| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹59.6 CrAdmitted-Finance CRYSTAL TOWER 4TH FLOOR TELIBANDHA RAIPUR | RAIPUR | RAIPUR | CHHATTISGARH | ₹59.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹62.8 CrAdmitted-Finance | ₹62.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹83.3 CrAdmitted-Finance | ₹83.3 Cr | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Larsen and Toubro Limited L1 | COCHIN SHIPYARD LIMITED L2 | hindustan shipyard limited L3 |
|---|---|---|---|---|---|---|
| 1.00SUMMARY OF QUOTATION | ||||||
| 1.01 | Services
Total Cost of Dry Dock Hire Charges and other Admin & General Services quoted in the BoQ | 1 | Nos | 11,39,35,310 ₹11.4 Cr | 5,42,91,020.4 ₹5.4 Cr | 8,07,83,898.7 ₹8.1 Cr |
| 1.02 | Cost of repair part :-
(a) Total cost of Hull Work Package | 1 | Nos | 14,89,19,407 ₹14.9 Cr | 17,84,46,506.86 ₹17.8 Cr | 23,83,34,791.57 ₹23.8 Cr |
| 1.03 | (b) Total cost odf Engineering Work Package | 1 | Nos | 14,71,75,945 ₹14.7 Cr | 20,64,68,500.07 ₹20.6 Cr | 21,91,06,867.87 ₹21.9 Cr |
| 1.04 | (c ) Total cost of Electrical Work Package | 1 | Nos | 6,24,84,480 ₹6.2 Cr | 6,35,61,515.94 ₹6.4 Cr | 8,58,54,421.86 ₹8.6 Cr |
| 1.05 | GST on serial 1.01 to 1.04 | 1 | Nos | 2,36,25,757.1 ₹2.4 Cr | 2,51,38,376.01 ₹2.5 Cr | 3,12,03,999 ₹3.1 Cr |
| 1.06 | Total Budgeary Cost of Spares | 1 | Nos | 9,54,84,858 ₹9.5 Cr | 9,54,98,166.68 ₹9.5 Cr | 16,94,96,665.36 ₹16.9 Cr |
| 1.07 | GST applicable for 1.06 | 1 | Nos | 47,74,242.9 ₹47.7 L | 47,74,908.45 ₹47.7 L | 84,74,833.26 ₹84.7 L |
| 1.08 | Any other Taxes & Duties | 1 | Nos | - | - | - |
| 1.09 | Miscellaneous (not included in any of the serial above) | 1 | Nos | - | - | - |
Tender Value
Refer Docs
EMD Value
₹2 Cr
Closing Date
4 Jul 2025, 4:00 pmClosed
The Admiral Superintendent
The Admiral Superintendent Naval Ship Repair Yard Naval Base Kochi
Dry Docking and Allied Repairs of INS Sutlej SR 26
2025_NAVY_710515_1
PP/04/3480/SUTLEJ/SR/25
Limited
Marine Services
120 days
NSRY Kochi
Shipyard must have own suitable dry dock shiplift and related facilities. No subcontracting. Dry Dock ship lift should be capable for docking INS Sutlej. Should have successfully undertaken atleast 3 refits of IN Ships in 3 years without LD. WCC requ
9 documents required · 9 mandatory
₹0
₹2 Cr
Yes
NSRY Kochi
11 Aug 2025
27 May 2025
5 Jul 2025
27 May 2025
4 Jul 2025
16 Jun 2025
27 May 2025 - 31 May 2025
2 Jun 2025
Amount
SUMMARY OF QUOTATION
Services Total Cost of Dry Dock Hire Charges and other Admin & General Services quoted in the BoQ
Cost of repair part :- (a) Total cost of Hull Work Package
(b) Total cost odf Engineering Work Package
(c ) Total cost of Electrical Work Package
GST on serial 1.01 to 1.04
Total Budgeary Cost of Spares
GST applicable for 1.06
Any other Taxes & Duties
Miscellaneous (not included in any of the serial above)
GST if any on serial 1.09
Description of Work / Item(s)
Amount
INSTRUCTIONS TO SHIPYARDS
(A) SHIPYARD TO QUOTE FOR ALL SERIALS. BULK/LUMPSUM COSTING IS NOT ALLOWED. ALL PAYMENTS WILL BE ON ACTUALS ON NOT EXCEEDING BASIS. (B) ALL SPARES ARE TO BE SOURCED THROUGH OEM AND OEM SUPERVISION IS TO BE ENSURED FOR ROUTINE/REPAIRS OF ALL EQUIPMENT. (C) IF SHIP REFIT AT SHIPYARD CONTINUES BEYOND 120 DAYS FOR ANY REASON INCLUDING FORCE MAJEURE, ALL ADMIN/GENERAL SERVICES ARE TO BE EXTENDED WITHOUT ADDITIONAL COST.
SHIPYARD IS REPONSIBLE FOR THE SAFETY OF THE VESSEL AND THE VESSEL'S PROPERTY FROM INCLEMENT AND ADVERSE WEATHER, FOR SAFETY AND SECURITY OF ALL ITEMS/ MATERIAL/EQUIPMENT THAT IS DEGUTTED/REMOVED FROM ONBOARD THE SHIP AND THE SAME ITEM IS TO BE FITTED ONBOARD. SHIPYARD IS TO ESTABLISH A SECURITY PERIMETER AROUND THE VESSEL WITH 2 SENTRIES ROUND THE CLOCK. SHIPYARD EXECUTIVES/STAFF/WORKERS/CONTRACTORS SHALL STRICTLY ABIDE BY ALL NAVAL PROCEDURES / INSTRUCTIONS INTIMATED VERBALLY OR IN WRITING BY SHIP'S OFFICERS AND PROJECT MONITORING OFFICERS. ALL SHIPYARD WORKERS /CONTRACTORS /STAFF ENTERING ONBOARD FOR WORK SHALL BE IN POSSESSION OF VALID ID CARDS AND SHALL SHOW THE SAME WHILE ENTERING/LEAVING OR AS DIRECTED. THE PASSES FOR OFFICERS, PMT AND SAILORS (INCLUDING CAR & BIKE) TO BE ISSUED WITHIN 5 DAYS OF THE ARRIVAL OF THE VESSEL WITH VALIDITY TILL COMPLETEION OF REFIT. THE ENTRY/ EXIT TO SHIP YARD WILL CONTINUE EVEN IN ABSENCE OF SHIP YARD PASSES.
PRIORITY CLEARANCE TO ALL NAVAL OFFICERS FOR ENTRY/EXIT TO SHIPYARD, SAILORS OF THE SHIP AND PROJECT MONITORING TEAM TO BE GIVEN SPECIAL CHANNEL FOR UNINTERRUPTED MOVEMENT).SHIPYARD TO PERMIT UNRESTRICTED ENTRY /EXIT OF MATERIAL/ SPARES/ ITEMS/ EQUIPMENTS ON SHIP'S AND PROJECT MONITORING OFFICER'S LETTER AT ANY HOUR OF THE DAY. IMMEDIATE CLEARANCE (WITHIN 05 MIN) TO BE GIVEN BY SHIPYARD ON VERBAL INTIMATION/EMAIL/LETTER FROM SHIP AND PROJECT MONITORING TEAM.SHIPYARD TO PERMIT ENTRY/EXIT OF INDIVIDUALS OF ANY FIRM /COMPANY/ORGANIZATION /GUESTS ONBOARD THE VESSEL ON SHIPS AND PROJECT MONITORING OFFICERS LETTER. PREFERRENTIAL /IMMEDIATE CLEARANCE(WITHIN 05 MIN) TO BE GIVEN BY SHPYARD BY VERBAL INTIMATION /EMAIL/LETTER FROMN SHIP OR PROJCT MONITORING TEAM. ALL SHIPYARD WORKERS/SUBCONTRACTORS ETC TO BE CHECKED/SCANNED PRIOR ENTRY ONBOARD THE SHIP AND ALSO ALL ITEMS/BAGS TO BE X-RAYED. CCTV RECORD (WITH NIGHT VISION) OF THE ENTIRE SHIP'S PERIMETER TO BE MAINTAINED FOR THE DURATION OF REFIT AND BACK UP OF ATLEAST 30 DAYS TO BE MAINTAINED.
GENERAL SERVICES
PROVIDE QA COVERAGE FOR ENTIRE WORK PACKAGE BY A REGISTERED THIRD PARTY INSPECTING AGENCIES EX - LRS, IRS, ABS ETC.
SHIPYARD TO SUBMIT QAP AND QIP WITH IN 2 WEEKS OF SIGNING OF CONTRACT
A DETAILED PERT /GANTT CHART TO BE SUMITTED TO NSRY AND SHIP (IN HARD AND SOFT MEDIA) ON TWO WEEKS PRIOR COMMENCEMENT OF REFIT. THE PERT/GANT CHART TO BE UPDATED TWICE EVERY MONTH AS PER THE PROGRESS OF REFIT.
ONLINE MONITORING OF REFIT AND PERT CARDINALS TO BE ENABLED WITH MS AZURE ACTIVE DIRECTORY, MS PROJECT AND MS OFFICE 365 WITH SHIPYARD REPS, NSRY(K) REPS AND SHIP STAFF AS USERS
DOCK BLOCK PREPARATION FOR DOCKING OF SHIP IN VERSION - I, BOTH CENTER LINE AND SIDE BLOCKS. SHIPYARD TO ARRANGE FOR THIRD PARTY INSPECTION AND HAND OVER DULY RECOMMENDED CERTIFICATE FOR DOCK BLOCK PREPARATION TO NAVY POST INSPECTION
DOCKING AND UNDOCKING OF THE VESSEL IN VERSION-II. (DURATION 30 DAYS). SHIPYARD TO PLAN AND COMPLETE ALL DRY DOCK RELATED WORK WITH IN DRY DOCK TIME. ELSE SHIPYARD TO CONTINUE DOCKING OF SHIP ALONG WITH ALL ALLIED SERVICES TILL COMPLETION OF WORK WITH OUT ANY EXTRA COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD OF CONTRACT
DOCKING & UNDOCKING (QUOTE AS ONE UNIT)
SUBSEQUENT DAYS IN DOCK.
ARRANGE TUG AND PILOTAGE FOR TAKING THE VESSEL FROM NAVAL JETTY TO THE DOCK, DOCKING, UNDOCKING & DELIVERY OF VESSEL BACK AT NAVAL JETTY. PAYMENT BASED ON THE ACTUAL TIMES AS PER WCC ON NOT EXCEEDING BASIS.
MOORING/UNMOORING AND LINE HANDLING FOR EACH OPERATION
PROVIDE WHARFAGE / WET BASIN FACILITIES (WITH 6M DEPTH AT ALL CONDITIONS) AS REQUIRED FOR COMPLETION OF WORK PACKAGE. DREDGING AS REQUIRED TO BE CARRIED OUT PRIOR TO COMMENCEMENT OF REFIT AT SHIPYARD'S COST. PAYMENT WILL BE RESTRICTED TO ACCEPTED PERIOD IN THE CONTRACT
NUD CONNECTIVITY TO SHIP FROM THE NEAREST POINT TO BE PROVISIONED FOR COMPLETE STAY INCLUDING DRY DOCK. CAT 6 CABLE ALSO TO BE PROVISIONED.
PROVISION OF SHORE POWER 3 PHASE, 415V, 50HZ, FOR 30 DAYS IN DRY DOCK & FOR THE DURATION OF STAY FOR COMPLETE REFIT INCLUDING NECESSARY CONNECTION / DISCONNECTION (RATES AS PER ACTUAL READING ON BOARD/ENERGY METER READING INSTALLED BY SHIPYARD) POWER SUPPLY CABLE AND METER TO BE PROVIDED BY SHIPYARD. QUOTE FOR 1000 KWH/DAY. PAYMENT AT ACTUALS AS PER FINAL READING. SHIPYARDS TO INSTALL POWER METER . SHIP SHOULD BE EARTHED AT 02 POINTS WHILE IN DRY DOCK. EARTHING CABLE TO BE SUPPLIED BY SHIPYARD.
CONTINUED PROVISIONING OF STABILISED POWER SUPPLY QTY -03 NOS
PROVIDE 03 SEA WATER FIRE MAINS WITH 07 BAR PRESSURE FOR ENTIRE DURATION WITH CONTROL VALVES, MANIFOLDS AND INCLUDE NECESSARY CONNECTION / DISCONNECTION. SHIPYARD TO CONNECT REFERENCE PRESSURE GAUGE AT DISCHARGE LINE. CALIBERATION CERTIFICATE OF PRESSURE GAUGES TO BE SUBMITTED ON START OF REFIT
SHIPYARD TO PROVIDE 02 PORTABLE AC UNITS (TOTAL 80 TR CAPACITY) WITH AIR HOSES AND VENT PIPES TO SHIP DURING THE PERIOD OF WHARFAGE AND DRY DOCKING. ADEQUATE FLEXIBLE HOSES (MINIMUM)TO CARRY CHILLED AIR FROM PORTABLE AC UNITS TO ACCOMODATION AREAS, IN SHIP'S SUPERSTRUCTURE AND BELOW DECKS AND ELECTRONICS/ CONTROLS/ SENSOR COMPARTMENTS OF THE SHIP TO BE CATERED BY SHIP YARD. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. RIGGING OF REQUIRED HOSES WIL BE RESPONSIBILITY OF THE SHIPYARD
PROVOSIONING, INSTALLATION, COMMISSIONING & MAINTENANCE OF 07 NOS SPLIT AC PLANTS OF 2 TR EACH IN SPECIFIC LOCATIONS OF ONBOARD SHIP IN THE LOCATIONS INDICATED BY SS CATERING FOR DUTY WATCH PERSONNAL STAYING ONBOARD DURING REFIT PERIOD. SHIPYARD TO MAINTAIN ALL 07 NOS SPLIT ACS THROUGHT THE DURATION FO THE REFIT. PROVISIONING/FITMENT ON APPROVAL OF COA.
PROVIDE FRESH WATER 05 TONS PER DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. QUOTE TO INCLUDE NECESSARY CONNECTION / DISCONNECTION
PROVIDE FACILITIES FOR GARBAGE COLLECTION AND DISPOSAL ARRANGEMENTS (15 KG EACH) TWICE PER DAY FROM SHIP PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE CRANE 10-25 TON CAPACITY DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE SERVICES OF TWO LISTERS DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE SERVICES OF ONE FORK-LIFT DURING THE REFIT (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
CLEANING OF ALL TANKS (10 FUEL TANKS, 09 FWT TANK, 01 BALLAST TANK, 03 DIRTY OIL TANK, 03 LUB OIL STORAGE TANK) VENTILLATION AND OBTAINING GAS FREE CERTIFICATE IS THE RESPONSIBILITY OF SHIPYARD. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE 15 FIRE FIGHTING TRAINED HOT WORK SENTRIES WITH 02 SUPERVISORS FOR 16 HRS EACH DAY FOR THE DURATION OF REFIT.NUMBER OF SENTRIES REQUIRED WILL BE INTIMATED BASED ON SHIP YARD'S REQUISITION FOR HOT WORK RECEIVED THE PREVIOUS DAY. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVISIONING OF 10 SEMI-SKILLED SAFETY SENTRIES TO ENSURE SAFETY AND HOUSE KEEPING DURINGTHE FOLLOWING EVOLUTIONS AND FOR UNDERTAKING TIMELY OPERATIONALISION AND TRIALS OF ALL EQUIPMENT ON COMPLETION OF ROUTINES/REPEIR:- (I) FOR MANNING THE SHIP TO CHECK FOR LEAKAGE/FOODING AT VARIOUS LOCATIONS DURING TRIALS OF FIRE MAIN,DRENCHER,SPRINKLER AND OTHER FIRE-FIGHTING SYSTEM CHECKS AS A PART OF PRE-REFIT AND POST REFIT TRIALS. (II) DURING TRANSFER OF LUB OIL AND FUEL IN SYSTEM TANKS AND EQUIPMENT FROM JETTY. (III) FOR MANNING VARIOUS COMPARTMENTS DURING HARBOUR TRIALS OF EQUIPMENT AND MAJOR FIRE FIGHTING EQUIPMENT. (IV) FITMENT OF BILGE PLATES IN UNDERWATER COMPARTMENTS AND SAFETY GUARDS OF ALL EQUIPMENT. (V) TORQUE TIGHTNESS CHECKS OF SYSTEM PIPES AND FLANGES THROUGHOUT THE SHIP PRIOR TO COMMISSIONING OF EACH SYSTEM TO PREVENT LEAKAGES.
TEMPORARY LIGHTING AND VINTILLATION ONBOARD FOR THE ENTIRE DURATION OF REFIT TO BE PROVIDED IN ALL MACHINERY COMPARTMENTS, COMPARTMENTS WITHIN SUPERSTRUCTURE, ALL ALLEYWAYS/ PASSAGE WAYS, CARGO SPACE, BALLAST TANKSMUST BE WELL LIT WITH 24 VDC LAMPS. PROVISION OF MAXIMUM 20 LIGHT POINTS PER DAY. PAYMENT AT ACTUALS. PROVISION OF 05 PORTABLE INTAKE/ EXHAUST BLOWERS OF MINIMUM 02 KW RATING WITH ADEQUATE HOSING ARRANGEMENT. ARRANGEMENT ON AS REQUIRED BASIS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE LOAD BANK 350 KW FOR LOAD TRIALS OF DAS WITH M-LOAD TRIALS CAPACITY INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT,IF ANY ONLY. SHIPYARD REQUIREMENTS VIZ. MANDATORY TRIALS POST ROUTINES ARE TO BE CATERED IN SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE PORTABLE 350 KW DA INCLUDING HIRE CHARGES WITH OPERATOR CREW AND NECESSARY CONNECTION/SHIFTING. (FOR NAVY'S ADDITIONAL REQUIREMENT,IF ANY ONLY. SHIPYARD REQUIREMENTS VIZ. DA REQUIREMENT VIEW NON AVAILABILITY OF SHORE SUPPLY TO BE CATERED SEPERATELY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
10 NOS PORTABLE VENTILATION BLOWERS NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR VENTILATION OF THE COMPARTMENTS AND TANKS (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY)
02 NOS LP AIR COMPRESSOR NEED TO BE SUPPLIED FOR THE DURATION OF REFIT FOR LP AIR SUPPLY. (FOR NAVY'S REQUIREMENT ONLY. SHIPYARD REQUIREMENTS ARE TO BE CATERED IN SEPERATELY)
SHIPYARD TO ENSURE MOVEMENT OF STEEL FROM MO (KOC) / NSRY (KOC) TO SHIPYARD INCLUDING LOADING / UNLOADING, MANPOWER (04 MEN), TRAILOR, MOBILE CRANE (02 NOS, 5 TONNE EACH), FORK LIFT AND OTHER REQUIRED ACCESSORIES. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ANALYSIS OF LUB OIL, COOLENT, HYDRAULIC OIL AND PORTABLE WATER. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. ANALYSIS OF LUB OIL, COOLENT AND PORTABLE WATER OF ALL MAIN ENGINES, DIESEL ALTERNATORS, GEAR BOXES AND AUXILARY MACHINERIES TO BE CARRIED THROUGH NABL CERTIFIED LABORATRY AND TWO COPIES OF THE EACH REPORT TO BE SUBMITTED WITHIN 24 HOURS OF TEST UNDERTAKEN.
(A) LUB OIL TEST (I) BASIC TEST:- THE BASIC TEST OF LUB OIL SHOULD COVERS THE FOLLOWING:- (a) BY USING METHOD OF ASTM D445 :- (aa) VISCOSITY @ 40 DEGREE C (CST) (ab) VISCOSITY @ 100 DEGREE C (CST) (ac) VISCOSITY INDEX (CALCUATED)
(b) WATER CONTENT (% VOL) BY ASTM D95 METHOD. (c) FLASH POINT ( DEGREE CENTIGRADE) BY ASTM D92 METHOD (d) TBN (MG KOH/G)) BY ASTM D644 METHOD (e) TAN (MG KOH/G)) BY ASTM D644 METHOD
(II) ADVANCE TEST :- THE ADVANCE TEST OF LUB OIL SHOULD COVERS THE FOLLOWING BY USING ASTM D5185 METHOD:- (a) WEAR METALIC PARTICALS OF FE, CR, NI, AL, CU, SN, PB AND AG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL. (b) CONTAMINANTS OF SI, NA AND MG TO BE ANALISED IN TERMS OF PPM IN THE GIVEN SAMPLES OF LUB OIL.
(B)COOLANT TEST / FRESH WATER ADDITIVE TEST:- THE FOLLOWING PARAMETERS TO BE ANALYSIS FOR GIVEN SAMPLE: (i) PH VALUE (ii) CHLORIDE CONTENT (iii) PERCENTAGE OF INHIBITOR (iv) HARDNESS (v) ANY OTHER TEST REQUIRED.
(C) POTABLE WATER TEST TO BE CARRIED OUT TO ACERTAIN THE SUITABLITY FOR DRINKING WATER
(D) HYDRAULIC TEST:- (a) BASIC TEST SHOULD COVERS THE FOLLOWING :- (i) VISCOSITY @ 20% IN TERMS OF CST BY USING METHOD OF ASTM D445 (ii) VISCOSITY @ 50% IN TERMS OF CST BY USING METHOD OF ASTM D446 (iii) VISCOSITY INDEX RESULTS BY CALICULATIONS BY USING METHOD OF ASTM D447 (iv) TESTING BY VISUAL / APPREARANCE (v) WATER CONTENT TEST BY CRACKLE (vi) WATER CONTENT TEST IN TERMS % VOL BY USING METHOD OF ASTM D95 (vii) PENTANE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893 (viii) TOLUENE INSOLUBLE TEST IN TERMS OF % WT BY USING METHOD OF ASTM D893 (ix) TAN TEST IN TERMS OF MG KOH/G BY USING METHOD OF ASTM D644 (x) SALT CONTENT TEST IN TERMS OF PPM BY USING METHOD OF IP 77 (xi) FLASH POINT TEST IN TERMS OF DEGREE CENTIGRADE BY USING METHOD OF ASTM D92/ 93
(b) HYDRAULIC ADVANCE TEST SHOULD BE CARRIED OUT TO FIND OUT THE MEASUREMENT OF CONTAMINATION (SIZE OF QUANTITY OF MECHANICAL IMPURITIES) BY USING THE METHOD OF DEFSTAN 5-56/ ISSUE 2 (1982) TO MEET THE ISO 11500.
(E) PROVISION OF CONTAINERS/ SAMPLE BOTTLES:- STANDARD CONTAINERS/ SAMPLE BOTTLES (CAPACITY OF 250 ML) TO BE PROVIDED BY SHIPYARDS FOR LANDING THE SAMPLES OF LUB OILS, COOLANTS, HYDRAULIC OILS ETC FOR ANALYSIS.
MECHANICAL CLEANING & PAINTING OF ALL POL TANKS AND BILGES. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. (a) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF ALL POL STORAGE TANKS.(1314 Sqr Mtrs)
(b) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF AVCAT STORAGE TANK AND SERVICE TANK (110 Sqr Mtrs)
(c) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF ALL POL HANGING TANKS (40 SqrMtrs)
(d) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF ALL DIRTY OIL TANK (30 SqrMtrs)
(e) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF MER BILGES(183 Sqr Mtrs )
(f) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF AER BILGES (75 SqrMtrs)
(g) MECHANICAL CLEANING & PAINTING OF AC COMPT (40 SqrMtrs)
(h) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF GLAND COMPT BILGES (25 Sqr Mtrs)
MECHANICAL CLEANING & PAINTING OF ALL FRESH WATER TANKS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. (a) MECHANICAL CLEANING & PAINTING (AS PER PAINT SCHEME) OF ALL FRESH WATER TANKS (1200 Sqr Mtrs)
COMPRESSION TESTING FOLLOWED BY GROUPING OF VIBRATION MOUNTS, REPLACE/ROUTINES TO BE CARRIED OUT AS PER NAVAL STANDARDS
ADMIN SERVICES
THREE SEPARATE SHORE TOILETS AND WASHROOMS FOR SHIP'S OFFICERS AND CREW RESPECTIVELY SUITABLE FOR 20 OFFICERS AND 185 SAILORS (01 FOR WOMEN SAILORS) NEAR TO SHIPS BERTH / DOCK (WITHIN 100 MTRS FROM THE SHIP).
01 AC DINING HALL WITH LEATHER SOFA SET, DINING TABLE AND CHAIRS, TV WITH DTH CONNECTION,MUSIC SYSTEM AND ADEQUATE CUTLERY DINING OF 20 OFFICERS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS).SQFT-600
01 DINING HALL FOR COMMANDING OFFICER WITH AC,TV WITH DTH CONNECTION,MUSIC SYSTEM AND ADEQUATE CUTLERY CLOSE TO CO'S OFFICE.
50 SEATER DINING HALL FOR SENIOR SALIORS WITH AC,TV WITH DTH CONNECTION,MUSIC SYSTEM AND ADEQUATE CUTLERY NEAR SHIPS BERTH
01 AC DINING HALL SUITABLE FOR DINING TABLE AND CHAIRS ,TV WITH DTH CONNECTION,MUSIC SYSTEM AND ADEQUATE CUTLERYFOR DINING OF 100 SAILORS AT A TIME NEAR SHIPS BERTH (WITHIN 200 MTRS, 1000 SQFT).
PROVISION OF SHORE GALLEY WITH 10 LPG BURNERS/ELECTRIC HOT PLATES , INCLUDING COST OF GAS/ELECTRICITY AND SINK WITH WATER CONNECTION FOR WASHING OF PLATES, UTENSILS ETC. FRESH WATER RO PURIFIER/ HEAVY DUTY AQUAGUARD TO BE FITTED FOR MEETING GALLEY AND SHIPS CREW WATER REQUIREMENT (AT TWO LOCATIONS VIZ GALLEY AND DINING HALL). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. GALLEY FOR COOKING FOOD FOR 200 PERSONS.
TWO AIR CONDITIONED SPACE FOR STORAGE SPACE (12 FEET X 12 FEET) FOR FRESH RATION. ONE MAINTAINED AT TEMPERATURE (1-3°C) AND OTHER AT (-10°C). SPACE FOR RATION IF REQUIRED.
SUPPLY 500 LITRES OF DRINKING WATER (AQUAFINA/ KINLEY/ BISLERY) PER DAY ONBOARD SHIP AND OFFICE SPACES.
