Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹10.4 Laccepted-aoc | accepted-aoc |
Tender Value
₹12.7 L
Closing Date
8 Apr 2019, 3:00 pmClosed
Executive Engineer Piu Division , Eluru
RFP for Selection of Consultants for Preparation of Techno Economic Feasibility Study and Detailed Project Report (DPR) for a) Bridge on river Krishna connecting N13 road in Amaravati and National Highway (NH) 65. b) New Bridge on River Krishna connecting NH 65 and old GT Road on downstream of Prakasam barrage. c) Road Bridge connecting E13 road in Amaravati and National Highway (NH) 16.
210436
NIT NO 21/ATO/2018-19/DT.18.07.2018,EXECUTIVE ENGINEER,PR,PIU DIVISION,ELURU
OPEN - NCB
Services
Andhra Pradesh
23 Apr 2019
4 Aug 2018
8 Apr 2019
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .