyhoistingmachineandallgearsreferredtoinprecedingregulationshallbeplainlymarkedwith the safe
shfVFU/GF lJlGDIH[DF\ H6FJ[,JHG pRSJFGF5|tI[S I\+VG[AWFH lUIZ 5ZT[;,FDTZLT[S[8,]\ JHGp9FJL XS[T[D K[PT[RMbB]
,B[,]CMJ]\ HM.V[P
(i)Inthecaseofhostingmachinehavingavariablesafeworkingload,eachsafeworkingloadand
conditions underwhichitisapplicableshallbe clearlyindicated.
s8fH]NF\H]NF\JHG;,FDTZLT[pRSLXSFTF4pRSJFGFI\+5Z4;,FDTZLT[pRSLXSF\T]5|tI[SJHGVG[S.CF,TDF\I\+G[ T[,FU]
50X[T[:5Q8NXF"JJFG]\ ZC[XP[
( j) Nopartof anyhoistingmachineorgearreferredtoinregulation„g‟aboveshallbeloadedbeyondthe
safe workingloadexceptfor the purposeoftesting.
s9fp5ZGFlJlGIDH[DF\H6FJ[,JHGpRSJFGFSM.56I\+S[lUIZGFSM. 56EFU5ZRSF;6LDF8[H~ZLCMIT[l;JFI4;,FDT JHG SZTF\
JW]JHG,FNJ]\ GlCP
(k)Motors,gears,transmissions,electricwiringandotherdangerouspartsofhoistingappliancesshallbe
provided withsufficientsafeguards.
s0fJHGpRSJFGF;FWGGLDM8ZM4lUIZ4lJW]TJFCS;FWGM4JLH/LGFTFZVG[HMBDLEFU[DF8[5]ZL;,FDTLGLHMUJF.SZJFGL ZC[X[P
(l)Hoistingappliancesshallbeprovidedwithsuchmeansaswillreducetoaminimumtheriskofthe
accidentaldescentoftheload.
s-f SM.JHG VS:DFTGLR[;ZSL50[T[J]\ HMBD VMKFDF\ VMK]\ ZC[ T[5|DFZGLSM.S;UJ0 JHG pRSJFGF;FWGDF\ SZJFGLZC[XP[
(m)Adequateprecautionsshallbetakentoreducetominimumtheriskofanypartofasuspendedload
becomingaccidentallydisplaced.
sTf ,8STFZFB[,FJHGDF\YLSM.56 EFU VS:DFTK]8M 50LHJFG]\HMBD VMKFDF\VMK]\ ZC[ T[DF8[5]ZTL ;FJR[TLZFBJFGLZC[X[P
CLAUSE22 :Measures forPrevention ofFire :
Thecontractorshallnotsetfiretoanystandingjungle,treebushwoodorgrasswithoutawrittenpermit
fromthe Engineer-in-charge .
Whensuchpermitisgiven,andalsoinallcaseswhendestroyingcutorduguptree,bushwood,grassetc.
byfire,thecontractorshalltakenecessarymeasures topreventsuchfirespreadingtoorother-wise
damagingsurroundingproperty.Whensuchpermitisgivenandalsoinallcaseswhendestroyingcutor dugup tress,
bush wood, grass etc. byfire,thecontractorshalltake necessarymeasures to preventsuchfire
spreadingtoorother-wisedamagingsurroundingproperty.
CLAUSE23 :Liability ofcontractorsfor anydamagesdonein or outsidework area:
CompensationforalldamagedoneintentionallyorunintentionallybyContractor‟slaborerswhetherinor
beyondlimitsofGovernmentproperty includinganydamagecausedby thespreadingoffirementionedin
theclause22,shallbeestimatedbytheEngineer-in-charge,orsuchotherOfficerashemayappointand
theestimatesoftheEngineer-in-charge,subjecttothedecisionoftheSuperintendingEngineer,onappeal
,shallbefinalandthecontractorshallbeboundtopaytheamountoftheassessedcompensationon demand, failing
which the same will be recovered from the Contractor as damages in the manner
prescribedinclause1ordeductedbytheEngineer-in-chargefromanysumsthatmaybedueorbecome
due fromGovernment tothe contractorunderthis contractorotherwise.
B\0Z#P SFDGF lJ:TFZVYJFT[GF ACFZYI[,SM.56G]SXFGDF8[SMg8=FS8ZHJFANFZ CMJFAFAT
B\0ZZDF\H6FjIF5|DF6[VFU5|;ZJFYLYI[,SM.56G]SXFG;lCTSMg8=FS8ZGFDH]ZMV[.ZFNF5]J"SS[VHF6TF\;ZSFZLlD,STGL
CNGLV\NZS[ACFZSZ[,FAWFHG]SXFGGFJ/TZGMV\NFHCJF,FGF.HG[ZVYJFV[D6[GLD[,F ALHFSM.VlWSFZLSF-X[VG[
CJF,FGF.HG[ZGMVFV\NFH4V5L,YI[4VlW1FS.HG[ZGFR]SFNFG[VFlWG4VFBZL U6FX[VG[DFU6LSZTF\VFSFZFI[,LJ/TZGL
T[JLZSDR]SJJFDF8[SMg8=FS8ZA\WFI[,ZC[X[VG[T[DSZJFDF\S;]ZSZX[TMT[JLZSDB\0!DF\9ZFJ[,LZLT[G]SXFGLTZLS[SMg8=FS8Z
5F;[YLJ;],SZJFDF\VFJX[VYJFVFSMg8=FS8C[9/VgIYF;ZSFZ5F;[,[6LYTLS[CJP5KL,[6LYFIT[JLZSDDF\YLCJF,FGF
The Contractorshallbear the expenses of defending any action or other legalproceeding thatmay be
broughtbyanypersonforinjurysustainedbyhim owing toneglectofprecautionstopreventthespreadof thefire and
heshallalsopaythe damagesand costthatmaybe awardedbythe courtin consequence.
VFU5|;ZTLV8SFJJF;F~;FJR[TLGF 5U,F\,[JFDF\YI[,A[NZSFZLG[5lZ6FD[SM. jIlSTG[YI[,.HFDF8[ 5U,F\,S[ [ALHLSFG]GL SFI"JFCLSZ[ TM
T[GL;FD[GFARFJG]\ BR"SMg8=FS8Z[EMUJJFG]\ZC[X[VG[T[JL SFI"JFCLG[5ZL6FD[SM8" TZOYLR]SFNMVF5TF\T[ G]SXFGL VG[BR"
EZJFG]\YFIT[T[D6[R]SJJFG]\ ZC[X[P
CLAUSE24 :Deleted
CLAUSE25 :Deleted
CLAUSE26: Worknottobesublet.Contract mayberescinded andsecuritydeposit forfeited for
subletting itwithoutapprovalorfor bribinga public officeror ifcontractor becomesinsolvent:
ThecontractshallnotbeassignedorsubletwithoutthewrittenapprovaloftheEngineer-in-charge.Andif
the contractor shallassign orsublethiscontractor attempttodosoorbecomeinsolventorcommenceany
proceeding togethimselfbeadjudicatedaninsolventormakeanycompromisation withhiscreditors,or
attempttodoso,theEngineer-in-chargemay,bynoticeinwriting rescindthecontract,Alsoifanybride, gratuity
gift loan, perquisite, reward or advantage, pecuniary or otherwise, shall either directly or indirectly
begiven,promisedorofferedby thecontractor,orany ofhisservants oragentstoany public officerorpersonin
theemploy ofGovernmentinanyway relating tohisofficeoremployment,orifany
suchofficerorpersonshallbecomeinanywaydirectlyorindirectlyinterestedincontract,theEngineer- in-
chargemaythereuponby noticeinwriting rescindthecontract.Intheeventofcontractbeing rescinded, thesecurity
depositofthecontractorshallthereuponstand forfeitedandbeabsolutely atthedisposalof Governmentand the
sameconsequenceshallensure asifthe contracthad been rescinded under clause 3 hereofand inadditionthe
contractorshallnotbeentitledtorecoverorbepaidforany work therefore actuallyperformed undercontract.
B\0Z&oAF\WSFD5[8FEF0[G VF5JFAFAT4D\H]ZLlJGF5[8FEF0[VF5JFYLVYJF;ZSFZLVlWSFZLG[,F\RVF5JFDF8[ VYJF
SMg8=FS8ZGFNZYI[YL SMg8=FS8 ZN YFI VG[HFDL VGFDTH%TYJF AFATo
CJF,F .HG[ZGF l,lBT5ZJFGULl;JFISMg8=FS8 SM.G[V[;F.G SZL XSFX[S[5[8FEF0[VF5LXSFX[GCL4VG[SMg8=FS8Z T[DGM SMg8=FS8Z
V[;F.GSZX[VYFJ5[8FEF0[VF5X[S[T[DSZJFGM5|ItGSZX[S[GFNZAGX[S[5MTFG[GFNZSZFJJFDF8[GLSM.SFI"JFCLSZX[S[
5FTFGF,[6JFZM;FY[SM.5TFJ8 SZX[S[T[DSZJFGM5|ItGSZX[TM CJF,FGF .HG[Zl,lBTGM8L;VF5LG[SMg8=FS8ZN SZLXSX[PJ/L
SMg8=FS8ZS[T[DGF SM. GMSZS[V[Hg8SM.;ZSFZLVlWSFZLG[VYJF;ZSFZLGMSZLDF\C[GFSM.56jIlSTG[ T[GFCM¡FS[HMSZLGL~V[ SM.56
5|SFZGL ,F\R4Al1F;4E[84 VG],FE4.GFDS[ VFlY"SALHFSM.5|SFZGF,FE5|tI1FS[5ZM1FZLT[VF5X[4 VF5JFG]\JRGVF5X[
S[VF5JFGLT{IFZLATFJX[VYJF VFJFSM.VlWSFZL S[jIlST 5|tI1FS[5ZM1F ZLT[SMg8=FS8DF\lCTWZFJTFYX[ TM CJF,FGF .HG[Z
l,lBTGM8L;VF5LG[SMg8=FS8ZNSZLXSX[PVFJLZLT[SMg8=FS8ZNYTF\SMg8=FS8ZGLHFDLGVGFDTH%TYI[,U6FX[4VG[T[
;\5]6"56[;ZSFZC:TSZC[X[VG[VFSZFZGFB\0v#C[9/HF6[S[SMg8=FS8ZNSZJFDF\VFjIMCMIT[JFHT[GF5lZ6FDMVFJX[VG[
JW]DF\ SMg8=FS8C[9/BZ[BZSZ[,FSM.56SFD DF8[SM.ZSDJ;],SZJFG[S[R]ST[,[JFGMSMg8=FS8ZG[CSSZC[X[GlCP
CLAUSE27:Sumspayableby way ofcompensationto be consideredas reasonablecompensation
withoutreferenceto actual loss:
All sums payable by a contractor by way of compensation under any of these conditions shall be
consideredasareasonablecompensationtobeapplied totheuseofGovernmentwithoutreferencetothe actualloss
ordamage sustained and whetheranydamage has orhad notbeen sustained.
B\0Z*oBZ[BZ UI[,BM8G[ ,1FDF\ ,LWF l;JFIJ/TZ~5[R]SJJFGLYTL ZSDG[JFHAL J/TZU6JF AFATo
BZ[BZBM8 S[G]SXFGG[,1FDF\,LWFl;JFIVG[ SM. G]SXFGYI]\CMIS[GYI]\CMITM 56XZTMDF\GLSM.56XZTC[9/SMg8=FS8Z[ J/TZ~5[R]SJJFGL
YTL TDFDZSDG[ JFHAL J/TZU6JFDF\VFJX[ VG[T[G[;ZSFZDF8[p5IMUDF\ ,[JFX[P
CLAUSE28 : Change inthe constitutionof firmtobe notified:
Inthecaseofatenderbypartners,anychangeintheconstitutionofafirmshallbeforthwithnotifiedby the
Contractorto Engineer-in-charge forhisinformation.
B\0Z(o5[-LGFA\WFZ6DF\ SM. O[ZOFZYI[T[GL HF6 SZJF AFATo
EFULNFZMV[8[g0ZEI]"CMIT[S[;DF\5[-LGFA\WFZ6DF\SM.O[ZOFZYTF\SMg8=FS8Z[CJF,FGF.HG[ZG[TD
[ GLHF6VY["T[JFO[ZOFZV\U[
TZTDFlCTUFZSZJFGFZC[X[P
CLAUSE29:Worksto beunder directions ofSuperintending Engineer:
Allworkstobeexecutedunderthecontractshallbeexecutedunderthedirectionandsubjecttothe
approvalinallrespectsofSuperintendingEngineeroftheCircleforthetimebeing,whoshallbeentitled
todirectatwhatpointorpointsandinwhatmannertheyaretobecommencedandfromtimetotime carried on.
B\0Z)oVlW1FS.HG[ZGL ;]RGF C[9/SFD SZJF AFATo
SMg8=FS8C[9/SZJFGF AWFHSFD ;S",GF H[T[JBTGF VlW1FS.HG[ZGL ;]RGF VG[C[9/ TDFD AFATM DF8[T[DGLD\H]ZLG[VFWLGZCLG[
SZJFGFZC[XP[ VFSFDSIF:Y/[S[:Y/MV[VG[S[JLZLT[X~SZJFJBTMJBTS[JLZLT[VFU/W5FJJFT[V \U[;]RGFVF5JFVlW1FS
.HG[ZCSSNFZZC[X[P
CLAUSE30 : (1)Disputes to bereferred to Tribunal:
Thedisputesrelatingtothiscontract,sofarastheyrelatetoanyofthefollowingmatters,Whethersuch
disputesariseduring theprogressofthework orafterthecompletionorabandonmentthereof,shallbe referredto the
ArbitrationTribunal, GujaratState.
(i)The ratesofpaymentunderclause5 forany tools, materialsandstores, inorupontheworksofthesite
thereoforbelonging to the contractororprocuredby himanintendedtobeused forexecutionof thework
oranypartthereofpossessionofwhichmayhavebeentakenbytheEngineer-in-chargeunderthesaid
(ii) TheReduction inratesmadebytheEngineer-in-Chargeunderclause9 from theitemsofworksnot
acceptedascompletedfullyin accordance with the sanctionedspecifications.
(iii)The rateofpaymentforanyclassofworkwhichisincludedintheadditionaloralteredworkcarried
outbythe contractor in accordancewith the instructions of the Engineer-in-Charge underclause14 and the
ratesforwhichisto bedetermined under the saidclause
(iv)Theratesofpaymentformaterialsalreadypurchasedoragreedtobepurchasedbythecontractor
beforereceiptofnoticegivenby theEngineer-in-Chargeunderclause15, and/ortheamountof compensation
payable to the contractorunderthesaidclauseforloss inrespectofsuch materials.
(v)Theamountofcompensationwhichthecontractorshallbeliabletopayunderclause17intheeventof
his failureto rectify, remove or reconstruct the workwithin the period specified inthe written intimation or
the amount of expenses incurred by the Engineer-in-Charge under the said clause 17 in rectifying,
removingor re-executingthe workorin removingand replacingthe materials orarticlescomplainedof.
(vi)ThereductionofratesasmaybefixedbytheEngineer-in-Chargeunderclause17forthe inferiorworkor
materialsasacceptedormadeuseof.
(vii)Theamountofcompensationpayablebythecontractorfordamagesasestimatedandassessedunderclause23.
(viii)Theamountpayableto the contractorfor the workcarried out under clause 33 in accordancewith the
instructionsandtherequirementsoftheEngineer-in-Chargeina case wherethere are no specifications .
(2)TheprovisionofSection-21oftheGPWDdisputeArbi.TribunalAct–92 &orderissuedbytheGovt.in
connectionwiththisActwillnowapplyforArbitration (AsperGovernmentinN.&W.R.D.letterNo.
(3)TheprovisionofArbitration Act.,shall insofarastheyareinconsistent withtheprovisionofthisactcease ofto
applytoanydisputearisingfromaworkscontractandallarbitrationproceedingsinrelationtosuchdisputebeforean
arbitrator,courtofauthorityshallstandtransferredtotheTribunal.
(4)The awardsdeclaredbythearbitratorshouldbespeakingaward,givingreasonsandcalculationsforevery itemof
claims.Thedecisionwillhavetobeimplemented byallthedepartmentsoftheStateGovernmentandPublicSector Enterprises
ofGujarat.(Resolution F.D.No.PB/1088/735/KT/Sachivalaya/Gandhinagar5 thOctober 1988.)
(5)IncaseofdisputeleadingtothecontractororGovernment ofGujaratapproaching toCourtofLaw,itshallbe
withinthejurisdictionwherethe siteofworkissituated.
(6)Thereferencetoarbitrationproceedingunderthisclauseshall not
(i)affecttherightoftheEngineer-in-chargeunderclause5totakepossession ofalloranytoolsplants materials and
stores in orupon the works ofsitethereofbelongingto the contractororprocured byhimand intendedto be used
fortheexecution oftheworkoranypart thereof.
(ii)Preclude the Engineer-in-charge fromutilisingthematerials purchased bythecontractorin anyworkor
fromremovingsuchmaterialstootherplaces,duringtheperiodtheworkisstoppedorsuspendedin
pursuanceofnoticegiven to thecontractorunderclause
(iii)Entitle thecontractortostop theprogressof thework or the carrying out the additionaloraltered work in
accordance with the provisions ofclause 14 oras thecasemaybe orclause33.
CLAUSE31 :Deleted
CLAUSE32 : Lump sumin estimates:
When theestimateonwhichatenderismadeincludeslumpsum inrespect ofpartofthework,the
contractorshallbeentitledtopaymentinrespectoftheitemsofworkinvolvedorthepartoftheworkin
question at the samerates asarepayableunderthis contract forsuchitems,orifthe partofthework in
questionisnotintheopinionoftheEngineer-in-chargecapableofmeasurementtheEngineer-in-charge
may,ashisdiscretion,paythelumpsumamountenteredintheestimateandthecertificateinwritingof
theEngineer-in-chargeshallbefinalandconclusiveagainstthecontractorwithregardtoanysum orsums payableto
him, under the provisions of thisclause.
B\0#ZoV\NFHDF\GLprRSZSDMo
H[V\NFHGFVFWFZ[8[g0Z T{IFZ SZJ]\CMIT[DF\HM SFDGFVD]SEFUMV\U[prRSZSDGM;DFJ[XYTMCMITMVFJLAFATMDF8[VF
SMg8=FS8C[9/R]SJJF5F+CMIT[HNZ[4YI[,SFDGLAFATMDF8[pSTSFDGFSM.EFUDF8[R]SJ6LD[/JJFSMg8=FS8ZCSSNFZZC[X[4
VYJFCJF,FGF.HG[ZGFDT[pSTSFDGF T[EFUG]\DF5,.XSFIT[DGCMI4TMCJF,FGF .HG[Z5FTFGF:JlJJ[SVG];FZ V\NFHDF\
GM\WFI[,LprRSZSDR]SJLXSX[ VG[VFB\0GLHMUJF.C[9/SMg8=FS8ZG[R]SJJF5F+YTLZSD S[ZSDMG[,UT] \CJF,FGF.HG[ZG]\ l,lBT
5|DF65+T[GF DF8[ VFBZLVG[lG6F"IS,[BFX[P
CLAUSE33 :Actionwhereno specifications:
Inthecaseofworkforwhichthereisnosuchspecification,suchworkshallbecarriedouttinaccordance
withtheDivisionalSpecificationand intheeventoftherebeing noDivisionalSpecifications,then,insuch
casetheworkshallbecarriedoutinallrespectsinaccordancewiththeinstructionsandrequirementsof the Engineer-
B\0##oSM.lJUTM GVF5L CMItIFZ[,[JFG\F 5U,F o
SM.lJUTMGCMIT[JF5|SFZGFSFDGLAFATDF\T[JLSFDl0lJhGGLlJUTMVG];FZCFYWZJFG]\ZC[X[VG[l0lJhGGLlJUTMGCMI
tIFZ[T[J]\ SFD TDFDZLT[CJF,F.HG[ZGL ;]RGFVM VG[H~ZLIFTVG];FZCFYWZJFG]ZC[X[P
CLAUSE34 :Definitionof work:
Theexpression“work”or“works”whereusedintheseconditionsshall,unless,therebesomethinginthe
subjectorcontextrepugnanttosuchconstructiontomeanthework,ortheworks,contractedtobe
executedunderorinvirtue ofthecontract,whether temporary orpermanentandwhetheroriginal,altered,
substituted oradditional.
B\0#$oSFDGL jIFbIFo
VFXZTMDF\J5ZFI[,SFDVYJFXaN5|IMUlJQFIGF;\NE"DF\SX]\lJ~wWGCMITMSFDR,FpS[SFIDLVG[D/ ] ;]WFZ[,F4AN,JFDF\
VFJ[,FS[JWFZFGFSMg8=FS8C[9/S[SMg8=FS8ZGL~V[SZJFGF YTF\ SFDS[SFDM V[JM YX[P
CLAUSE35 :Contractorpercentagewhether applied to netorgrossamount ofthe bill:-
The percentage referred to in the tendershallbe deducted from/added to the grossamountof the billbefore
deductingthe value ofanystockissued. (This clausewillbe applicableonlyforB-1 Tender)
CLAUSE36-(B-1)/Clause 35-(B-2):Non refund ofquarryfees&Royalties :
Thecontractorshallpaytheroyaltytothecompetentauthority/localbodyasperrules.Thecontractor
shallfurnishquarterly thestatementshowingquantityofquarriedmaterials,fromwhom purchased(with
fulladdress oftheseller) and copiesofbills forpurchase to the DistrictOfficerof the Miningand Geology
Departmentorauthority competenttolevy royalty intheareaofwork.Contractorshallalso furnishsuch additional
informationas regardroyalty paymenttothe royalty authority. Theroyalty chargespaid shallbe
bornebytheContractorandshallnotbereimbursedbytheExecutiveEngineer(Authority:- R&BD
CircularNo.TNC –2286–UO–39 (19)–Cdated23-10-1989.)
pnMU4BF6 VG[pHF"lJEFUGF p5ZMSTlJQFI 5ZtJ[GF TFP!q!q(* GF 9ZFJ S|DF\SV[D;LVFZvZ!&(v&&(5K DF\H6FjIF 5|DF6[
SFI"JFCLSZJFGL;]RGF ov
!f ~FP ZP ,FB sA[,FBf YL JW]V\NFHL ZSDGF\SFDM CMIT[JF SFDM DF8[SFI"5F,S.HG[ZzLSFDGMJS"VM0"ZVF5[ S[T]ZTH SFDGF
XL0I],vALGL GS,H[T[lJ:TFZGFDNNGLX lGIFDSVYJF ÒHLVM,MHL;L:8 VYJF VF;L:8g8ÒHLVM,MHL;L:8 VYJF E]:TZVG[BGLH
XFBFGF ÒHL<,FSR[ZLGFJ0F H[VMS,[S8ZzLGLSR[ZLDF\A[;[ K[T[DG[VF5JFGLZC[X[P
Zf~FPZP ,FBsA[,FBfYLp5ZGF SMg8=FS8ZMV[T[VMV[BZLN[,BGLHGMHyYMVG[T[SIF\YLBZLN[,K[T[J[RGFZGLlJUTM
NXF"JTFAL,MGLGS,MTYF5+GF ~5DF\DFCLTLNZ +6DF;p5Z!PDF\NXF"J[,VlWSFZLG[5]ZL5F0JFGLZC[X[PVFAL,MDF\DF, J[RGFZG]\
GFD4:Y/4TFZLB VG[
DF,,[GFZG]\ GFDVG[HyYMJU[Z[NXF"J[,FCMJFHM.V[P
#fH~Z50I[H~ZLSL:;FDF\p5Z!PDF\NXF"J[,VlWSFZL|zLTZOYL JW]DFCLTLlJUTDF,S[AL,GF;A\WDF\DF\UJFDFVFJ[ TMT[H[T[
SFI"5F,S.HG[ZzLBGLHBFTFGF VlWSFZLG[T[lJUTMSMg8=FS8Z5F;[YLD[/JJFDF\DNNSZX[PHMVFJLDFCLTL;DI;ZVF5JFDF\GF VFJ[T[ SM.
SFI"5F,S.HG[ZzL4 TZOYLVF V\U[;CSFZGD/[ TMBGLHlJEFUGFVlWSFZLT]T"HVF AFATlGIFDSzLGFwIFGp5Z
D]SX[PH[VMVFV\U[pnMU4BF6 VG[pHF"lJEFUTYFH[T[ ;\A\lWTlJEFUGF;lRJzLGFwIFG5ZD]SX[VG[VFJM5+D?I[YL;A\lWT
lJEFUGF;lRJzL4H[T[SFI"5F,S.HG[ZzLG[T FtSFl,SDFCLTL5]ZL5F0JF;]RGFVF5X[P VF5|YFVD,LAGTF\VF5lZ5+GL
TFZLBYL;LSIMZL8L0L5MhL85ZTSZJF DF8[ZMI<8L EIF¶V\U[GF 5|DF65+GM VFU|CZFBJFGMZC[X[ GCLP
ZFHI;ZSFZGF AF\WSFDDF8[J5FTF UF{6 BlGHGLZMI<8L EZJFAFATPPPPP
VFSFDDF\HIFZ[;FNLDF8LsVM0L"GZLS,[fVG[s;MO8fD]ZDJF5ZJFDF\VFJ[T[GFp5Z56ZMI<8LR]SJJF5F+K[PlJX[QFDF[UF{6
BGLH AFATDF\ U]PUF{PVPlGP!)&&VG[T[GF VG];\WFGDF\JBTMJBTACFZ5F0JFDF\VFJ[,F9ZFJM4,FU] 50X[P4VG[T[D]HA ,LhS[
5ZDL8,[JFG]\VG[ZMI<8LEZJFGLZC[XP[ spWMU4BF6VG[pHF¶lJEFU9ZFJS|DF\SV[DPV[DPVFZPq!!Z TFP!v)v_$ qZ_!#qK
!vVPSZFZC[9/GFOF.G,AL,GLGS,HL<,FGF;\,uGpWMUVG[BF6lJEFUGFHL<,FGFE]:TZVlWSFZLG[VF5JFGL
s DFPDPlJEFUGM5lZ5+S|DF\S8LV[G;L q!_q Z P Zq s!$f q ;TFPZ(v$vZ__#TYFZ*v$vZ 5f
Clause 37:-(B-1)/Clause 36-(B-2):Compensation undertheworkmen‟scompensationAct:
Thecontractorshallberesponsibleforandshallpaycompensationtohisworkmanpayableunderthe
Workman‟sCompensationAct. 1923(VIIIof1923)hereinaftercalledthesaidAct)forinjuriescausedto
theworkman.Ifsuch compensation recoverable by Governmentasprincipalundersub-section 12(1)of the
saidActonbehalfoftheContractoritshallberecoverablebyGovernmentfrom thecontractorundersub
section12(2)ofthesaidsection.Suchcompensationshallberecoveredinthemannerlaiddowninclause
B\0#*oSFDNFZJ/TZVlWlGID C[9/J/TZo
SFDNFZMG[YI[,.HFVMDF8[!)Z#GFSFDNFZJ/TZVlWlGIDC[9/R]SJJF5F+SM.56J/TZR]SJJFSMg8=FS8ZHJFANZZC[X[P
pSTVlWlGIDGLS,D!ZGL5[8FS,D!PC[9/4SMg8=FS8ZJTL;ZSFZ[D]bI51FSFZTZLS[VFJ] \J/TZR]SjI]\CMITM;ZSFZT[ZSD
pSTS,DGL5[8FS,D!PC[9/4SMg8=FS8ZJTL;ZSFZ[D]bI51FSFZTZLS[VFJ] \J/TZR]SjI]\CMITM;ZSFZT[ZSDpSTS,DTL
5[8FvS,DZPVgJI[SMg8=FS8Z5F;[YL J;],SZL XSX[PVFJ] \ J/TZp5ZGF B\0!DF\ H6FJ[,LZLT[J;],SZJFDF\ VFJX[P
CLAUSE37-A-(B-1)/Clause36-A(B-2):
TheContractorshallberesponsibleforandshallpaytheexpensesofprovidingmedicalaidtoany workmenwhomay
sufferabodily injury asaresultofanaccident.Ifsuchexpensesare incurredby Government, the same shallbe
recoverable fromthe contractorforwith and bededucted, withoutprejudice to
anyotherremedyofGovernmentfromamountdue or thatmaybecome due to the Contractor.
VS:DFTG[5ZL6FD[SM.SFDNFZG[XFZLZLS.HFYFITMT[G[TALAL;CFI5]ZL5F0JFDF8[SMg8=FS8ZHJFANZFZC[X[VG[T[V\U[G]\BR"
T[D6[R]SJJFG]\ZC[X[PVFJ]\BR";ZSFZ[ SI]"CMI TMSMg8=FS8Z5F;[YL T[TZTHJ;], SZJF5F+ ZC[X[VG[;ZSFZGFALHF SM. 5U,FG[ AFW GF
VFJ[T[ZLT[SMg8=FS8ZGL,[6L VYJF CJ[5KL,[6LYGFZZSDDF\YL T[SF5L,[JFX[
Clause 37-B:-(B-1)/Clause 36-(B-2):
Thecontractorshallprovideallnecessarypersonalsafetyequipmentandfirstaidapparatusavailablefor
theuseofthepersonemployedonthesiteandshallmaintainthesameinsuitableconditionforimmediate
useatanytime and shallcomply with the followingregulations in connection therewith.
(a)TheworkersshallberequiredtousetheequipmentsoprovidebytheContractorandContractorshall take adequate
stepstoensure properuseofthe equipmentbythose concerned.
(b)Whenworkiscarriedoninapproximatestoanyplacewherethereisariskofdrowningallnecessary
equipmentshallbeprovidedandkeptforuseandallnecessarystepsshallbetakenforthepromptrescue
ofanyperson,in danger.
(c)Adequate provision shallbe made forpromptfirstaid treatmentofall injuries to be sustainedduringthe
course ofthe work.
Clause 38 :-(B-1)/Clause37-(B-2):
The quantities shown in thetenderare approximate and no claimshallbe entertained forquantitiesofwork
executedbeinglessthanthoseenteredinthetender.Inthecaseofincreaseinthequantitiesbymorethan
30% thenewratewillbepaidtothecontractorforthequantitiesinexcessof30%Theratesforthe increased
quantities asaforesaid willbe fixedinthe mannerspecified inclause–14
Clause 39 :-(B-1)/Clause38-(B-2):Employmentoffamine or otherlabour:
The contractorshallemploy any famine,convictor other labour orparticularkindorclass,ifordered in writingto
doso bytheEngineer-in-charge.
B\0#)oN]QSF/U|:TlJ:TFZGFVYJF ALHF DH]ZMG[SFD[ZFBJF AFAToCJF,FGF .HG[ZV[JM,[lBTC]SD SZ[TMN]QSF/YLV;ZU|:T4
U]G[UFZTZLS[P;HF5FD[,FVYJFVD]RMSS;5|SFZGF JU" S[JU"GFALHF DH]ZMG[SMg8=FS8Z SFD[ZFBJFGF ZC[X[P
Clause 40:-(B-1)/Clause39-(B-2):
Nocompensationshallbeallowedforany delay causedinthestarting ofthework onaccountofdelay in
makingavailablethefullsite oflandata time.
Clause 41 :-(B-1)/Clause40-(B-2):
Noclaim forcompensationshallbeallowedforanydelayinexecutionoftheworkonaccountofwater standing
inborrowpitsorcompartment. The ratesareinclusiveofhardorcracked soil, excavationinmud,
subsoilwaterorwaterstandinginborrow-pitsandnoclaim foranextrarateshallbeentertainedunless otherwise
expresslyspecified.