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (INCLUDING OFFICE TABLE, EXECUTIVE CHAIR, VISITORS SOFA, FIRMLY MOUNTED GODREJ SAFE, 01 STRONG LOCKER AND 03 VISITORS CHAIRS AND DINNING TABLE WITH CHAIR) WITH ATTACHED TOILET FOR COMMANDING OFFICER. FOR REFIT DURATION
AIR CONDITIONED & FULLY FURNISHED OFFICE SPACE (03 ROOMS/CONTAINERS) FOR OFFICERS. INCLUDING 05 TABLE, 05 EXECUTIVE CHAIR, AND 10 VISITORS CHAIRS FOR REFIT DURATION
AC OFFICE SPACE FOR REFIT OFFICE (HALL WITH SEPERATORS/ ROOMS(06)/ CONTAINERS(06) FOR OFFICES VIZ, ENGG OFFICE, ELE OFFICE, HULL OFFICE, GUNNERY/SS OFFICE, SHIPS/REG OFFICE AND REFIT OFFICE, SIX TABLES,20 CHAIRS AND 08 RACKS WITH LOCK FOR FILE KEEPING ARE TO BE PROVIDED FOR REFIT DURATION AND 01 FOR WOMEN AVR REST ROOM
PROVIDE 02 AC OFFICE SPACE / CONTAINER WITH REFRIGERATOR FOR SHIPS SICK BAY FOR REFIT DURATION INCLUDING BEDS,TABLES AND STORAGE CUPBOARDS (TWO EACH)
DRINKING WATER THROUGH RO/AQUAGAUARD AND SEPARATE TOILETS FOR SHIP'S OFFICERS AND CREW ARE TO BE PROVIDED WITHIN 50 M OF OFFICE SPACE (BISLERI WATER)
PROVIDE FOUR STD LAND LINE TELEPHONE CONNECTION FOR SHIP STAFF. SAME TO BE INSTALLED AT OFFICE/SHIP AS INDICATED BY SHIP STAFF FOR REFIT DURATION
PROVIDE SIX PC(NOT OLDER THAN THREE YEARS) WITH VALID WINDOWS AND MS OFFICE FOR REFIT DURATION FOR SHIP STAFF
PROVIDE INTERNET CONNECTION AT FOUR LOCATIONS AS INDICATED BY SHIP STAFF FOR REFIT DURATION
FOUR PRINTERS WITH EIGHT SUITABLE CATRIDGES AND ONE HEAVY DUTY COPIER/PRINTER WITH TWO SUITABLE TONERS ARETO BE PROVIDED REFIT DURATION
40 INCH TV WITH DTH CONNECTION AT 04 SEPARATE LOCATIONS ARE TO BE PROVIDED DURING REFIT PERIOD
ALL PCs/PERIPHERALS IN OFFICE SPACES TO BE SETUP IN LAN CONFIGURATION AS INDICATED BY SHIP STAFF
STATIONARY IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF SHIPS OFFICE FOR RS 25,000/- PER MONTH
PROVIDE FIVE 40 FT CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF SPARES / ITEMS DURING REFIT TIME.
PROVIDE AC 02 CONTAINERS/LAY-APART STORE FOR STOWAGE AND PRESERVATION OF CRITICAL SPARES / ITEMS DURING REFIT TIME.
PROVIDE TWO SEPARATE AC PORTABLE CABINS FOR OOD AND DUTY WATCH DURING NIGHT ADJACENT TO SHIP IN JETTY FOR THE FULL REFIT DURATION.
(A) PROVIDE FULLY FURNISHED OFFICE SPACE( 400 SQFT) FOR OI/C PROJECT MONITORING TEAM OF NSRY(KOC) WITH TWO ACs, WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (44INCH ATLEAST WITH DISH CONNECTION). TWO(02) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER(4-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER(TOTAL 12 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS, DELIVERY DETAILS WILL BE PROVIDED BY COA)
(B) PROVIDE FULLY FURNISHED OFFICE SPACE( 200 SQFT) FOR HOD WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (44INCH ATLEAST WITH DISH CONNECTION). TWO(02) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER(4-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER(TOTAL 12 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS, DELIVERY DETAILS WILL BE PROVIDED BY COA)
(A) PROVIDE FULLY FURNISHED OFFICE SPACE( 200 SQFT) FOR HOD, WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (44INCH ATLEAST WITH DISH CONNECTION). TWO(02) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER(4-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER(TOTAL 12 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS, DELIVERY DETAILS WILL BE PROVIDED BY COA)
(C) PROVIDE FULLY FURNISHED OFFICE SPACE( 200 SQFT) FOR HOD, WORK STATION, LOCKERS, STORAGE, ATTACHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (44INCH ATLEAST WITH DISH CONNECTION). TWO(02) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER(4-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER(TOTAL 12 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS, DELIVERY DETAILS WILL BE PROVIDED BY COA)
(A) PROVIDE FULLY FURNISHED OFFICE SPACE( 400 SQFT) WITH FOR OFFICERS AND STAFF OF RMT(COMMERCIAL DEPARTMENT,NSRY(KOC) WITH TWO ACs, FOUR WORK STATIONS, FOUR LOCKERS AND STORAGE, WITH REFURBISHED TOILET, WASHROOM, CHANGING ROOM, LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION AND TV (MINIMUM 42 INCH ATLEAST WITH DISH CONNECTION). FOUR(04) ALL-IN-ONE-PCs BRANDED/NOT ASSEMBLED, MINIMUM i5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE WITH TWO(02) MULTIFUNCTION COLOUR LASER PRINTER(3-IN-1) AND TWO(02) MULTIFUNCTION B/W LASER PRINTER(3-IN-1) ONE FOR EACH PC WITH ADDITIONAL SIX COMPLETE SETS OF PRINTER CARTRIDGES ONE SET FOR EACH PRINTER(TOTAL 24 SETS OF CARTRIDGES)AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS, DELIVERY DETAILS WILL BE PROVIDED BY COA)
(C) ONE FULLY FURNISHED AC OFFICE SPACE FOR FIVE(05) SAILORS OF THE PROJECT MONITORING TEAM WITH FIVE(05) INDIVIDUAL WORKSTATIONS, STORAGE AND LOCKERS, ATTACHED TOILET, WASHROOM, CHANGING ROOM AND LAND LINE TELEPHONE WITH STD AND 01 BROAD BAND CONNECTION. PROVIDE FIVE PCs BRANDED/NOT ASSEMBLED, MINIMUM I5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE FOR RMT(PLANNING & COMMERCIAL) OF NSRY. SPECS TO BE CONFIRMED FROM NSRY, KOCHI WITH ONE JUMBO MULTIFUNCTION COLOUR LASER PRINTER(3-IN-1) WITH ADDITIONAL TWELVE COMPLETE SETS OF CARTRIDGES/TONERS AND PAPER SHREDDER (NOTE: ALL PCS/PERIPHERALS/IT PROVIDED TO PROJECT MONITORING TEAM WILL BE RETAINED BY COA, IN VIEW OF DATA SECURITY AND SPECIFICATIONS WILL BE PROVIDED BY COA) ALL OFFICE STATIONARY ITEMS / SUPPLIES AS REQUIRED, FOR THE ENTIRE DURATION OF THE REFIT IS TO BE PROVIDED. (ALL PCS / PERIPHERALS TO BE SET UP IN LAN CONFIGURATION, AS AND WHERE REQUIRED BY COA)
CO'S SHORE OFFICE WITH AC AND FULLY FURNISHED, 400 SQFT, WITH ATTACHED TOILET AND LANDLINE WITH STD ALL-IN -ONE-PC WITH MULTIFUNCTION COLOUR LASER PRINTER, LASER FAX MACHINE AND PAPER SHREDDER AND 01 BROAD BAND CONNECTION. ATTACHED DINING HALL WITH 4 CHAIRS.
FURNISHED AC OFFICE SPACE FOR HOD'S AND SHIPS OFFICERS (05 HODS, 15 OFFICERS) 06 ROOMS, 600SQFT EACH. WITH TOILET & TELEPHONE EXTENSION LINES IN EACH ROOM ALL-IN-ONE-PC WITH MULTIFUNCTION COLOUR LASER PRINTER, LASER FAX MACHINE AND PAPER SHREDDER AND 02 BROAD BAND CONNECTION
PROVIDE THREE STD LAND LINE TELEPHONE CONNECTION FOR RMT OF NSRY FOR REFIT DURATION
SIX CARTRIDGES TO BE PROVIDED FOR REFIT DURATION TO RMT OF NSRY
PROVIDE FOUR PCs(NOT OLDER THAN THREE YEARS) BRANDED/NOT ASSEMBLED, MINIMUM I5 PROCESSOR, SCREEN SIZE ATLEAT 20 INCHES, ATLEAST 8GB SINGLE RAM, WITH ORIGINAL WINDOWS 10 AND ABOVE AND ORIGINAL MS OFFICE FOR RMT(PLANNING & COMMERCIAL) OF NSRY. SPECS TO BE CONFIRMED FROM NSRY, KOCHI
PROVIDE INTERNET CONNECTION AT FOUR LOCATIONS AS INDICATED BY RMT OF NSRY FOR REFIT DURATION
TWO PRINTERS WITH EIGHT SUITABLE CATRIDGES AND ONE HEAVY DUTY COPIER/PRINTER WITH TWO SUITABLE TONERS ARE TO BE PROVIDED
02 NOS 40 INCH TV WITH DTH CONNECTION AT TWO SEPARATE LOCATIONS ARE TO BE PROVIDED
ONE OFFICE ASSISTANT/CLEANING STAFF FOR DAILY MAINTENANCE TO BE AVAILABLE 12 HRS IN A DAY FOR REFIT DURATION
STATIONARY, AS INDICATED BY RMT, IS TO BE PROVIDED FOR SMOOTH FUNCTIONING OF RMT(PLANNING & COMMERCIAL) OFFICE OF NSRY FOR Rs 30,000/- PER MONTH
FOLLOWING TO BE ENSURED FOR ALL ABOVE OFFICE SPACES (A) DRINKING WATER THROUGH RO/AQUAGAUARD WITHIN 50 M (B) SEPARATE TOILETS FOR OFFICERS AND CREW ARE TO BE PROVIDED WITHIN 50M (C) DAILY MAINTENANCE / CLEANING
PROVIDE ONE CHANGING ROOM WITH LOCKERS AND ATTACHED WASH ROOM FOR 10 NSRY(K) WORKERS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE 04 DATA ENTRY OPERATORS WITH 1-2 YEARS EXPERIENCE HAVING ADEQUATE COMPUTER KNOWLEDGE AND EXPERIENCE IN MS PROJECT, OFFICE(PPT, WORD, EXCEL, ETC). (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACTIVITIES) FOR PLANNING (02 NOS) & COMMERCIAL (02 NOS) DEPARTMENT OF NSRY. SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 1465/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT DATA ENTRY OPERATORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE 02 TECHNICAL SUPERVISIORS [RETIRED IN SAILORS (ERA/EAP) OR EACH WITH MINIMUM B.TECH WITH TWO YEARS EXPERIENCE IN SHIPYARD ] FOR PLANNING & COMMERCIAL DIVISION OF NSRY. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES). SALARY TO MATCH SHIPYARD ASSISTANT MANAGER LEVEL. (SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 2565/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT COORDINATORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS).
PROVIDE 02 REFIT COORDINATORS EACH WITH MINIMUM B.TECH WITH ATLEAST TWO YEAR EXPERIENCE. SALARY TO MATCH SHIPYARD ASSISTANT MANAGER LEVEL. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES) FOR RMT OF NSRY. PAYMENT AT ACTUALS.SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 2565/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT COORDINATORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE 03 ACCOUNTANTS CUM AUDITORS WITH ATLEAST BCOM DEGREE AND HAVING 2 YEARS EXPERIENCE IN ACCOUNTING AND AUDIT FOR HANDLING BILLS AND CONTRACTS FOR COMMERCIAL DEPARTMENT OF NSRY. (ADDITIONAL DAYS INCLUDED FOR PRE-REFIT AND POST-REFIT ACIVITIES) PAYMENT AT ACTUALS. SHIPYARD TO PROVIDE A PROOF OF MINIMUM WAGES OF RS 2198/- PER DAY (EXCLUDING EPF AND ESI CONTRIBUTION OF EMPOLYEE & EMPLOYER) PAID TO THE REFIT ACCOUNTANT-CUM-AUDITORS. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
ACCOMODATION FOR OFFICERS AND SAILORS(INCLUDING CONSERVENCY, HOT WATER, HOUSE KEEPING,LAUNDRY SERVICE AND FULYY FURNISHED RECREATIONAL AREA/ ANTE ROOM OFFICERS, SENIOR SAILORS & JUNIOR SAILORS). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
(a) AC DELUXE SUITS FOR CO AND 04 HODs, AC DELUXE ROOMS FOR 20 OFFICERS WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION.FULLY FURNISHED WITH ACCESSORIES AND CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION.TOTAL QTY -20, PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. )
(b) AC CABINS FOR 55 SENIOR SAILORS OF SHIP ON TWIN SHARING BASIS WITH ATTACHED TOILETS AND BATHROOMS. FULLY FURNISHED WITH ACCESSORIES, CABLE TV AND DISPLAY UNITS DURING REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS. QTY-30 )
AC DORMITORY FOR JUNIOR SAILORS (185 MEN) OF SHIP WITH ATTACHED TOILETS, BATHROOMS, FULLY FURNISHED WITH ACCESSORIES, CABLE TV AND DISPLAY UNITS DURING THE ENTIRE REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
AC DORMITORY FOR WOMEN AGNIVEER SAILORS (12) OF SHIP WITH ATTACHED TOILETS, BATHROOMS, FULLY FURNISHED WITH ACCESSORIES, CABLE TV AND DISPLAY UNITS DURING THE ENTIRE REFIT DURATION. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
AC DELUXE SUITS FOR OFFICERS OF PROJECT (REFIT) MOINTORING TEAM OF DOCKYARD WITH ATTACHED TOILETS AND BATHROOMS DURING REFIT DURATION. FULLY FURNISHED WITH ACCESSORIES AND CABLE TV WITH DISPLAY UNIT AT EACH ACCOMODATION, QTY -03. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
SINGLE AC CABIN WITH ATTACHED TOILET/BATH. FULLY FURNISHED WITH ACCESSORIES TV AND DISPLAY UNITS FOR REFIT REVIEW OFFICERS DEPUTED BY COA, QTY-5, PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
TWO ROOMS NEAR SAILORS ACCOMPODATION FOR FUNCTIONING OF SHIP'S BARBER SHOP AND DOBHI. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
THREE AIR-CONDITIONED AND FULLY FURNISHED ROOMS(14X14 FEET EACH)WITH 05 CUPBOARDS EACH FOR SETTING UP SICKBAY.PAYMENT AT ACTULS
CLEARNCE OF MEDICAL WASTE ON DAILY BASIS
SHIPYARD TO PROVIDE FULLY EQUIPED AMBULANCE ON SHORT NOTICE
PROVIDE TWO ONE TONNER TRUCK (WITH TRANSIT INSURANCE, PACKING AND LOADING) FOR TRANSPORTING SHIPS MATERIAL/SPARES FROM SHIPYARD TO MO(K)/NSRY(K) FOR 10 HRS/100 KMS PER DAY WHICHEVER IS LESS. REQUIREMENT FOR TRANSPORT WILL BE INTIMATED ONE DAY IN ADVANCE. PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
PROVIDE TWO FIVE SEATER AC CARS ONE EACH FOR FOR PROJECT OFFICER AND COMMERCIAL OF NSRY, KOCHI. (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2021, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS)
PROVIDE ONE FIVE SEATER AC CAR FOR VISITING OFFICERS (NSRY). (15 HRS/150 KMS PER DAY) (CAR REGISTRATION NOT TO BE OLDER THAN 2021, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES) PAYMENT AT ACTUALS
PROVIDE ONE SEVEN SEATER AC CAR FOR RMT(NSRY) (15 HRS/150 KMS PER DAY). (CAR REGISTRATION NOT TO BE OLDER THAN 2021, WHITE COLOUR, FITTED WHITE SEAT COVERS, SANITISATION DAILY, DRIVER TO BE WELL GROOMED AND MUST WEAR SHIRT, TROUSER AND SHOES WITH VALID POLICE CLEARANCE CERTIFICATE FOR DRIVERS)
TWO 05 SEATER AC CAR FOR SHIPS REFIT OFFICERS(EO) AND HODs (15 HRS/100 KMS PER DAY) (**CAR REGISTRATION NOT TO BE OLDER THAN 2021)/AVAILABLE DAY AND NIGHT
TWO AC BUS (52 SEATER) 15 HRS/150 KMS PER DAY).
PROVISION OF TWO MINI LORRY OF FOUR TONNE CAPACITY FOR TRANSPORTING SHIP'S MATERIALS/ITEMS/ SPARES.(15 HRS/150 KMS PER DAY). PAYMENT BASED ON THE ACTUAL DAYS AS PER WCC ON NOT EXCEEDING BASIS.
HULL - PART I
SURVEY THE FOLLOWING STRUCTURE IN ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 AS MENTIONED BELOW :- EXTERNAL UW HULL (A) 100% VISUAL SURVEY OF FULL UNDERWATER HULL AND BOOT TOP INCLUDING WIND AND WATER AREAS I.E. AREA UP TO 500MM ABOVE BOOT TOP AREA (B) 100% VISUAL SURVEY OF EXTERNAL UW HULL AND USG IN WAY OF MACHINERY COMPARTMENT NOTE:- EYE HOOKS IF USED FOR PROPELLER OR SHAFT REMOVAL/ FITMENT ARE TO BE REMOVED BEFORE UNDOCKING AND GROUND FLUSHED. PAD PIECES WITH FAIR EDGES MAY BE RETAINED EXCEPT THOSE WITH WATERJETS AND SURFACE DRIVES. SEA CHEST/ SEA TUBES/ UW INLETS/ OUTLETS AND OBDS (A) 100% VISUAL SURVEY AND ENDOSCOPY OF ALL SEA CHEST/ SEA TUBES/ UW INLETS/ OUTLETS AND OBDS. NOTE: (I) ALL SEATUBES ARE TO BE SURVEYED IRRESPECTIVE OF THEIR MATERIAL. DURING SURVEY OF SEA TUBES, SPECIFIC ATTENTION IS TO BE PAID TO THE NECK REGION. ALL BRANCH PIPES/ FLUSH THROUGH LINES WELDED TO SEA CHEST/SEATUBES ARE TO BE SURVEYED AS PART OF SEATUBES. IN CASE OF TALWAR CLASS OF SHIPS, THE RUBBER LINING OF THE SEA TUBE SHALL BE INSPECTED FOR ANY DETERIORATION AND WATER ENTRAPMENT. (II) CONDITIONAL ASSESSMENT OF BIMETALLIC JOINTS IS TO BE CARRIED OUT WHILST UNDERTAKING SURVEY OF THE SEATUBES. 100% ENDOSCOPY OF SEATUBES IS TO BE CARRIED OUT POST REPAIRS AND APPLICATION OF COATING PRIOR TO UNDOCKING OF THE SHIP. (III) SEA TUBES NOT ACCESSIBLE FOR SURVEY AND PAINTING BECAUSE OF SMALL DIAMETER ARE TO BE RENEWED. TANKS/TANK TOPS SPECIFIC DEFECTS PROJECTED BY SS. NOTE:- USG OF TANK TOPS MAY BE UNDERTAKEN FROM INSIDE THE TANK IN CASE OF DEGUTTING CONSTRAINTS, IF ANY. BILGES, COFFERDAMS, VOID SPACES SHAFT RECESS, AREA IN VICINITY OF SUCTION STRAINERS OF EDUCATORS (A) SPECIFIC DEFECTS PROJECTED BY SS (B) VISUAL SURVEY OF ALL INTERNAL ACCESSIBLE AREAS OF MACHINERY COMPT BILGES AND SPECIFIC DEFECTS PROJECTED BY SS IN OTHER COMPARTMENTS (FOR GROUP D SHIPS) NOTE: - IN THE CONTEXT OF HULL SURVEY MACHINERY COMPARTMENTS INCLUDE COMPARTMENTS WHICH ARE SHELL TOUCHING AND HOUSE MAIN MACHINERY INCLUDING ASP. INTERNAL UW HULL STRUCTURE & ABOVE WATER STRUCTURE (A) SPECIFIC DEFECTS PROJECTED BY SS*. (*SS TO UNDERTAKE ONBOARD HULL INSPECTION WITH SPECIAL ATTENTION TO DEFECT PRONE LOCATIONS AS PROMULGATED BY IHQ- MOD(N)/DNA AND AMENDED SUBSEQUENTLY BY AA. AND PROJECTS IN DL-II) NOTES: - (I) SS TO CHIP, CLEAN AND OFFER FOR SURVEY POST GAS FREE CERTIFICATION, WHEREVER APPLICABLE. SS TO RE-PRESERVE THE STRUCTURE ON COMPLETION OF SURVEY. (II) PAINT SCHEME IS TO BE RESTORED POST SURVEY/ RENEWAL IAW NO 53/16/ NCDS/ POLICY DIRECTIVES. (III) ABOVE ROUTINE AT NOTE (I) IS NOT APPLICABLE TO SOUND PROOF COMPARTMENTS, AVCAT AND AVPIN TANKS. (IV) DURING EACH REFIT, SURVEY TO BE COMPLETED AS PER NO 1/15 AND CHAPTER 43 OF INBR 2 AND REPORT TO BE FORWARDED AS PER INSTRUCTIONS CONTAINED IN NO 01/15. SUBSEQUENTLY TO BE RECORDED IN HULL MASTER RECORD. (V) FOR THE AREAS WHEREIN SAMPLE USG IS TO BE UNDERTAKEN, IT IS ESSENTIAL THAT THE SAMPLE AREA BE CHOSEN SUCH THAT IT TRULY REPRESENTS THE SUSPECT AREAS UNDER CHECK. SUCH AREA TO BE IDENTIFIED JOINTLY BY THE SHIP STAFF AND REFITTING AUTHORITY. (VI) ENHANCED HULL SURVEY NORMS FOR ESR MAY BE PROMULGATED SEPARATELY BY AA IF REFIT EXTENSION IS FOR STRUCTURAL RENEWAL.
CARRY OUT SURVEY AND INSPECTION OF ALL BOLLARDS (12 NOS)/FAIRLEADS (20 NOS)/ CLEATS (50 NOS)/ DECK EYES (40 NOS)/ STAGHORN (10 NOS) AND OTHER DECK FITTINGS STRUCTURE INCLUDING STIFFENING MEMBERS IN THE VICINITY WITH NON-DESTRUCTIVE TECHNIQUES, AND INCLUDE IN THE SURVEY REPORT. FOR TOWING AND CABLE CLENCH, CHECK THE EFFICACY OF THE ATTACHMENT USING NON-DESTRUCTIVE TESTING.
ALL TANKS (FWT - 09, FUEL TANK - 10, DIRTY OIL TANK-04, LUB OIL STORAGE TANK - 02, VOID SPACE - 01,PME & SME SUMP -02, BALLAST TANK - 01, AVCAT TANK-01) COFFERDAMS (02) AND SEA TUBES (02) WHICH ARE REPAIRED BY BUILD-UP/RENEWAL ARE TO BE AIR PRESSURE TESTED IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
ALL TANKS (FWT - 09 NOS, FUEL TANK - 10 NOS, DIRTY OIL TANK-04 NOS, LUB OIL STORAGE TANK - 02 NOS, VOID SPACE - 01 NOS,PME & SME SUMP -02 NOS, BALLAST TANK - 01 NOS, AVCAT TANK-01 NOS), COFFERDAMS (02 NOS) AND SEA TUBES (02 NOS) WHICH ARE REPAIRED BY BUILD-UP/RENEWAL OR ARE SUBJECTED TO HOT WORK FOR WELDING OF PAD PIECE/ FOUNDATION ON ANY OF THEIR BOUNDARIES ARE TO BE AIR PRESSURE TESTED. THE PRESSURE APPLIED SHOULD NEVER EXCEED THAT WHICH CORRESPONDS TO A PRESSURE OF 0.2 KG/SQ CM (2 METERS OF WATER OR 0.20 BARS OR 2.1/2 IBF/ SQ IN).NOTE: ALL OUTSTANDING DEFECTS AFFECTING WATER TIGHT INTEGRITY OF W/T COMPARTMENTS/ CLUSTERS/ TANKS, WHICH COULD NOT BE RECTIFIED DURING PREVIOUS OPERATIONAL CYCLE, ARE TO BE PROJECTED IN DEFECT LIST PART II.
REMOVE MARINE FOULING FROM ENTIRE UW EXTERNAL HULL AREA USING WOODEN SCRAPPER OR HYDRO JETTING WITH MAXIMUM PRESSURE NOT EXCEEDING 3000 PSI.
SCRAP AND CLEAN UNDER WATER AND BOOT TOPPING AREA (INCLUDING WIND AND WATER AREAS APPROX - 150 SQ M)) TO REMOVE ALL LOOSE PAINT FILM, RUST ETC. PAINT SCHEME REPAIR/ RENEWAL IS TO BE UNDERTAKEN IAW IHQ, MOD POLICY LETTER NC/0528/LLPS DATED 20 JUL 11 AND NCD 1491 ISSUE 1 OF MAY 11 AND SURFACE PREPARATION TO BE UNDERTAKEN IAW WITH NO 53/16. NOTE :- WIND AND WATER AREAS TO BE CONSIDERED UP TO 500MM ABOVE BOOT TOP.
CARRY OUT SURVEY OF EXTERNAL UW HULL STRUCTURE IN ACCORDANCE WITH NO 01/15 AND IHQ MOD (N)/ DNA LETTER NC/7631 DATED 01 NOV 22 AS FOLLOWS :- (A) 100% VISUAL SURVEY OF COMPLETE UNDERWATER HULL AND BOOT TOP INCLUDING WIND AND WATER AREAS I.E. AREA UP TO 500MM ABOVE BOOT TOP AREA (B) 100% VISUAL SURVEY OF EXTERNAL UW HULL AND USG IN WAY OF MACHINERY COMPARTMENT
EXCESSIVE AREAS OF BREAKDOWN OF ABRASIVE ANTICORROSIVE PAINTS TO BE BLASTED AND RECOATED WITH FULL PAINT SCHEME. PAINT SCHEME ON FULL UNDERWATER HULL AND BOOT TOP INCLUDING WIND AND WATER AREAS I.E. AREA UP TO 500MM ABOVE BOOT TOP AREA IS TO BE RESTORED (APPROX 150 SQ M). SURFACE PREPARATION TO BE UNDERTAKEN IAW WITH NO 53/16. PAINT SCHEME REPAIR/ REPAIRS IS TO BE UNDERTAKEN IAW IHQ, MOD (N) POLICY LETTER NC/0528/LLPS DATED 20 JUL 11 AND NCD 1491 ISSUE 1 OF MAY 11.
APPLICATION OF ONE COAT OF A/F PAINT ON UNDER WATER HULL (APPROX AREA- 1400 SQ M)AND BOOT TOP AREA (APPROX AREA -150 SQ M) TO BE CARRIED OUT POST ADEQUATE SURFACE PREPARATION BASED ON THE FINDINGS OF JOINT INSPECTION WITH OEM. PAINT TOUCH UP/ MAINTENANCE PAINTING TO BE CARRIED OUT IAW NO 53/16/ POLICIES/ NCD IN VOGUE.