B\0$!oSFD SZJFDF\YI[,lJ,\A DF8[J/TZV\U[GM CSSNFJM o
RMS0LDF\VYJFSM.EFUDF\ 5F6LHJFG[SFZ6[SFD SZJFDF\ lJ,\A V\U[ SX]J/TZV5FX[GlCPVF NZDF\;BT VYJF lTZF0JF/LHDLG
DF8[GFSFNJVG[E]UE"H/JF/F EFUDF\5F6LEZF.ZC[T]CMIT[JL RMS0LGLHuIFDF\BMNSFDDF8[GFNZGM;DFJ[XYFIK[VG[VgIYF
:5Q8H6FjI]CMI T[l;JFI4JWFZFGFNZDF8[SM.CSNFJMwIFGDF\ ,[JFX[GlCP
Clause 42 :-(B-1)/Clause41-(B-2): Entering uponor commencing any portion orwork:
TheContractorshallnotenteruponorcommenceanyportionorworkexceptwiththewrittenauthority and
instruction of the Engineer-in-charge or of hissubordinatein charge ofthe work. Failingsuch
authority, the Contractorshallhave no claimto askmeasurementoforpayment forwork.
B\0$ZoSFDGM SM.EFUGJ[;ZYL CFYWZJF S[X~SZJF AFATo
CJF,FGF.HG[ZG[VYJFTFAFGFSFDGFCJF,FGFVlWSFZLGMl,lBTC]SDVG[;]RGFl;JFISMg8=FS8ZSFDGMEFUGJ[;ZYLCFYWZL
S[X~SZL XSX[GlCPVFJMC]SDGD?IM CMITMSFDGFSM.DF5,[JFV\U[ S[R]SJ6LDF8[SMg8=FS8ZSXM CSSNFJMSZLXSX[GlCP
Clause 43 :-(B-1)/Clause42-(B-2): Minimumage ofperson employed:
(I)No Contractorshallemployanyperson who is underthe age of18 years.
B\0$#oSFD[ZBFI[,jIlSTVMGLVMKFDF\VMKL JIo
SMg8=FS8Z!(JQF"GLGLR[GLpDZGLSM.56jIlSTSFD[ZFBL XSX[ GCLP
Clause 43(1) :-(B-1)/Clause 42-(B-2):
Theemploymentofdonkeysand /orotheranimalsand thepaymentoffairwages:ForAsphalt
work(s)asfaraspossible,onlytheadultpersonsshouldbeemployedbythecontractor.Iftheadultperson
arenotavailable, thenthechildrenbelow theageof15(Fifteenyears)shouldnotbeemployedunderany
(ii)Nocontractorshallemploydonkeysorotheranimalswithbranchingofstringorthinrope.The
branchingmustbe atleastthreeincheswide and should be oftape (Newer).
ZfSMg8=FS8ZUW[0FVYJFALHF5|F6LVMGF5L9GFEFU5ZhL6LNMZLVYJF5FT/]\NMZ0]\AF\WLG[T[DG[SFD[,.XSX[GlCP5L9EFU
5ZAF\WJF VMKFDF\ VMKL # .\R5CM/LOLTsGJFZfSFDDF\ ,[JLP
(iii)Noanimalsufferingfromstores,lamenessoremaciationorwhichisimmatureshallbeemployedon
#f WFZFJF/F4BM0\UFTF VYJF S'XS[GFGF5|F6LG[SFD[ZFBL XSFX[ GCLP
(iv)The Engineer-in-charge orhis agentis authorised to remove fromthe workanyperson oranimal found
working whichdoesnotsatisfy these conditions and noresponsibility shallbeaccepted by Governmentfor
anydelaycaused in the completion workbysuch removal.
$f VF XZTM D]HA G CMI T[JL SM.56 jIlSTS[5|F6L SFDSZTLq SZT] \DF,]D50[TM T[G[SFD5ZYL N]ZSZJFGL ;tTF CJF,FGF.HG[ZG[ S[T[DGF
V[Hg8G[K[ VG[VFJLZLT[SM.jIlST S[5|F6L N]ZSZJFYLUI[, SM.56 lJ,\ADF8[;ZSFZGLSM.HJFANFZLZC[X[GlCP
(v)TheContractorshallpay fairandreasonablewagestotheworkmanemployedbyhim inthecontract
undertakenbyhim intheeventofanydisputearisingbetweentheContractorandhisworkmenonthe
groundsthatthewagespaidarenotfairandreasonable,thedisputeshallbereferredwithoutdelaytothe
Engineer-in-chargewho shalldecide thesame. Thedecisionof the Engineer-in-chargeshallbe conclusive
andbindingontheContractor,butsuchdecisionshallnotinanywayaffecttheconditionsinthecontract
regardingthe payment to be madebyGovernmentat the section tenderrates.
5f5MT[CFYWZ[,FSMg8=FS8DF8[SFD[ZFB[,SFDNFZMG[SMg8=FS8Z[jIFHALJ[TGR]SJJFG]\ZC[X[PR]SJ[,JFHALGCMJFGFD]¡F5Z
SMg8=FS8ZVG[T[DGFSFDNFZMJrR[SM.hW0MpEMYFITMT[hW0MlJGFlJ,\AC [ JF,FGF.HG[ZG[;M5JFDF\VFJX[VG[T[V\U[T[VM
lG6"IVF5X[PCJF,FGF.HG[ZGM lG6"IVG[A\WGSTF"ZC[X[P5Z\T]VFlG6"IYLD\H]ZSZ[,F8[g0ZGFNZ[;ZSFZ[SZJFGLYTLR]SJ6LG[
,UTLSMg8=FS8DF\YL XZTMG[SXL V;ZYX[GlCP
(vi)Governmentatthesanctioned tenderrates.
Thecontractorshallprovidedrinking waterfacilities totheworkers/laborersemployedonGovernment
worksAmenitiesrelatingtosanitationshallalsobeprovidedtotheworkers/laborersemployedonworks
(inurbanareas).ifthecontractorfails tocomply withtheseprovisions,theEngineer-in-chargeshallgive notice
inwriting andif thecontractordoesnotprovide this facility totheworkers/laborerswithin aperiod
oftendaysfrom thedateofthenotice inwriting,theEngineer-in-chargeshallthereuponmakethe arrangement
fordrinkingwaterat the costofthe contractor.
&f;ZSFZLSFD[ZFB[,FSFDNFZM oDH]ZMG[5LJFGF5F6LGL;UJ0 SMg8=FS8Z[5]ZL5F0JFGLZC[X[PsXC[ZLlJ:TFZMDF\fSFD[ZFB[,F
SFDNFZMG[:JrKTFlJQFIS;UJ0M 565]ZL5F0JFGLZC[X[PSMg8=FS8ZVFHMUJF.G] \5F,GSZJFDF\lGQO/HX[TMCJF,FGF.HG[ZT[G[
,[lBTGMl8;VF5X[VG[SMg8=FS8ZVFJL,[lBTGM8L;GLTFZLBYLNLGN;GLD]NTDF\SFDNFZMvDH]ZMG[VF;UJ0GCLVF5[TM
CJF,FGF .HG[ZSMg8=FS8ZGFBR["5LJFGF5F6LGL jIJ:YF SZX[P
(vii)TheContractorshallprovidetheamenityofpropershadeandsheltertotheworkers/labourersand
theirchildrenonGovernmentworksassoonasthework starts.Ifthecontractor fails toprovideshedand shelter, the
Engineer-in-charge shallprovidethe same atthe costofcontractor.
*fSFDX~YFIS[TZTHSMg8=FS8Z[;ZSFZLSFD5ZGFSFDNFZMDH]ZMVG[T[DGFAF/SMG[IMuIX[0VG[VFzIVF5JFGL;UJ05]ZL
5F0JFGLZC[X[P X[0 VG[VFzI:YFG5]ZF 5F0JFDFSMg8=FS8ZlGQO/HX[TMSMg8=FS8ZGFBR["CJF,F.HG[Z5]ZF5F0X[P
Clause 44 :-(B-1)/Clause43-(B-2):Methodofpayment:
Paymenttocontractorshallbemadebychequedrawnonanytreasurywithinthedivisionconvenientto
them, providedthe amountexceeds Rs. 10 AmountnotexceedingRs. 10 willbe paidin cash.
B\0$$R]SJ6LGLZLTo
R]SJ6LGLZSD~ !_SZTFJW]CMITM4 SMg8=FS8ZG[VG]S]/CMIT[JF 0LJLhGGFlJ:TFZGL SM.56TLHMZL 5ZGFR[SwJFZFT[DG[ R]SJ6L SZFX[~FP
!_YLJW]GCMI T[JLZSDZMS0[YLR]SJJFDF\ VFJX[P
Clause44A:AnysumofmoneydueandpayabletotheContractor(includingthesecuritydeposit
returnabletothecontractor)executinganyGovernmentworkorworkofany DistrictPanchayatwholly
financedasgrant-in-aidunderthiscontractshallbeappropriatedby anyDistrictPanchayat/Government
andshallbesetoffagainstanyclaim oftheGovernment/DistrictPanchayatofGujaratstateby theDistrict
PanchayatofGujaratState/Governmentforthepaymentofasum ofmoneyarisingoutorunderanyother
contractmadeby thecontractorwiththeGovernment/DistrictPanchayatofGujaratStateforthework wholly
thecontractoragainstanyclaimoftheGovernment/DistrictPanchayat ofGujaratstateis available,sucha recovery
shallbe madefromthe contractoras arrearsoflandrevenue.
Clause45: Deleted
Clause 46 :-(B-1)/Clause45-(B-2):Employmentofscarcity labour :
IfGovernmentdeclaresastateofscarcityorfaminetoexistinanyvillagesituatedwithin16kilometersof
thework,theContractorshallemploy uponsuchparts ofthework,asaresuitable forunskilled labour,any
personcertified tohim by theEngineer-in-chargeorbyanypersonstowhom,theEngineer-in-chargemay
havedelegatedthisdutyin writingtobeinneedofreliefandshallbeboundtopaytosuchpersons,wages
notbelowtheminimumwhichGovernmentmayhavefixedinthisbehalf.Anydisputeswhichmay arise
inconnectionwith the implementation ofthisclauseshallbedecidedby theEngineer-in-chargewhose
decisionshallbefinalandbindingon thecontractor.
B\0$&oVKTU|:TlJ:TFZGFDH]ZG[SFD[ZFBJF AFATo
SFDGF:Y/[YL!&SLDLGLV\NZVFJ[,FSM.56UFDDF\VKTGLVYJFN]QSF/GLl:YTL5|JT"TLCMJFG]\;ZSFZHFC[ZSZ[4TMH[DF\S]X/
SFZLUZMGLH~ZGCMIT[JF SFDGFSM.56EFUp5ZSMg8=FS8Z4CJF,FGF.HG[ZVYJFT[D6[T[V\U[GLOZHH[G[,[lBTZLT[;M\5L
CMIT[JLjIlSTV[H[jIlSTV[H[jIlSTVMG[ZFCTGLVFJxISTFCMJFG]\5|DF65+VF%I]\CMIT[DG[SFD[ZMSJFGFZC[X[VG[PVFV\U[
;ZSFZ[H[NZGSSLSIF"CMIT[YLVMKFGCMIV[JFNZ[VFJLjIlSTVMG[J[TGR]SJJFT[ A\WFI[,ZC[XP[ VFB\0GFVD,5ZtJ[SM.56
TSZFZp5l:YTYFITM T[GM lG6"ICJF,FGF.HG[ZSZX[ VG[T[lG6"I SMg8=FS8ZDF8[VFBZL VG[A \WGSTF" ZC[X[P
Clause 47 :-(B-1)/Clause46-(B-2):Deleted
Clause48 :-(B-1)/Clause47-(B-2):TheratestobequotedbytheContractormustbeinclusiveofsales tax . Noextra
paymentonthis accountwillbe made tothe contractor.
B\0$*oSMg8=FS8Z8F\S[TE
[ FJDF\ J[RF6J[ZFGM ;DFJ[X Y.UI[,MU6FX[P VF5[8[ SMg8=FS8ZG[SM.JWFZFGLR]SJ6LSZJFDF\VFJX[GlCP
Clause49:-(B-1)/Clause48-(B-2):TheContractorshould,asfaraspossible,obtainhisrequirementoflaborers
skilledandunskilled,fromthe nearestEmploymentExchangesoastoutilizethelocalemploymentpotential.If there
arenolocalEmploymentExchangeorsuchExchangesarenotabletoprovidetherequiredlabourlocally,suitable
laborersshouldbe utilisedtothemaximumextentpossible .
B\0$) oSMg8=FS8Z[HM.TFS]X/VG[ALGS]X/DH]ZMXSICMItIF\;]WLGHLSDF\GHLSGLZMHUFZSR[ZLV[YLD[/JJF4H[YL:YFlGSZMHUFZXlSTGMp5IMUY.
XSX[P:YFlTSZMHUFZSR[ZLVMGCMIVYJFVFJLSR[ZLVMH~ZLDH]ZM:YFlGSZLT[5]ZF5F0LXS[T[DGCMITMIMuIDH]ZMG[AT[T[8,FJW]5|DF6DF\p5IMU SZJMP
Clause 50 :-(B-1)/Clause49-(B-2):Fair Wages:
If aContractor failstopay within„7‟(Seven) daystothelaborer(s)/worker(s)theminimum wages
prescribedby theGovernmentundertheMinimumWagesAct.1948asinforcefrom timetotime,the Engineer-in-
chargeshallbeatliberty todeducttheamountpayabletothelaborer/workersfrom his
(Contractors)billsordeposit(s)payableby theContractoraftermakingdueinquiriesandestablishing the
claim(s)ofthelaborer(s) /Workers(s).
Thecontractorshallnotbeentitledtoanypaymentofcompensationonaccountofanylossthatthe
Contractormayhavetoincuronaccountof theactionasaforesaid.Beforetheactionasaforesaid,is enforced, anotice
inwriting totheContractorshallbe issued by theEngineer-in-charge topay thewagsas
perMinimumWagesActinforceatthe relevanttime.IfContractordoesnotactasaforesaidwithinseven days,
thentheactioncontemplated asabove shallbetaken againsthim.
B\05_oJFHAL J[TGo
JBTMJBTVD,DF\CMIT[D]HA!)$(GF,W]TDJ[TGVlWlGIDC[9/;ZSFZ[lGITSZ[,F,W]TDJ[TGDH]ZG[SFDNZG[;FT
lNJ;DF\SMg8=FS8ZGR]SJ[TMCJF,FGF .HG[ZG[IMuITF5F;SZL T[DHDH]ZMGL SFDNFZMGMCSS:YFl5TSZLG[DH]ZMG[SFDNFZMG[ R]SJJF5F+
ZSDSMg8=FS8ZGF AL,MVYJF SMg8=FS8Z[R]SJJF5F+VGFDTvVGFDTMGL ZSDDF\YLSF5L ,[JFGLK]8ZC[X[P
p5ZH6FjIFD]HA,[JFDF\VFJ[,F 5U,FG[ SFZ6[SMg8=FS8ZG[ SM.56G]SXFGHFITMT[DF8[ SM.56 R]SJ6LVYJFJ/TZD/JF5F+
ZC[X[GlCPp5ZH6FjIFD]HAG]\5U,]\VD,DF\D]SJFDF\VFJ[T[5C[,FCJF,FGF.HG[ZT[;DI[VD,DF\CMIT[,W]TDJ[TGVlWlGID
VG];FZJ[TGR]SJJFDF\SMg8=FS8ZG[,[lBTGM8L;VF5X[4SMg8=FS8Zp5ZH6FjIFD]HA;FTlNJ;DF\JT"X[GCLTMT[GL;FD[p5Z
lJRFIF"D]HAGF5U,F EZJFDF\VFJX[P
Clause 51 :-(B-1)/Clause50-(B-2): Deleted
Clause 52 :-(B-1)/Clause51-(B-2): ListofMachinery :
Thecontractorsshallalsogivealistofmachineriesinhispossessionandwhichtheypurposetouseonthe
B\05ZoI\+;FDU|LGL IFNL o
SMg8=FS8Z5F[TFGFSAHFDF\GL VG[SFD DF8[p5IMUDF\ ,[JF lJRFZ[,I\+;FDU|LGLIFNL 56VF5JFGLZC[X[P
Clause53 :(I)Incase,therollerdeployedbyDepartmentfortheuseoncontractwork iskeptidlebythe
contractorforwantofadequatelabourandmaterials,thecontractorwillhavetopayrentalchargesasper
prevailingruleseven though theitems of rollingand wateringare tobe carried outbythe department.