PAINT SCHEME OF ALL TECHNICAL WINDOWS ABOVE WATER LINE TO BE RESTORED IAW NO 53/16. TEST AND TRIALS OF ALL RENEWED PLATES ARE TO BE CARRIED OUT IAW PARA 42 AND 43 OF NO 01/15.
CARRY OUT ABRASIVE BLASTING/SCRAPING TO BARE METAL OF AREAS OF CORROSION/ PAINT DAMAGE. RESTORE THE PAINT SCHEME AS PER SHIPS UW PAINT SCHEME IN ACCORDANCE WITH NO 53/16.
EXAMINE RUDDER STRUCTURE IN ACCORDANCE WITH NO 01/15, PAYING PARTICULAR ATTENTION TO HULL PLATING IN THE VICINITY OF RUDDER(S) AND FITTINGS UP TO THE RUDDER HEAD, FOR ANY SIGNS OF CORROSION AND ANY OTHER DEFECTS/ DAMAGE.
EXAMINE AND CHECK CLEARANCES OF LOWER AND UPPER BEARINGS OR BUSHES, WHICHEVER IS FITTED, OF RUDDER. RENEW/ REPACK RUDDER BEARINGS/ GLAND BUSHES, IF REQUIRED (BR 3000 ART. 2811 & BR 3001 ART. 2805 REFERS) . SS TO RECORD IN EMAP.
EXAMINE RUDDER PINTLE BEARINGS TO ENSURE THAT THEY ARE FULLY LUBRICATED BEFORE UNDOCKING.
MISSION CRITICAL EQUIPMENT CARRY OUT PRE DOCKING CHECKS, AT LEAST TWO WEEKS PRIOR TO DOCKING AND POST UNDOCKING CHECKS, WITHIN ONE WEEK OF UNDOCKING, WITH THE HELP OF YARD, TO CONFIRM THE STATE OF EACH ICCP ANODE, REFERENCE ELECTRODE AND ACU WHEN ALONGSIDE AND INITIATE CORRECTIVE ACTIONS RESPECTIVELY IAW PARA 22 OF NO 03/21. NOTE : (A) RESULTS OF PRE DOCKING CHECKS ARE TO BE FORWARDED AS PER FORMAT PLACED AT APPENDIX 'G'/H TO HITU, NMRL AND REFITTING AUTHORITY AND THE RESULTS OF POST UNDOCKING CHECKS ARE TO BE FORWARDED TO HITU ONLY.
MISSION CRITICAL EQUIPMENT UNDERTAKE DUMMY LOAD TEST/OPEN LOOP FULL LOAD TEST OF ACUS FITTED ONBOARD, AS PER INSTRUCTION CONTAINED IN CHAPTER 4 PARA 4.10 TO 4.13 OF INBR 372, WHENEVER SHIP IS IN DRY DOCK TO CONFIRM SATISFACTORY WORKING OF ACUS. NOTE:- OEM MANUAL IS TO BE REFERRED, IN CASE FOR MICRO-PROCESSOR CONTROLLED NEW GENERATION ACU WHICH HAVE LOW OUT PUT RIPPLE, IS FITTED. CHECKS TO BE PERFORMED AS PER PROCEDURE GIVEN IN APPENDIX ‘K’ OF NO 03/21.
MISSION CRITICAL EQUIPMENT CARRY OUT INSULATION RESISTANCE CHECKS OF ANODES(03) AND REFERENCE ELECTRODES (03) DURING DRY DOCKING CHECKS WITHIN TEN DAYS OF THE DOCKING OF THE SHIP IAW PARA 23 OF NO 03/21.
MISSION CRITICAL EQUIPMENT INSPECT THE STATE OF DI-ELECTRIC SHIELDS AROUND THE ANODES AND REFERENCE ELECTRODES FOR ANY MECHANICAL DAMAGE, UNDERTAKE REPAIR/ RENEWAL AS REQUIRED. PRESERVE THE DI - ELECTRIC SHIELD IAW NO 53/16.
MISSION CRITICAL EQUIPMENT OPEN, INSPECT AND CLEAN THE ICCP COFFERDAMS (06) DURING DRY DOCKING OF THE SHIP. TO PREVENT SEEPAGE OF WATER INTO COFFERDAM, THE CABLE ENTRY GLAND, CABLE EXIT GLANDS AND COFFERDAM LID SHOULD BE MADE WATERTIGHT. AS AN ADDITIONAL MEASURE, POTTING WITH IHQ APPROVED/ NMRL DEVELOPED HYDROPHOBIC COMPOUND IS TO BE CARRIED OUT AS PER PARA 26 OF NO 03/21.
MISSION CRITICAL EQUIPMENT INSPECT JUNCTION BOXES/ COFFERDAMS FOR SIGNS OF CORROSION AND WT INTEGRITY, ESPECIALLY ON COVER AND CABLE GLAND.
MISSION CRITICAL EQUIPMENT UNDERTAKE AIR PRESSURE TEST OF THE COFFERDAM POST STRUCTURAL REPAIR/ RENEWAL ON COFFERDAM STRUCTURE PRIOR FITMENT OF THE CABLE OF THE ANODE/ REFERENCE ELECTRODE, AS PER NORMS APPLICABLE FOR ANY COFFERDAM/ VOID SPACE ONBOARD.
MISSION CRITICAL EQUIPMENT CARRY OUT SERVICEABILITY CHECKS OF ACU BY REFITTING AUTHORITY AS PER PARA 22 OF NO 03/21.
MISSION CRITICAL EQUIPMENT SCRAPE THE SURFACE OF ARALDITE PUTTY FILLED IN RECESS OF SECURING BOLTS/ ANODES (03)/ REFERENCE ELECTRODES (03) WITH EMERY PAPER TO MAKE IT ROUGHENED AND APPLY FRESH COAT OF ARALDITE PUTTY IN THE RECESS AS A SAFEGUARD AGAINST ANY INSULATION FAILURE.
MISSION CRITICAL EQUIPMENT IN CASE OF BLASTING AND PAINTING OF SHIP’S HULL, THE ANODES/ ELECTRODES MUST BE SUITABLY COVERED/ MASKED TO ENSURE THAT THE PAINT DOES NOT FALL ON THE ELECTRODE SURFACES.
INSPECT SACRIFICIAL ANODES FITTED TO UNDER WATER HULL, RUDDERS, ROPE GUARD, SHAFT TUNNEL, STERN TUBES, INLETS AND OUTLETS, SEA TUBES, BILGES AND COFFERDAMS. RENEW THOSE CONSUMED 50% OR MORE. (MK XII - 09 NOS, MK IV - 07 NOS, MK V - 08 NOS, MK VI - 11 NOS). SACRIFICIAL ANODES ARE TO BE PROVIDED BY YARD
CLEAN REMAINING SACRIFICIAL ANODES WITH STEEL WIRE BRUSH. NOTE:- ENSURE SACRIFICIAL ANODES ARE NOT PAINTED. ANY PAINT OR COATING OVER THE ANODES IS TO BE SCRAPPED CLEAN BEFORE UN-DOCKING.
CARRY OUT THE 100 % VISUAL SURVEY OF INLETS AND DISCHARGES. CLEAN AND EXAMINE GRATINGS OF INLETS AND DISCHARGES (QTY-09). EXAMINE PLATING AND COATING OF INLETS AND DISCHARGES AND AREAS ADJACENT TO THEM. CARRY OUT REPAIRS AS REQUIRED AND PRESSURE TEST THE REPAIRED SEA TUBES.[NOTE:- VALVES ARE REQUIRED TO BE OPENED BY SS/YARD. SS TO CHIP, CLEAN AND PREPARE THE SURFACE AREA AND OFFER FOR SURVEY.]
PAINT ALL 09 INLETS AND DISCHARGES AS PER NO 53/16.
100% VISUAL AND ENDOSCOPY SURVEY OF SEA TUBES (QTY -02).CARRY OUT REPAIRS/RENEWAL AS REQUIRED AND PRESSURE TEST THE RENEWED/REPAIRED SEA TUBES.
REMOVE, CLEAN AND EXAMINE GRATINGS OF ALL UNDER WATER INLETS AND DISCHARGES (09). EXAMINE PLATING, COATING AND ZINCS OF INLETS AND DISCHARGES AND AREAS ADJACENT TO THEM. REPLACE GRATINGS POST COMPLETION OF REPAIR AND RECOAT WORK ON INLETS, DISCHARGES AND GRATINGS.
CARRY OUT 100% VISUAL SURVEY AND ENDOSCOPY OF ALL SEA CHEST(07)/ SEA TUBES(02)/ UW INLETS/ OUTLETS AND OBDS (20) FOR INTERNAL CORROSION, PITTING AND CRACKS ETC. SEA TUBES GRADED CRITICAL DURING THE PRECEDING REFITS ARE TO BE ULTRASONICALLY SURVEYED AND REPAIRED AS PER INSTRUCTION CONTAINED IN THE NAVY ORDER 01/15. UNDERTAKE AIR PRESSURE TEST OF ALL REPAIRED/ RENEWED SEA TUBES/SEA CHEST AND OBDS POST STRUCTURAL REPAIR/ RENEWAL. (FOR ALL SHIPS) NOTE: (I) ALL SEATUBES ARE TO BE SURVEYED IRRESPECTIVE OF THEIR MATERIAL. DURING SURVEY OF SEA TUBES, SPECIFIC ATTENTION IS TO BE PAID TO THE NECK REGION. ALL BRANCH PIPES/ FLUSH THROUGH LINES WELDED TO SEA CHEST/ SEATUBES ARE TO BE SURVEYED AS PART OF SEATUBES. IN CASE OF TALWAR CLASS OF SHIPS, THE RUBBER LINING OF THE SEA TUBE SHALL BE INSPECTED FOR ANY DETERIORATION AND WATER ENTRAPMENT. (II) CONDITIONAL ASSESSMENT OF BIMETALLIC JOINTS IS TO BE CARRIED OUT WHILST UNDERTAKING SURVEY OF THE SEATUBES. 100% ENDOSCOPY OF SEATUBES IS TO BE CARRIED OUT POST REPAIRS AND APPLICATION OF COATING PRIOR TO UNDOCKING OF THE SHIP. (III) SEA TUBES NOT ACCESSIBLE FOR SURVEY AND PAINTING BECAUSE OF SMALL DIAMETER ARE TO BE RENEWED.
ALL SEA CHEST/SEA TUBES (09) AND OBDS (20) WHICH ARE REPAIRED BY BUILD-UP/RENEWAL ARE TO BE AIR PRESSURE TESTED IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
RESTORE/RENEW PAINT SCHEME OF ALL UW SEA CHEST (07)/ SEA TUBES (02)/ OBDS (20) WITH APPROPRIATE PAINT SCHEME POST COMPLETION OF SURVEY AND REPAIR AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA TIME TO TIME. SEA TUBES REMOVED FOR REPAIR TO BE ABRASIVE BLASTED AND COATED WITH PAINT SCHEME PRIOR TO FITMENT. PLATES LAPS, WELDS ETC TO BE FAIRED WITH EPOXY PUTTY BEFORE APPLICATION OF PAINT. FOR FAC CLASS, SHIPS SEATUBES ARE TO BE PAINTED WITH SEPARATE PAINT SCHEME AS APPROVED BY IHQ/DNA.
EXAMINE MAST STRUCTURE, WHIP AERIAL PLATFORMS AND THE SURROUNDING STRUCTURE ON DECK, EYE PLATES, LOAD CARRYING MEMBERS FOR SIGNS OF CORROSION. EXAMINE BOLTED, RIVETED AND INTERMITTENT WELDED STRUCTURE CONNECTIONS FOR SIGNS OF FRACTURE. PORTABLE AND SEMI PORTABLE FITTINGS TO BE REMOVED FOR CLOSER EXAMINATION OF STRUCTURE UNDERNEATH. ANY KNOWN DEFECTS TO BE RAISED TO DOCKYARD FOR RECTIFICATION.
SURVEY AND TEST ALL STANDING & RUNNING RIGGINGS FITTED ON MAST STRUCTURE ALONG WITH ASSOCIATED FITTINGS. RENEW WIRE ROPES AND ASSOCIATED FITTINGS AS NECESSARY.
CARRY OUT LOAD TESTING OF EYE PLATES, BOTTLE SCREWS ETC IF DUE (NOT TO EXCEED 27 MONTHS).
SAMPLE VISUAL SURVEY OF DADOES OF BULKHEADS IN WET COMPARTMENTS AND RECTIFY DEFECTS OBSERVED ( FOR SHIPS IN CLASS D CATEGORY SHIPS).
EXAMINE FUNNEL CASING BOTH INTERNAL AND EXTERNAL, PAYING PARTICULAR ATTENTION TO PLATING AND PERFORATED SHEET, WIRE MESH ETC, CASING ON INTERNAL SIDE (IF APPLICABLE). PORTABLE OR SEMI PORTABLE FITTINGS THAT OBSCURE STRUCTURE ARE TO BE REMOVED FOR THE EXAMINATION OF STRUCTURE BEHIND. PROJECT THE SPECIFIC DEFECTS TO YARD FOR LIQUIDATION. STRUCTURE REVEALED POST REMOVAL OF SEMI PORTABLE FITTINGS TO BE PRESERVED IN ACCORDANCE AS PER NCD AND NO 53/16 AND POLICY LETTERS.
EXAMINE CONDITION OF PAINT COATING OF HELO /HANGER DECK FOR ANY DEFECTS. ALL PAINT DEFECTS ARE TO BE PROJECTED TO DYD POST INSPECTION OF PAINT CONDITION BY HITU. PAINT SCHEME REPAIR/ RENEWAL , IF ANY, IS TO BE UNDERTAKEN POST HYDRO-BLASTING / ABRASIVE BLASTING BY YARD AS PER NO/ NCDS/ POLICY LETTERS IN VOGUE. PAINT TO BE SUPPLIED BY YARD.
CARRY OUT LOAD TESTING OF DECK RINGS/ LASHING POINTS OF HELO DECK AND HELO HANGAR AS PER NCD 3910 AND NO (STR) 10/09. DECK RINGS BROKEN TO BE REPAIRED/ RENEWED AND RE-LOAD TESTED.
CARRYOUT VISUAL SURVEY OF ALL SAFETY NETS (19). IN CASE OF ANY DEFECTIVE/BER, THE SAME HAS TO BE . RENEW/ REPLACED WITH A NEW ONE.
INSPECT ALL MODULAR ACCOMMODATION FITTINGS LIKE BUNKS (180), LOCKERS (180), CABINETS (30), KIT LOCKERS (180) ETC FITTED IN MESS DECKS, CABINS AND OFFICES FOR ANY DEFECTS AND DAMAGES INCLUDING THEIR LOCKING SYSTEMS. PROJECT SPECIFIC DEFECTS TO YARD FOR RECTIFICATION. YARD TO UNDERTAKE DEFECT RECTIFICATION FOR THE SAME
EXAMINE LAGGING AND RAISE SPECIFIC DEFECTS TO YARD FOR RENEWAL OF DAMAGED LAGGING. YARD TO UNDERTAKE RENEWAL OF DAMAGED LAGGING POST REMOVAL OF DAMAGED LAGGING. SS TO RENEW PAINT SCHEME OF AFFECTED AREAS BEFORE RENEWAL OF LAGGING.
MISSION CRITICAL EQUIPMENT DISMANTLE TURNING OUT MECHANISM FROM THE BEVEL GEAR BOX, BOTTLE SCREW, GRAB SCREW AND EXAMINE THE CONDITION OF THRUST BEARINGS, SLEEVES, GRAB SCREWS FOR SIGN OF CORROSION AND WEAR. REPAIR/RENEW AS NECESSARY. (TOTAL DAVITS - 04)
MISSION CRITICAL EQUIPMENT FIT BACK AND CHARGE WITH FRESH GREASE.
MISSION CRITICAL EQUIPMENT UNDERTAKE IN-SITU VISUAL INSPECTION INCLUDING DIMENSIONAL CHECKS, OF SUSPENSION LINK AND ASSOCIATED CONNECTING HOOK/ RELEASE GEAR OR OTHER FASTENINGS.NOTE: - LIMITS FOR WEAR DOWN TO BE RESTRICTEDBBFF IAW 2.13 OF INBR 1552.
MISSION CRITICAL EQUIPMENT ENSURE ANCHOR WINDLASS FOUNDATION BOLTS FOR TIGHTNESS. EXAMINE CONDITION OF HULL STRUCTURE AT WINDLASS MOUNTING AND ENSURE WATERTIGHT INTEGRITY.
MISSION CRITICAL EQUIPMENT REMOVE, EXAMINE AND REASSEMBLE THE FOLLOWING AS PER INSTRUCTION AND MAINTENANCE MANUAL:(A) CLUTCH SHIFTING ARRANGEMENT.(B) SPOOLING GEAR ASSEMBLY.
MISSION CRITICAL EQUIPMENT OPEN UP GEAR BOX AND EXAMINE GEAR TEETH AND BEARINGS FOR DAMAGE/WEAR. RENEW AS NECESSARY.
MISSION CRITICAL EQUIPMENT A VCI-111 EMITTER IS INSTALLED IN THE BOX.THIS EMITTER SHOULD BE REPLACED AT INTERVAL OF 24 MONTHS AS AND WHEN THE CONTROL BOX IS OPEN OR IF THE BOX IS LEFT OPEN FOR ANY LENGTH OF TIME.
MISSION CRITICAL EQUIPMENT SURFACE PREPARATION BY HYDRO BLASTING OF THE ANCHORS(02), CHAIN CABLE(14 FULL AND 08 HALF SHACKLE)) AND ASSOCIATED ACCESSORIES(BOTTLE SCREW SLIP-02, BLAKE SLIP-02,LUGGLESS JOINING SHACKLE-30, D SHACKLE - 04, SWIWEL PIECE-02, RIDING SLIP-02,) IS TO BE CARRIED OUT PRIOR TO UNDERTAKING VISUAL SURVEY.
MISSION CRITICAL EQUIPMENT CARRY OUT SURVEY OF ALL STOPPER ASSEMBLIES BY REMOVING THE JOINING SHACKLE AND OPEN UP THE PELICAN HOOK. HAMMER TEST ALL PARTS OF THE STOPPER ASSEMBLY, INCLUDING EACH CHAIN CABLE LINK AND THE PELICAN HOOK. VISUALLY EXAMINE ALL PARTS OF THE STOPPER ASSEMBLY FOR CRACK AND DISTORTION. CHECK PELICAN HOOK, BUCKLER LINK FOR OPERATION AND EASE OF MOVEMENT AND ABILITY TO SECURE THE PELICAN HOOK. IF THE BUCKLER LINK IS DIFFICULT TO OPERATE, IT MUST BE MADE WORKABLE BY CLEANING AND GREASING THE PIN. EXAMINE FOR CORROSION, PARTICULARLY IN STRESS AREAS. IAW NO 02/21. (IF REPAIR OF BLAKE SLIP AND BOTTLE SCREW SLIPS IS NOT FEASIBLE WHEN LINKS ARE FOUND EXCESSIVELY CORRODED, PARTED OR IF CHAIN IS MISSING, THE ITEM IS TO BE DECLARED UNSERVICEABLE.) NOTE: - SS TO DISCONNECT STOPPER ASSEMBLIES AND LAND THEM AT SHOP FLOOR.
MISSION CRITICAL EQUIPMENT UNSCREW BOTTLE SLIP/ COMPRESSOR WHEREAS FITTED TO ITS FULLEST EXTENT AND THOROUGHLY CLEAN AND GREASE THREADS BEFORE ASSEMBLY.
MISSION CRITICAL EQUIPMENT UNDERTAKE SURVEY OF ADAPTER PIECE FOR CRACKS OR WEAR AND UNDERTAKE REPAIR AS PER NO 02/21.
MISSION CRITICAL EQUIPMENT SURVEY ALL DECK FITTINGS ASSOCIATED WITH ANCHOR CHAIN CABLE ARRANGEMENT IE DECK EYES/ EYE PLATES INCLUDING GULLETINE/ GULLETINE ROLLER, COMPRESSOR WITH COMPLETE STRUCTURE WHEREAS FITTED PAYING PARTICULAR ATTENTION EYE PLATES/ EYE BOLTS ETC FOR WEAR, CORROSION/ DETERIORATION AND OVALITY OF HOLE. UNDERTAKE REPAIR/ RENEWAL IAW NO 02/21.
MISSION CRITICAL EQUIPMENT SURVEY ANCHOR(02), CHAIN CABLE(02), SWIVEL ADAPTOR(04), SHACKLES(30) AND ALL ASSOCIATED FITTINGS(BOTTLE SCREW SLIP-02, BLAKE SLIP-02,LUGGLESS JOINING SHACKLE-30, D SHACKLE - 04, SWIWEL PIECE-02, RIDING SLIP-02,DECK CLENCH-02) AN EXPERIENCED DOCKYARD BLACKSMITH IS TO ASSIST THE SURVEY).BREAK, CLEAN AND GREASE ALL JOINING SHACKLES. UNDERTAKE REPAIR/ RENEWAL AS APPLICABLE IAW NO 02/21. FORWARD A REPORT ON IN 305/ NSO 269(B) TO AUTHORITIES AS MENTIONED IN PARA 15 OF NO 02/21.
SURVEY AND RENEW SUSPECT SAFETY NETS IF NOT CARRIED OUT DURING LAST 3 YEARS. SS TO MAINTAIN RECORD OF SURVEY AND RENEWALS. QTY - 19 NOS
MISSION CRITICAL EQUIPMENT CLEAN DAMPERS(APPROX.18 NOS) AND FAN IMPELLERS(7 NOS). INSPECT FAN IMPELLERS AND UNDERTAKE OPERATIONAL CHECKS OF DAMPERS. RAISE SPECIFIC DEFECTS TO YARD, IF ANY.
WHERE THE GREASE FILTERS CONSIST OF A SINGLE SHEET OF COPPER IN THE GAUGE FRAME WHICH SLIDES INTO A HOUSING IN THE EXHAUST TRUNKINGS (SOME SHIPS MAY HAVE GAUGE BOXES FITTED IN THE CANOPIES) THE PORTABLE SECTION OF THE LINING BETWEEN THE FILTER AND THE EQUIPMENT SERVED IS TO BE REMOVED AND THE INTERNAL SURFACES OF PORTABLE, CANOPY AND TRUNKING THOROUGHLY CLEANED. CARRYOUT RANDOM CHECKS TO CONFIRM NECESSITY OF INTERNAL SURFACE CLEANING.
BLOW THROUGH OF TRUNKING WITH AUTOMATIC ROBOTIC CLEANING BE UNDERTAKEN TO VENTILATION TRUNKINGS OBSERVED CLOGGED / DIRTY AS INDICATED BY SS.
RENEW AIR FILTER ELEMENTS / PADS/ FRAMES. QTY- 21 NOS
UNDERTAKE REMOVAL, OVERHAULING AND FITMENT OF MOTORIZED VALVES/ OTHER VALVES OPERATED IN MANUAL OR PNEUMATICALLY AS INDICATED BY SHIP MAXIMUM UPTO 25%. POST FITMENT, UNDERTAKE OPERATION CHECKS THAT LIMIT SWITCHES/ INDICATORS OPERATE IN CORRECT POSITION IN BOTH END POSITIONS.
EXAMINE THE INTERIOR OF HOT WATER AND FRESH WATER EXPANSION TANKS FOR CORROSION(QTY- 10 NOS). RAISE SPECIFIC DEFECTS AS NECESSARY.
STRIP EXAMINE AND REFIT 50% OF FOLLOWING:- (A) DISCHARGE VALVES(06) (B) NON GEARED STORM VALVES(12) (D) PLUG COCK VALVES(16) (E) RENEW WORN OUT LEATHER SEATINGS (06).
EXAMINE AND REFIT PORTABLE PUMP DISCHARGE OVER BOARD VALVES AND CONNECTIONS(QTY - 06 NOS).
EXAMINETHE STRUCTURE OF ALL AVCAT TANKS FOR PITTING, CORROSION AND OTHER STRUCTURAL DEFECTS AND DAMAGE. PROJECT SPECIFIC DEFECTS TO YARD FOR RECTIFICATION. EXTERIOR SURFACES OF TANKS SURVEYED DURING PERIODICAL SURVEY OF STRUCTURE TO BE INCLUDED IN DEFECT LIST TOGETHER WITH A LIST OF ITEMS/FITTINGS AND MACHINERY WHICH WILL BE REQUIRED TO BE LIFTED/ DEGUTTED TO FACILITATE SURVEY. YARD TO UNDERTAKE DEFECT RECTIFICATION.
EXAMINE PRESERVATIVE COATING OF TANKS. PROJECT SPECIFIC DEFECTS TO YARD. YARD TO RESTORE PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE. NOTE: INSPECTION OF PAINT OEM BE CARRIED OUT WHEREVER APPLICABLE.