Clause 53 (ii) If the contractor does not plan his programme so as to suit the requirement of the
Department, theproportionaterentalcharge onrollershallberecovered fromthecontractor.
Clause 54 :-(B-1)/Clause53-(B-2):Locallabour onnormalrates :
Thecontractorshallhavetoengagelocallabourandpersonseekingemploymentwhereavailableon
B\05$o;FDFgINZ[:YFlGSDH]ZM o
;FDFgI NZ[D/LXS[T[D CMI tIF\ ZMHUFZJF\K]:YFlGSDH]ZM VG[:YFlGS jIlSTVMG[SMg8=S8Z[SFDZFBJFGFZC[X[P
Clause 55 :-(B-1)/Clause54-(B-2):Rentwillbe recovered fromthe contractor for the land given to them
forstacking materials aswellas forconstruction oftemporaryhutments etc.
Land measuringCharges
1. One hectare orless Rs. 05 Permonth
2. More than 1 hectare &upto 2 hectares Rs.10 permonth
3. More than 2 hectare &upto 3 hectares Rs.15 permonth
4. More than 3 hectare &upto 4 hectares Rs.20 permonth
Clause56 -(B-1)/Clause55-(B-2):Thecontractorshallemployonlysuchlabourwhoshallproducea valid
certificateofhavingbeen vaccinated againstsmall-pox withina period oflast threeyears.
B\05&oSMg8=S8ZK[<,F#JQF"GLD]NTNZlDIFGXLT/FGLZ;LV5F.CMJFAFATG]\:JLSFI"5|DF65+ZH]SZGFZDH]ZMG[HSFD[ ZFBX[P
Clause57 :-(B-1)/Clause 56-(B-2):
1Huts:Thecontractorshallbuildsufficientnumberofhutsonasuitableplotoflandfortheuseofthelaborers
accordingtothefollowingspecifications.
(1) Hutsofbamboosandgrassmaybeconstructed.
(2) (2)Agoodsiteshallbeselected.Highgroundremovedform junglebutwellprovidedwithtress shallbechosen whereveritis
available.Theneighborhoodof rank jungle,grass orweeds should particularlybeavoided.Camps
shouldnotbeestablishedclosetolargecuttingsofearthwork.
(3) Thelinesofhutsshallhaveopenspacesofatleast10m.between rows. Whenagoodnaturalsitecannot be
procured,particularattentionshouldbe giventothedrainage.
(4) Thereshouldbenoover-crowding.Floorspacesattherateof2.8Sq.m.perheadshallbeprovided. Careshould betakento
seethatthe hutsare keptcleanandingoodorder.
(5) Thecontractormustfindouthisownland.IfhewantsGovernmentland,heshouldapplyforitandpay assessmentforit.
2. DrinkingWater:The contractorshallasfaras possible,providean adequatesupplyofchlorinatedpurepotable
drinkingwaterfortheuseoflaborers. Thisprovision shallbeattherateofnotlessthan4.5litersperhead.No provision
need-bemadewherethereisasuitablenala,riverorwellwithin0.4kmofthecamp.However arrangement
shouldasfaraspossible, bemadetochlorinatewaterbychlorinated tablesforeitisallowedfor drinkingpurpose.
3. The contractorshallconstructsemipermanentlatrinesfortheuse ofLaborersonthefollowingscale,namely(a)
Wherefemaleareemployed,thereshallbeatleastonelatrineforevery 25females.(b)Wheremalesare
employedthereshall beatlest onelatrine forevery25malesprovidedthatwhere thenumber ofmales orfemale
exceed100,itshallbesufficientifthereisonelatrineforevery25malesorfemales,asthecasemaybeupto thefirst100andone
forevery50thereafter.
4. Privacyinlatrines: Everylatrineshallbeundercoverandsopartitionedoffastosecureprivacy,andshall havea
properdoorand fastenings.
5. Noticetobedisplayedoutsidelatrinesandurinals:(1) Where workersofbothsexesareemployedthereshall
bedisplayedoutsideeachblockoflatrineandurinalanoticeinthelanguageunderstoodbythemajorityfthe
workersForMenOnly orForWomen Only :as thecasemaybe.(2) Thenoticeshallalsobearthefiguresofa
manorofawomen,asthecase maybe.
6. Urinals :Thereshallbeatleastoneurinalformale/femaleworkersupto50employedatatime.Providedthat
wherethenumberofmaleorfemaleworkmen,asthecasemaybe,exceeds500,itshallbesufficient ifthereis
oneurinalforevery50malesorfemalesuptothefirst500andoneforevery100malesorfemalesorpart thereof.
7. LatrinesandUrinalstobe accessible:(1)Thelatrinesandurinalsshallbeconvenientlysituatedandaccessible
toworkersatalltimes atthe establishment.(2) (I)Thelatrinesandurinalsshall beadequatelylighted andshall
bemaintainedinaclean andsanitarycondition atalltimes(ii)Latrinesandurinalsotherthanthoseconnected
withaflushsewagesystemshallcomplywiththerequirementsofthePublicHealthAuthorities.
8. Waterforlatrinesandurinals:Watershallbeprovidedbymeansofpipesortanksortherise,soalsobe
convenientlyaccessibleinor nearthelatrinesandurinals.
9. Bathingandwashingplaces:(1)Thecontractorshallconstructsufficientnumberofbathingplaceseveryunit of20
persons beingprovidedwithaseparatebathing place.(2)Washing places shouldalsobeprovidedforthe
purposesofwashingclothes.Everyunitof30personsshallhaveatleastonewashingplace.(3) suchbathing andwashing
placeshouldbesuitably screenedandseparateplacesprovidedformaleandfemaleworkers .(4)
Suchfacilitiesshallbeconvenientlyaccessibleandshallbe keptinclearand hygieniccondition.
10. Drainage:Thecontractorshallmakesufficientarrangementfordrainingawaytheseweragewateraswellas waterfrom
thebathingandwashing placesandshalldisposeoffthiswastewaterinsuchaswayasnottocause nuisance.
Thecontractorshouldobtainapermission fromtheGujaratWaterPollution ControlBoard, Gandhinagar
ifWaterissobedrainedinriverornearthewell.Thecontractorwouldputmalariaoilonceina weekin
stagnantwaterroundabouttheresidence.
11. Medical facilities:Thecontractorshallengageamedicalofficerwithatravelingdispensaryforacamphaving
500ormorepersonsifthereisnoGovernmentorotherprivatedispensarysituated within6k.m.fromthecamp.
12. Conservancyandcleanliness:Thecontractorshallprovidethenecessarystaffforeffectingthesatisfactory
conservancyandcleanliness ofthecamptothesatisfactionoftheEngineer-in-charge.Atleastonesweeperper
200personsshouldbeengaged.Conservancy staffshoulddumprefugeincompostpit,awayfromthelabour camp.
13. HealthProvisions:TheDistrictHealthOfficer oftheDistrictortheDeputyDirectorofHealthService shall be
consultedbefore openingalabourcampandhisinstructionsonmatters,suchasthewatersupply,sanitary
convenience,thecamp-site,accommodationand foodsupplyshallbefollowedbythecontractor.
14. Precautions againstepidemic:(a)Theauthorities inchargeofthecoloniesshouldgetthelaborersinoculated
againstcholeraandplague andvaccinatedagainstsmallpoxatthetimeorrecruitment,iftheyarenot inoculated
orvaccinatedwithin6monthsor3yearsrespectively priortothedateofrecruitment.(b)When,inanylabour
campthereisanepidemicdiseaseoristhreatenedwithsuchanoutbreak,theauthoritiesinchargeofthelabour
camps shouldensurethatalltheinmates ofthelabourcolonies areinoculated orvaccinated asthecasemay be,
depending onthediseases,within72hoursaftertheoutbreak.(c)Theauthorities inchargeofthelabourcolony
shouldarrangetocommunicatebywireregardingtheoutbreakoftheepidemicdiseasesontheverydayofthe
outbreak,oftheMamlatdaroftheTaluka,theDistrictHealthofficerortotheDeputyDirectorofPublicHealth
inchargeofthatareaandtheDirectorofPublicHealth. Thereaftertheyshouldcontinuetosenddaily reportsto
theaboveofficersinthe prescribedformregardingthe progressoftheepidemicdisease.(d) Whentheauthorities
inchargeofthelabourcolonysuspectorhavereasontobelievethatanyimmediate ofthelabourcoloniesis
sufferingfromtheinfectiousorcontagiousdisease,theyshallforthwitharrangeforthesegregation ofsuch
personstoisolatedhutstobespecificallyprovidedforthepurposeandalsofortheirtreatment (e)Asregional
malariaepidemic outbreaksarelikelytooccurinsuchprojectareas,theauthorities inchargeofthelabour
coloniesshouldreportpromptly theoccurrenceofunusualincidenceofcasesofmalariaandalsoinformthe
DistrictHealthOfficeroftheDistrict,DeputyDirectorofPublicHealthy (Malaria)andtheDirectorofPublic
Healthandalsoarrangetoinstituteallnecessaryanti malarial measuresas maybeadvisedbytheofficialsofthe
PublicHealthDepartment.
(t)Theauthoritiesinchargeofthe coloniesshouldalsoarrangetocarryoutany othermeasuresthatmaybe
recommendedbytheofficialsofthePublicHealthDepartmentnecessarytopreventorcontrolthe spreadofdisease.
15.Restrooms:(1)Ineveryplacewhereincontractlabourisrequiredtohaltatnightinconnectingwiththecontract
worksandinwhichemploymentofcontractlabourislikelytocontinueforthreemonthormore,thecontractorsshall
provideandmaintainrestroomsor othersuitablealternativeaccommodationwithin fifteendaysofthe employment
ofcontractlabour.
(2) Ifthe amenityreferred toin subruleisnotprovidedbythecontractor withintheperiod prescribed,the employer
shallprovidedthe samewithina periodoffifteendaysoftheexpiryoftheperiodlaiddowninthesub-rule(1). (3)
Separateroomsshallbeprovidedforwomenemployees.
(4) Effective andsuitableprovisionshallbemadeineveryroomsforsecuringandmaintainingadequateventilation
forthecirculation offreshairandthereshallalsobeprovidedandmaintainedsufficientandsuitablenaturalor
artificiallighting.
(5) Therestroomorothersuitablealternativeaccommodation shallbeofsuchdimensionsastoprovideatleasta floorareaor1.
Sq.mt.Foreachperson makinguseofrestrooms.
(6) The rest roomor other suitablealternativeaccommodationshall be so constructedas to afford adequate
protectionagainstheat,wind,rain,andshallhavesmooth,hardandimpervioussurface.
(7) The rest rooms or other suitable alternativeaccommodationshall be at a convenientdistance from the
establishmentandshallhaveadequatesupplyofwholesomedrinkingwater.
16.CanteenFacilities:(1)Ineveryestablishment ofcontractworkandwhereinworkregardingtheemployment of
contractlabourislikelytocontinueforsixmonthsandwhereincontactlabournumbering onehundredormoreare
ordinarilyemployed, theadequatecanteenfacilities shallbethecontractorfortheuseofsuchcontractlabourwithin
sixtydaysofthecommencementoftheemploymentofcontractlabour.
(2) Ifthecontractor failstoprovidethecanteenfacilitieswithinthetimelimitlaiddown thesameshallbeprovided
bytheprincipalemployerwithinsixtydaysofthetimeallowedtothecontractor.
(3) Thecanteenshallbemaintained bythecontractororprincipalemployeesasthecasemaybeinanefficient manner.
17. Accommodationin canteen:(1)The canteenshallconsistofatleastdining hall, kitchen, storeroom,pantry,and
washingplacesseparatelyforworkerandfor utensils.
2 (I)Thecanteenshallbe sufficientlylightedatalltimes whereanypersonhasaccesstoit.
(ii)Thefloorshallbemadeofsmoothandimperviousmaterialsandinsidewallsshallbelime-washed orcolor-
washedatleastonceineachyear,providedthattheinsidewallsofthekitchen shallbelime-washed everyfour months.
3 (I)Thepremisesofthecanteenshallbemaintainedincleanandsanitarycondition.
(ii)Wastewatershallbecarriedawayinsuitablecovereddrainsandshallnotbeallowedtoaccumulatesoascause nuisance.
(iii)Suitablearrangementsshallbemadeforthecollectionanddisposalofgarbage.
18.Accommodationindininghall:(1)Thedininghallshallaccommodateatatime,atleast30%ofthecontract
labourworkingata time.
(2) Thefloorareaofthedininghallexcludingtheareaoccupiedperdinnertobeaccommodated shallasprescribed insubrule(1)
(3) (I)Aportionofthedininghallandservicecountershallbepartitionedandreservedforwomenworkers,in
proportiontotheirnumbers.(ii)Washingplacesforwomenshallbe separateandscreenedto secureprivacy.
(4) Sufficienttable,stools,chairsorbenchesshallbeavailableforthenumberofdinerstobeaccommodatedas
prescribedinsubrule1.
19.Equipmentincanteen:(I)Thereshallbeprovidedandmaintainedsufficientutensils,crockery,cutlery,
furnitureandanyotherequipmentnecessaryfortheefficientrunningofthecanteen.
(ii)The furnitureutensilsandotherequipmentshallbemaintainedina cleanandhygieniccondition.
(2) (I)Suitablecleanclothsfortheemployeesservinginthecanteenshallalsobeprovidedandmaintained.
(ii)Aservicecounter,ifprovided, shallhavea topofsmoothandimperviousmaterials.
(iii)Suitablefacilitiesincludinganadequatesupplyofhotwatershallbeprovidedforthecleaningofutensilsand equipment.
20.Foodstufftobeserved:Thefoodstuffandotheritemstobeservedinthecanteenshallbeinconformity with the
normalfoodhabitsofthecontractlabour.
21.Pricestobedisplayed:Thechargesforfoodstuffs,beveragesandany otheritem servedinthecanteen shallbe
basedon“noprofit,noloss”andshallbeconspicuouslydisplayedinthecanteen.
22.Canteentoberunon“No profit noloss”basis:Inderivingthe pricesoffoodstuffsandotherarticlesservedin
thecanteen,thefollowingitemsshall notbetakenintoconsiderationasexpenditure,namely.
(a) therentforthelandandbuilding.
(b) Thedepreciationandmaintencechargesforthebuildingandequipmentprovidedforinthecanteen.
(c) Thecostofpurchase,repairsandreplacementofequipmentincludingfurniture,crockery,culteryandutensils. (d) The
waterchargesandotherchargesincurredforlightingandventilation.
(e) Theinterestontheamountspentontheprovisionsandmaintenance offurnitureandequipmentprovidedforin thecanteen.
Thelocalofficersshouldcheckupwhether,facilitiesasofferedandwhichareadmissibleunderthe
existingrulesandordersaremadeavailabletotheworkersandenforceuponthecontractorsthenecessity
ofadheringtotheinstructionsforpromotionofwelfareoftheworkersaccordingtothetermsofthe
23.-BOOKSOFACCOUNTSANDREGISTRESOFTHECANTEEN: Thebooksofaccounts and
registersandotherdocumentsusedinconnectionwiththerunning ofthecanteenshallbeproducedon demand to
24.-AUDITOFTHEACCOUNTSOFTHECANTEEN:Theaccountspertainingtothecanteenshall
beauditedonceevery12 monthsbyregisteredaccountantsandauditors.ProvidedthattheLabour
Commissionermayapprove ofanyotherpersonto auditthe accounts;ifhe is satisfiedthatit is notfeasible to
appointaregistered accountantand auditorin viewof the siteorthelocation ofthe canteen.
CLAUSE58 :-(B-1)/Clause57-(B-2): Contractorshallhave to arrange forthe supplyofgumboots. Hand
gloves, masketc. invariablyto thelaborers/workers engaged bythe contractoronasphaltwork.
CLAUSE59 :-(B-1)/Clause58-(B-2):The Contractorshallnotshow anydistinction between Harijan and
otherclass oflaborers/workers employed to carryoutthe Governmentwork.
CLAUSE60 :Price variation clause:Price variation :
For(A)Labour(B)Materialsand(C)P.O.L.TheamountspayabletotheContractorfortheworkdone
shallbeadjustedforincreaseordecreaseintheratesof(A)Labour (B)Materialsexceptingthose
materialssuppliedbyGovernmentasperSchedule-Aandcement,steelandasphaltand(C) P.O.L.as
(A) Labour:IncreaseordecreaseinthecostduetoLabourshallbecalculatedquarterlyinaccordance
withthefollowingformula.
VI = 0.75 x{ plxR x i–io }
Vl=Increaseordecreaseinthecostofworkduringthequarterunderconsiderationduetochangeinrates
R=Thevalueofworkdoneinrupeesduringthequarterunderconsideration,afterexcludingthevalueof extra items
and afterdeductingthe costof.
(i)-Materialssuppliedfrom theDepartmentalstoreto theContractoratfixedrate asspecified inschedule–
(ii) Value of cement, steel and asphalt brought by the contractor valued at star rate plus the
increase/decrease forwhichpriceadjustmentis doneunderclause59 /Abelow:-
io= Theaverageconsumerpriceindexforindustrialworkersforthequarterin whichtenderswereopened
i=Theaverage consumerprice indexforindustrialworkers forthe quarterunderconsideration.
pl= Percentage oflabourcomponents (specifiedin Schedule i.e %Labour)
*Thisreferstoaverage consumer‟s price-index(wholesale) for industrial workers as applicable to
Ahmedabad as published by GovernmentofIndia, MinistryofLabourBureau.
(B)Materialsother thanCement,Steeland Asphalt:Theincrease ordecrease incostofmaterialsother than
cement, steelandasphaltshallbe calculatedquarterlyin accordancewiththefollowingformula:
Vm=0.75x{pmx R xi–io }
Vm=Increaseordecreaseinthecostorworkduringthequarterunderconsiderationduetochargeintheratesof
R=The valueofworkdoneinrupeesduringthequarter underconsideration,afterexcludingthevalue ofextraitems
andafterdeductingthecostof.
(i)MaterialssuppliedfromtheDepartmentstoretothe Contractoratfixedratesasspecifiedinschedule–A.
(ii)Valueofcementasphaltandsteelbroughtbythecontractorvaluedatstarrateplustheincreased/decreasefor
whichpriceadjustmentisdoneunderclause59/Abelow:-
io: Theaveragewholesalepriceindex*(allcommodities)forthequarterinwhichtenderswereopenedaspublished
i= Theaveragewholesalepriceindex( allcommodities)forthequarterunderconsideration.
pm=Percentageofmaterialcomponent(specifiedinschedule…i.e. %)ofitem.
@= For materialswholesalepriceindexaspublishedbyReserveBankofIndia shouldbereferredto.
(C)P.O.L.:Theincreaseordecreaseinthecostofpetrol,diesel,oil,andlubricantsshallbecalculatedquarterly in
accordancewiththefollowingformula.
Vd=0.75x{ pdxR xD–Do}
Vd= Increaseir decreaseincostofworkduringquarterofconsiderationduetochangeinratesofpetrol,oiland
lubricants(POL)
R=The valueofworkdoneinrupeesduringthequarter underconsideration,afterexcludingthevalue ofextraitems
andafterdeductionthecostof.
(i)-MaterialssuppliedfromtheDepartmentstoretothe Contractoratfixedrateasspecifiedinschedule–Aand
(ii) whichpriceadjustmentisdoneundersub-clause59/Abelow:-
Do=Theaveragepriceofhighspeeddiesel(HSD)fixedbyI,O.C.forthedistrictinwhichtheworkistobecarried
outforthequarterinwhichthetenderswereopened.
D= The averagepriceofHSDfixed bythe I.O.C. forthe districtinwhichtheworkisto becarriedoutforthe quarter
underconsideration.
pd= PercentageofP.O.L.Component(specifiedinschedule)oftheitem.i.e. %
ConditionsforvariationexceptforCement,SteelandAsphalt:
(1) Noadjustmentshallbe donefortheworkdoneinthefirsttwelve monthsofthetimelimit.Adjustmentpayable/
recoverablewillbecalculatedfortheremainingworkdoneduringthesubsequentperiod.
(2) Thesumtotalpriceadjustment forA,.B,andCwillbelimitedto5.00%oftheestimatedcostofworkputto
tenderlessthecostofMaterials suppliedfrom theDepartmentalstoretotheContractoratfixedrateasspecified
inschedule-A andcement,steelandasphaltvaluedatinputratesmentionedasunderonwhichthesanctioned
estimateisbased.Whenclause60A(B1)59A(b2)isnotdeleted.
Quantity Inputrateperton
Cement: M.T Rs. PerM.T.
MildSTeel: M.T Rs PerM.T.
HYSDBars/: M.T Rs.…… PerM.T.
Asphalt:80/100 M.T Rs. PerM.T.
I.O.C./Eassar/Impoted
(3) Thequarterreferredtointheaboveformula shallmean thequarterofthecalenderyearJanuary toMarch,April
toJune,JulyotSeptemberandOctobertoDecember.Evenifthetendersareopenedinthemiddleofaquarter,
theaverageindexforthecalender quarterwillbeconsideredThesameprinciplewouldapplyforidentifyingthe
quarterwhentheworkiscompletedinthemiddleofcalenderquarter.
(4) Thevalueofextraitems willbeexcludedforworkingoutthevalueof„R‟intheaboveformulainallthesecases.
(5) Intermediate paymentofescalationtobemadeunderthisclauseoneachoccasion shallbelimitedinsucha
mannerthatthetotalup-to-datepaymentofescalationwillnotexceedthe proportionatepercentageoftheceiling
ofcalculationasrelatedtothe proportionatevalueofthecontractcost.
(6) Priceadjustmentshallbeapplicable onlyfortheworkthatiscarriedoutwithinthestipulatedtimeorextensions
thereofasarenotattributabletothecontractor.Noclaimforpriceadjustment otherthanthoseprovidedherein
shallbeentertained.
(7) Thisclause willbeapplicableinrespectofworkswhichoftheestimatedcostputtotenderisaboveRs.25.00lacs
andthetimelimitinvolvedismorethan12months.
CIAUSE60A-(B-1)/Clause59-(B-2):PriceVariationforCement,SteelandAsphaltbroughtbyContractor:
Theamountspayabletothecontractorsfortheworkdoneinvolvinguseofcement,steelandasphaltwhenthese
materialsarenotsuppliedbytheGovernmentas for scheduleAshallbeadjustedforincreaseordecreaseintherates
ofthesematerialsas under:-
(4)Pricevariationforcement,steelandasphaltbroughtbythecontractor.
Thestarratesforcement,mild steelandtorsteel&asphalttobe broughtbytheContractorshallbeconsidered
ExsupplyDepot/Godownasunder:-
QuantityStarrate
Cement: M.T.Rs . perM.T. Monthinwhich
MildSteel: M.T.Rs. . perM.T. DTPisapproved
TMT/HYSDBars: .......... M.T.Rs . perM.T.
Asphalt(80/100): M.T.Rs perM.T.
I.O.C./Eassar/Impotedfor imported Asphalt/ ESSAR/ Conditions of circuler
No./102006/1577/8/H dagted 8/12/08 is applicant. June–2010
[TheabovestarratesarelinkedwithReserveBankofIndiapriceindexforsteelandcementforthemonthin
whichtheDTPsareapproved. ThestarrateforasphaltwillbebasedontherateofKoyliRefineryprevailing onthe
dateonwhichtheestimateis prepared.
ThemonthinwhichDTPsareapproved willbe specifiedinthetenderdocument.Starratesshouldbementionedin
thetendercopyasunder:-
I.ForCement,PriceofcementfromauthoriseddealershouldbeobtainedforthemonthinwhichtheD.TP.sare
approved&mentionedasstar ratebeforeissueoftendercopy.
II.Forsteel&H.Y.S.D.bars,rateofSAIL shouldbeobtainedforthemonthinwhichtheDTPs.areapprovedand
mentionedasstarratebeforeissueoftendercopy.
III.ForbasicindexspecificmonthinwhichtheDTPsareapprovedshouldbementionedbeforeissueoftendercopy.] The
fluctuationsinratesofcementandsteel shallbeadjustedinthebillspayabletothecontractorsasunder:
Signatureofthecontractor: SignatureoftheEngineer
A = DifferenceofAmountpayableorrecoverable
B= Starrateofsteel/cement/Asphalt
C1–The(Quarterly)averagecorrespondingindex ofsteel,cementforthe quarter underconsideration(aspublished
inmonthlybulletinor ReserveBankofIndia) .
C0.-Priceindexofcement/steelforthemonthinwhichtheDTPSareapprovedpublishedinmonthlybulletinof
ReserveBankofIndia).
D-Qty.ofcement/steelactuallybroughtbythecontractoronsiteofworkandconsumedintheworkduringthe
quarterdulysupportedwithbillasrecordedincementconsumptionregisterorMB(forsteel).
Conditionsforvariationinpricesofcementand steelonly:-
1. No Ceilingforescalationfordifferenceinthecostofsteelandcementwillbeapplicable.
2. Thisclauseshallbeoperativefrom thedateofissueofworkorderanduptotheexpiryoforiginalandextended timelimit.
3. Thisformulashallbe usedindividuallyforcement/mildsteelandTorsteelforcalculatingadjustment.
4. Thecementandsteelbroughtbythecontractor onsiteofworkshallbeusedonly afterthesameistestedby the
5. IfsuchmaterialsarenotfoundaspertherequirementofI.S.specification ,thesameshallberemovedbythe
contractorforwhichnoclaimshallbeentertained.
6. Thisclausewillbeappliedtotheworkirrespective ofthecostofwork(videR&BD.G.R.NoTNC/1089/(4)
Conditionsforvariationin ratesofasphaltonly:-
1. TheContractorshallprocureasphaltdirectlyfromrefinaryonly.
2. TheContractorwillnotbefurnished“P”fromforpurchaseofquantity ofasphaltrequiredforthiswork.
3. TheContractorwillhavetoproduceinoriginalallthegatepassesissuedbytherefinaryandalsothebillin
originaltotheEngineer-in-charge.
4. TheNumberoftransporttankercarryingtheasphaltshallbefurnishedbythecontractor.
5. Thetestcertificate regardingthegrade ofasphaltaswellastestresultofasphaltfrom GERILaboratoryorother
LaboratoryapprovedbyR&BDepartmentshall havetobeproduced.
6. Thedifferencebetweentwoactualratesofpurchaseasper originalbillproducedandthestarrate forthequantity
ofasphaltactuallyused inthework andworkiscompletedduringoriginaltimelimit only willbe paid/recovered
aftertheasphaltinthework.NoEscalation fortheworksestimatedtocostupto5lacsandremaininguseof
asphaltwillbepayable.(videR&BD. CircularNoSTR/10/2001/M-3429-Hdtd.04/10/05)
7. Thedifferencewillbepayable/recoverablefrom thedateofissueofworkorderandthispricevariationwillnot be
subjecttoanycelling.
8. Noadvancepaymentor securedAdvancewillbepayableagainstasphalt.
9. Thispartofclauseforpricevariation ofasphaltwillbeapplicable forworks estimatedtocostaboveRs.5Lacs
andinvolvinguseofasphalt.
(AuthorityR&BDGRNo.TNC–1089(4)–C, dated31-8-1991 modifiedvideG.R.sofevennumbersdated5-10-
1991&7-4-1992andG.C.No.STR–1097–182/Hdated27-11-97and21-11-98ofR&BD)
CLAUSE61:-(B-1)/Clause 60-(B-2):FENCINGANDLIGHTING:
(a)Thecontractorshall,unlessotherwisespecified,beresponsiblefortheproperfencing,lightinggradingandtaking
ofthenecessary safetymeasuresforallworkscomprisedinthecontractandfortheproperprovision oftemporary
road,way,foot-way,guards,fences,caution notices,etc.asfarasthesamemay berendered necessarybyreasonsof
theworkforthe accommodationofworkmen,footpassengersorothertrafficandofownersandoccupiersofadjacent
propertyandthepublic andshall remainresponsibleforanyaccidentthatmayoccuronaccountof hisfailure totake
proper&timelyprecautions.
(b)Allthearrangementsmadeforfencing andlighting shallbemaintained by thecontractor through thecurrencyof
thecontracttillthephysicaltakingoveroftheworkbydepartment.
CLAUSE 62 : -(B-1)/Clause 61-(B-2):LIABILITY OFACCIDENTSTO PERSONS :
Responsibilitiesandliabilitieslfthecontractor underWorkmen‟s CompensationActaregiveninclauseNo.37in
additionfollowingshallalsoapply:
(a) Ontheoccurrenceofanaccident,whichresultindeathofworkmen employedythecontractor orwhichisso
seriousaslikelytoresultindeathofanysuchworkmenthecontractor,shallwithin24hoursofhappening of
suchGovernment againstalllossordamagesustainedbytheGovernment resultingdirectly orindirectlyfrom
hisfailuretogiveintimationinthemanneraforesaid including thepenalties orfines,ifany,payable bythe
Governmentasa totheprovisionsofthe saidactinregardto suchaccident(s).
(b) Inthe case ofanaccident ,inrespect ofwhichcompensation may become payable underWorkmen‟s
CompensationAct.whetherbythecontractororbytheGovernmentasprincipalEmployer,itshallbelawful
fortheEngineer-in-chargetoretainoutofmoneydue andpayabletotheContractor,such sumorsumofmoney
asmay,intheopinionoftheEngineer-in-charge,besufficienttomeetsuchaliability,Theopinionofthe
Engineer-in-chargeshallbefinalregardtoallmattersarisingunderthisclause.
CLAUSE63:-(B-1)/Clause 62-(B-2):ACCESSTOSITEANDWORKONSITE:
TheEngineermay,ifheconsidersfitformtotime,enteruponanyland(s)whichmaybeinpossessionofthe
contractorthiscontractforthepurposeofexecuting anyworknotincludedinthiscontractbyagentsorbyother
contractors,atthisopinion andthecontractor shall,inaccordancewith therequirementsoftheEngineer-in–charge,
affordallreasonablefacilitiesforexecution oftheworkincluding occupation oflandsbystructureorotherwisefor
anyothercontractoremployedbytheGovernmentandhis workmenfortheworkmenoftheGovernmentwhomaybe
employedintheexecutiononornear thesite oftheworknotincludedinthecontractor ofanycontractinconnection
withorancillarytotheworkandindefault,thecontractorshallbeliabletotheGovernmentforanydelayorexpenses
incurredbyreasonofsuch default.Providedalwaysthatifdamagearising.Makeastatement ofthesametothe Engineer-in-
chargewho shallfromtime to time,assess the value in hisjudgmentofsuchdamageand goes
Governmentshallfromtimetotimepaytothecontractor theamounts(ifany)acceptedasjustifiedbytheEngineer- in-charge:
CLAUSE64:-(B-1)/Clause 63-(B-2):REPORTSREGARDINGLABOUR:
TheContractorshallsubmitthefollowingreportstotheEngineer-in-charge:
(I)Adailyreportinthesuitableform ofthestrength oflabour,bothskilledandunskilled employed byhimonthe
work(s).Thecontractorshallincreaseordecreasethestrengthbothskilled orunskilled.ifdirected bytheEngineer- in-
charge.The submissionofsuch reportsshallnot,however,relievethecontractorofhisresponsibilitiesand duties
regardingprogressoranyotherobligationunderthecontract
(ii) Aclassifiedweeklyreturninthesuitableformofthenumber ofpersonemployedontheworksduringthe
(iii) Aweeklymedicalreportinthesuitableformshowingthehealthofthecontractor‟scamp.Thenumberof
personsillorincapacitiesandthe natureoftheirillness.