UNDERTAKE PRESSURE TESTING OF AVCAT TANKS WHICH ARE REPAIRED BY BUILD-UP/ RENEWAL IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
EXAMINE THE STRUCTURE OF ALL FUEL/LUB OIL TANKS INCLUDING TANK TOPS FOR PITTING, CORROSION AND OTHER STRUCTURAL DEFECTS AND DAMAGE. PROJECT SPECIFIC DEFECTS TO YARD FOR RECTIFICATION. EXTERIOR SURFACES OF TANKS SURVEYED DURING PERIODICAL SURVEY OF STRUCTURE TO BE INCLUDED IN DEFECT LIST TOGETHER WITH A LIST OF ITEMS / FITTINGS AND MACHINERY WHICH WILL BE REQUIRED TO BE LIFTED TO FACILITATE SURVEY.(QTY- 14 NOS)
EXAMINE PRESERVATIVE COATING OF TANKS. PROJECT SPECIFIC DEFECTS TO YARD. YARD TO RESTORE PAINT SCHEME IN ACCORDANCE WITH NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE. NOTE: INSPECTION OF PAINT OEM BE CARRIED OUT WHEREVER APPLICABLE.NOTE: INSPECTION OF PAINT OEM BE CARRIED OUT WHEREVER APPLICABLE.(QTY- 14 NOS)
UNDERTAKE PRESSURE TESTING OF FUEL (10 NOS)/ LUB OIL(04 NOS) TANKS WHICH ARE REPAIRED BY BUILD-UP/ RENEWAL IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
EXAMINE PRESERVATIVE COATING OF TANKS. PROJECT SPECIFIC DEFECTS RELATED TO YARD. YARD TO RESTORE PAINT SCHEME IAW NCD 1491, NO 53/16 AND POLICY DIRECTIVE ISSUED BY IHQ/DNA AS APPLICABLE. NOTE: (A) INSPECTION OF PAINT OEM BE CARRIED OUT WHEREVER APPLICABLE (B) GALVANISED LADDERS ARE NOT TO BE PAINTED. ENSURE THAT SUCTION STRAINER BOXES ARE CLEAR. (C) THE SURFACE PREPARATION WORK AND PAINTING INTERIORS OF FRESH WATER AND DISTILLED WATER TANKS IS REQUIRED TO BE UNDERTAKEN BY HEALTHY PERSONNEL, WEARING CLEAN OUTFITS. ON COMPLETION, OF PAINTING, EACH TANK SHOULD BE INSPECTED TO ENSURE THAT THE COATING/ PAINT FILM COMPLETELY COVERS THE SURFACE, WITH PARTICULAR ATTENTION TO PARTS OF THE STRUCTURES WHICH ARE NOT READILY VISIBLE. (D) THE MINIMUM TIME FOR FILLING THE FRESH WATER TANK IF FRESHLY COATED SHOULD BE 7 DAYS. THE TANKS SHOULD BE WASHED OUT WITH FRESH WATER AND ANY SEDIMENT OR DIRT PRESENT SHOULD BE REMOVED AND THE COVERS ARE CLOSED BEFORE THE TANKS ARE BROUGHT INTO USE. (E) THE WATER SAMPLE FROM THE TANK AFTER 72 HOURS OF IMMERSION SHOULD BE SENT TO NMRL OR THE NAVAL DOCKYARD LABORATORIES FOR POTABILITY TEST PRIOR TO USE OF WATER FOR DRINKING PURPOSE.(QTY - 09 NOS)
UNDERTAKE PRESSURE TESTING OF FW TANKS WHICH ARE REPAIRED BY BUILD-UP/ RENEWAL IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.(QTY - 09 NOS)
UNDERTAKE AIR PRESSURE TESTING OF BALLAST TANK WHICH ARE REPAIRED BY BUILD-UP/RENEWAL IAW PARA 47 OF NO 01/15. NOTE:- THE PRESSURE TESTING IS TO BE CARRIEDOUT BY REFITTING AUTHORITY IN THE PRESENCE OF SHIP STAFF AND QC INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
UNDERTAKE VISUAL SURVEY OF ALL TANKS AND CHECK THE PAINT CONDITION OF ALL BALLAST/TRIMMING TANKS INCLUDING FITTINGS INSIDE THE TANKS FOR ANY PAINT DEFECTS/DETERIORATION. RESTORE/RENEW, WHICHEVER IS APPLICABLE, THE PAINT SCHEME OF AFFECTED AREA POST APPROPRIATE SURFACE PREPARATION.
EXAMINE THE CONDITION OF SACRIFICIAL ANODE (5 NOS) FITTED IN COFFERDAM AND VOID SPACES, IF ANY. UNDERTAKE RENEWAL OF SACRIFICIAL ANODES IF CONSUMED BEYOND 50%.
RESTORE PAINT SCHEME OF COFFERDAMS AND VOID SPACES IN ACCORDANCE WITH RELEVANT NO 53/16/NCD 1491/POLICY DIRECTIVES AND POST SURVEY AND RENEWAL.
UNDERTAKE PRESSURE TESTING OF ALL COFFERDAM (01 NO) AND VOID SPACES (04 NOS) WHICH ARE REPAIRED BY BUILD-UP/ RENEWAL IAW PARA 47 OF NO 01/15. THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QUALITY CONTROL INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES INCLUDING LOG AND ECHO SOUNDER COMPARTMENT.
UNDERTAKE AIR PRESSURE TESTING OF ALL SLUDGE AND BILGE TANKS (06 NOS) WHICH ARE REPAIRED BY BUILD-UP/RENEWAL IAW PARA 47 OF NO 01/15. NOTE: - THE PRESSURE TESTING IS TO BE CARRIED OUT BY REFITTING AUTHORITIES IN THE PRESENCE OF SHIP STAFF AND QC INSPECTORS OF THE REFITTING AUTHORITY. UNDER NO CIRCUMSTANCE, THE PROCEDURE OF RUNNING PRESSURE TEST IS TO BE USED TO CONFIRM THE STRUCTURAL INTEGRITY OF THESE SPACES.
WEIGH THE BOAT (05 NOS)AND COMPARE WITH IDEAL WEIGHT. RECORD THE SAME IN BOAT LOG BOOK. UNDUE INCREASE OF WEIGHT, IF ANY BE REPORTED FOR DETAILED EXAMINATION. (NOTE :- FOR SHORE UNITS EVERY TWO YEARS.)
FSWR SLINGS TO BE LOAD TESTED IAW INBR 1552. PERIOD OF TEST SHOULD NOT EXCEED 27 MONTHS.(NOTE :- FOR AFLOAT UNITS EVERY REFITS.)
CARRY OUT LEAK TEST OF FUEL TANK(04 NOS) BY LP AIR WITH ASSISTANCE FROM REPAIR YARDS. (NOTE :- FOR SHORE UNITS EVERY TWO YEARS.
EXAMINE ENTIRE GUARD RAIL ASSEMBLY VIZ GUARD RAIL STANCHIONS, PVC COATED WIRE, SS FITTINGS, EYE PLATES AND GUARD RAIL STANCHION HEEL FITTINGS . RAISE SPECIFIC DEFECTS TO YARD FOR RECTIFICATIONS.
REPLACE/RENEW DEFECTIVE/ BROKEN/ CORRODED EARTHING CONNECTIONS AS PROJECTED BY SS.
MISSION CRITICAL EQUIPMENT CALIBRATE THE OVER-LOAD MECHANISM OF STARTER.
MISSION CRITICAL EQUIPMENT CHECK CONTACT AND WIRING FOR WEAR/DETERIORATION. RENEW AS NECESSARY. JOB INVOLVES DISMANTLING OF ASSEMBLIES FOR INSPECTION AND BOXING UP POST INSPECTION/ REPAIRS.
MISSION CRITICAL EQUIPMENT EXAMINE ENTIRE ASSEMBLY INCLUDING BRAKE LINING, BRAKE SHOE, BRAKEDISC AND ASSOCIATED FITTINGS. RENEW BRAKE LINING AND SHOE OF EXCESSIVELY WORN DOWN.
MISSION CRITICAL EQUIPMENT SURVEY ALL WIRE ROPES,SPARE GEAR AND OTHER ASSOCIATED LIFTING GEARS. RENEW AS NECESSARY.
MISSION CRITICAL EQUIPMENT CARRY OUT SPM CHECKS ON ELECTRICAL MOTOR. LUBRICATE/REPLACE BEARING AS NECESSARY.
MISSION CRITICAL EQUIPMENT OVERHAUL ELECTRIC MOTOR SUBJECT TO QC CHECKS. CARRY OUT TRIALS ON COMPLETION OF REPAIRS.
MISSION CRITICAL EQUIPMENT OPEN SLEWING ASSEMBLY BEARING HOUSING AND INSPECT BEARING FOR PLAY. RENEW IF NECESSARY.
MISSION CRITICAL EQUIPMENT INSPECT THE WORM WHEEL ASSEMBLY FOR ANY WEAR AND PRESENCE OF METALLIC PARTICLES.JOB INVOLVES DISMANTLING OF GEARBOX ASSEMBLIES FOR INSPECTION AND BOXING UP POST INSPECTION/ REPAIRS.
MISSION CRITICAL EQUIPMENT CHECK OIL IN GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER.CHECK BEARINGS FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION.RENEW/REPAIR AS NECESSARY.JOB INVOLVES DISMANTLING OF GEARBOX ASSEMBLIES FOR INSPECTION AND BOXING UP POST INSPECTION/ REPAIRS.
MISSION CRITICAL EQUIPMENT RECORD VOLT/AMPS/SPEED PARAMETERS OF DAVIT AND ASSOCIATED SYSTEMS DURING LOAD TEST.RECORD LOAD TEST DETAILS.
MISSION CRITICAL EQUIPMENT CHECK BRAKE LINING ON WINCH AND CHANGE LINER IF DAMAGED.
MISSION CRITICAL EQUIPMENT CHECK ALL ROTATING PARTS, LEVER ETC FOR FREE MOVEMENT.
MISSION CRITICAL EQUIPMENT EXAMINE BRAKE LINING. RENEW BRAKE BAND IF EXCESSIVELY WORN DOWN.
MISSION CRITICAL EQUIPMENT OVERHAUL ELECTRIC MOTOR SUBJECT TO QC CHECKS. CARRY OUT TRIALS ON COMPLETION OF REPAIRS.
MISSION CRITICAL EQUIPMENT SURVEY ALL WIRE ROPES, SPARE GEAR AND OTHER ASSOCIATED LIFTING GEARS. RENEW AS NECESSARY.
MISSION CRITICAL EQUIPMENT CHECK OIL LEVEL IN REDUCTION GEAR CASE AND EXAMINE GEAR TEETH FOR BREAKAGE AND PRESENCE OF FOREIGN MATTER. CHECK BEARING FOR COLLAPSE AND SHAFT FOR RUST AND CORROSION. RENEW AND REPAIR AS NECESSARY.JOB INVOLVES DISMANTLING OF GEARBOX ASSEMBLIES FOR INSPECTION AND BOXING UP POST INSPECTION/ REPAIRS.
MISSION CRITICAL EQUIPMENT EXAMINE ASSOCIATED EYE PLATES AND STRUCTURE TO WHICH THEY ARE ATTACHED AND RENEW EYE PLATES IF DEFECTIVE.NOTE:-1. EXAMINE DAVIT FOR DEFECT BEFORE AND AFTER HANDLING THEIR NORMAL LOAD. WHEN DAVITS ARE USED FOR HANDLING AMMUNITION, EXAMINE ALSO AT INTERVALS DURING OPERATION.2. IF ANY PART EFFECTING THE STRENGTH OF LIFTING AND HANDLING EQUIPMENT BECOMES DEFECTIVE AND IS REPAIRED OR RENEWED, SHIP STAFF INSPECT BEFORE FURTHER USE AND ARRANGE FOR FURTHER STANDARD TEST AT FIRST OPPORTUNITY.3. INSPECT THE BRAKE LININGS, PINS, BUSHES, AND GEARS FOR WEAR AND TEAR.
MISSION CRITICAL EQUIPMENT UNDERTAKE IN-SITU VISUAL SURVEY AND EXAMINATION OF LIFTING AND ASSOCIATED CONNECTING HOOK/ FASTENING INCLUDING DIMENSIONAL CHECKS NOTE:- LIMITS FOR WEAR DOWN TO BE RESTRICTED IAW 2.13 OF INBR 1552.
MISSION CRITICAL EQUIPMENT SCRAP/ CLEAN RUSTED AREAS TO BARE METAL PRESERVE IN ACCORDANCE WITH NO 53/16. (ENSURE LUBRICATING POINTS AND MOVEABLE PARTS ARE NOT PAINTED). (QTY- 02 NOS)
MISSION CRITICAL EQUIPMENT CARRY OUT LOAD TESTING OF ACCOMMODATION LADDER AND ASSOCIATED FITTING AS PER NCD 3910 AND INBR 1552 (NOT EXCEEDING THAN 27 MONTHS)(QTY- 02 NOS)
PROVIDE NECESSARY INPUT ON WEIGHT OF ITEMS REMOVED/ REPLACED TO THE SHIP STAFF DURING REFIT WITH THE FOLLOWING DETAILS: -(A)WEIGHT OF EQUIPMENT/ COMPONENTS INCLUDING INSTALLATION MATERIAL BEING ADDED/ REMOVED AND ITEMS BEING DEGUTTED/ RE-GUTTED. IN CASE OF NON- AVAILABILITY OF DETAILS OF WEIGHT, ACTUAL WEIGHING OF ITEMS IS TO BE ENSURED.(B) CO-ORDINATES (X, Y, Z) OF CENTRE OF GRAVITY OF ALL WEIGHT ARE TO BE PROVIDED FOR RECORDING IN THE WEIGHT MANAGEMENT BOOK.
SCRUTINISE THE WEIGHT CALCULATION FORWARDED BY SS AND PROVIDE ASSISTANCE IN FINALISING THE POSITIONS OF ADDITIONAL WEIGHTS (IF REQD) FOR DOCKING/UNDOCKING.
MISSION CRITICAL EQUIPMENT EXAMINE THE COMPLETE STRUCTURE OF CRANES. RAISE SPECIFIC DEFECT FOR REPAIR/ RENEWAL THE WORN OUT/ DAMAGED STRUCTURAL PARTS OF THE CRANE.
MISSION CRITICAL EQUIPMENT EXAMINE THE OPERATION OF SOLENOIDS AND SOLENOIDS VALVE AND PROJECT THE DEFECTS FOR RECTIFICATION.
MISSION CRITICAL EQUIPMENT CHECK THE CONDITION OF ALL HYDRAULIC HOSES FOR WORN OUT/ LEAKSGE. RAISE SPECIFIC DEFECTS FOR REPLACEMENT OF THE HYDRAULIC HOSES AS REQUIRED.
MISSION CRITICAL EQUIPMENT EXAMINE THE FUNCTION OF PROXIMITY SENSORS, ENCODER AND LIMIT SWITCHES (03 NOS). UNDERTAKE REPAIR/ RENEWAL AS REQUIRED.
MISSION CRITICAL EQUIPMENT UNDERTAKE COMPLETE OPERATIONAL CHECKS OF FIXED/ PORTABLE ELECTRICAL CONTROL PANEL COMPONENTS. RAISE SPECIFIC DEFECTS TO YARD/ OEM FOR DEFECT RECTIFICATION.
MISSION CRITICAL EQUIPMENT UNDERTAKE OPERATIONAL CHECKS OF ELECTRICAL MOTOR (01 NO). CARRY OUT OVERHAULING OF ELECTRIC MOTORS IF REQUIRED.
SURVEY ALL UNDERWATER APPENDAGES/FITTINGS FOR PITTINGS, CORROSION OR ANY DAMAGE PAYING PARTICULAR ATTENTION TO PAINT FAILURE/DAMAGE AREA TO STERN SHAFT BRACKET, ROPEGUARD, EDDY PLATES, EDDY CONES, STERN TUBE, SKEG, BILGE KEEL PLATE, STABILIZER FIN ETC. IAW NO 01/15. UNDERTAKE REPAIR AS NECESSARY.
CLEAN TO BARE METAL ALL CORRODED AREA AND AREA OF PAINT FAILURE OF U/W APPENDAGES AND PRESERVED IN ACCORDANCE WITH NO 53/16 AND POLICY DIRECTIVES ISSUED BY NHQ/IHQ TIME TO TIME.
CHECK DRAUGHT MARKS ARE IN POSITION AND INTACT WITH SHIP STRUCTURE. (NES-164/DEFSTAN 02-164 & BR 3001 CHAPTER 28 ARTICLE 2811). UNDERTAKE PAINTING OF DRAFT MARKS AS PER NO 53/16 AND POLICY DIRECTIVES ISSUED BY IHQ/DNA FROM TIME TO TIME.
UNDERWATER FASTENINGS EXAMINE FAIRING OF UNDERWATER APPANDAGES FOR ROUGHNESS AND UNFAIRNESS OR ANY DAMAGE PAYING PARTICULAR ATTENTION TO SHAFT BRACKETS, ROPEGUARDS AND EDDY PLATES ETC. RENEWAL/REPAIR THE UNFAIRED/DAMAGED FAIRING FOR THEIR SMOOTHNESS.
RECOAT SHAFT BRACKETS IN ACCORDANCE WITH NO 53/16.
OPEN UP OR REMOVE AS NECESSARY AT LEAST 25% OF UNDERWATER VALVES AND FITTINGS FOR EXAMINATION OF VALVES AND ASSOCIATED SEA TUBES. POSITION OF INDICATING GEAR TO BE ADJUSTED TO AGREE WITH POSITION OF VALVE WHEN SHUT. ALL SECURING STUDS TO BE LIGHTLY TAPPED WITH HAMMER AND IF ANY STUD FAILS. ALL STUD IN THE SAME JOINT TO BE REMOVED AND REPLACED. ALL VALVES TO BE COMPLETED DURING EACH REFIT CYCLE IN CONJUCTION WITH NR 1.QTY 03 OUT OF 10
CARRY OUT 100% NDT OF THE WELD JOINTS OF BILGE KEEL OR PRESSURE TESTING OF BILGE KEEL.
INSPECT THE GEARBOX GEAR BACKLASH FOR ANY EVIDENCE OF EXCESSIVE WEAR OR DEFECT. RECTIFY AS NECESSARY.
UNDERTAKE OPERATIONAL CHECKS OF BPSPLB AND HAND HELD REMOTE CONTROL UNIT. PROJECT SPECIFIC DEFECTS TO YARD/OEM.
BROWS ARE TO BE EXAMINED, REPAIRED AS NECESSARY. UNDERTAKE LOAD TEST.
AFTER THE SRM MODULE IS RESET, CHECK THE MECHANICAL PULL STATION MECHANISM AS PER MAINTENANCE MANUAL CHAPTER 5 (PARA 8) UNDER ANNUAL MAINTENANCE.
DISCONNECT THE DISCHARGE PIPING FROM THE CYLINDER VALVE. USING AIR OR NITROGEN, BLOW OUT THE DISCHARGE PIPING AND MAKE SURE ALL THE NOZZLE CAPS HAVE BLOWN OFF. IF ANY NOZZLE CAP(S) FAILS TO BLOW OFF DURING TEST, CAREFULLY EXAMINE PIPING SYSTEM AND NOZZLE(S) TO DETERMINE CAUSE AND TAKE APPROPRIATE CORRECTIVE ACTION. NOTE – REPEAT TEST TO ASSURE BOTH PIPING SYSTEM AND NOZZLES ARE UNOBSTRUCTED.
RECONNECT THE DISCHARGE RELEASING MODULE OR VALVE CAP ASSEMBLY(S) TO THE APPROPRIATE CYLINDER VALVE(S) AND SECURE EACH WITH THE FOUR PROVIDED SCREWS. NOTE – (A) REFER TO PAGE 4-1 OR 4-2 OF OEM MAINTENANCE MANUAL.(B) REMOVE THE KEEPER PIN FROM THE SYSTEMS RELEASING MODULE, IF USED.
REMOVE NITROGEN ACTIVATION CYLINDER AND DISCONNECT THE SYSTEM RELEASING MODULE FROM THE CYLINDER VALVE FOR INSPECTION. RE-INSTALL THE NITROGEN ACTIVATION CYLINDER POST INSPECTION.NOTE – DO NOT LOSE OR DAMAGE THE INTERFACE GASKET BECAUSE IT WILL BE REQUIRED TO RECONNECT THE SRM. IF THE SRM IS MOUNTED REMOTELY, REMOVE ALL MODEL BFR-CAP(S), VALVE CAP ASSEMBLY FROM EACH OF THE CYLINDER VALVE(S) BY UNSCREWING THE FOUR MOUNTING SCREWS AND REMOVE THEM FROM THE CYLINDER VALVES(S).
CHECK SATISFACTORY OPERATION OF THE FUSIBLE LINK SYSTEM AS PER MAINTENANCE MANUAL (CHAPTER 5 PARA 3 AND 4, UNDER ANNUAL MAINTENANCE).
RE-INSTALL THE SYSTEM RELEASING MODULE COVER. NOTE - VERIFY THAT THE DATE ON THE CARTRIDGE IS VISIBLE IN THE VIEWING WINDOW.
INSTALL A NEW ACTUATION CARTRIDGE. NOTE – (A) BEFORE INSTALLING THE NITROGEN CARTRIDGE, IT IS NECESSARY TO MAKE SURE THAT THE ACTUATING PIN IS MOVING FREELY. INSERT THE ACTUATION PIN RESETTING TOOL INTO THE THREADED HOLE OF THE MANIFOLD MOUNTING BLOCK WHERE THE NITROGEN CARTRIDGE IS INSTALLED AND THEN REMOVE THE BFR-PRT.(B) PRIOR INSTALLING NITROGEN ACTUATION CARTRIDGE, THE INSTALLER SHALL INSPECT THE SEALING CAP FOR PUNCTURES OR OTHER DAMAGES AND VERIFY THAT THE CARTRIDGE WEIGHS MORE THAN THE STATED MINIMUM GROSS WEIGHT STAMPED ON THE CARTRIDGE. IF ANY EVIDENCE OF DAMAGES, PUNCTURE OR IF THE CARTRIDGE WEIGHS LESS THAN THE MINIMUM GROSS WEIGHT, RENEW THE CARTRIDGE.
HULL - PART II
SHIPYARD TO UNDERTAKE STEEL RENEWAL/BUILD UP AT INDICATED BY NSRY(KOC) TO REPAIR CORROSSION / UNDULATION / PITTING ETC AT ALL LOCATIONS INCLUDING TANKS / SEA TUBE / SEA CHEST / HULL PLATES/RUDDER / BRIDGE TOP SOFT PATCH / MACHINERY FOUNDATION PLATES/HAWSE PIPE / FIAR LEAD / BOLLARD ETC SHIPYARD TO QUOTE FOR NECESSARY DE-GUTTING / RE-GUTTING INCLUDING COST OF SPARES LIKE LAGGING ETC. COATING / PAINTING TO BE RESOTRED POST STEEL RENEWAL. PAYMENT BASED ON THE ACTUAL STEEL RENEWAL UNDERTAKEN AS PER WCC ON NOT EXCEEDING BASIS. APPROX 35 TONS OF STEEL RENEWAL ENVISAGED. ALL HOT WORK ARE TO BE UNDERTAKEN INCLUDING ALL SAFETY REQUIRMENT INCLUDING HOT WORK SENTRIES. (QTY- 60 TONS)
MISSION CRITICAL EQUIPMENT SHIPYARD TO UNDERTAKE COMPLETE OVERHAULING OF ANCHOR WINDLASS GEARBOX AND MOTOR SHAFT AND CABLE LIFTERS AND ENGAGING CLUTCH AND ASSOCIATED ACCESSORIES. ALL SPARES REQUIRED TO BE PROVIDED BY YARD. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST -3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING.(QTY- 01 NOS)
MISSION CRITICAL EQUIPMENT BRAKE LINING OF BOTH BAND BRAKES TO BE RENEWED. ITEM TO BE PROVIDED BY YARD. JOB INVOLVES DISMANTLING OF BRAKE ASSEMBLY AND FITMENT POST COMPLETION (QTY -02 NOS)
MISSION CRITICAL EQUIPMENT RENEWAL OF CONTROL PANEL ALONG WITH FOUNDATION OF ANCHOR WINDLASS TO BE UNDERTAKEN. JOB INVOLVES DEGUTTING AND REGUTTING OF CONTROL PANEL, WIRING, SWITCHES. MATERIAL TO BE SUPPLIED BY YARD. MAT - MS (QTY -02 NOS)
MISSION CRITICAL EQUIPMENT SHAFT COVERING PLATE - 2, BONNET COVER - 2 AND FISHER MAN PLATE - 2 CORRODED AT SCATTERED LOCATION AND TO BE MANUFACTURED AS PER SAMPLE AND FITMENT TO BE CARRIED OUT IN SITU. MATERIAL TO BE SUPPLIED BY YARD (2 SQM APPROX EACH). (MAT-MS, QTY -06 NOS)
DP TEST OF CABLE CLENCH IS TO BE CARRIED OUT. IF TEST FAILS NECESSARY REPAIR TO BE CARRIED OUT. POST COMPLETION OF REPAIR A CERTIFICATE TO BE ISSUED FOR THE SAME. MATERIAL AND SPARES TO BE SUPPLIED BY SHIPYARD (QTY -02 NOS).
FLUKE OF BOTH ANCHORS COMING INWARD WHILST HEAVING . REPAIR/ RENEWAL /OVERHAULING OF JAMMED CONNECTING SHAFT AND CROWN OF ANCHOR AND JAMMED SWIVEL PIECE. (QTY -02 NOS).
MISSION CRITICAL EQUIPMENT COMPLETE OVERHAULING OF ELECTRO HYDRAULIC DECK CRANE IS TO BE UNDERTAKEN INCLUDING HYDRAULIC PUMPS , MOTORS, CONTROL AND OPERATING PANEL. MANUAL OPERATION VALVES ARE TO BE RENEWED. ALL SPARES ARE TO BE PROVIDED BY YARD. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST-3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING (QTY - 01 NOS)
MISSION CRITICAL EQUIPMENT LEAKAGE OBSERVED FROM HYDRAULIC LINES DURING OPERATION. HYDRAULIC HOSES TO BE RENEWED WITH COUPLING.MATERIAL TO BE SUPPLIED BY YARD. OEM- PELLIGRINI (QTY -08 NOS)
MISSION CRITICAL EQUIPMENT FLUORESCENT RED PAINTING OF DECK CRANE ALPHABET MARKING PLATES IS TO BE UNDERTAKEN. PAINT IS TO BE SUPPLIED BY YARD (QTY - 06 NOS)
MISSION CRITICAL EQUIPMENT OPERATING PLATFORM ALONG WITH OVERHEAD SHED OF DECK CRANE CORRODED TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD. (MAT- ALUMINUM, QTY -01).
MISSION CRITICAL EQUIPMENT RENEWAL OF 10 MM STEEL WIRE ROPE OF 2.5 TON DECK CRANE TO BE UNDERTAKEN AND OEM AND INITIAL BREAK LOAD CERTIFICATE TO BE PROVIDED. SWR TO BE SUPPLIED BY YARD
COMPLETE OVERHAULING OF HYDROGRAPHIC DAVIT ALONG WITH ALL ACCESSORIES IS TO BE UNDERTAKEN INCLUDING RENEWAL OF ALL PULLIES (QTY- 04 NOS) AND SPRING (QTY- 02 NOS). ALL SPARES TO BE PROVIDED BY YARD. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST -3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING.
RENEWAL OF SPRING OF HYDROGRAPHIC DAVIT TO BE UNDERTAKE AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD. MAT - MS (QTY- 02 NOS)
SURVEY COMPLETE FOUNDATION OF HYDROGRAPHIC DAVIT. RENEW FOUNDATION IF NECESSARY. SECURING ARRANGEMENT OF THE DAVIT TO BE MADE ON CAPTAIN'S DECK. JOB INVOLVES REMOVAL AND RENEWAL OF MFMB LAGGING AND DEGUTTING REGUTTING OF OTHER ITEMS FOR HOT WORK. MATERIAL TO BE SUPPLIED BY YARD.(QTY- 01 NOS)
DAVIT SECURING WIRE ROPE ALONG WITH ALL ACCESSORIES TO BE RENEWED AS PER SAMPLE. ALL ITEMS TO BE PROVIDED BY YARD (MAT- 8 MM SWR, QTY -01)
MISSION CRITICAL EQUIPMENT COMPLETE OVERHAULING OF BOTH ACCOMMODATION LADDERS ALONG WITH ALL ACCESSORIES IS TO BE UNDERTAKEN BY YARD INCLUDING GEARBOX AND MOTOR (QTY- 04 NOS) AND PLATFORMS (QTY- 02 NOS) AND HANDRAILS (04 NOS). ALL SPARES TO BE PROVIDED BY YARD. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST-3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING
MISSION CRITICAL EQUIPMENT UPPER PLATFORM SECURING BRACKETS IN SHIP SIDE BROKEN SAME TO BE RENEWED AS PER SAMPLE. JOB INVOLVES REMOVAL AND RENEWAL OF MFMB LAGGING AND DEGUTTING REGUTTING OF OTHER ITEMS FOR HOT WORK (MAT- MS, QTY -2).