(iv) Areportofanyaccident,which mayhaveoccurred,tobe sentwithin24 hoursoftheoccurrence. (v)
Suchotherreportasmaybeprescribed.
CLAUSE65:-(B-1)/Clause 64-(B-2):TreasureTrove:
Intheeventofdiscoverybythecontractororhisemployees,duringtheprogressofworkofanygold,silver,oilor
othermineralsofanydescriptionandpreciousstones,treasures,coils,antiquates,relic,fossilsorotherarticlesor
valueofinterestwhethergeological,archaeologicaloranyothersuchtreasure&otherthingshallbedeemedtobethe
absolutepropertyoftheGovernmentandthecontractorshalldulypreservethesametothesatisfactionofthe Engineer-in-
charge, formtimetotime,andrelievethe sameto suchpersonsastheEngineer-in-chargemayappoint.
Thecontractshalltakeallreasonableprecautions topreventhisworkmen other personfromremoving ordamaging
anysucharticlesorthings,immediatelyafterthediscoverythereofandbeforeremovalacquainttheEngineer-in-
chargewithdiscoveryandcarryouthisordersforthedisposalofthe same.
CLAUSE66:-(B-1)/Clause 65-(B-2):Indemnity:
Thecontractor shallindemnifytheGovernmentagainstallactions, suits,claims&demands through ormadeagainst
theDepartment inrespectofworkofthiscontractoragainstanylossdamagetoDepartment inconsequenceofany
actionorsuitbeingbroughtagainstthecontractorforanythingdoneoromittedtobedoneinexecutionoftheworkof thiscontract.
CLAUSE67:-(B-1)/Clause 66-(B-2):Insuranceof Labour:
Thecontractorshallberesponsibletoarrangeforinsuranceofalllabour,skilledandunskilled workers,supervisors
etc.employedbyhimasperlabourregulationoftheState.
CLAUSE68:-(B-1)/Clause 67-(B-2):SettingOut:
Thecontractorshallberesponsibleforthetrueandpropersettingoutoftheworksandthecorrectness ofpositions,
levels,dimensions andalignmentsofallpartsoftheworkandfortheprovisionsofallnecessaryinstruments,
applianceandlabourinconnection therewith.if,atanytimeduringtheprogressofthework,anyerrors,appearor
ariseintheposition,levels,dimensions oralignmentsofanypartofthework,thecontractor,onbeingrequiredto
rectifysucherrorsbytheEngineer-in-charge shallathisownexpensedosotothesatisfactionortheEngineer-in- charge
.ifhowever,such euroisbased onincorrectdatasuppliedinwritingbythe Engineer-in-charge,theexpenses
ofrectifyingthesameshallbebornebytheDepartment. Thecheckingofandsettingoutofanylineorlevelbythe Engineer-in-
charge orhisrepresentativeshallnotinanyway,relivethecontractorofhisresponsibilitiesforthe correctness
oftheerror.Thecontractorshallcarefully protectandobserveallbench-mark,site-nails,pageandother
thingsusedinsettingoutofthework(s).
CLAUSE69:-(B-1)/Clause 68-(B-2):CementRegister:
Aregisterintheprescribedformshowingday-to-dayreceipt,consumptionandbalanceofcementon siteofwork will
be maintainedbythe Department,whichshallinvariablybe signeddailybythe contractoror his authorised
representativeintokenofitscorrectness.
CLAUSE70:-(B-1)/Clause 69-(B-2):MaterialsandWorksTestRegister:
Aregisterintheprescribedfromshowingday-to-dayreceipt,consumptionandbalanceofcement onsiteofworkby
theDepartment andeveryentrythereofshallinvariablybesignedbytheContractororhisauthorizedrepresentative
intakenofitscorrectness.
CLAUSE71:-(B-1)/Clause 70-(B-2):ProgressSchedule:
(a)The contractorshall furnish within one month(unless extended by the Engineer-in-charge)of the order
tostartthework,theprogressscheduleinquadruplicateindicatingthedateorstaring.Themonthly
progressexpectedtobeachievedandtheanticipated completiondateofeachmajoritem ofworktobedonebyhim,
alsoindicatingdatesof,procurementandsettingupthe materials,plantsand machinery.Thescheduleshould
includeastatementofproposedgeneralanddetailedarrangements forcaringoutworks,andofitem,orderand
mannerinsuchitisproposedgeneralanddetailedarrangements forcaring outworks,andofitem,orderandmanner
inwhichitisproposedthattheseshallbeexecuted. Thepracticetotheachievementtowardscompletionofthework
inthetimelimit andoftheparticular itemsonthedatesspecifiedinthecontract andshallhavetheapproval ofthe Engineer-in-
charge.Furtherthedatesfortheprogress, asinthis scheduleshallbeadheredto.
(a) incase itissound necessary,atanystagetoalter theschedule.thecontractorshallsubmitin good,timearevised
scheduleincorporatingnecessarymodificationproposedandgetthesameapprovedfromtheEngineer-in-charge
.Norevisedscheduleshallbeoperativewithoutsuchacceptanceinwriting.TheEngineer-in-charge isfurther
empoweredtoaskformoredetailedschedule orschedule. anybyweek,foranyitem oritems andthecontractor shall
supplythe sameasand whenaskedfor.
(b) TheEngineer-in-charge shallhave,atalltimes,theright,withoutinanywayvitiatingthiscontractforming
groundsforanyclaim,toaftertheorderoftheworkofanypartthereofandthecontractor shallafterreceiving
suchdirection,proceedintheorder directed.The contractorshallalso revisethe progress.Schedulesaccordingly
andsubmit four copiesoftherevisedscheduletotheEngineer-in-chargewithinsevendaysofthesaidEngineer's
directiontoaltertheorderofworks.
(c) Thecontractorshallfurnishsufficientplant,equipmentandlabourandshallworksuchhoursandshiftsasmay be
necessarytomaintaintheprogressoftheworkasperapprovedprogress-schedule,The workingandshiftshall
companywithall theGovernmentregulationsinforceandshallbesuch,asmaybeapprovedbytheEngineer-in-
chargeandthe samenotbe variedwithoutthepriorapprovalofEngineer-in-charge.
(d) Thecontractorshallfromtimetotime.asmayberequiredbytheEngineer-in-charge.furnishtheEngineer-in-
charge withastatementinwritingofthearrangementsheproposestoadopt fortheexecutionofthiscontractand
theEngineer-in-charge may,ifheconsidersnecessaryatanytimeadvisealternationinthesame.whichthe
contractorshalladoptonnoticethereof.
(e) Theprogress-schedule(s) shallbeintheformofprogresschart,forms,statementsand/orreportsasmaybe
approvedbytheEngineer-in-charge.
Thecontractorshallsubmitfourcopies showingtheprogressofthework intheform ofachartetc.atperiodical intervalsas
maybe specifiedbyEngineer-in-charge.
(f) TheapprovaloftheprogressschedulesbytheEngineer-in-chargeshallnotrelievethecontractorofschedule
requiredbytheEngineer-in-chargeshall notentitlethecontractortoanyextrapayment.
CLAUSE72 - -(B-1)/Clause 71-(B-2):Deleted
CLAUSE73 - -(B-1)/Clause 72-(B-2):Deleted
CLAUSE74 - -(B-1)/Clause 73-(B-2):Deleted
CLAUSE75 - -(B-1)/Clause 76-(B-2):Deleted
CLAUSE76 : -(B-1)/Clause75-(B-2):
Beforestarting thework,thecontractorwillhavetoobtainthe licensefrom theDistrictAssistantLabour
Commissionerunder the ContractLabour(RegulationandAbolition)Act.1970andcontractLabour
(regulationandAbolition)GujaratRules1972afterpayingnecessaryfeesanddepositonthebasisofthe
numberoflabourtobe employedon thework andwillhavetosupply two true copiesof the said licenseto the
DeputyExecutive Engineerbeforethe workis started.
CLAUSE77:-(B-1)/Clause76-(B-2): One percentof estimated costput to tender for thiswork after deducting
thecostofmaterialsasperSchedule'A'valuedatbasic rateinthesanctionedestimateshallbe deductedfrom
therunningaccountbillsofthecontractorfortestingthequalityofmaterialsand workmanship,noadditionaltesting
chargesinadditionto the aboveshallbe recoveredfromthecontractor (Applicableto R&BWorks only)
(G.R.No. R&BTNC-1085-4-C, Dated 20-12-91)
From thecontractor(ApplicabletoR&B worksonly)(G.R.NoR&BTNC/1085/-4-CDated20-12-91)TheEngineerincharge
willgetthecementandsteeltestedinlaboratoriesof G.E.R.I.EngineeringColleges,Polytechnics,EngineersIndiaLtd,D.G.T.D.
andotherlaboratoriesapprovedby R&BorWaterResourcesDepartmentorIndustriesDepartmentandthetestresults ofthese
LaboratorieswillbebindingtotheContractoraboutsuitable of useof materials(G.R.NoR& B TNC/1088/IB/ 220/18-C Dated 31-3-05)
Howeverinrespectofworksinvolvinguseofasphalt,thecontractorwillsetupthesitetestingLaboratory andwillprovidetesting instruments
Laboratory:Thecontractorwillconstructpuccastructureofminimum25squaremeterareadulyconnectedwithwaterand electric
supplytohousesite testingLaboratory.
Instruments:Thecontractorwillprovideandinstalltheinstrumentsasperfollowing.I.S.Standardtocarryoutthetestprescribed therein.
1.Penetrationtestas perI.S.1203 2.Softening pointtestas perI.S.1204
3.Ductilitytestas perI.S.1208 4.Viscocitytestas perI.S.1206Specificationgravitytestas perI.S.1202
Theinstrumentsprovidedshould beasperI.S.Standard,socertifiedand beregularly andperiodically(R.&B.D.G.R.No.SSR-
B\0**P!oSMg8=FS8ZwJFZF5]ZF5F0JFDF\VFJ[,DF,;FDFGGFS[8,F\5ZL1F6MSZFJJFT[V\U[GFccXL0I],VMO8[:8L\UccVFHM0[;FD[,K[PVFJF5ZL1F6MU]HZFT
.HG[ZL;\XMWG;\:YF4J0MNZFVG[T[C:TSGL1F[+LI,[AMZ[8ZLDF\SZFJJFGFZC[X[PVG[T[GF5ZL6FDMSMg8=FS8ZG[A \WGSTF¶ZC[X[PVFp5ZF\THMIMHGFDF8[V,U
,[AMZ[8ZLWZFJTF\U]6JtTFlGIDG5[8FlJEFUCM.TMT[5[8FlJEFUwJFZFVYJFU]HZFTDF\VFJ[,H]NLH]NL.HG[ZSM,[HMq5M,L8[SGLSS[HIF\VF5|SFZGF
DF,;FDFGDF\5ZL1F6MGL5]ZTL;UJ0CMIT[DF\D[gI]V,VMOSJM,L8LSg8=M,wJFZFlGITSZ[,WMZ6MVG];FZSZFJLXSFX[ PVFp5ZF\TGLR[GLBFGUL;\:YFVM
56DF,;FDFGGF5ZL1F6MDF8[sTFPZ#v#v_#;]WLSZFJJFDF\VFJ[,K[PfT[;\:YFVMDF\56SZFJLXSFX[Ps!fV[DPS[P;M.\U8[:8L\U,[AMZ[8ZL4VDNFJFNsZf
lGZDF.g:8L8I]8VMO8[SGM,MHL4VDNFJFNs#fI]GLSV[gHLGLIZL\UV[g0V[0JF.hZL;lJ¶;4;]ZTs$fXLBZSg:<8g84VDNFJFNs5fALPJLPV[DPV[gHLGLIZL\U
SM,[H4 lJWFGUZ s&f S[PALPV[DPV[gHLGLIZL\U ZL;R¶,[AMZ[8ZL4 VDNFJFN s*f WD¶l;\C N[;F. .g:8L8I]8 VMO8[SGM,MHL4 G0LIFN sDFgITFJWFZJFGFC]SDM VFWLGf
5Z\T]S],SZFJJFGFYTF\5ZL1F6MGF!_8SF5ZL1F6MVYJFVMKFDF\VMK]!5ZL1F6U]HZFT.HG[ZL;\XMWG;\:YF4J0MNZFBFT[VYJFT[GFC:TSGL1F[+LI
,[AMZ[8ZLDF\SZFJJFGFZC[X[PVG[VFXZT5|MH[S8GL,[AMZ[8ZLDF\SZFJ[,5ZL1F6MDF8[56,FU]50X[PDFPDPlJP5ZL5+S|DF\SV[;PV[;PVFZPq!_)*qHLPV[GPq
!_&qSI];L q(qXTFPZv$v)(TYFDFPDPlJP 5ZL5+S|DF\S 5ZR q !_Z #q E]lGHGq 5#q!ZqXTFPZ$v)vZ !TYF Z*v)vZ ZP
lJX[QFDF\GD¶NFH/;\5ltTVG[5F6L5]ZJ9FlJEFUC[9/SMg8=FS8;¶wJFZFSFDDF\,FJJFDF\VFJTF\,MB\0VG[l;D[g8GLU]6JtTFV\U[V[gHLGLI;¶.g0LIF,LPTYF
0LPHLP8LP0LPH[JL:JT\+T[DH;1FD;\:YFGL;[JF,.VFJFTH7MDFZOTU]6JttFFRSF;6LSZFJJFDF\VFJX[PsGPHPVG[5FP5]P lJEFUGMTFPZ#v)vZ ZGM
9ZFJS|DF\SV[;P8LPV[,P q!_)$q5(q EFUqZqC f
B\0*&PZovVFSFDDF8[.HFZNFZwJFZFJF5ZJFDF\VFJTLl;D[g8GLBF,LY[,LVMlJEFUG[Z5Y[,LGFA\0,DF\O|LVMOSM:85ZTVF5JFGLZC[X[PJF5Z[,L
Y[,LVMGF58SFJ[:8[H U6LAFSL)58SFY[,LVMl0lJhGGFD]bI DYSGF5LP0A<I]P0LP:8MZDF\ 5CM\RF0JFGLZC[X[PsDFPDPlJPGMTFPZv!vZ $GM5ZL5+5ZR q
Annexure:Theinformationinthefollowingannexurespecimensshouldbefurnishedonseparateletter pad
(Referred to in Condition No.-2 GeneralRules and Directionforthe guidanceofContractors.)
TheChiefofficer PLACE :
DetailsregardingmyourpartnersourCompany(inthecaseoflimitedCompany)Names,address(es), telephone
numbers(s)income tax etc.are asunder:
Sr. Name(s) of Fulladdressof Telephone Residential Telephone Full addressof
no. Person/Partner theplace of No.(s) address(es) No.(s) income taxoffice
Director ofthe business (with (office) (Resi) ward whereincome
taxreturnis filed
company pincode)
I/Weherebyagreetointimatetoyouaboutchangeifany,intheabove-mentionedaddress(es)andtelephoneNo.(s)withinFifteen days ofits
occurrence tillmay/our deposit,forthe saidworkpaid by me/us is notreturnedtome/us.
Dated Signature of Tenderer
8[g0ZVF.8DMGFEFJMEZTLJBT[U6TZLDF\,LW[,DH]ZLTYF:5[XLOLS[XGDF\H6FjIFD]HADF,;FDFGV\U[GFSFDGF:Y/GF50TZEFJMsNZf
V\U[GLlJUTPsVFlJUT#_,FBSZTF p5ZGF\SFDDF\EZLZH]SZJL OZHLIFTK[Pf
VfDH]ZLGFN{lGSNZ
!fS0LIF4;]YFZ4%,dAZ4:SL<0SFZLUZMGFNZ ~FP
ZfEL:TL4C[<5Z4JU[Z[;[DL:SL<0SFZLUZMGFNZ ~FP
#fDH]ZMs:+Lv5]~QFfVF:SL<0DH]ZMGFNZ ~FP
VG]\ 8[g0ZVF.8DG\P DF,;FDFGGLlJUT I]lG8 NZ
ZP 5yYZR6TZGM WPDL
S5RL !Z DLDL YL
#P BF6 WPDL ~FP
$P ,L0 SLPDL ~FP
Z[TL5|F%TL:YFG ,L0SLDL
5P ,FS0]\;FULgS8;F.h
s;Z[ZFXIFNL DF8[f
sVfAFZL RMPDL ~FP
sAfAFZ6F RMPDL ~FP
&P O,MZL\U8F.<; RMDL ~FP
* 5M,L;SM8F:8MGHF0F.DLDLP RMDL ~FP (
VfZ5DLDL NZPDL ~FP
Af!ZDLDL NZPDL ~FP
ZfsZ:TFVMfSFDGF:Y/p5ZGFEFJ
VG\ 8[g0Z DF,;FDFGLlJUT BF6 ,L0 I]lG8 NZ~FP
VG]\ 5|Fl%T:YFG]\ SLDL
ZP CF0" D]ZD WPDLP
!Z DLDL YLZ_ DLDL WPDLP
&P 5yYZ5LRL\UDF8[ WPDLP
#f CM8DL1FGFSFDMDF8[SFDGF:Y/p5ZGF50TZGFEFJ
VG]\ 8[g0ZVG]\ lJUT I]lG8 NZ ZLDFS;"
!P S5RL WPDLP BF6
ZP U|L8 WPDLP BF6
#P A<SVF:OF\<8 WPDLP
$P 0FDZSFDLDH]ZL WPDLP
$f5],MGFSFDMoSFD:Y/p5ZGFEFJ
VG\ 8[g0Z DF,;FDFGLlJUT BF6 ,L0 I]lG8 NZ~FP
VG]\ 5|Fl%T:YFG]\ SLDL
!P DXLGS:04D[8, WPDLP
5P CF.8[g;F.,JF8Z WPDLP
p5ZMST 5lZlXQ8MDF\VF5[,8[g0ZDF\EZ[,EFJMGLRSF;6LV\U[CM.T[BFTFG[A \WGSTF" ZC[X[GCLP T[DHT[GF\NXF"J[,BF6 DYS[YL:5L;LOLS[XGD]HAGMDF,;FDFG
GCLD/[TMT[:5LXLOLS[XG5|DF6[GFMDF,;FDFGBFT]DFgI SZ[T[ VgIHuIFV[YL,FJL VF5LX]H[DF8[S M. J/TZGM S,[.D D]SJFDFVFJX[ GlCP
PERFORMANCEBOND
(Seeclauseno.1)
(Thedateofthisbond mustnotbepriortothedateoftheinstrumentinconnectionwithwhichitisgiven)
Principal(Contractor)
Sumofbond(expressinwordsand figures)
ContractNo.anddateofContract
KNOWALLMENBY THESEPRESENT,THATWE,THEPRINCIPALSANDSURETY:Abovenamedareheld firmly
bounduntothe ………………………………..hereinaftercalled theEmployerinthe amount statedfor
paymentofwhichsum,wellandtrulytobemade,webindourselves,ourheirs,executors.administrators and successors jointly
andseverally,firmly bythesepresentssubjecttotheprovisions ofwhichtheaforesaidContractor
ondemandandwithoutdemandona claimbeingmadebytheEmployer.
THECONDITIONOFTHISOBLIGATIONISSUCH:Thatwhereastheprincipalshaveenteredintoacontract with the
Employer numbered and dates as shown above and hereto attached for the execution of work
NOWTHEREFORE, ifthePrincipalshallwellandtrulyperformandfulfillattheundertakings,covenants,terms,
conditionsandagreements ofsaidcontractduringtheoriginaltermsofthesaidContractandany extensionsthereof that maybe
grantedbytheEmployerwithorwithoutnoticetothesuretyandduringthelifeoranyguaranteerequired
underthecontractandshallalsowellandtrulyperform andfulfillalltheUndertakings,covenantsterms,conditions
andagreementsofanyalldutyandunduly authorisedmodifications ofsaidContractthatmayhereafterbemade,
noticeofwhichmodificationstothesuretybeingherebywaivedorshallpayover,makegoodandreimbursetothe
Employeralllossanddamageswhichtheemployermaysustainbyreasonoffailureordefaultonthepartofsaid
Principalsotodo.
We……………………………………………….furtheragreethattheguaranteehereincontainedshallremainin
fullforceandeffectduringtheperiodthatwouldbetakenforthevalidity ofthesaidContract,andthatitshall continueto
beenforceabletill allthe duesoftheemployerunderorbyvirtueoftheContracthavebeenfullypaidand its claims satisfiedor
dischargeortill theEmployercertifiesthat thetermsandconditionsandaccordinglydischarges
the guarantee. Unless a demand or claim under this guarantee is made on us in writing on or before the
………………………………………………weshallbedischargedfromallliabilityunderthisguaranteethereafter.
INWITNESSWHEREOF,theaboveboundedpartieshaveexecutedthisinstrumentundertheirseveralsealsonthe
dateindicatedabovethenameandcorporatesealofeachcorporatepartlybeingheretoaffixedandthesepresentsduly
signedbyits undersignedrepresentatives,pursuanttoauthorityofitsgoverningbody.
Inthepresenceofwitness
by………………………………………….affixCorporateSeal
Attested Corporatesurety
Businessaddress
Affixby……………………………………………corporateSeal
ForandonbehalfoftheEmployer
LISTOFWORKSALREADYCOMPLETEDBYTHETENDERER
.HFZNFZ[5}ZFSZ[,SFDMGLIFNL
Sr.No. Nameofwork Place Cost on Time taken in Remarks
S|DF\S SFDG]\GFD :Y/ completion months To lJX[QFGM\W
5}ZF YI[, completethework
SFDGLlS\DT SFD 5]Z] SZJF DF8[
Note:Necessarycertificatefromofficeconcernedshallbeattachedwiththetender
;A\lWTVlWSFZLG]\H~ZL5|DF65+8[g0Z;FY[ ZFBJ]\P
LISTOFPLANTANDMACHINERYINGOODWORKINGORDERAVAILABLEWITHTENDERER
.HFZNFZ5F;[ ;FZLVG[RF,]CF,TDF\CMIT[JFI\+MVG[ VMHFZMGLIFNL
Sr. Plant or Location Age of Make Capacity Approximat Remark
No. Machinery :Y/ Machinery AGFJ8 1FDTF e Value lJX[QFGM\W
S|DF\ VMHFZM VYJF DXLGZL S[8,F V\NFHLlS\DT
S I\+M JQF¶H]GLK[P
DECLARATIONREGARDIGWORKSONHANDWITHTENDERER
.HFZNFZGFCFY5ZCMIT[JFSFDGLlJUT
Sr. Nameofwork Place Estimated Date of Stipulated Amount Brief Remark
No. SFDG]\GFD :Y/ Cost issue of period of of work details of lJX[QFGM\W
S|DF\S V\NFHL work completio done on delay if
lS\DT order n date of any
SFD X~ SFD 5]Z] filling -L, HM
SZJFGF SZJFGL tender YI[, CMI
C]SDGL lGITD]NT 8[g0Z EIF¶ TM T[GF
TFZLB TFZLB 8}\SDF\
Note 1:Amount ofworkincolumn6should be given uptothe month previous to the monthinwhichtenders areinvited .
GM\Wov VF;G&DF\H[DF;DF\8[g0ZDF\UJFDF\VFjI]CMI T[ 5C[,FGFDF;GFV\T ;]WLSZ[,SFDMGLZSD NXF¶JJLP
Note 2:Necessary certificatefromthe officerconcernedshall be attachedwiththe tender.
SCHEDULE –AVG];]lRvS
Schedule showing(approximately) the materialsto be supplied fromthe Publicworks store forwork
contractedto executedandtheratesatwhichtheyareto be charged for
H[ SFD CFY WZJF DF8[ SMg8=FS8 SZFIM CMI T[ SFDDF\AF\WSFD lJEFUGF :8MZDF\YL 5}ZM 5F0JFGMDF,;FDFGs VFXZ[f VG[
T[V\U[J;],,[JFGF NZNXF¶JTL VG];}lR
Particulars Approximate Rate atwhichthe materialswillbe Placeofdelivery
lJUT quantity chargedto the contractor SMg8=FS8Z5F;[YL 0L,LJZLG]\ :Y/
V\NFHLHyYM DF,;FDFGDF8[ ,[JFGM YTM NZ
Unit V[SD Ratein Rupees
GM\W!ov~l5IF5,FBYLJW]S[VMKLlS\DTGFSFDDF\JF5ZJF;LD[g8VG[VYJF :8L, TYF SM.56SFDDF\0FDZSFDDF\lJEFU TZOYL
5]ZL5F0JFDF\VFJX[GCLPsDFPDPlJP9ZFJS|DF\S8LPV[GP;LPq !_(5q$qV[; TFPZ_v!Zv)!TYFV[;P8LPVFZPq!_)*q(ZqC
TFPZ*v!!v)* TYF8LPV[GP;LPv!_((vVF.ALq ZZ_v!(v;TFP #!v#v_5f5Z\T] GD¶NF 4H/;\5ltTVG[5F6L 5]ZJ9F lJEFUwJFZF
SFDDF\JF5ZJFH~ZL:8L,lJEFUwJFZF5]~5F0JFGLHMUJF.TFPZ#v&v)*GFlJEFUGF9ZFJS|DF\SV[;P8LPV[,Pq
!_)qS[q5(q EFUsCfwJFZFRF,] ZFBJFDF\ VFJ[ K[PVF V\U[ X[0I],vV[DF\ H[ HMUJF.SZJFDF\VFJ[T[ VFBZLU6FX[P
GM\WvZ ov ;LD[g8 ov HIFZ[ ;LD[g8 .HFZNFZ wJFZF SFDDF\ JF5ZJF ,FJJFDF\ VFJ[ tIFZ[ VFJM ;LD[g8 .HFZNFZ
VF.PV[;P5|DF65+JF/FTYFD}/pt5FNSS\5GLDF\YL;LWLZLT[D[/JJFGMZC[K[PVG[T[GLBZF.DF8[T[GFR]SJ6FGFAL,MSFP.PzLG[
ZH]SZJFGFZC[X[PVFJM;LD[g8S\5GLGFVlWSTlJS|[TF5F;[YLBZLNLXSFX[[GCL5Z\T]EFJJWFZFGF :8FZZ[.8D]HAR]SJ6] SZJF
V\U[GLU6TZLDF\,[JFGF;LD[g8GFEFJMVlWSTlJS|[TF 5F;[YLD[/JL XSFI45Z\T]VlWSTlJS|[TF5F;[YLBZLNSZLXSFIGCLPs
TFP&v$v)(GF[DFPDPlJP5lZ5+8LV[G;L q!_((q VF.AL q s!(fq ; f
GM\Wov#ov,MB\0ovHIFZ[,MB\0.HFZNFZwJFZF,FJJFDF\VFJ[tIFZ[T[V\U[G]\AL,V;,DF\SFP.PG[ZH]SZJFG]\ZC[X[PVG[VFJF
:8L,G]\ U[ZL,[AMZ[8ZLS[ .HG[ZLSM,[H S[5M,L8LSGLSDF\8[:8L\USZFjIF AFN H:8L,SFDDF\ JF5ZJF N[JFDF\ VFJX[P
GM\W$ov0FDZovHIFZ[SFDDF\JF5ZJF0FDZ.HFZNFZwJFZF,FJJFGMCMItIFZ[T[0FDZ.HFZNFZ[VM.,ZLOF.GZLDF\YL5{;F
EZL tIF\YL H;LWM BZLNJFGMZC[X[PVF V\U[ .HFZNFZ[5]ZLSZJFGLXZTM GLR[D]HA ZC[X[Ps!f .HFZNFZ0FDZ SIF\YL ,FjIFT[V\U[G]\
AL,V;,DF\SFP.PG[ZH]SZJFG]\ZC[X[PsZf ZLOF.GZLGFU[85F; 56AL,;FY[;FD[,SZJFGF ZC[X[Ps#f0FDZH[8[gSZDF\,FJJFDF\
VFJ[T[8[gSZGMJFCGG\AZATFJJFGMZC[X[Ps$f0FDZp5Z.HFZNFZzLG[V[0JFg;5[D[g8VYJF ;LSIM0¶V[0JFg;D/LXSX[GCLP
s5f.HFZNFZ[ZH]SZ[,V;,AL,DF\0FDZGMU|[0sSJM,L8LV\U[fp<,[BCMJMHM.V[PVFV\U[.HFZNFZ[0FDZGFU|[0V\U[G]\8[:8
ZLh<8qU|[0V\U[G]\5|DF65+ZH]SZJFG]\ZC[X[Ps&f.HFZNFZ[0FDZGLVFJSqJ5ZFXqARTV\U[G]\ZHL:8Z%,Fg8q;F.8p5Z
lGEFJJFG]\ ZC[X[Ps DFPDPlJP5lZ5+S|DF\S V[;P8LPVFZq!_)*q (ZqC TFPZ*v!!v)*VG[ Z!v!!v)(f
Note5:Thepersonorfirmsubmittingthetendershouldseethattheratesintheaboveschedulearefilled
up bythe Engineer-in-charge the issueoftheformprior tothesubmission of thetender.
8[g0ZZH]SZGFZjIlSTS[5[-LV[ 8[g0ZZH]SZTF\5C[,F\T[G[VF5JFDF\VFJTF\OMD¶DF\CJF,FGF.HG[Z[ p5ZGLVG];]lRDF\ NZEZL
VF%IF CMI T[GL BFTZL ,[JL
Note6:Emptycement bagsofcementifsuppliedbytheGovernmentwillbethepropertyofthe
contractorand no recoveryfornon-return willbe made
SM.SFDDF8[SMg8=FS8ZG[lJGF D]<I[5]ZM5F0JFGM DF,;FDFG VG];]lRvBT[DHSMg8=FS8ZGF SZFZ;FY[HM0[,LlJUTMGL IFNL
p5ZF\TVG];]lRvSDF\ H6FJJ]\P
Notes7:StoretobesuppliedtocontractorsforaworkfreeofcostshouldbementionedinSchedule'A' in
addition toschedule 'B'andthe specification attached to thecontractagreement form.
Memorandumshowing itemsworksto be carried out :
CFY WZJFGF SFDGL AFATMNXF¶JTL IFNL
items No. Quantities itemofwork Tendered Unit Totalamount
AFAT G\AZ estimated out SFDGL AFAT Rates V[SD accordingto
orless 8[g0ZDF\ estimated
V\NFH[,HyYMH[ NXF¶J[,NZ quantities
VMKM JtTM Y. V\NFHLHyYF
XS[ VG];FZ S],ZSD
AsperSeparatesheetattached
(A) TotalTendered amount Rs…………………….
(B) Rebateonabovetenderedamount(ifany)………….%(Infigure) Rs………………….
(C) Nettenderedamount(A–B) Rs……………………
Notes1- Allwork shallbe carriedoutasperPublicWorksDepartmentHandbook andotherspecifications
ofDivision oras directed.
GM\Wv! ovAW]\ HSFD AF\WSFD lJEFUGL5]l:TSFVG[l0lJhGGL ALHLBF; lJUTD]HA VYJF ;}RGF5|DF6[SZLVF5JFG]\ ZC[X[P
Notes2-AllthecolumnsisScheduleshouldbefilledininkandthetotaloftheentriesinthelastcolumn should be
struckbythe contractorunderhissignature.