MISSION CRITICAL EQUIPMENT ACCOMMODATION LADDER HANDRAILS BROKEN SAME TO BE MANUFACTURED AS PER SAMPLE AND REFITTED. MATERIAL TO BE SUPPLIED BY YARD (MAT- AL, QTY -04).
MISSION CRITICAL EQUIPMENT ALUMINUM COVER OF MOTOR AND GEAR BOX DAMAGED. TO BE REPAIRED AS PER SAMPLE.MATERIAL TO BE SUPPLIED BY YARD (MAT - AL, QTY -02))
MISSION CRITICAL EQUIPMENT ACCOMMODATION LADDER STANCHIONS BROKEN ALONG WITH SS CHAINS (QTY- 15 NOS) SAME TO BE MANUFACTURED AS PER SAMPLE AND REFITTED. MATERIAL TO BE SUPPLIED BY YARD (MAT- AL, QTY -20).
MISSION CRITICAL EQUIPMENT RENEWAL OF 12 MM STEEL WIRE ROPE OF PORT AND STBD ACCOMMODATION LADDER TO BE UNDERTAKEN AND OEM AND INITIAL BREAK LOAD CERTIFICATE TO BE PROVIDED. SWR TO BE SUPPLIED BY YARD
MISSION CRITICAL EQUIPMENT OVERHAULING OF RIB DAVIT GEARBOX (QTY- 02 NOS), WIRE DRUM WINCHES SPOOLING GEAR AND ALL ASSOCIATED PULLEYS AND ALL OTHER ASSOCIATED ACCESSORIES TO BE UNDERTAKEN. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST-3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING. ALL SPARES ARE TO BE PROVIDED BY YARD. (QTY -01)
MISSION CRITICAL EQUIPMENT SERVICEABILITY CHECKS OF AUTOMATIC RELEASE HOOKS TO BE UNDERTAKEN AND CERTIFICATE TO BE ISSUED TO SHIP. OEM- PALFINGER (MODEL- CAR 35. QTY -03)
MISSION CRITICAL EQUIPMENT RENEWAL OF STEEL WIRE ROPE OF RHB DAVIT TO BE UNDERTAKEN. WIRE ROPE TO BE SUPPLIED BY YARD. INITIAL BREAK LOAD CERTIFICATE BY OEM AND DESTRUCTION CERTIFICATE TO BE PROVIDED BY YARD (QTY - 50 MTR)
MISSION CRITICAL EQUIPMENT HOISTING LIMIT SWITCH OF DAVIT BROKEN ALONG WITH MS ROD. SAME TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (QTY -01)
MISSION CRITICAL EQUIPMENT OVERHAULING OF GEMINI DAVIT GEARBOX (QTY- 02 NOS), WIRE DRUM WINCHES SPOOLING GEAR AND ALL ASSOCIATED PULLEYS AND ALL OTHER ASSOCIATED ACCESSORIES. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST-3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING. ALL SPARES ARE TO BE PROVIDED BY YARD. (QTY - 01)
MISSION CRITICAL EQUIPMENT RENEWAL OF STEEL WIRE ROPE OF GEMINI DAVIT TO BE UNDERTAKEN. WIRE ROPE TO BE SUPPLIED BY YARD . INITIAL BREAK LOAD CERTIFICATE BY OEM AND DESTRUCTION CERTIFICATE TO BE PROVIDED BY YARD (QTY - 50 MTR)
MISSION CRITICAL EQUIPMENT HOISTING LIMIT SWITCH OF DAVIT BROKEN ALONG WITH MS ROD AND CHAIN SAME TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (QTY - 01)
MISSION CRITICAL EQUIPMENT OVERHAULING OF SMB DAVITS GEARBOX (QTY- 04 NOS), WIRE DRUM WINCHES (QTY- 04 NOS) SPOOLING GEAR (QTY- 04 NOS) SUSPENSION HOOKS, TRACK WAY ROLLERS (16), ALL ASSOCIATED PULLEYS (32), BRAKES (08), HARBOR PINS (08) AND ALL OTHER ASSOCIATED ACCESSORIES. JOB INVOLVE DISMANTLING OF EQUIPMENT, ST-3 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING. ALL SPARES ARE TO BE PROVIDED BY YARD.
MISSION CRITICAL EQUIPMENT STEEL WIRE ROPE OF ALL FOUR SMB DAVITS RUBBING WITH AFT DAVIT ARMS. STEEL WIRE ROPE OF ALL DAVITS ALONG WITH PULLIES TO BE REMOVED AND ALIGNMENT OF ARMS AND PULLIES TO BE CHECKED. SURVEY OF STEEL WIRE ROPES IS TO BE UNDERTAKEN AND RENEW STEEL WIRE ROPES AND PULLIES AS NECESSARY. ALL ITEMS TO BE PROVIDED BY YARD (MAT - SWR, QTY - 420 MTRS)
MISSION CRITICAL EQUIPMENT SURVEY OF COMPLETE DAVIT FOUNDATIONS ALONG WITH PULLEY GUIDING TRACK IS TO BE UNDERTAKEN. REPAIR OR RENEWAL OF DAMAGED AREA IS TO BE UNDERTAKEN. ALL ITEMS TO BE PROVIDED BY YARD (MAT -MS, QTY -08)
MISSION CRITICAL EQUIPMENT ARM BRAKES OF SMB DAVITS CORRODED/ JAMMED. TO BE RENEWED INSITU. MATERIAL TO BE SUPPLIED BY YARD (MAT- MS. QTY -08 NOS)
MISSION CRITICAL EQUIPMENT HEAVY OIL LEAKAGE AND ABNORMAL NOISE OBSERVED FROM GEARBOXES OF ALL SMB DAVIT. DI/ DRTO BE UNDERTAKEN INSITU. ALL SPARES ARE TO BE PROVIDED BY YARD. JOB INVOLVES DISMANTLING OF GEARBOX AND BOXING-UP POST COMPLETION (QTY -04 NOS)
MISSION CRITICAL EQUIPMENT SPAN WIRE ROPE FITTED BETWEEN DAVIT ARMS (FOR SECURING LIFE LINE) TWISTED/ KINKED. TO BE RENEWED AND FITTED INSITU. MATERIAL TO BE SUPPLIED BY YARD (MAT -SWR 18 MM, QTY -04 NOS)
MISSION CRITICAL EQUIPMENT CABLE CONDUIT PIPE OF ALL FOUR SMB DAVITS DAMAGED , TO BE RENEWED AS PER DIMENSIONS. MATERIAL TO BE SUPPLIED BY YARD (QTY-08, MAT-MS DIMENSION- 50 MTR X1 INCH EACH)
MISSION CRITICAL EQUIPMENT SERVICEABILITY CHECKS OF BOTTLE SCREW SLIP OF ALL 04 SMB DAVITS TO BE UNDERTAKEN. RENEWAL TO BE UNDERTAKEN, IF FOUND DEFECTIVE (MAT - MS, QTY -16).
MISSION CRITICAL EQUIPMENT BOTTLE SCREW SLIP LOCKING PINS AND ROD FOR SECURING BOAT GRIPES ARE DAMAGED. TO BE RENEWED. JOB INVOLVES RENEWAL OF PINS AND TIGHTENING ROD (MAT - MS ROD, 10 LOCKING PINS AND 20 TIGHTENING RODS).
MISSION CRITICAL EQUIPMENT SECURING PIN ALONG WITH CHAIN BROKEN/ DAMAGED OF HARBOR PIN IN ALL SMB DAVIT . TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (MAT - SS, QTY -16 NOS)
MISSION CRITICAL EQUIPMENT REPLACEMENT OF SUSPENSION LINK OF ALL SMB DAVITS TO BE CARRIED OUT I.A.W. NHQ/DNA LETTER NC/1729 DATED 10 MAY 22 (MAT - CAST IRON, QTY - 08 NOS). ALL ITEM TO BE PROVIDED BY YARD
MISSION CRITICAL EQUIPMENT REPLACEMENT OF PLAFINGER MILLS HOOK FITTED ON ALL SURVEY MOTOR BOATS TO BE CARRIED OUT I.A.W. NHQ/DNA LETTER NC/1729 DATED 10 MAY 22. (OEM - PALFINGER, QTY - 08 NOS). ALL ITEM TO BE PROVIDED BY YARD
OVERHAULING OF AMMUNITION AND VICTUALLING DAVIT AND ALL OTHER ASSOCIATED ACCESSORIES IS TO BE UNDERTAKEN. ALL SPARES ARE TO BE PROVIDED BY YARD. (QTY- 02 NOS)
RENEWAL OF STEEL WIRE ROPE OF VICTUALLING AND AMMUNITION DAVIT TO BE UNDERTAKEN. WIRE ROPE TO BE SUPPLIED BY YARD . INITIAL BREAK LOAD CERTIFICATE BY OEM AND DESTRUCTION CERTIFICATE TO BE PROVIDED BY YARD (MAT - 8 MM SWR, QTY - 100 MTR)
MISSION CRITICAL EQUIPMENT COMPLETE OVERHAULING OF TELESCOPIC HANGAR IS TO BE UNDERTAKEN BY YARD INCLUDING ALL GEAR BOX, MOTORS, CONTROL PANEL, ALL OTHER ASSOCIATED FITTING AND MANUAL OPERATION. ALL SPARES ARE TO BE PROVIDED BY YARD. (QTY- 01 NOS)
MISSION CRITICAL EQUIPMENT ALUMINUM TRACK COVER OF TELESCOPIC HANGAR DAMAGED/PERISHED. TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (MAT - AL, QTY -08)
MISSION CRITICAL EQUIPMENT REPLACE HANGAR DOOR BOTTOM BAR WEATHER STRIP (SOFT NEOPRENE SEAL), CANVAS REINFORCED NEOPRENE STRIPS. ALL ITEMS OR SPARES ARE TO BE PROVIDED BY YARD.(QTY- 75 RMT)
MISSION CRITICAL EQUIPMENT BIMETALLIC JOINT OF TELESCOPIC HANGAR AND WT BULKHEAD CORRODED/ HOLED. TO BE RENEWED IN SITU. JOB INVOLVE SA2.5 PREPARATION OF THE AREA AND RENEWAL OF PLATE/ FRP AS NECESSARY (MAT – AL/ MS, QTY – 20 RMT)
MISSION CRITICAL EQUIPMENT COMPLETE OVERHAULING OF HANGAR SHUTTER TO BE UNDERTAKEN BY YARD INCLUDING OVERHAULING OF GEAR BOX, MOTOR, CONTROL PANEL AND ALL OTHER ASSOCIATED FITTINGS. JOB INVOLVE DISMANTLING OF EQUIPMENT, SA 2.5 SURFACE PREPARATION AND PAINTING OF EQUIPMENT AND CHARGING OF OIL POST OVERHAULING. SPARES, IF REQUIRED ARE TO BE PROVIDED BY YARD.(QTY - 01 NOS)
MISSION CRITICAL EQUIPMENT HANGAR SHUTTER SLAT CORRODED, HOLED AT 02 LOCATIONS. TO BE RENEWED INSITU. JOB INVOLVES DISMANTLING OF HANGAR SHUTTER, RENEWAL OF SLAT AND FITMENT POST RENEWAL OF SLAT. MATERIAL TO BE SUPPLIED BY YARD MAT - AL (QTY- 02 NOS)
MISSION CRITICAL EQUIPMENT WATER LEAKAGE OBSERVED FROM HANGAR TOP. SUSPECT GRP COATING DAMAGED. SAME IS TO BE RENEWED. MATERIAL TO BE SUPPLIED BY YARD APPROX. AREA - 30 SQMTR
RENEWAL OF HELO DECK PAINT IS TO BE CARRIED OUT. PAINT IS TO BE SUPPLIED BY YARD. (QTY - 220 SQ MTR)
DECK MARKING OF HELO DECK TO BE UNDERTAKEN AS PER NEW POLICY WITH FLORESCENT PAINT. FRICTION TEST OF HELO DECK TO BE PROVED AFTER PAINTING (QTY -30 SQ MTR)
RENEWAL OF SAFETY NETS OF HELO DECK AS PER SAMPLE IS TO UNDERTAKEN (MAT - PP ROPE, QTY -19 NOS), ALL ITEMS TO BE PROVIDED BY YARD
RENEWAL OF SAFETY NETS FRAME OF HELO DECK AS PER SAMPLE. MATERIAL TO BE PROVIDED BY SHIPYARD (MATERIAL- MS, QTY -20 NOS)
OVERHAULING OF THREE ROLLER FAIR LEADS TO BE UNDERTAKEN INSITU. JOB INVOLVES REMOVAL OF ROLLERS, THOROUGH GREASING OF SUB PARTS AND ASSEMBLING OF ROLLERS. ITEMS ARE TO BE SUPPLIED BY YARD. (QTY- 05 NOS)
MISSION CRITICAL EQUIPMENT HYDROPHOBIC POTTING COMPOUND TO BE FILLED IN ICCP ANODE AND RE COFFERDAMS I.A.W. NHQ/DNA NC/2614 DATED 14 DEC 23. MATERIAL TO BE SUPPLIED BY YARD (QTY- 06 NOS)
MISSION CRITICAL EQUIPMENT CALIBRATION OF PORTABLE ZN REFERENCE ELECTRODE TO BE UNDERTAKEN. RENEW IF FOUND DEFECTIVE (QTY - 01)
MULTIMETER NOT FUNCTIONING PROPERLY. TO BE RENEWED AND CALIBRATED. MATERIAL TO BE SUPPLIED BY YARD (QTY- 01 NOS).
MISSION CRITICAL EQUIPMENT OVERHAUL/ REPAIR OF FOLLOWING COMPONENTS OF FWD AND AFT STP VIEW FREQUENT TRIPPING AND MALFUNCTIONING: - (A) OVERBOARD PUMP - 2 NOS (B) MACERATOR PUMP - 2 NOS (C) IMO PUMP - 2 NOS (D) MIXER PUMP - 2 NOS (E) DOSIMETER PUMP - 2 NOS (F) BLOWER PUMP - 2 NOS (G) BOOKCELL - 02 NOS (H) CONTROL PANEL FUNCTIONAL CHECKS - 02 NOS (J) LEVEL SWITCHES OF V1 & V2 TANK - 04 NOS)
MISSION CRITICAL EQUIPMENT PVC PIPELINES OF FWD AND AFT STP CRACKED RESULTING WATER LEAKAGE IN COMPARTMENT. TO BE RENEWED IN SITU. MATERIAL TO BE SUPPLIED BY YARD (MAT - PVC, QTY - 20 RMT)
MISSION CRITICAL EQUIPMENT OBTAIN INTERNATIONAL SEWAGE POLLUTION PREVENTION CERTIFICATE VALID FOR DURATION OF FIVE YEARS FROM A STATE AUTHORISED ACCREDITED AGENCIES AS SPECIFIED IN MEPC 115(51) AND 227(64) FOR THE SHIP ADOPTED ON 01 APR 04 AS PER REGULATION 5 OF REVISED ANNEX IV OF MARPOL 73/78 (3930), ISSUE 3, SEP 16 IS RELEVENT.(QTY- 02 NOS)
MISSION CRITICAL EQUIPMENT SURVEY OF BOTH STP PLATFROM INCLUDING INACCESSIBLE AREAS AND REPAIR/ RENEWAL DEFECTIVE AREAS. JOB INVOLVES DEGUTTING AND REGUTTING OF STP PLANT. MATERIAL TO BE SUPPLIED BY YARD (MAT -MS,AREA - 25 SQM )
MISSION CRITICAL EQUIPMENT UNDERTAKE VISUAL SURVEY OF V1, V2 TANKS, DECLORINE TANK, THE CORRISION IS FOUND TO BE EXCESSIVE , UNDERTAKE USG SURVEY OF TANKS. RENEW FOUND DEFECTIVE. CARRYOUT CLEANING/ SURVEY OF TANKS AND UNDERTAKE REPAIRS IF NECESSARY. INSPECT THE INTERNAL AND EXTERNAL PAINT COATING AND RECORD WITH APPROPRIATE PAINT SCHEME AFTER COMPLETION OF REPAIRS AND SURFACE PREPARATION. (MAT - MS, QTY - 40 SQ MTR)
MISSION CRITICAL EQUIPMENT INSPECT FREENESS OF VENT LINE OF V1 AND V2 TANKS BY BLOWING THROUGH WITH AIR PROJECT DEFECT. RENEW FOUND DEFECTIVE (QTY - 80 RMT)
MISSION CRITICAL EQUIPMENT OVERHAULING OF FOLLOWING VALVES VIEW NOT HOLDING PROPERLY. ALL SPARES TO BE PROVIDED BY YARD (A) GATE VALVES (08 NO.) - 100 MM ECH (B) STP ISOLATING VALVE (04 NO.) - 100 MM EACH (C) OVERBOARD DISCHARGE VALVE (12 NO.) - 150 MM EACH (D) SEWAGE INLET ISOLATING VALVE (02 NO.) - 100 MM EACH (E) SEA WATER ISOLATING VALVES (05 NO) - 65 MM EACH
RENEWAL AND CALIBRATION OF FOLLOWING H2S SENSORS TO BE UNDERTAKEN VIEW SERVICE LIFE EXPIRE. CALIBRATION CERTIFICATE TO BE GIVEN POST COMPLETION. ALL ITEMS TO BE PROVIDED BY YARD (A) PORTABLE H2S SENSOR. QTY- 04 NOS, MAKE- GMI (B) FIXED H2S SENSORS. QTY - 04 MAKE VACMAN MX 32
CHEMICAL CLEANING OF FOUR ATUS AND THREE FCUS INCLUDING FILTERS CLEANING AND PRESSURE TESTING OF COOLING COILS IS TO BE UNDERTAKEN. DAMAGED IF ANY IS TO BE RECTIFIED. ALL SPARES ARE TO BE PROVIDED BY YARD.JOB INVOLVES DISMANTLING OF ASSEMBLY, FINS CLEANING AND FITMENT POST COMPLETION (QTY- 07 NOS)
CHECKS OF ALL BEARINGS, PULLEYS AND ALIGNMENT OF ALL FOUR ATUS TO BE UNDERTAKEN IN SITU. REPLACEMENT OF BEARINGS, PULLEYS TO BE UNDERTAKEN. OPEN AND CLEAN ALL IMPELLERS AND CHECKS FOR CORRECT OPERATION IS TO BE CARRIED OUT.(QTY- 04 NOS)
OUTLET TRUNKING OF ATUS (04 NOS) INCLUDING BELLOWS (INSIDE THE CASING) BROKEN/ DAMAGED/ PERISHED. TO BE RENEWED. JOB INVOLVES REGUTTING/DEGUTTING OF TRUNKING AND INSULATION. (QTY -20 RMT)
EXISTING AIR TREATMENT FILTER (04 NOS EACH) AND GREASE FILTERS OF SHIP'S GALLEY AND OFFICER'S GALLEY (10) BROKEN/DAMAGED. TO BE RENEWED AS PER SAMPLE.MATERIAL TO BE SUPPLIED BY YARD (QTY- 26 NOS)
ACOUSTIC PERFORATED SHEET IN ALL ATU COMPARTMENTS DAMAGED AND BROKEN TO BE REPLACED. MATERIAL TO BE SUPPLIED BY SHIPYARD. APPROX. AREA 300 SQ MTRS
CHEMICAL CLEANING OF VENTILATION TRUNKING TO BE UNDERTAKEN. JOB INVOLVES REGUTTING/ DEGUTTING OF TRUNKING, CHEMICAL CLEANING & PAINTING AND INSULATION. JOB INVOLVES REGUTTING/DEGUTTING OF TRUNKING AND INSULATION (QTY -430 RMT)
TRUNKING AT FOLLOWING LOCATIONS DAMAGED/PERISHED. TO BE RENEWED. (A) ATU1 & 2 LOBBY (B) CAPTAIN LOBBY (C) BRIDGE (D) JS DINNING HALL (E) SS DINNING HALL (F) DINNING HALL LOBBY ABOVE DB (G) WARDROOM LOBBY (H) SOR (J) 51 MEN MESS (K) PO MESS (L) WOMEN AGNIVEER MESS (M) GALLEY SERVERY (N) AMCO . JOB INVOLVES REGUTTING/ DEGUTTING OF TRUNKING AND INSULATION. TOTAL AREA APPROX. 120 RMT.
VERY LOW AIR FLOW OBSERVED IN MCPO MESS, 45 MEN MESS, 51 MEN MESS, 24 MEN MESS, SURVEY OPS ROOM, BRIDGE. TRUNKINGS TO BE OPENED AND CHEMICALLY CLEANED AND POSITION OF FLAPS TO BE ASCERTAINED. ADDITIONAL 10 FLAPS TO BE FITTED ON EXISTING TRUNKING FOR AIR BALANCING. CHECKS FOR MOTORS FOR OPTIMUM PERFORMANCE TO BE UNDERTAKEN. DAMAGE, IF ANY IS TO BE RECTIFIED. JOB INVOLVES REGUTTING/ DEGUTTING OF TRUNKING AND INSULATION.. ALL ITEMS TO BE PROVIDED BY YARD (QTY - 100 RMT)
VERY LOW AIR FLOW AND SUBOPTIMAL EXHAUST OBSERVED IN JSWC, JS BATHROOM, SSWC, SS BATHROOM, WOMEN BATHROOM, OFFICER WC, CAPTAIN WC AND NO WC. TRUNKING TO BE OPENED AND CHEMICALLY CLEANED AND POSITION OF FLAPS TO BE ASCERTAINED, CHECKS FOR MOTORS OPTIMUM PERFORMANCE TO BE UNDERTAKEN. DAMAGE, IF ANY IS TO BE RECTIFIED. ADDITIONAL FLAPS TO BALANCE AIR FLOW TO BE FITTED, IF REQUIRED. JOB INVOLVES REGUTTING/DEGUTTING OF TRUNKING AND INSULATION.. ALL ITEMS TO BE PROVIDED BY YARD (QTY - 100 RMT)
VERY LOW AIR FLOW AND SUBOPTIMAL EXHAUST OBSERVED IN AATA RICE STORE, OIL STORE, TINNED STORE, NBCD STORE, WARDROOM STORE, DRY PROVISION STORE, NAVAL STORE, FWD HYDRO STORE, BOSUN STORE, PAINT STORE AND LAUNDRY. TRUNKING TO BE OPENED AND CHEMICALLY CLEANED AND POSITION OF FLAPS TO BE ASCERTAINED, CHECKS FOR MOTORS FOR OPTIMUM PERFORMANCE TO BE UNDERTAKEN. DAMAGE, IF ANY IS TO BE RECTIFIED. ADDITIONAL FLAPS TO BALANCE AIR FLOW TO BE FITTED, IF REQUIRED. JOB INVOLVES REGUTTING/DEGUTTING OF TRUNKING AND INSULATION.. ALL ITEMS TO BE PROVIDED BY YARD.TOTAL AREA APPROX. 100 RMT.
EXHAUST OF SHIPS GALLEY FOUND BE SUBOPTIMAL. TRUNKING TO BE OPENED AND CHEMICALLY CLEANED AND DI/ DR TO BE UNDERTAKEN (QTY - 30 RMT)
SECURING ARRANGEMENT OF MOTOR ALONG WITH TRUNKING AND BELLOW PERISHED AT BOSUN STORE. TO BE RENEWED AND SECURED IN SITU. MATERIAL TO BE SUPPLIED BY YARD (MAT - MS/ CANVAS/ GI SHEET).(QTY - 01 NOS)
EXHAUST TRUNKING OF LAUNDRY DRIER DAMAGED/ HOLED. TO BE RENEWED AND SECURED. MATERIAL TO BE SUPPLIED BY YARD AREA APPROX. - 10RMT
DIFFUSERS AND PUNKHA LOUVERS BROKEN AT SCATTERED LOCATIONS. SAME TO BE RENEWED AS PER SAMPLE. ALL ITEMS TO BE PROVIDED BY YARD. (QTY- 120 NOS)
RENEWAL OF VENTILATION TRUNKING WIRE MESH AT SCATTERED LOCATIONS AND ATU FORCED SUPPLY MOTOR WIREMESH OF ATU NO 2 AND ATU NO 4 TO BE UNDERTAKEN AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (MAT - MS, QTY -35 NOS)
OVERHAULING OF MUSHROOM HEADS/ GOOSE NECKS/ ATU MAIN INLET AND EXHAUST TRUNKS TO BE UNDERTAKEN. JOB INVOLVES REGUTTING/DEGUTTING OF MUSHROOM HEADS/ GOOSE NECKS/ ATU MAIN INLET AND EXHAUST TRUNKS INCLUDING DECK PIECE FOR OVERHAULING/RENEWAL/PAINTING. NUTS/BOLTS, WIRE MESS, FLAPS AND OPERATING WHEELS ARE TO BE RENEWED. SPARES TO BE PROVIDED BY YARD (QTY -51)
RENEWAL OF DRAIN PIPES OF ALL THREE FCUS TO BE UNDERTAKEN. ITEMS TO BE PROVIDED BY YARD (MAT - CUNI) (QTY- 20 RMT)
RENEWAL OF CHILLED WATER LAGGING OF ALL THREE FCUS TO BE UNDERTAKEN. ITEMS TO BE PROVIDED BY YARD.(QTY- 30 SQMTR)
CHAIN CABLE MOVING AREA IN BOTH HAWSE PIPES WORN OUT SAME TO BE REPAIRED/RENEWED INSITU. JOB INVOLVES RENEWAL OF HAWSE PIPE AND RENEWAL OF PAINT SCHEME POST HYDRO JET BALLASTING. ALL ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 15 SQMTR)
CHAIN CABLE WASHING ARRANGEMENT INSIDE BOTH HAWSE PIPES CLOGGED. 06 HOLES TO BE MADE FOR THE SAME WITH GAS CUTTING TORCH. JOB INVOLVES RENEWAL OF FIREMAN LINES. SYSTEM IS TO PROVED TO SS. ALL ITEMS TO BE PROVIDED BY YARD. (QTY- 02 NOS)
AIR PRESSURE TESTING (APT) OF CLUSTER NO 1, 2,3,4,5,6,7,8,11,12, 13, 14 AND 15 TO BE PROVED IN PRESENCE OF HITU.
AIR HOSE TEST (AHT) OF CLUSTER NO 9 (MER) AND CLUSTER NO 10 (AER) TO BE UNDERTAKEN IN PRESENCE OF HITU.