GM\WvZ ovVG];}lRDF\AWFBFGFGL lJUTM;CLYL EZJL VG[K[<,F BFGFGLGM\WMGM;ZJF/M SZLSMg8=FS8Z[5MTFGL ;CL SZJL
Notes3-Ratesquotedincludeclearanceofsite(priorcommencementofworkandatitsclose)inall
respects andhold good forworkunderallconditions, site,moisture, weatheretc.
GM\Wv# ov8F\S[,FNZDF\4:Y/GL sSFDGF VFZ\E[VG[5}~YFIT[JBT[fNZ[SZLT[;FO;}OL SZJFGM;DFJ[XYFIK[PVG[T[NZ TDFD
5lZl:YlT4:Y/4E[H4 CJFDFGJU[Z[C[9/SFD DF8[VD,DF\ ZC[X[P
Note 4-To becontinued on additionalsheets, iffoundnecessary.
GM\Wv$ ovH~ZH6FIJWFZFGF SFU/MHM0L RF,] ZFBJ]P
Signature of theContractor
NagarSevasadan,Anjar
DFU"VG[DSFGlJEFUNJFZFZFHIGFZ:TFVMG]AF\WSFDVG[T[GLDZFDTVG[HF/J6LGLSFDULZLDF8[TFP!q!Zq)*YL
VD,DFVFJ[ T[ZLT[H[SM.SFDGF8[g0ZMlJEFU NJFZFACFZ5F0JFDFVFJ[T[DF0FDZlJEFU NJFZF5]ZMG5F0TF
SMg8=FS8ZNJFZFAFZMAFZH[T[VM.,S\5GLDF0FDZGF5{;FEZL,FJJFGMZC[X[T[5|DF6[:5Q8;]RGFVR]SVF5JLV[8,[
S[TFP!q!Zq)*AFNDFUJFDFVFJTFSM.568[g0ZMDFXL0I],V[DFlJEFUNJFZF0FDZ5]ZM5F0JFGLVF.8DMGM
;DFJ[XSZJFGFZC[X[GCLP
!P>HFZNFZ0FDZSIFYL,FjIF T[ V\U[G]AL,V;,DFlJEFUG[ZH]SZJFG] ZC[X[P
ZPZLOF.GZLGFU[85F;5ZAL,;FY[;FD[,SZJFGFZC[X[P#P0FDZH[8[gSZDF,FJJFDF VFJ[K[T[8[gSZGMJFCGG\AZ
ATFJJFGMZC[X[P$P0FDZp5Z>HFZNFZzLG[V[0JFg;5[D[g8VYJF;LSIMZV[0JFg;D/L XSX[GCLP5P>HFZNFZ[ZH]
SZ[,0FDZGFV;,AL,DF0FDZGMU|0SM,L8LV\U[GMp<,[BCMJMHM.V[VFV\U[>HFZNFZ[0FDZGFU|[0V\U[G]8[:8ZLh<8
qU|[0V\U[G]5|DF65+ZH]SZJFG]ZC[X[P&P>HFZNFZ[0FDZGLVFJSqJ5ZFXqARTV\U[G]ZHL:8Z%,Fg8;F.8p5Z
lGEFJJFG]ZC[X[P
p5ZMSTVG];\WFGDFH6FJ[,TFPZ*q!!q)*GF5ZL5+GL;]RGFS|DFS*ZNU6LT[GFAN,[GLR[D]HAGL
;]RGFVMD]HASFI"JFCLSZJFGLZC[X[P
s!f ;]RGFS|DFSs*f
sVf ~F5P ,FB;]WLGMV\NFHLZSDGFSFDMGF0FDZSFDMGF8[g0ZMDF0FDZGMEFJNXF"JJFG]ZC[X[PGCLT[DHT[JF
SFDMDF\8[ 0FDZGMEFJTOFJT56R]SJJFGMqJ;],SZJFGMZC[X[GCLPsAf~F5P EFJ ,FBYLJW]V\NFHLTSLDTGF0FDZ
TOFJTGL HMUJF.GLR[NXF"J[,lJUT[SZJFGLZC[X[P
s!f0FDZGMHZ}ZL:8FZZ[8 H[DF;DF0L8L5L D\H]ZYFI T[ DF;GFZLOF.GZLGFEFJ8[g0ZDFHyYF ;FD[ NXF"JJFGFZC[X[P
sZfZLhJ"A[gSGFA],[8LGDF0FDZGFCM.>g0[1FGMCMJFYL9[S[NFZJS"VM0"ZVF%IFAFNH[0FDZBZLN[T[ZLOF.GZLGF
D]/AL,MZH]SZ[VG[BZLN[, HyYMJS"VM0"ZD]HASFDDFJF5Z[tIFZ[VG[8[g0ZD]HAGL;DI DIF"NFDFSFD5]6"SZ[tIFZ[
AL,MBZLNEFJ;FY[p5ZMSTs!fDFH6FJ[,:8FZZ[8JrR[TOFJTH6FITMR]SJ6]qZLSJZLsV[0H[:8D[g8fSZJFGL
ZC[X[Ps#f~F5P ,FBYLJW]V\NFHLTZSDGFSFDMDFVFHMUJF.SZLJS"VM0"ZGLTFZLBYLR]SJ6]ZLSJZLSZJFGL
ZC[X[Ps$f9[S[NFZ[BZLN[,0FDZGF8[:8L\UGFHZ}ZL5|DF56+M9[S[NFZ[;FNZSZJFGFZC[X[Ps5fH[SFDGLV\NFHLTlS\DT~FP
Z5P ,FBS[T[YLJW]CMIVG[;DIDIF"NFAFZDF;S[T[YLJW]CMIT[JFlS:;FDF5|F.hJ[ZLOLS[XGs,[AZD8L"ZLI,
5LPVMPV[,PfU6JFGLYTLSFDGLZSD "R"DF\YL0FDZGLSL\DTTYFp5ZD]HAGM0FDZGMTOFJT56AFNSZJFGM ZC[X[P
DCtTDDIF"NFU6TLJBT[560FDZGLV\NFH DF\,[JFI[,A[hLSEFJYLYTLlS\DTU6L V\NFHLTZSDDF\YLAFNSZL AFSLZC[,ZSD
5ZCF,GL5|JT"DFG HMUJF.VG];FZDCtTD DIF"NF U6JFGLZC[X[P
sZfSMg8=FS8ZBZLN[,0FDZ;FY[lJEFULI SR[ZLV[5LOMD"5]Z]5F0JFG] ZC[X[ GCLP
0FDZGF5ZL1F6MGLZLSJg;LTYF0FDZGF;F.8p5Z5ZL1F6AFAT Nl1F6U]HZFTTF\+LSVlWSFZLVMqSD"RFZLVMG[
:Y/5Z50TLD]xS[,LGLZH]VFTGFVG];\WFG[CM8DL1F%,Fg8 VG[5[JZYLSZJFGF0FDZGFSFDDF\0FDZGF8[:8LUDF50TL
D]xS[,LVMVG[T[V\U[GF;]RGMAFAT;ZSFZzLGLlJRFZ6FVFYL;J["CM8DL1F%,Fg8YLSZJFGF0FDZSFDDF\0FDZGF
5ZL1F6SZJF:Y/p5Z IMuI DF/BFSLI ;J,TM TYF;FWGMp5,aWSZJFDF VFJ[ TM0FDZ5ZL1F6GLSFDULZL1F[+LS SD"RFZLDF\
%,Fg8 ;F.8p5ZY.XS[ T[ DF\8[lJRFZ6FCFYWZJFDF\VFJ[,K[P
5|JT"DFG5wWTLD]HA0FDZSFDGF8[g0ZMDF>HFZNFZ[%,Fg8pTZ0FDZ,FJLG[SFDMSZJFGLHMUJF.Y.CMI
GJF0FDZSFDGM8[:8 YIFAFNH p5IMU SZJMHZ}ZLCMI NZ[S%,Fg8 ;F.8p5Z0FDZ5ZL1F6 DF8[GLDF/BLI ;J,TM TYF
;FWGM>HFZNFZNJFZFp5,aWCMJFHZ}ZLAG[K[PVFYL;J[";\AWLTM;]RGFVM5F9JJFDF\VFJ[K[S[%,Fg8;F.8p5Z
5ZL1F6GLHMUJF.CJ[5KLYL0FDZSFDGF8[:8DFVJxIZFBJFGLZC[X[PJW]DF:Y/p5ZGL8[:8SFDULZLDF8[G]uGFG
NZ[STF+LSSD"RFZLG[ZC[T[DF8[0FDZGF5ZL1F6GLTF,LDU[ZLG[H]NLH]NL5|IMUXF/FTZOYLlJEFUGFNZ[SDNNGLX
>HG[ZqVlWSDNNGLX>HG[ZqGFIASFI"5F,S>HG[ZqSFI"5F,S>HG[ZG[D[/JJFGLZC[X[P %,Fg8;F.8p5Z0FDZGF
5ZL1F6MG]ZHL:8Z 1F[+LSVlWSFZLzLV[lGEFJJFG]ZC[X[P %,Fg8 ;F.8p5Z5ZL1F6GL5wWTL DF\8[GLR[5|DF6[GL8[g0ZDF\
HMUJF.ZFBJFGLZC[X[P
s!f DF/BFSLI;J,T:Y/p5ZVFXZ[Z5RMPDLPGF1F[+O/GL5FSFAF\WSFDJF/L,[AMZ[8ZLHZ}ZL5F6LTYF,F.8GL
;]lJWF ;CLTZFBJFGLZC[X[P sZf;FWGMGL;J,T0FDZSFDGFGLR[ NXF"J[,H]NFH]NF 5ZL1F6MDF8[GLT[GL ;FD[NXF"J[,
VF.PV[;PD]HAGF;FWGMp5,aWSZJFGFZC[X[P
s!f5[GL8=[;G8[:8 o VF.PV[;P!Z_# sZf;[FOGL\U 5M.g8 8[:8 oVF.PV[;P !Z_$ s#f0S8L,L8L8[:8
ov VF.PV[;P!Z_( s#f JL:SM;L8L8[:8ov !Z_&s5f:5[;LOLS[XGU|[JL8L8[:8ovVF.PV[;P!Z_$p5ZMST ;FWGM
VF.PV[;P5|DF6LTCMJFHM.V[T[DHT[G[lGIlDTZLT[;[,LA|[8SZFJLSFI"ZTCF,TDFZFBJFGFZC[X[P5ZL1F6GL;\bIFo
V[DPVMPV[:8L:5[;LOLS[XG;[SXG) D]HA0FDZSFDMGFSM,L8LVMOAFI\0ZGF8[:8GL;\bIFA[hZLSJZ80"NXF"J[,K[P
T[HMTFNZA[8[gSZNL9GD]GF+65ZL1F56M%,Fg8;F.8p5ZSZJFGFZC[X[PTNp5ZF\TCJ[5KLYLGLR[8[A,GF:T\A# VG[$DF\NXF"jIF
5|DF6[GF5ZL1F6MU[ZLDF56SZJFGFZC[X[P
VF.PV[;P !Z_!q!)*(D]HA5ZL1F6MGL;\bIF 5ZL1F6SZJFGL ;]WFZ[,;\bIF
8[gSZGL;\bIF 5ZL1F6GL;\bIF 8[gSZGL;\bIF 5ZL1F6GL;\bIF
ZYL!5 Z !!YLZ_ Z
AFSLGF NZ[5_8[gSZNL9 !
p5Z D]HAGF0FDZGF ;F.8p5Z T[DH U[ZL DF5ZL1F6MSZJFGLHMUJF.VMCJ[5KLGF NZ[S0FDZSFDGF8[g0ZM DF\VJxI
ZFBJFGLZC[X[PVF;]RGFVMGMVD,R]:T56 YFI T[J] NZ[S 1F[+LIVlWSFZLVMVJxIwIFGZFBJ]5ZL5+S|DFS V[;PV[;PVFZP
!_))v VF.P5LP)!s)f; TFP Z&q*q))
8L0LV[;V\U[HMUJF.SZJFGM;]WFZMs9ZFJS|DFSJ[J[VqUF\WLqJJ8q8L0LV[;)*P)(qHFo$$5!TFP!)q*q)*TFP
!q$q_*YLJ[RF6J[ZFSFINFDFSZ[,HMUJF. D]HA~F!_P__,FBYL JW]lS\DTGFJS;"qSMg8=FS8;\AW[ZSDGLR]SJ6L
JBT[R]SGFZ[R]SJFGLZSDGFA[8SF,[B[ZSDJ[ZF5[8[D]/:Y/[YLS5FTSZLG[8L0LV[;!_lNJ;;ZSFZLEZ6FDF\8[GF
;FNFR,GYLJ[RF6J[ZF ;NZ[HDFSZFJJFGFZC[X[TFP!q$qZ__Z5KLR]SJJF5F+ YTLJS;"SMg8=FS8JW[ T[JF;\HMUM DFA[
8SFGL8L0LV[; GLS5FTSZJFGLZC[X[P TFPZZq$qZ__ZJ[RF6J[ZFSlDxGZU]PZFP VDNFJFN
ZFHIDF\J'1FFZM56G[5|M:TFCGD/[T[V\U[GF;J["5|ItGMZFHI;ZSFZNJFZFSZJFDFVFJ[K[PJQFM"JQF"J'1FZM5JFGF
SFI"S|DG]VFIMHG56DM8F5FI[SZJFDF\VFJ[K[P VF5|ItGG[J[UVF5JFA\WF.ZC[,qGJF A\WFTFDSFGMGLSFDULZL V\U[
GLR[D]HAGL;]RGFVMVF5JF DFVFJ[K[P s!fGJFDSFGMDF\ V\NFHMGFEFU ~5[J'1FZM56DFJHTVG[ pK[ZGLSFDULZLGM
;DFJ[XV\NFHDFVJxI SZJMsZf DSFGGFS\5Fpg0DF&P&DL8ZGFV\TZ[J'1FMZM5JFGLHMUJF.SZJLs#fh05YLpULXS[
,F\A]8SL ZS[VG[,L,MTZLVF5[ T[JFJ'1FMGL5;\NULJFJ[TZDF\8[SZJLs$fJ'1FMGL DFJHT5F6L5FJ]TYFBFTZJU[Z[;3/L
AFATMGMVF.8DDF\;DFJ[XSZJMDSFGAF\WSFDGM5FIMBMNF6GL;FY[J'1FMZM5JFH[YL DSFG5]6"YFI tIFZ[; \AWLT BFTFG[
DSFGGL;FY[;FY pK[Z[,FJ'1FM56 ;M5L ;SFIVF DF8[HZ}ZH6FITMS\5Fpg0JM, G]AF\WSFDXZ}VFTDF\CFYWZJ]
XSICMITMDSFGGFS\5Fpg0GL;FYM;FYVF;5F;GFlJ:TFZDF\JGlJEFUGF;CSFZYLJWFZFGFJ'1FMGMJFJ[TZ56
SZJ]VF;]RGFVMG]R]:T56[VD,SZJFTYFT[GL;DF\TZ[;DL1FFSZJF;J["SFI"5F,S>HGZZzLVMqVlW1FS>HG[ZzL VMG[
VFYL;]RGF VF5JFDFVFJ[K[ P
Signatureofthe contractor: SignatureoftheEngineer
Name ofwork:- PROVIDING, SUPPLYING, LOWERING, LAYING & JOINTING VARIOUS DIA WATER
PIPELINE IN VARIOUS AREA OF ANJAR NAGARPALIKA AT ANJAR-KUTCH
SPECIALATTENTION
LabourWelfareCess
AsperGovt. ofGujarat(R&B)Dept. SachivalayaGandinagarCircularNo.
S.S.R./102004–IB 41(24)Asdated2/10/06ThelabourwelfareCess1%should be
deducted(Recovered) fromEachBill of the saidwork.
Nagar Sevasadan,
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
tender doc.pdf
Schedule - B1 160MM DIA.pdf
Schedule - B2 200MM DIA.pdf
Download all tender documents and submit your bid