HYDRAULIC DOOR CLOSURE MALFUNCTIONING TO BE REPLACED AT VARIOUS NWT DOORS. ITEMS TO BE PROVIDED BY YARD.(QTY- 45 NOS)
MORTISE LOCKS OF NWT DOORS BROKEN TO BE RENEWED AS PER SAMPLE. ALL ITEMS TO BE PROVIDED BY YARD. (MAT - GODREJ, QTY -45)
SLIDING DOORS FIXED RAILINGS, ROLLERS , RUBBER BEADING LOCKING ARRANGEMENT ( M/S GODREJ) FOUND DEFECTIVE AND NOT WORKING IN NWT DOORS OF PLOTTING ROOM-01, HOD'S CABIN-04 NOS, WT OFFICE-01, SICK BAY-01, MO'S CABIN-01, JOM MESSES-04 NOS), SR SAILOR'S MESSES-04 NOS. TO BE RENEWED IN SITU. ALL SPARES TO BE PROVIDED BY YARD (QTY - 18 NOS)
NWT DOOR ALONG WITH LOCKING ARRANGEMENT (M/S GODREJ) AT SCATTERED LOCATIONS UPROOTED/ DAMAGED. TO BE RENEWED AS PER SAMPLE. ALL ITEMS TO BE PROVIDED BY YARD (QTY - 40 NOS)
POWDER COATED PAINTING OF ALL NWT DOOR BE UNDERTAKEN. JOB INVOLVE DEGUTTING/ REGUTTING OF DOOR, PAINT REMOVAL AND POWDER COATING (QTY -93)
KICK OUT PANEL ON NWT DOOR DAMAGED. TO BE RENEWED AND FITTED INSITU. ALL SPARES TO BE PROVIDED BY YARD (QTY -25 NOS)
FOLDABLE DINING TABLE ALONG WITH CUSHIONED CHAIR DAMAGED/ UPROTTED IN JUNIOR AND SENIOR SAILOR DINING HALL. TO BE RENEWED IN SITU AS PER SAMPLE . ITEMS TO BE PROVIDED BY YARD (MAT - SS, QTY -18 NOS))
TROPHY/ BOOKS AND CROCKERY LOCKERS OF JUNIOR AND SENIOR SAILOR DINING HALL DAMAGED. TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (MAT - SS CRCA, QTY -08 NOS). ITEMS TO BE PROVIDED BY YARD. (QTY- 08 NOS)
UTENSIL RACK IN SHIP'S GALLEY, MCPO’S MESS, JSDH, SSDH, DAMAGED TO BE RENEWED IN SITU. JOB INVOLVES MANUFACTURING OF UTENSIL RACKS AND WELDING IN SITU WITH SUPPORTING BRACKETS.MATERIAL TO BE SUPPLIED BY YARD (MAT- SS, AS PER SIZE , DIMENTION- 1X1.5 MTR EACH RACK, QTY -08)
MASALA/ ITEMS CONTAINER LOCKER AND VEGETABLE CUTTING TABLE IN SHIP'S GALLEY/ OFFICER GALLEY/ OFFICER PANTRY DAMAGED/ DEFORMED. JOB INVOLVES CUTTING AND WELDING OF SUPPORTING BRACKET/ BASE AND FITMENT OF ITEMS IN SITU. ALL ITEMS TO BE PROVIDED BY YARD. (MAT-SS, QTY -14 NOS)
RACKS ALONG WITH SECURING ARRANGEMENT OF PAINT STORE, BOSUN STORE, DRY PROVISION STORE, TINNED STORE, AATA RICE STORE, WARDROOM STORE, OIL STORE, ENG. AND ELECTRICAL STORE CORRODED/ HOLED. TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD MAT- SS/CRCA. (QTY- 25 NOS)
MANUFACTURING AND FITMENT OF METALLIC RACK AND TABLE TOP WITH DRAWERS (AS PER DRAWING BY SS) AT CAPTAIN SECT./ CAPTAIN PANTRY AND SENIOR SAILOR PANTRY. WORK INVOLVE DEGUTTING/ REGUTTING OF LAGGING/ PANELING/ FITTING. MATERIAL TO BE SUPPLIED BY YARD (MAT -SS, QTY -10 NOS)
MANUFACTURING AND FITMENT OF FIREFIGHTING LOCKER BELOW LSO COMPARTMENT AS PER DRAWING FORWARDED BY SS. MATERIAL TO BE SUPPLIED BY YARD. (QTY- 01 NOS)
STOWAGE LOCKERS AND LOCKING ARRANGEMENT TO BE MADE AS PER DRAWING IN BOATSWAIN STORE AND PORT CATWALK FOR KEEPING LIFE JACKET. MATERIAL TO BE SUPPLIED BY YARD (MAT -SS) (QTY - 03 NOS)
TABLE TOP ALONG WITH DRAWER OF MCPO MESS/ HULL OFFICE/ CTO/ LAUNDRY/ MCR/ SICKBAY/ WTO DAMAGED. TO BE RENEWED AS PER SAMPLE PROVIDED BY SHIP STAFF. ITEMS TO BE PROVIDED BY YARD. (MAT - SS/CRCA, QTY - 12 NOS)
REPLACEMENT OF DAMAGED PANELS ALONG WITH INSPECTION WINDOE OF SHIP'S GALLEY TO BE UNDERTAKEN INSITU. JOB DEGUTTING/REGUTTING OF GALLEY EQUIPMENTS, DECK UNDERLAY, LAGGING AND OTHER ASSOCIATED FITTING. ALL ITEMS TO BE PROVIDED BY YARD (MAT -SS, QTY - 80 SQ MTR)
RO WATER PURIFIER CUM COOLER OF JSDH AND SSDH ALONG WITH FRESH WATER PIPES TO BE RENEWED AS PER SAMPLE . ITEMS TO BE PROVIDED BY YARD. JOB INVOLVES DEGUTTING/ REGUTTING OF FOUNDATION/ FRAMES AND LAGGING. (CAPACITY- 50 LTR/HR, MAKE WATER DOCTOR/ KENT, QTY - 02 NOS)
KENT RO WATER PURIFIER FITTED IN OFFICER GALLEY/ SHIPS GALLEY/ CAPTAIN PANTRY/ MCPO MESS AND DINING HALL NOT WORKING. TO BE RENEWED ALONG WITH SECURING ARRANGEMENT AND PIPE LINE AND FITTING. ALL ITEMS TO BE PROVIDED BY YARD. (MAKE - KENT GRAND STAR 9 LTRS, QTY - 05 NOS)
FOLLOWING DAMAGED IN MESS DECKS. TO BE RENEWED AND FITTED AS PER SAMPLE (MAT -CRCA) (A) KIT LOCKERS - 40 NOS (B) COMMON SHOE LOCKERS - 20 NOS (C) COMMON SOAP LOCKERS - 12 NOS (D) BUNK LEE RAILS - 60 NOS (E) BUNK LADDER - 15 NOS) (F) BOOK HOLDER (20 NOS) (G) BOTTLE GUARD (30 NOS) ITEMS TO BE PROVIDED BY YARD. JOB INVOLCE DEGUTTING/ REGUTTING OF LOCKERS AND OTHER ASSOSIATED FITTING
LOCKING ARRANGEMENTOF 60 IN NO.s MESS LOCKERS , 20 IN NOS CUPBOARDS AND 60 IN NO.s SHOE LOCKERS DAMAGED, TO BE RENEWED AS PER SAMPLE. JOB INVOLVES CHANGING AND FITMENT OF LOCKS. JOB INVOLVES FITMENT OF MAGNETIC CATCH. ALL ITEMS TO BE PROVIDED BY YARD. ( MAT- CRCA/ GODREJ, QTY -140)
SLIDING CHANNEL OF SHOE LOCKERS OF MESS DECK AND VARIOUS OFFICE SPACES DAMAGED/ UPROTTED. TO BE RENEWED AS PER SAMPLE, ALL ITEMS TO BE PROVIDED BY YARD (MAT - CRCA, QTY -80 NOS)
MANUFACTURING AND FITMENT OF BAGGAGE SECURING ARRANGEMENT ON SHIP SIDE FRAME IN MESS DECKS AS PER DRAWING PROVIDED BY SS . JOB INVOLVE DEGUTTING/ REGUTTING OF BUNKS/ LOCKERS/ LAGGING. MATERIAL TO BE SUPPLIED BY YARD. (MAT -MS, QTY 08 NOS)
RENEWAL OF THREE TIER BUNK IN PO MESS AND ARTIFICER MESS (11 SET). JOB INVOLVES DEGUTTING/ REGUTTING OF BUNK ALONG WITH GUARD LEE RAILS, SHOE LOCKER AND OTHER ASSOSIATED FITTINGS. MATERIAL TO BE SUPPLIED BY YARD. (MAT -CRCA, QTY -33 NOS)
RENEWAL OF TWO TIER BUNK IN CIVILIAN MESS (QTY-02 SET). JOB INVOLVES DEGUTTING/ REGUTTING OF BUNK ALONG WITH GUARD LEE RAILS, SHOE LOCKER AND OTHER ASSOSIATED FITTINGS. MATERIAL TO BE SUPPLIED BY YARD (MAT -CRCA, QTY - 04 NOS))
SOFAS OF MESS DECK/ HOD'S CABINS/ HULL OFFICE/ MCR/ GYRO DAMAGED. TO BE RENEWED AS PER SAMPLE . ITEMS TO BE PROVIDED BY YARD. (MAT - CRCA/ WOODEN, QTY - 15 NOS)
TV CABINET OF MESS DECKS/ HOD'S CABIN/ OFFICER'S CABINS/ DINING HALL DAMAGED. TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD. (MAT - CRCA/ WOODEN, QTY -15).
TWO TIER BUNKS OF NO CABIN, SHS AND ALL HOD CABINS UPROOTED/DAMAGED. TO BE RENEWED AS PER SAMPLE. QTY - 14, MAT-CRCA
FOLLOWING DAMAGED IN OFFICE SPACES. TO BE RENEWED AS PER SAMPLE (A) SLIDING FILE CABINETS - 20 NOS (B) COMPUTER KEYBOARD DRAWER - 20 NOS ITEMS TO BE PROVIDED BY YARD. (MAT - CRCA/ WOODEN, QTY -40 NOS).
EXECUTIVE CHAIR OF HOD'S CABINS/ OFFICE SPACES DAMAGED. TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD (QTY - 20 NOS
WOODEN CHAIR OF MESS DECKS/ WARDROOM DAMAGED. TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD (MAT - WOOD/ SS, QTY -20 NOS)
FOLLOWING WORK TO BE CARRIED OUT FOR REFURBISHMENT OF WARDROOM AS PER SAMPLE PROVIDE BY SHIP STAFF. ITEMS TO BE PROVIDED BY YARD - (A) RENEWAL OF COMPLETE PANELING (60 SQMTR) (B) RENEWAL OF WOODEN CABINET (04 NOS) (C) RENEWAL OF WOODEN CHAIR (08 NOS)AND DINING TABLE (1 NOS) (D) RENEWAL OF WOODEN BAR COUNTER AND ASSOCIATED FITTING (01 NOS) (E) RENEWAL OF CAP STAND/ SUCCESSION BOARDS (04 NOS) (F) RENEWAL OF EXECUTIVE SOFA (02 NOS) (G) RENEWAL OF TV CABINET ALONG WITH DRAWERS (01 NOS)
FOLLOWING WORK TO BE CARRIED OUT REFURBISHMENT OF CAPTAIN CABIN AS PER SAMPLE PROVIDE BY SHIP STAFF. ITEMS TO BE PROVIDED BY YARD - (A) RENEWAL OF COMPLETE PANELING (50 SQMTR) (B) RENEWAL OF CABINET/ CUPBOARDS (05 NOS) (C) RENEWAL OF WOODEN CHAIR (02 NOS) AND DINING TABLE (01 NOS) (D) RENEWAL OF EXECUTIVE SOFA (02 NOS) (E) RENEWAL OF CAP STAND/ SUCCESSION BOARDS (02 NOS). (F) RENEWAL OF TV CABINET ALONG WITH DRAWERS (01 NOS) (G) RENEWAL OF BUNK ALONG WITH SHOE LOCKERS (01 NOS) (H) WOODEN TROPHY CABINET (01 NOS)
VINYL FLOORING DAMAGED IN CAPTAIN CABIN AND WARD ROOM. TO BE RENEWED. APPROX. AREA 90 SQ MTRS. ITEMS TO BE PROVIDED BY YARD.
LIGHT WEIGHT DECK COVERING OF DRY COMPARTMENT DETERIORATED AT SCATTERED LOCATION TO BE RENEWED. FULL RENEWAL OF DECK UNDERLAY TO BE UNDERTAKEN. MATERIAL TO BE PROVIDED BY YARD. (APPROX. ARES- 400 SQ MTRS).
LIGHT WEIGHT DECK COVERING OF WET COMPARTMENT DETERIORATED AT SCATTERED LOCATION TO BE RENEWED. FULL RENEWAL OF DECK UNDERLAY TO BE UNDERTAKEN.( APPROX. AREA- 100 SQ MTRS). ITEMS TO BE PROVIDED BY YARD.
DADO CASTING DAMAGED AT SCATTERED LOCATION IN WET COMPARTMENT. TO BE RENEWED. APPROX. AREA- 150 RMT. ITEMS TO BE PROVIDED BY YARD.
CUPBOARDS DAMAGED IN ALL OFFICERS CABINS TO BE MANUFACTURED AND FITTED INSITU. (MAT-CRCA). ITEMS TO BE PROVIDED BY YARD.(QTY - 15 NOS)
WALLPAPER OF SENIOR SAILOR AND JUNIOR SAILOR DINING HALL DAMAGED. TO BE RENEWED. MATERIAL TO BE SUPPLIED BY YARD (QTY - 60 SQ MTR)
FOLLOWING WORK TO BE UNDERTAKEN IN SURVEY OPS ROOM/ BRIDGE. ALL ITEMS TO BE PROVIDED BY YARD. (A) CHAT TABLE AND SHS TABLE ALONG WITH DRAWERS UPROOTED/ DAMAGED IN SURVEY OPS ROOM AND BRIDGE. TO BE RENEWED AS PER SAMPLE (MAT - CRCA/ WOOD). (B) MANUFACTURING AND FITMENT OF COVER OF MB PIPE (MAT - CRCA, QTY - 20 RMT) (C) MANUFACTURING AND FITMENT OF WHITEBOARD ALONG WITH SECURING ARRANGEMENT (MAT - CRCA/ WOOD, QTY -02)
MANUFACTURING AND FITMENT OF SECURING ARRANGEMENT OF PRINTERS/ TV/ PC/ UPS/ NCN SWITCHES IN SURVEY OPS ROOM/ WTO/ CTO / MCR/ HULL OFFICE/ HOD'S CABINS AND ALLEYWAYS. MATERIAL TO BE SUPPLIED BY YARD (MAT - SS/CRCA, QTY - 40 NOS)
DRAINAGE ARRANGEMENT OF BOTH COLD AND COOL ROOMS DAMAGED TO BE REPLACED WITH NEW FITTINGS. JOB INVOLVES MANUFACTURING AND FITMENT OF DRAINAGE TRAY (MAT - SS), DRAIN PIPE (MAT - CUNI) AND RENEWAL OF 02 SCREW DOWN VS. JOB INVOLVES DEGUTTING AND REGUTTING OF METALLIC PLATE AND LAGGING. (AREA-02 SQM, LENGTH-10 RMT , QTY-02 NO.S). SUSPECTED CORROSION/THINNING OF COOL ROOM/COLD ROOM BULKHEAD/DADOE AREA. TO BE REPAIRED POST SURVEY. (QTY- 02 NOS)
LOCKING ARRANGEMENT AND CARRYING HANDLE AND CLIPS OF COOL AND COLD ROOM DAMAGED. TO BE RENEWED IN SITU. (MAT- SS, MAKE- GODREJ LTD, QTY -02)
DEGUTTING/ REGUTTING OF ALUMINUM CHEQUERED PLATE OF COOL AND COLD ROOM AND LOBBY VIEW WATER ACCUMULATION. PUF (POLYURETHANE FOAM) INSULATION TO BE RENEWED POST SURFACE PREPARATION. PLYWOOD TO BE RENEWED POST INSULATION AND CHEQURED PLATE TO BE FITTED. HEAT INPUT TEST TO PROVED POST COMPLETION OF ALL WORK
SCRATCH MARKS OBSERVED ON MIRROR OF BATHROOMS/ WCS/ ALLEYWAY/ MESS DECKS/ OFFICERS CABINS. TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD. (MAT - SS 304, QTY - 40 NOS))
HEAVY DUTY NON- SKID PLASTIC GRATINGS TO BE FITTED IN ALL WC AND BATHROOMS INSITU AS PER DIMENSION. MATERIAL TO BE SUPPLIED BY YARD. (QTY -120 SQ MTR)
STAINLESS STEEL WASH BASINS OF OFFICER'S AND SAILOR'S WC AND BATHROOM AND CABINS ALONG WITH FITTING AND DRAIN PIPES DAMAGED. TO BE RENEWED AS PER SAMPLE. JOB INVOLVE INSTALLATION OF NEW WASHBASIN ALONG WITH JAGUAR TAPS/ BOTTLE TRAP AND OTHER ASSOCIATED FITTING. ALL ITEMS TO BE PROVIDED BY YARD. (MAT - SS, QTY -12 NOS)
STAINLESS STEEL URINAL ALONG WITH FITTING AND DRAIN PIPE DAMAGED IN JSWC/ SSWC. TO BE RENEWED AS PER SAMPLE. JOB INVOLVE INSTALLATION OF NEW SS URINAL ALONG WITH ALL OTHER ASSOCIATED FITTING. ITEMS TO BE PROVIDED BY YARD. (MAT - SS, QTY -03 NOS)
STAINLESS STEEL ANGLO INDIAN WC DAMAGED/ HOLED IN JSWC/ SSWC/ WOMEN WC. TO BE RENEWED AS PER SAMPLE. JOB INVOLVE INSTALLATION OF NEW WC ALONG WITH ALL OTHER ASSOCIATED FITTING. ITEMS TO BE PROVIDED BY YARD. (MAT - SS, QTY -10 NOS)
JAGUAR CERAMIC WC OF CAPTAIN'S/ OFFICER'S/ NO'S/ SICKBAY WC BROKEN. TO BE RENEWED AS PER SAMPLE. JOB INVOLVE INSTALLATION OF NEW WC ALONG WITH ALL OTHER ASSOCIATED FITTING ITEMS TO BE PROVIDED BY YARD. (MAKE - JAGUAR, QTY -03 NOS)
WC SEAT COVERS DAMAGED/ BROKEN AT JSWC, SSWC AND OFFICER'S WC TO BE RENEWED. MATERIAL TO BE SUPPLIED BY YARD. (MAT-PVC, MAKE - JAGUAR, QTY -25 NOS)
FOLLOWING JAGUAR FITTINGS IN BATH ROOM/ WC DAMAGED TO BE RENEWED. (A) BIB COCK -15 NOS (B) SHOWER MIXING VALVES - 10 NOS (C) HAND WASH DISPENSER (3X6 INCH) - 15 (D) PILLAR COCK - 10 NOS (E) WASH BASIN BOTTLE TRAPS - 15 NOS (F) SHOWER CABINET OF OFFICERS BATHROOM- 03 (G) HEALTH FAUCET QTY -20, (H) SOAP TRAY (1 FEET) - 30, (J) SS HANGER 0.8 MTR - 30 NOS, (K) SSDOUBLE CLOTH HOOK - 40, (L) HAND BAR 0.5 MTR - 20, TOWEL HANGAR (0.5 MTR) - 30. ITEMS TO BE PROVIDED BY YARD. (MAT -SS, MAKE - JAGUAR, QTY - 238 NOS)
S/W FLUSHING ARRANGEMENT OF WCS DAMAGED/ BROKEN. TO BE REPLACED WITH NEW ARRANGEMENT. JOB INVOLVES RENEWAL OF FLUSHING LINE (MAT- CUNI), PRESSURE CONTROLLING GATE VS AND FLUSHING MECHANISM/ FLUSHING VS. ALL FITTINGS SHOULD SUSTAIN PRESSURE OF 8 BAR. CONNECTION TO BE FITTED WITH BOTH MAIN SUPPLY LINE AND COMMODE. CLAMPS TO BE WELDED FOR SECURING OF FLUSHING LINE. RUBBER BUSH TO BE USED FOR CONNECTION WITH THE COMMODE. (DIA - 2 INCH, MAKE - JAGUAR, QTY -30 NOS). MATERIAL TO BE SUPPLIED BY YARD
15 IN NO CUBICAL WCs PANEL DAMAGED AND DETERIORATED AND ARE TO BE RENEWED VIEW END OF SHELF LIFE. JOB INVOLVES CHANGING OF STAINLESS STEEL PANELS WITH INSPECTION WINDOW 250 mm ABOVE THE DECK LEVEL, ALONG WITH FITMENT OF LOCK, HOLDING FAUCET AND WATER TAP ARRANGEMENT OF CUBICLES. MATERIAL TO BE SUPPLIED BY YARD (QTY - 120 SQMTR)
DADO AREA OF WOMEN AGNIVEER BATHROOM/ WC CORRODED/ HOLED. TO BE RENEWED IN SITU. JOB INVOLVE REGUTTING/ DEGUTTING OF PANELING/ LAGGING/ DECK COVERING/ DADO CASTING. MATERIAL TO BE SUPPLIED BY YARD (QTY - 6 RMT)
PORTABLE WC/ URINAL CUBICLES FOR HOSPITAL SHIP AT QUARTERDECK TO BE SEPARATED. INDIVIDUAL FRESH WATER AND DRAINAGE CONNECTION TO BE PROVIDED TO EACH CUBICLE. ALL DOORS OF THE WASHROOM AND WC TO BE RENEWED. FIXED FRESH WATER LINE TO BE PROVIDED FOR PORTABLE WC/ URINALS MATERIAL TO BE SUPPLIED BY YARD (QTY - 06 NOS)
MANUFACTURING AND FITMENT OF NR STRETCHER BOX TO BE UNDERTAKEN AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (MAT - CRCA, QTY -10 NOS)
RENEWAL OF FRESH WATER PIPELINES FOR HOSPITAL SHIP CONVERSION AT QUARTERDECK TO BE UNDETAKEN. MAT- CU/NI, QTY-80 RMT. JOB INVOLVES CONNECTION AND SECURING OF FILLING LINE FOR PORTABLE WC AND URINALS. ALL PIPELINES AND ACESSORIES TO BE PROVIDED BY YARD.
RESERVE FW TANK OF WARDROOM PANTRY/ OFFICER GALLEY/ SHIP'S GALLEY/ JSDH/ SSDH/ BATHROOM/ WC/ BRIDGE TOP TANKS/ BAMBOO DECK TANK LEAKING ALONG WITH PIPELINES . TO BE RENEWED ALONG WITH ALL ASSOCIATED FITTING AND FOUNDATION AS PER SAMPLE (MAT-SS). JOB INVOLVE REGUTTING/ DEGUTTING OF PANELING/ LAGGING. ALL ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 12 NOS)
PULVERIZE WITH AUTO WATER DRAW SYSTEM TO BE FITTED IN ALL DINING HALLS AND PANTRIES AS PER MARPOL. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 06 NOS)
CRACK OBSERVED IN URINAL LINES OF SAILOR'S AND OFFICERS BATHROOM AND ATU DRAIN PIPE. SAME TO BE RENEWED AS PER SAMPLE. MAT- MS PIPE DIA-4''. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 22 RMT)
WATER LEAKAGE OBSERVED FROM WEATHER DECK DRAIN LINES SAME TO BE RENEWED AS PER SAMPLE( MAT- MS PIPE DIA-3''). ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 10 NOS)
DRAIN PIPE OF BOTH GALLEY, DINING HALLS AND PANTRY THINNED AND CHOCKED AT SCATTERED LOCATIONS. TO BE CHEMICALLY CLEANED, RENEW DEFECTIVE PIPES AND TO BE FITTED IN SITU WITH SECURING BRACKETS (MAT- MS)(APPROX. -70 RMT). SIZE- 100 MM
DECK DRAIN OF WEATHER DECK (MAT- MS) AND BETWEEN DECK (MAT- CUNI) CHOKED/ DAMAGED DUE TO ONSET OF CORROSION. ALL DRAIN PIPES TO BE CHEMICALLY CLEANED. THINNED AND DAMAGED PIPES TO BE MANUFACTURED. JOB INVOLVES REMOVAL AND FITMENT OF NEW PIPELINES WITH BRACKETS. DIA-100 MM LENGTH- 250 RMT
STRAINERS TO BE FITTED IN ALL DRAIN LINES TO PREVENT FROM CHOCKING. MAT- BRASS. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 40 NOS)
URINAL LINE OF JUNIOR SAILOR WC/ SSWC AND OFFICER WC HOLED. TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD (QTY - 35 RMT)
SOIL PIPE LINE OF WCS AND STP INLETS/ OUTLETS DETERIORATED AT INDICATED LOCATION. PIPE TO BE OPENED, CHEMICALLY CLEANED AND TO BE FITTED BACK. JOB ALSO INVOLVES CLEANING, MANUFACTURING OF DAMAGED PIPES, REMOVAL OF PANELING AND RE-FITMENT OF PANELS, MAT- MS. DIA - 6 INCH. (QTY- 100 RMT)
CHEMICAL CLEANING OF ALL BLACK WATER LINES WC/ BATHROOMS TO BE UNDERTAKEN. WORK INVOLVE DEGUTTING/ REGUTTING OF LINE AND PAINTING PRIOR FITMENT. MAT- MS. DIA - 6INCH. (QTY- 200 RMT)
ROD GEARING MACHENISM OF ALL SANITRAY LINES FOUND SUBOPTIMAL SAME TO BE REPAIRED OR RENEWED AS PER SAMPLE. CAPS TO BE PLACED ON ALL ROD GEARING POINTS MAT- BRASS. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 38 NOS)
FW LINE FOR RESERVE TANK AT BAMBOO DECK AND BRIDGE TOP DAMAGED. TO BE RENEWED. MAT CU/NI. GRATINGS TO BE PROVIDED TO AVOID DAMAGE TO THE LINES. MATERIAL TO BE SUPPLIED BY YARD. (QTY - 40 MTR)
CLEANING OF RESERVE FRESH WATER TANK AT BAMBOO DECK,BRIDGE TOP AND ALL BATHROOM AND WC TO BE CARRIED OUT AND NECESSARY PAINT SCHEME TO BE APPLIED. PAINT IS TO BE SUPPLIED BY YARD. (QTY -10 NOS). JOB INVOLVE OPENING OF MANHOLE/ TANK AND CLEANING/ PAINTING OF THE SAME
EXHAUST PIPE OF COMBISTREAMER IN SHIP'S GALLEY TO BE RENEWED IN SITU. ALL ITEMS TO BE PROVIDED BY YARD (MAT - MS/ GI PIPE, QTY - 5 MTR)
INDUSTRIAL GARBAGE DISPOSAL UNIT OF SHIPS GALLEY AND OFFICER GALLEY NOT WORKING AND FOUND DEFECTIVE. TO BE RENEWED AND FITTED AS PER SAMPLE. JOB INOLVE DEGUTTING/ REGUTTING OF ITEMS/ DECKCOVERING/ LOCKERS. ALL ITEMS TO BE PROVIDED BY YARD (QTY -02)
HEIGHT OF RANGE OF SHIPS GALLEY TO BE REDUCED BY 500 MM FOR EASY ACCESS FOR COOKING IN RANGE. JOB INVOLVE DEGUTTING/ REGUTTING OF RANGE AND CUTTING OF BRACKET TO 500 MM (MAT – MS, QTY -04 NOS)
MISSION CRITICAL EQUIPMENT WOODEN CHOCKS OF SMB AND RHB DAVITS ALONG CANVAS COVER/ PADDING AND MS PLATES DAMAGED. TO BE REPAIRED IN SITU. (MAT - WOOD/MS). ITEMS TO BE PROVIDED BY YARD. (QTY- 20 NOS)
RUBBER SEALS OF GRP HATCHES/ DOORS OF SMB AND ENGINE COVER OF RHB DAMAGED/ UPROOTED. TO BE RENEWED. ITEMS ARE TO BE PROVIDED BY YARD.(QTY- 18 NOS)
LOCKING ARRANGEMENT, HINGES, HANDLES OF HATCHES/ DOORS/ ENGINE COVER DAMAGED IN ALL SMBS AND RHB. TO BE RENEWED (MAT-SS). ITEMS IS TO BE PROVIDED BY YARD. (QTY- 12 NOS)
SPLIT WINDOW AC OF FOUR SMBs NON-OPS. TO BE RENEWED. QTY-04, MAKE-VOLTASJOB INVOLVES REGUTTING DEGUTTING OF AC FOUNDATION.
MISSION CRITICAL EQUIPMENT GRP LAMINATION OF ALL 04 SMBS AND 01 RHB DAMAGED AT SCATTERED LOCATIONS. TO BE RE- LAMINATED IN SITU. ITEMS TO BE PROVIDED BY YARD.(QTY- 90 SQMTR)
MISSION CRITICAL EQUIPMENT PROPELLER GUARD OF ALL SMBS BROKEN. TO BE RENEWED AS PER SAMPLE ( MAT- SS). ITEMS TO BE PROVIDED BY YARD. (QTY - 04 NOS)
COXSWAIN AND CREW CHAIRS OF SMBS BROKEN. TO BE RENEWED IN SITU. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 16 NOS)
WOODEN CABINET AND CUPBOARD OF ALL FOUR SMBS BROKEN/DAMAGED. TO BE RENEWED IN SITU. ITEMS ARE TO BE PROVIDED BY YARD(MAT - WOOD). (QTY - 20 NOS)
D-FENDERS OF SMBS UPROOTED/ BROKEN FROM VARIOUS LOCATIONS. TO BE RENEWED AND FITTED BACK IN POSITION. FENDER IS TO BE PROVIDED BY YARD. (QTY - 12 NOS)
GUARD RAILS OF ALL SMBS DAMAGED/ BENT. TO BE RENEWED INSITU (MAT-SS). ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 12 NOS)
HAND RAILS OF ALL SMBS UPROOTED TO BE REPAIRED INSITU (MAT-SS). ITEMS ARE TO BE PROVIDED BY YARD.(QTY - 12 NOS)
FAIRLEADS OF SMBS UPROOTED TO BE REPAIRED (MAT- SS). ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 16 NOS)
08 NO STAG HORNS OF SMBS BENT/ UPROOTED. TO BE REPAIRED/ RENEWED (MAT-SS). ITEMS ARE TO BE PROVIDED BY YARD.
MANUFACTURING AND FITMENT OF WIRE ROPE GUIDING PLATES ON ALL SMB TO AVOID GRP DAMAGE (MAT-SS PLATES). ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 20 NOS)
BUTTERFLY NUTS OF ALL SMB HATCHES BROKEN/DAMAGED. TO BE RENEWED AS PER SAMPLE. QTY-50, MAT-SS
WASH BASIN OF ALL SMBs PERISHED/UPROOTED. TO BE RENEWED INSITU.QTY-04, MAT- SS. JOB INVOLVES REMOVAL OF BROKEN BASINS ALONG WITH GRP FOUNDATION. RENEWAL OF BASIN AND RESTORATION OF GRP. ALL MATERIALS TO BE PROVIDED BY SHIPYARD.
WEIGHING OF ALL 04 SMBS AND 1 RIB AND 1 GEMINI TO BE UNDERTAKEN AND CERTIFICATE BE ISSUED. WEIGHT OF ALL FOUR SMBs AND RHB OBSERVED TO BE INCRESED MORE THAN 10 %. DI/DR TO BE UNDERTAKEN. SUSPECT WATER INGRESS IN FOAM FILLED COLLARS OF RHB.
MISSION CRITICAL EQUIPMENT DP TEST OF TWO POINT AND FOUR POINT LIFTING HOOKS OF ALL 04 SMBS AND 01 RHB TO BE UNDERTAKEN AND CERTIFICATE BE ISSUED. JOB INVOLVES REMOVAL AND RE LAMINATION OF GRP.
FOUR POINT LIFTING SLINGS OF RHB AND GEMINI TO BE RENEWED AS PER SAMPLE. MAT- NYLON. ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 03 NOS)
ANNUAL ROUTINE OF PALFINGER MILLS LIFTING HOOKS (QTY - 08) OF ALL FOUR SMBS BE UNDERTAKEN THROUGH OEM IAW IHQ MOD(N)/ DNA LETTER NC/4700 DATED 30 SEP 22. JOB INVOLVE REGUTTING/ DEGUTTING OF GRP AND DP TEST
SURFACE PREPARATION BY WATER JET BLASTING TO BE UNDERTAKEN FOR ALL 04 SMBS. COMPLETE PAINT TO BE REMOVED AND RENEWAL OF COMPLETE PAINT SCHEME TO BE UNDERTAKEN. PAINT IS TO BE SUPPLIED BY YARD (PAINT - SIGMA ALPHAGEN 650 RED/ BROWN) ANTIFOULING PAINT. (QTY - 300 SQMTR)
SECURING BRACKETS FOR LIFE BUOYS, BAR CHECKS AND SHORES OF ALL SMB BROKEN/ PERISHED TO BE REPAIRED/ RENEWED AS PER SAMPLE (MAT- SS BRACKET). ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 70 NOS)
WIND SCREEN, SIDE & FRONT WINDOW GLASS AND SLIDING GLASS OF ALL FOUR SMB DISLODGED, RUBBER COAMING CRACKED. FOLLOWING JOBS TO BE CARRIED OUT. (A) RUBBER COAMING TO BE RENEWED (B) SLIDING CHANNELS ALONG WITH SLIDING GLASS AND TOUGHENED GLASS TO BE RENEWED IN SITU. ALL ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 32 NOS)
STEEL WIRE GRIPES OF ALL SURVEY MOTOR BOATS DAMAGED. TO BE RENEWED AS PER SAMPLE (MAT - SWR 12 MM). ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 08 NOS)
WINDSCREEN (MAT - ACRYLIC SHEET, QTY -01), COXSWAIN CHAIR AND CREW CHAIR OF RHB DAMAGED. TO BE RENEWED AS PER SAMPLE. ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 05 NOS)
WEIGHT OF 7 M RHB FOUND TO BE INCREASED SUSPECT INGRESS OF WATER THROUGH FOAM FILLED COLLAR. DI/ DR TO BE UNDERTAKEN AND RENEWAL TO BE UNDERTAKEN AS NECESSARY. (QTY - 01 NOS)
DECK CLEATS OF RHB UPROOTED SAME TO BE RENEWED AND REFITTED. JOB INVOLVES REMOVAL AND RENEWAL OF GRP. MAT-SS. ITEMS TO BE PROVIDED BY YARD. (QTY - 08 NOS)
RHB FOOT STRAPS BROKEN SAME TO BE RENEWED AS PER SAMPLE. MAT- NYLON STRAPS. ITEMS TO BE PROVIDED BY YARD.. (QTY - 40 NOS)
RHB ENGINE COVER AND HINGES BROKEN TO BE REPAIRED INSITU. HYDRAULIC DOOR CLOSER TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD. (QTY - 02 NOS)
MANUFACTURING OF BOAT HOOK AS PER SAMPLE. MAT - WOOD (QTY- 15 NOS)
FUEL TANKS OF ALL SMB TO BE REMOVED AND PRESSURE TESTED. IF ANY LEAKAGE FOUND TO BE REPAIRED/ RENEWED ALL SPARES TO BE PROVIDED BY YARD (QTY- 04 NOS)
LOAD TEST OF FOLLOWING ITEM IS DUE. LOAD TESTING TO BE CARRIED OUT AS PER DETAILS FORWARDED BY SS- ACCOMMODATION LADDER (P&S) , AMMUNITION DAVIT ,VICTUALLING DAVIT, RIB DAVIT, GEMINI DAVIT , HYDROGRAPHIC DAVIT, SMB DAVIT PORT FWD , SMB DAVIT PORT AFT , SMB DAVIT STBD FWD , SMB DAVIT STBD AFT, DECK CRANE , ANCHOR WINDLASS (WRAPPING HEAD) GUARD RAILS, HELO DECK RINGS, SHIP'S BROW BIG, SHIP'S BROW SMALL ,BOW SHACKLE, SNATCH BLOCK , JACKSTAY SNATCH BLOCK , JACKSTAY TRAVELER BLOCK, HOSE HANGING PENDANT , RAS STIRRUP ,JOGGLE SHACKLE, D SHACKLE(19 NOS) , 32 MM JACKSTAY ROPE (150 MTR), SCRAMBLE NET, RIGGING SLIP FOR RAS/ JACK STAY SLIP ,BLAKE SLIP DECK EYE, BOTTLE SCREW SLIP DECK EYE , DECK EYE FOR JACKSTAY, DECK EYE FOR IN HAUL BLOCK, DECK EYE FOR TRIPOD LEG, 15 MM DECK EYE, BOW SHACKLE FOR TOWING, TOWING PENDANT AFT, TOWING CHAFFING PIECE , RAS TRIPOD, WELLING SPRING HOOK SHACKLE FOR IN/ OUT HAUL, WOODEN BLOCK WITH SHACKLE (JB BLOCK), ANCHOR STROP WITH SHACKLE, FUELING POINT DECK EYES FOXLE, FUELING POINT DECK EYES FOXLE, TOWING SHACKLE WITH SLIP, SAFETY PREVENTER, WIRE STROP FOR TEST LOAD, 16 MM SUPRELINE (220 MTR), LEADS MAN PLATFORM (PORT & STBD), CHAFFING PIECE, RAS STIRRUP, DECK CLENCH, TOWING SLIP, SMB GRIPES, JACKSTAY GROMMET, DECK EYE FOR TOWING (02 NOS), 64 MM TOWING HAWSER (220 MTR), CARGO NET (02 NOS) , HELO DECK SAFETY NETS (19 NOS) , ANCHOR STROP DECK EYE (04 NOS), JACKSTAY RIGGING SLIP, MOORING CAPSTAN, TRAVELER BLOCK BOTH SIDE EYES
OVERHAULING OF 37 DOORS AND 32 HATCHES TO BE CARRIED OUT. JOB INVOLVES REPAIRING OF LOCKING HANDLE- 108, BUSH - 108, BAR - 60, SPRING - 30,CLIPS - 92, WEDGE- ETC. DOOR/ HATCHES TO BE REMOVED FOR REPAIRS AND FITMENT TO BE UNDERTAKEN POST PAINTING
AUTO RETAINING ARRANGEMENT OF WT DOORS DAMAGED. TO BE RENEWED AT VARIOUS LOCATIONS. MATERIAL TO BE SUPPLIED BY YARD. (QTY - 30 NOS)
MANUFACTURING AND FITMENT OF SAMSON BAR ALONG WITH SECURING ARRANGEMENT ON WT DOOR (MAT - SAMSON BAR - GI, BRACKET - MS) (QTY- 37 NOS)
RUBBER BEADING OF 37 WT DOORS AND 32 HATCHES TO BE RENEWED AS PER NCD 1447 & 1448. CHALK TEST AND ULTRASONIC LEAK DETECTION TEST TO BE PROVED POST FITMENT OF RUBBER BEADING. MATERIAL TO BE PROVIDED BY YARD. (MAT-SILICON RUBBER BEADING) (QTY- 69 NOS)
SPRINGS MECHANISM OF 32 WT HATCHES AND 07 EMERGENCY ESCAPE SCUTTLES FOUND SUBOPTIMAL. SPRING MECHANISM TO BE RENEWED (SPRING QTY - 69). ALL SPARES TO BE PROVIDED BY YARD. (QTY - 69 NOS)
HYDRAULIC SPRING MECHANISM TO MADE FOR 10 HEAVY WATER TIGHT HATCHES. ALL ITEMS TO PROVIDE BY YARD. (QTY-10 NOS)
FOUR EMERGENCY ESCAPE SCUTTLES NOT CLOSING PROPERLY AND FOUND TO BE SUBOPTIMAL. TO BE RENEWED IN SITU. ALL ITEMS TO BE PROVIDED BY YARD. (QTY- 04 NOS)
BUTTERFLY NUTS OF WT HATCHES, VENT FLAPS, ATU SUPPLIES AND SCUTTLES BROKEN/DAMAGED. TO BE RENEWED AS PER SAMPLE. QTY-200, MAT-SS
WATER TIGHT MARKING AND LOCATION MARKING ON WT DOOR AND HATCHES PERISHED/ CORRODED. TO BE RENEWED IN SITU. JOB INVOLVE DEGUTTING/ REGUTTING OF MARKING/ LAGGING. ITEMS ARE TO BE PROVIDED BY YARD. (MAT - AL) (QTY- 200 NOS)
WEATHER DECK HATCH COAMING CORRODED/ THINNED. TO BE SURVEYED AND RENEWED. ITEMS ARE TO BE PROVIDED BY YARD. MAT - MS (QTY - 10 NOS)
SS STANCHION OF WATER TIGHT HATCHES CORRODED/ HOLED/ DAMAGED. TO BE RENEWED AS PER SAMPLE (MAT -SS, QTY - 120)
ROPE HANDLING DECK CLEATS UPROOTED FROM BOAT DECK TO BE RENEWED. TO BE RENEWED AS PER SAMPLE DEGUTTING AND REGUTTING OF LAGGING TO BE UNDERTAKEN BY YARD. (QTY - 20 NOS)
DECK PIECE/ DISTANCE PIECE OF MUSHROOM HEADS / GOOSE NECKS/ ATU MAIN INLET AND EXHAUST TRUNKS. TO BE SURVEYED AND RENEWED. (QTY- 40 NOS)
SHIPS BROW ALONG WITH STANCHIONS UPROOTED/ DAMAGED. TO BE RENEWED AS PER SAMPLE (MAT - AL). ITEMS ARE TO BE PROVIDED BY YARD.(QTY- 03 NOS)
WATER INGRESS OBSERVED FROM BRIDGE TOP DURING HEAVY RAIN. SUSPECT GRP LAMINATION DAMAGED. TO BE RENEWED IN SITU.(QTY - 30 SQMTR)
VOICE PIPE FROM BRIDGE TO CAPTAIN’S CABIN TO BE RENEWED INSITU. MAT-AL. ITEMS ARE TO BE PROVIDED BY YARD. (QTY - 10 RMT) PIPE DIA- 40MM.
PVC GUARDRAILS TO BE RENEWED WITH TULIPS AND SS FITTINGS. MATERIAL TO BE SUPPLIED BY YARD. (QTY- 400 RMT)
COLLAPSIBLE GUARDRAIL STANCHIONS WITH SHOE CORRODED TO BE RENEWED AS PER SAMPLE. MAT-MS.(QTY- 40 NOS)
FIXED STANCHIONS ALONG WITH SHOES CORRODED FROM BASE. TO BE MANUFACTURED AND WELDED INSITU. MAT - MS (QTY- 20 NOS)
SPURN WATER COAMING OF UPPER DECKS CORRODED AT SCATTERED LOCATIONS TO BE CROPPED AND RENEWED. JOB INVOLVES DEGUTTING AND REGUTTING OF LAGGING BELOW DECK. ITEMS ARE TO BE PROVIDED BY YARD. (QTY- 120 MTR)
RE-TAPPING OF HOLES OF DECK POTS TO BE UNDERTAKEN ON UPPER DECKS. MATERIAL TO BE SUPPLIED BY YARD. (QTY - 150 NOS)
CERMONIAL AWNING OF CAPTAIN DECK, BRIDGE WING (P & S) AND HELO DECK TO BE RENEWED. ALL ITEM TO PROVIDE BY YARD. (QTY- 120 RMT)
EXISTING CANVAS COVERS FOR VARIOUS DECK MACHINERY AND FITTINGS DAMAGED. TO BE MANUFACTURED NEW AS PER SAMPLE FOR THE LIST BELOW:- (A) 7 m RHIB COVERS - 02 (B) SMB COVERS - 06 (C) SMB DAVIT MOTOR AND GEAR BOX - 06 (220X190X150 CM) (D) ANCHOR WINDLASS COVERS - 02 (E) CDT WINCH COVER - 02 (F) HMG COVERS - 02 (G) MMG COVERS - 03 (H) LMG COVERS - 05 (J) ROPE REEL COVERS - 07 (K) TUG SCREEN COVER 8X8 M - 04 (L) ANCHOR BAG - 02 (M) PNEUMATIC FENDER COVERS - 06 (N) 40/60 GUN COVERS - 02 (P) DECK CRANE CONTROL PANEL COVERS - 02 (Q) DIESEL DRIVEN PP COVER - 03 (R) SEAMANSHIP GEARS - 18 (S) BOAT BAGS - 04 (T) AWNING OF HELO DECK,-01 (U) BRIDGE WING ( P & S) -02 (V) CAPTAIN DECK (P&S) -02 (W) BAMBOO DECK-02
HELO DECK 3 LEG AWNING STANCHION, CAPTAIN DECK AWANINIG STANCHION AND BAMBOO DECK AWANING STANCHION DAMAGED/ BROKEN, TO BE MANUFACTURED AS PER DIMENSION. QTY- 30 NOS, MAT-AL. (QTY - 30 NOS)
RENEWAL OF AWNING STANCHIONS AND FRAMES ON BRIDGE WING PORT AND STBD TO BE UNDERTAKEN IN SITU (MAT- GI/AL/ CANVAS, QTY- 25 RMT)
HELO DECK AND BRIDGE WING STANCHION FIXING NUT BOLTS DAMAGED/ BROKEN, TO BE RENEWED AS PER SAMPLE. QTY-219, MAT-SS DIMENTION- M10 - 90, M16- 85, M24 -44
BRIDGE WING, CAPTAIN DECK HELO DECK STANCHION FIXING GROOVES THREADING DAMAGED , TO BE REPLACED IN SITU. POST REPLACING HELO DECK PAINT SCHEME TO BE RENEWED AND FRICTION TEST CARRIED OUT.REPORT TO BE HANDED OVER TO SS QTY-54
JUMPING LADDERS AND SCRAMBLE NETS BROKEN/ DAMAGED. TO BE RENEWED AS PER SAMPLE. MATERIAL TO BE SUPPLIED BY YARD. (QTY - 11 NOS)
BONDING STRAPS UPROOTED AT SCATTERED LOCATION ON UPPER DECKS. SAME TO BE RENEWED WITH NECESSARY SS BOLTS. MATERIAL TO BE SUPPLIED BY YARD. (QTY- 200 NOS)
BRIDGE AND SURVEY OPS ROOM TOUGHENED WINDOW GLASS TO BE RENEWED AS PER SAMPLE. ITEMS TO BE PROVIDED BY YARD.(QTY- 16 NOS)
APPLICATION OF NANO MATERIAL BASED PAINT IN BILGES AREA IN THE VICINITY OF HEAVY MACHINERIES VIZ RO PLANT, PME, SME, AC PLANTS ETC. APPROX PAINT QTY - 100 SQ M. PAINT TO BE PROVIDED BY SHIPYARD.
MECHANICAL CLEANING (ST-3) AND PAINTING OF ALL UNDERWATER COMPARTMENT (51 NOS) TO BE UNDERTAKEN AS PER NO 53/16.APPROX AREA - 1500 SQMTR
OVERHEAD STOWAGE RACK FITTED AT QUARTER DECK CORRODED/ HOLED. TO BE RENEWED AS PER DIMENSION AT QUARTER DECK (MAT-MS). MATERIAL TO BE SUPPLIED BY YARD. (QTY- 04 NOS)
ROPE REEL AT SCATTERED LOCATIONS ON WEATHER DECK CORRODED/HOLED. TO BE RENEWED AS PER SAMPLE. OPERATING MECHANISM FOUND JAMMED. TO BE RENEWED.(QTY- 10 NOS)
WATER ACCUMULATION OBSERVED BEHIND PANEL IN SS WC, JS WC AND WOMEN WC RESULTING HEAVY CORROSION IN DADOE AREA . DADOE AREA TO BE RENEWED AND HOLES TO BE MADE FOR WATER CLEARANCE. JOB INVOLVES REGUTTING/DEGUTTING OF LAGGING/SS PANELING/DECK COVERING/DADOE CASTING.(QTY- 30 RMT)
LEADSMAN PLATFORM AT FOXLE (PORT & STBD) ALONG WITH SECURING ARRANGEMENT AND SS CHAIN CORRODED/HOLED. TO BE RENEWED INSITU AS PER SAMPLE. (QTY -02 NOS)
UNDULATION OBSERVED ON DECK OF FOLLOWING COMPARTMENTS:- (A) CMR, (B) GYM, (C) ATTA/RICE STORE, (D) ENGINEERING WORKSHOP, (E) REGULATING OFFICE, (F) SHIP'S OFFICE, (G) HULL WORKSHOP, (H) HI- FIX ROOM, (J) PORT CATWALK, (K) NEAR VICTUALLING DAVIT, (L) SRE, (M) PMO CABIN, (N) MCPO MESS, (P) SS BATHROOM, (Q) WOMEN BATHROOM NEAR DOOR, (R) GYRO, (S) FWD LOBBY, (T) ATU 1 & 2 LOBBY. TO BE SURVEYED AND RENEWED. JOB INVOLVES REGUTTING/ DEGUTTING OF LAGGING, PANELING, CABLE TRAY, DECK COVERING & BUNKS & LOCKERS. (QTY -25 SQMTR)
HEAVY UNDULATION OBSERVED AT SCATTERED LOCATIONS ON MAIN DECK, QUARTER DECK, BAMBOO DECK, GUN DECK, BELOW GUN DECK, CAPTAIN DECK PORT & BSTBD, BRIDGE WING PORT & STBD & BRIDGE TOP. TO BE SURVEYED AND RENEWED. JOB INVOLVES REGUTTING/ DEGUTTING OF LAGGING, PANELING, CABLE TRAY & DECK COVERING.(QTY - 30 SQMTR)
BUCKLING ON BULKHEADS OBSERVED AT FOLLOWING LOCATIONS : (A) CAPTAIN PANTRY, (B) SHS CABIN STBD , (C) SURVEY OPS ROOM PORT, (D) DINING HALL FWD & STBD, (E) EO CABIN FWD, (F) SS DINING HALL FWD, (G) SERVERY COUNTER FWD, (H) NBCD OFFICE AFT, (J) GUNNERY OFFICE STBD FWD, (K) MCPO MESS FWD, (L) PO MESS AFT, (M) SEAMEN LOBBY NEAR MIRROR ON PORT, (N) BARBER SHOP PORT & STBD, (P)BELOW GUN DECK STBD, (Q) CAPTAIN DECK (NO & SHS CABIN), (R) JS BATHROOM FWD & STBD,(S) WARDROOM ROOM STBD BEHIND CAP STAND TO BE SURVEYED AND RENEWED. JOB INVOLVES REGUTTING/ DEGUTTING OF LAGGING, PANELING, CABLE TRAY, DECK COVERING & BUNKS & LOCKERS. (QTY- 60 SQMTR)
PITTING’S OBSERVED AT FOLLOWING LOCATION ON DECK: (A) BELOW SPLIT AC FOUNDATION ON QUARTER DECK (B) AFT SPDC LOBBY (C) GYRO LOBBY (D) BOSUN STORE LOBBY (E) QUARTER DECK NEAR WT DOOR (QTY -5 SQMTR)
DECK & DADOE CORRODED/ THINNED/ HOLED AT FOLLOWING LOCATIONS : (A) VS STORE NEAR WT DOOR (B) SDO COMPARTMENT FWD (C) PLOTTING ROOM AFT BULKHEAD (D) AFT HYDRO STORE NEAR FRESH WATER TANKS & BELOW RACKS (E) BELOW GUN DECK NEAR CABLE GLAND TO BE SURVEYED AND RENEWED. (QTY- 5 SQMTR)
AREA BELOW MAIN MAST HEAVILY CORRODED/ THINNED/ HOLED CAUSING WATER LEAKAGE IN PLOTTING ROOM. TO BE SURVEYED AND RENEWED. JOB INVOLVES DISMANTLING OF MAIN MAST AND HEAVY DEGUTTING/ REGUTTING ON PLOTTING ROOM. (QTY -02 SQMTR)
BULKHEAD AND FRAME ABOVE NWT DOOR OF QUARTER DECK THINNED/ HOLED/ CORRODED. TO BE SURVEYED AND RENEWED. JOB INVOLVES DEGUTTING AND REGUTTING OF TRUNKING, LAGGING & PANELING. (QTY -01 SQMTR)
DECK, CHEQUERED STRIPS AND SUMP OF FWD AND AFT HYDRO STORE (DECK HEAD OF FW TANKS) CORRODED/ THINNED AT SCATTERED LOCATIONS. AREA TO BE SURVEYED AND RENEWED. (QTY - 10 SQMTR)
DECK & CHEQUERED STRIPS AT FOLLOWING LOCATIONS THINNED/ CORRODED: (A) PAINT STORE, (B) GYM, (C) MER, (D) AVCAT CONTROL ROOM LOBBY, (E) FWD NAVAL STORE LOBBY, (F) AFT SPDC, (G) STORE OFFICE, (H) BULK INSTRUMENT ROOM, (J) FOXLE, (K) ENGINEERING WORKSHOP LOBBY (L) ENGINEERING WORKSHOP (M) NBCD STORE LOBBY. AREA TO BE SURVEYED AND RENEWED. (QTY -20 SQMTR)
BOTTOM ROD COAMING INCLUDING ROLLER OF SAFETY NET CUT-OUT TO BE RENEWED AS PER SAMPLE. (QTY - 40 RMT)
SCUPPERS ALONG WITH RUBBER PAD ON PORT AND STBD SIDE IN BOOT TOP AREA TO BE RENEWED AS PER SAMPLE (MAT - MS WITH NEOPRENE RUBBER(QTY - 30 NOS)
SCUPPER LIPS FOR VARIOUS OBD DAMAGED/ BROKEN. SCUPPER LIPS (NEOPRENE RUBBER) TO BE MANUFACTURED AND FIXED ON BOTH SHIP SIDE WITH SS NUT-BOLTS. SIZE- 10 X 8 INCH (QTY -50 NOS)
CYLINDER STOWAGE FRAME CORRODED/ THINNED ON BOAT DECK (PORT & STBD). RA FOR MANUFACTURING OF FRAMES AND WELDING OF THE SAME IN SITU (MAT - MS, QTY -12)
FWD AND AFT STP BLOWER BASE AND IMO DISCHARGE LINE ON UPPER DECK CORRODED/THINNED. TO BE REPAIRED/RENEWED. BASE QTY-02, IMO LINE-04.
DECK IN VICINITY OF FWD STP IN FWD HYDRO STORE CORRODED. AREA TO BE SURVEYED AND RENEWED AS REQUIRED.(QTY - 5 SQMTR)
HYDRO JET/ GRID BLASTING TO BE CARRIED OUT ON FOXLE AREA AND PAINT SCHEME TO BE RENEWED VIEW HEAVY CORROSION. PAINT TO BE SUPPLIED BY YARD. (QTY -200 SQMTR)
FALSE HATCH COVERS FOR MER, MCR, AER, AC, WARD ROOM LOBBY AND HELO DECK COMPARTMENT TO BE MANUFACTURED AS PER DIMENSION. MAT-AL. (QTY- 06 NOS)
ALUMINUM CHECKERED PLATE OF BETWEEN DECK LADDERS ALONG WITH NON-SKID RUBBER MAT WORN OUT/ DAMAGED. TO BE RENEWED AS PER SAMPLE. MAT - AL & RUBBER (QTY - 140 NOS)
BETWEEN DECK LADDERS OF QUARTER DECK, CAPTAIN DECK, BOAT DECK, BRIDGE, CAPTAIN LOBBY, SURVEY OPS ROOM LOBBY, BRIDGE LOBBY AND MAIN ALLEYWAY OBSERVED TO BE DAMAGED/PERISHED. TO BE RENEWED ALONG WITH FOOTSTEPS, HAND RAILS AND NON-SKID RUBBER. MAT- AL,SS, RUBBER (QTY -08 NOS)
EXISTING COT HANGER FOR LIFE RAFT CORRODED. MANUFACTURING OF COT HANGER AS PER SAMPLE. MAT -SS (QTY -20 NOS)
LIFE RAFT BASE AND WOODEN STAND WITH GRP COATING (30 NOS) AND NYLON LASHING (30 NOS) ON WEATHER DECK CORRODED/THINNED. TO BE REPAIRED/RENEWED.(QTY -15 NOS)
REPLACEMENT OF SECURING BATONS IN ATTA/ RICE STORE, TINNED STORE, DRY PROVISION STORE, OIL STORE, CLOTHING STORE, FWD NAVAL STORE, STORE OFFICE, ELECTRICAL STORE, AFT SPDC, BULK INSTRUMENT ROOM, AFT HYDRO STORE, FWD HYDRO STORE, MEDICAL STORE, PAINT STORE, BOSUN STORE AND NBCD STORE TO BE UNDERTAKEN. MATERIAL TO PROVIDE BY YARD ( MAT – SS/ CRCA) (QTY - 200 NOS)
BULKHEAD AND DADOE AREA OF MER EXHAUST INSIDE OFFICER WC HEAVILY CORRODED/HOLED. AREA TO BE SURVEYED AND RENEWED. JOB INVOLVES DEGUTTING/REGUTTING OF MUSHROOM HEAD EXHAUST OF MER, MANHOLE AND LAGGING/PANELLING FROM OFFICER WC. (MAT - MS) (QTY -4 SQMTR)
HAND HOLDING BAR WITH BRACKET ON PORT AND STBD BOAT DECK AND CATWALK AREA CORRODED/HOLED. TO BE RENEWED. (MAT-MS) (QTY - 50 SQMTR)
SECURING BRACKET OF FRESH WATER LINE OF LSO CORRODED. TO BE RENEWED.(QTY - 30 NOS)
ASSISTANCE REQUIRED FOR CUTTING OF EXTRA FITTINGS/ BRACKETS AT SCATTERED LOCATION. JOB INVOLVE REGUTTING/ DEGUTTING OF LAGGING/ PANELING/ SWITCH SOCKET AND OTHER ASSOCIATED FITTING. (QTY - 1500 SQMTR)
SECURING BRACKET OF 9 LTR AFFF, 2 KG CO2 & 10 KG DCP BROKEN. TO BE RENEWED (MAT- MS) (QTY -45 NOS)
FIREFIGHTING HOSE BASKETS/ BOXES BROKEN/ CORRODED AT VARIOUS LOCATIONS. TO BE RENEWED (MAT - MS) (QTY - 20 NOS)
SECURING BRACKETS FOR FB5(X) & FB10(X) BROKEN/CORRODED. TO BE RENEWED (MAT - MS) (QTY - 07 NOS)
FIREFIGHTING LOCKER AT FWD DC AND AFT DC POST BROKEN/ DAMAGED AT SCATTERED LOCATIONS. TO BE RENEWED (MAT- CRCA). (QTY - 08 NOS)
BASCCA LOCKERS BROKEN/DAMAGED AT SCATTERED LOCATIONS. TO BE RENEWED (MAT- CRCA). (QTY - 15 NOS)
SECURING ARRANGEMENTS OF PORTABLE PUMPS & STARTERS BROKEN. TO BE RENEWED (MAT- CRCA). (QTY - 26 NOS)
ELSA STOWAGE BOXES BROKEN/ DEFORMED. TO BE RENEWED (MAT- CRCA) (QTY - 30 NOS)
REPAIR/RENEWAL OF SECURING BRACKETS OF FIXED SHORE, METALLIC SHORE, PORTABLE EXHAUST BLOWER AND BA CHARGING COMPRESSOR VIEW CORRODED/ THINNED. MAT - MS (QTY - 20 NOS)
RENEWAL OF METALLIC BALLAST BAY TANK FOR BASCCA CHARGING VIEW CORRODED/ THINNED. MAT- MS (QTY- 02 NOS)
INSTALLATION OF AFFF TANK FOR FIREFIGHTING ARRANGEMENTS ON HELO DECK. MAT- MS (QTY - 01 NOS)
INSTALLATION OF FIXED MOTOR DRIVEN BA COMPRESSOR OF 300 BAR CAPACITY AT QUARTER DECK. MAT - MS (QTY - 01 NOS)
PENNANT NUMBER PAINTING OF THE SHIP TO BE CARRIED OUT AS PER DIMENSION VIDE IHQ MOD LETTER NO OP/WE/3051/POLICY DATED 16 JUL 20 AND HQENC LETTER GN/190/ PENNANT NUMBER DATED 14 SEP 20 FOR SURVEY SHIP. 1219mm (HEIGHT) X 976mm (WIDTH) X 203mm LETTER WIDTH. (QTY - 02 NOS)
DRAUGHT MARKINGS FOR FWD DRAFT, AFT DRAFT, PROPELLER DRAFT AND MULTIBEAM SENSOR (GONDOLA) TO BE CARRIED OUT. JOB INVOLVES FABRICATION OF SUITABLE SIZE LETTERS AS PER DIMENSIONS. POST WELDING OF LETTERS, PAINTING OF THE SAME TO BE CARRIED OUT AS PER DRAUGHT MARKING STANDARDS. TO BE DONE ON BOTH PORT AND STBD SIDES. (QTY - 08 NOS)
QUARTER MASTER TABLES (02), GANGWAY STATE BOARDS (06) (MAT -SS) ,ROSTRUM/ PODIUM (02), LIFEBUOY STAND (04) AND CEROMINIAL DICE (02) DAMAGED/ DETERIORATED. AS PER EXISTING DIMENSION. (02 EACH), MAT- WOOD/ SS
FAT INSULATION AT INDICATED LOCATIONS DAMAGED, TO BE RENEWED IN-SITU. INCLUDING COMPARTMENTS FOR HABITABILITY UPGRADATION IAW PARA 6B IHQ MoD POLICY NC/POLICY/H-121/EQQUIPMENT DATED 05 APR 17 AND NCD 1430. (QTY - 1500 SQMTR)
BREATHERS ON UPPER DECKS HEAVILY CORRODED/ THINNED TO BE RENEWED WITH FLANGES & SS NUT BOLTS (TO BE PROVIDED BY YARD AS PER SIZE AND REQUIRED NO). MAT-SS. JOB INVOLVES MANUFACTURING OF BASE, BREATHER DIA- 4 INCH, LENGTH- 1M (QTY - 25 NOS)
DECK PENETRATION OF BREATHERS, VENT FLAPS & GOOSE NECKS HAVILY CORRODED/ HOLED, TO BE RENEWED. JOB INVOLVES MANUFACTURING AND FITMENT OF DECK PIPE & BREATHER WITH COVER ,DEGUTTING AND REGUTTING OF PANELS, LAGGING AND OTHERS FITTINGS SIZE- VARIOUS FOR ALL FITTINGS. DIMENTION - 1 RMT LENGTH X 5 INCH DIA OF PIPE QTY - 30 . MAT- MS
FOLLOWING MACHINES NOT WORK IN SHIP'S GYM (A) MULTIGYM EQUIPMENTS - 02 (B) TREADMILL -02 (C) CROSS TRAINER - 02 (D) BENCH PRESS - 02 TO BE RENEWED / REPLACED. JOB INVOLVE INSTALLATION OF MACHINE POST REPLACEMENT ALL ITEMS TO BE PROVIDED BY SS (MAKE - FITKING/ DECATHLON, QTY -08 NOS)
WINCH AND DAVIT ASSEMBLY OF OCEANOGRAPHIC DAVIT HARD TO TURN/ MOVE TO BE EASED. OVERHAULING OF THE ENTIRE SYSTEM TO BE CARRIED OUT. BLOCKS AND PULLEYS TO BE OVERHAULED. HIGH TENSION SPRING TO BE REMOVED, CLEANED, GREASED AND TO BE FITTED BACK. TESTING OF TENSILE STRENGTH FOR SPRING IS TO BE CARRIED OUT. WIRE TO BE CLEANED AND GREASED. JOB INVOLVES REPLACEMENT OF SPARES LIKE BEARINGS-12 NOS, OIL SEALS-3 NOS, CIRCLIPS-5 NOS, GEAR BOX OIL- 100L, PULLEYS-05 , PULLEY BLOCKS- 06 NOS AND OTHER MECHANICAL PARTS FOUND DAMAGED DURING OPENING INSPECTION. ALL GREASE NIPPLES TO BE RENEWED AND CHARGED. POST COMPLETION OF WORK SYS TO BE PROVED. A LOAD TEST CERTIFICATE FOR WINCH ASSEMBLY TO BE ISSUED.(QTY - 01 LS)
FOLLOWING METALLIC SS/ BRASS/ ACRYLIC TALLY DAMAGED. TO BE RENEWED AS PER DIMENSION/ SAMPLE. (A) COMPARTMENT TALLEYS (HOSPITAL SHIP DUAL WHEREVER RELEVANT) - 96 NO.s (ACRYLIC) (B) COMPARTMENT BELOW TALLY- 40 NO.s (SS) (C) FRAME STATION TALLY - 140 NO.s (SS) (D) SHIP NAME TALLY (CAPTAIN DECK AND CATWALK EITHER SIDE) - 04 NO.s (SETS) (BRASS) (E) MAN HOLE TALLY FOR TANKS- 35 NO.s (BRASS) (F) EQUIPMENT TALLEY- 50 NOS (SS) (G) LOAD TEST TALLIES - 20 NOS (SS) (H) OPERATING INSTRUCTION TALLIES OF EQUIPMENTS INCLUDING STP - 40 NOS (SS) (J) ENGRAVED MUSHROOM HEAD/ GOOSE NECK/ BREATHER PIPE TALLIES - 60 (BRASS)
DOMESTIC FW PIPES CORRODED HOLED AT SCATTERED LOCATIONS. PIPES (MAT- CuNi) TO BE MANUFACTURED NEW AND SECURED IN SITU WITH CLAMP.INVOLVING REMOVAL AND REFITMENT OF PANELLING. DAMAGED PANELS ALSO TO BE REPLACED. QTY- 130 RMT
LOCKERS ON UPPERDECKS CORRODED / DAMAGED , TO BE RENEWED AS PER DIMENSION. MAT- SS , QTY- 08 AS PER DIMENTION- 2X6 MTR EACH. (QTY - 08 NOS)
REPAIR OF DAMAGED WC PIPELINE FROM HOSPITAL SHIP WC TO AFT STP. MATERIAL OF SOIL PIPE INCLUDING SPARES, SUPPORTING BRACKET WITH LINE DIAGRAM PROVIDED BY SHIPYARD. DIMENTION - 6 INCH PIPE X 20 RMT
FATIGUE LIFE ASSESSMENT OF SHIP DURING DOCKING OF THE SHIP SHOULD BE SCHEDULED IN THE EARLY PHASE OF REFIT ITSELF, DURING WHICH THE SAMPLES ARE TO BE CUT AND SENT TO NMRL BY YARDS. SAMPLES FOR THE ANALYSIS TO BE EXTRACTED FROM THE HULL OF THE SHIP SHOULD BE OF ‘INITIAL CONSTRUCTION/ OLDEST PLATE’, IN ORDER TO MIMIC THE LIFE OF THE HULL. SAMPLES ARE TO BE EXTRACTED FROM FOLLOWING CRITICAL AREAS WHICH ARE MORE LIKELY TO BE PRONE TO FATIGUE DAMAGE, IN CONSULTATION WITH NMRL:- (A) MIDSHIP SECTION NEAR KEEL. (B) FORWARD 1/3RD LENGTH OF THE SHIP (UNDERWATER). (C) ANY OTHER AREA DEEMED NECESSARY FOR EVALUATION, BASED ON HISTORY OF PAST RENEWALS/ DEFECTS/ INDICATIVE SIGNS OF ACCUMULATED STRESS. SAMPLES ARE TO BE A COMBINATION OF SHELL PLATE, AS WELL AS SHELL PLATE WITH LONGITUDINAL STIFFENER.
ROLL PITCH INDICATER TO BE CALIBRATED AS INDICATED BY SS VIEW CALIBRATION DUE. (QTY - 06 NOS)
SERVICEABILITY CHECKS/ REPAIRS/ RENEWAL AND CALIBRATION OF ULTRASONIC LEAK DETECTER TO BE CARRIED OUT. MAKE- (SDT 270) (QTY - 01 NOS)
SERVICEABILITY CHECKS OF FOLLOWING TO BE UNDERTAKEN (A) GYROSIGHT. QTY -06 NOS (B) NIGHT VISION BINOCULAR (QTY -07) (C) DAY VISION BINOCULAR (QTY -07)
SS CURTAIN CHANNEL ALONG WITH CURTAIN IN BRIDGE FOR CHART TABLE, JSDH, SSDH, MESS DECK ALL BATHROOM UPROTTED. TO BE RENEWED IN SITU. (QTY - 20 NOS)
MANUFACTURING OF RAT GUARD TO BE UNDERTAKEN AS PER SAMPLE. MAT – GI, QTY - 15
MANUFACTURING OF CROWBAR TO BE UNDERTAKEN AS PER SAMPLE. QTY – 06
NOSE DROP PIN OF BETWEEN DECK LADDERS, WT HATCH STANCHIONS AND COLLAPSABLE STANCHIONS DAMAGED. TO BE RENEWQED AS PER SAMPLE (MAT - SS , QTY - 150)
MANUFACTURING AND FITMENT OF DUMBELL SECURING RACK (04),PULL UP BAR IN SHIPS GYMNASIUM AND QUARTERDECK. (QTY - 08 NOS)
MAIN NOTICE BOARD DAMAGED. SAME TO BE MANUFACTURED AND FITTED INSITU. ITEMS TO BE PROVIDED BY YARD (MAT -WOOD) (QTY - 02 NOS)
ELECTROPLATING OF FOLLOWING ITEMS TO BE CARRIED OUT (A) CEREMONIAL STANCHIONS - 13 NOS. (B) CEREMONIAL CHAIN - 20 NOS. (C) GALLEY RANGE SS PLATE -20 NOS. (D) SS CHAINS OF HATCHES - 30 NOS.
TOOLS STOWAGE RACKS IN HULL WORKSHOP, MEDICAL STORE, BULK INSTRUMENT ROOM, AFT HYDRO STORE, STORE OFFICE, NBCD STORE, NAVAL STORE CORRODED/ DAMAGED. TO BE RENEWED AS PER SAMPLE. MAT- GODREJ CRCA). MATERIAL TO BE SUPPLIED BY YARD. (QTY - 40 NOS)
INSTALLATION OF LAGGING AT INDICATED LOCATIONS TO BE UNDERTAKEN BY PIN - ARC METHOD WHICH PROVIDES BETTER FINISH IN COMAPRISON TO CONVENTIONAL ADHESIVE BASED INSTALLATION. AREA APPROX - 100 SQ MTR
VISUAL SURVEY OF EXTERNAL UNDERWATER HULL AND ROBOTIC USG IN WAY OF MACHINERY COMPARTMENT MAY BE UNDERTAKEN.
REPAIR/ RENEWAL OF MISCELLANEOUS FITTINGS ON UPPER DECK BY KCERAMIC BACK STRIP WELDING WHICH REDUCES THE AREA OF DEGUTTING AND REGUTTING. AREA APPROX - 50 SQ MTR.
SURFACE PREPARATION BY ROBOTIC HYDRO BLASTING TO BE UNDERTAKEN ON UNDERWATER HULL WHICH REDUCES MANPOWER AND SCAFFOLDING REQUIREMENTS. AREA APPROX - 200 SQ MTR
PHASED ARRAY ULTASONIC TESTING TO BE UNDERTAKEN AS AN ADVANCED NON- DESTRUCTIVE INSPECTION OF WELDMENTS. AREA APPROX - 50 SQ MTR
REFURBHISMENT OF MANHOLE OF FUEL TANK NO. 9 VIEW OBSTRUCTION OBSERVED WHILE OPERATING DOOR OF AVACT CONTROL ROOM. JOB INVOLVES CROP AND RENEWAL OF MANHOLE SILL HEIGHT TO REDUCE DISTANCE FROM DECK. PRESSURE TESTING OF TANK TO BE UNDERTAKEN POST RENEWAL.
MANUFACTURING OF TESTING JIG FOR LOAD TEST OF RAS POINTS WHICH REDUCES MANHOURS, COLD MOVE REQUIREMENTS AND CRANE REQUIREMENTS. QTY- 02 NOS
OVERHAULING OF ALL SCUTTLES AND PORT HOLES FITTED AT VARIOUS LOCATION TO BE UNDERTAKEN. JOB INVOLVE REMOVAL OF THE SCUTTLE, RENEWAL OF SILICON RUBBER BEADING, BRASS NUT/ BOLT REPLACEMENT, BUTTERFLY NUT REPLACEMENT (BRASS), RENEW THE DEFCTIVE PARTS AND PAINT RENEWAL (QTY - 20)
MANUFACTURING AND FITMENT OF RACKS WITH SLIDDING DOORS ALONG WITH SECURING ARRANGEMENT AND LOCKING ARRANGEMENT FOR KEEPING SIG RIFLE, INSAS AND CARBINE AND OTHER EXPLOSIVE ITEMS IN SHIP'S ARMOURY TO BE UNDERTAKEN AS PER DRAWING AND SAMPLE PROVIDED BY SHIP STAFF (MAT - SS/ GODREJ, QTY - 50 NOS)
MODIFICATION TO THE EXISTING DOOR CLIP HANDLE BY PROVISIONING AN EXTENSION PIECE FOR ADEQUATE CLEARANCE OF THE SUPPORTING HAND FROM THE EDGE OF THE DOOR IAW IHQ MOD (N)/DNA LETTER NC/3784 DATED 29 MAR23. (MAT – MS, QTY – 70, MAT – SS FOR COOL AND COLD ROOM DOORS, QTY – 10
REPLACEMENT OF ALL SACRIFICIAL ANODES WITH INDIUM FREE ALUMINIUM ALLOY SACRIFICIAL ANODES. MK IV – 07 NOS, MK V – 09 NOS, MK VI – 09 NOS, MK XII – 12 NOS
SECURING OF VARIOUS NBCD ITEMS, MINOR FOUNDATION OF BATTERIES AND LIFEBUOY SECURING STAND ALONG WITH MOB MARKER WITH DIRECT FASTENING TECHNOLOGY AT VARIOUS LOCATIONS IAW NHQ/ DNA LETTER NC/ 1902-002 DATED 19 OCT 23.
RENEWAL OF PAINT SCHEME IAW NHQ/ DNA LETTER NC/0528 DATED 10 APR 24 AT FOLLOWING LOCATION ON WEATHER DECK: (A) JUNCTION OF SHIPSIDE SHELL, DECK SPURN WATER COAMING. (B) JUNCTION OF SUPERSTRUCTURE, SIDE SHELL AND SUPERSTRUCTURE DECK, (C) AROUND BOLLARD AND STANCHIONS FOUNDATIONS. (D) DECK FITTINGS NEAR THE EDGES AND AROUND THE DECK EYES (E)COAMING OF ALL DECK MACHINERIES ON WEATHER DECK JOB INVOLVE HYDRO BLASTING OF THE AFFECTED AREA FOR PAINT REMOVAL AND APPLICATION OF 01 COAT PRIMER AND 02 COAT OF ANTICORROSIVE (MAKE – PPG). PAINT TO BE SUPPLIED BY YARD
HULL - PART III
CAT-II- ABER REPLACEMENT OF ANCHOR WINDLASS AUTH- HQSNC LETTER NC/3000/01(ABER)(II) DATED 23 MAY 18.)
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
REMOVAL OF EXISTING ANCHOR WINDLASS ALONG WITH MOTOR AND CONTROL PANEL. (NEW WINDLASS WILL BE SUPPILED BY MO(K)
FITMENT OF NEW ANCHOR WINDLASS ALONG WITH MOTOR AND CONTROL PANEL AT EXISTING ANCHOR WINDLASS LOCATION (FOXLE) BY OEM / IN PRESENCE OF OEM.(NEW WINDLASS WILL BE SUPPILED BY MO(K)
MANUFACTURING & FITMENT OF NEW FOUNDATION FOR WINDLASS AS PER DIMENSIONS (NEW WINDLASS WILL BE SUPPILED BY MO(K)
DEGUTTING & REGUTTING OF LAGGING/ PANELING/ CABLE TRAYS ETC
LAYING OF CABLE AND SEALING OF NEW CABLE GLANDS. REMOVAL OF OLD CABLES AND FILLING UP OF OLD CABLE GLANDS. (NEW WINDLASS WILL BE SUPPILED BY MO(K)
LOAD TEST & TRIALS POST FITMENT BY OEM( HAT & SAT IN PRESENCE OF HITU
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
DP TEST AND PAINTING OF HOT WORK AFFECTED AREAS, DECK PENETRATIONS TO BE UNDERTAKEN
APT OF HOT WORK AFFECTED CLUSTERS TO BE CARRIED OUT.
CAT-II ABER REPLACEMENT OF MOORING CAPSTAN AS PER APPROVED BPS (AUTH- HQSNC LETTER NC/3000/01(ABER)(II) DATED 23 MAY 18.)
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
REMOVAL OF EXISTING CAPSTAN ALONG WITH MOTOR, CONTROL PANEL AND OTHER ACCESSORIES.
FITMENT OF CAPSTAN ALONG WITH MOTOR, CONTROL PANEL AND OTHER ACCESSORIES AT EXISTING LOCATION (FOXLE) BY OEM / IN PRESENCE OF OEM.(NEW CAPSTAN WILL BE SUPPILED BY MO(K)
MANUFACTURING & FITMENT OF NEW FOUNDATION FOR WINDLASS AS PER DIMENSIONS (NEW WINDLASS WILL BE SUPPILED BY MO(K)
DEGUTTING & REGUTTING OF LAGGING/ PANELING/ CABLE TRAYS ETC
LAYING OF CABLE AND SEALING OF NEW CABLE GLANDS. REMOVAL OF OLD CABLES AND FILLING UP OF OLD CABLE GLANDS. (NEW CAPSTAN WILL BE SUPPILED BY MO(K)
LOAD TEST & TRIALS POST FITMENT BY OEM( HAT & SAT IN PRESENCE OF HITU
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
DP TEST AND PAINTING OF HOT WORK AFFECTED AREAS, DECK PENETRATIONS TO BE UNDERTAKEN
APT OF HOT WORK AFFECTED CLUSTERS (CLUSTER NO 14, 15) TO BE CARRIED OUT.
ABER CAT-II- ABER REPLACEMENT OF PORT AND STBD ACCOMODATION LADDERS AS PER APPROVED BP. NC/3000/01 (ABER) DATED 29 MAY 18.
REMOVAL/ DEGUTTING OF TWO EXISTING ACCOMMODATION LADDER ALONG WITH WINCH, MOTOR, CONTROL PANEL, STEEL WIRE ROPES AND OTHER ASSOCIATED FITTINGS
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
FITMENT OF TWO NEW ACCOMMODATION LADDER ALONG WITH WINCH, MOTOR, CONTROL PANE, STEEL WIRE ROPES AND OTHER ASSOCIATED FITTINGS TO SUIT THE EXISTING SIZE BY OEM / IN PRESENCE OF OEM. (NEW ACCOMODATION LADDER 02 NOS. WILL BE SUPPILED BY MO(K)
DEGUTTING & REGUTTING OF LAGGING, PANELING, PAINTING IN WAY OF HOT WORK
RENEWAL OF NEW SAFETY SWITCHES
MFG AND FITMENT OF NEW FOUNDATION
SUPPLY AND LAYING OF CABLE. REMOVAL OF OLD CABLING.
LOAD TEST & TRIALS POST FITMENT BY OEM ( HAT & SAT IN PRESENCE OF HITU)
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
ABER CAT-II- ABER REPLACEMENT OF FOUR SMB DAVITS AS PER APPROVED BP. (AUTH - NC/3000/07 DATED 29 OCT 18).
REMOVAL OF EXISTING DAVIT INCLUDING GEARBOX, MOTOR, WINCH AND FOUNDATIONS.
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
MANUFACTURING AND FITMENT OF NEW FOUNDATION BRACKETS/ STIFFNERS/ PILLERS BELOW DAVIT BASE.
INSTALLATION OF NEW SMB DAVIT ALONG WITH GEARBOX, MOTOR, WINCH AND OTHER ASSOCIATED FITTINGS (ITEM WILL BE PROVIDED BY MO(K)
DEGUTTING AND REGUTTING OF LAGGING/ PANELING/ FITTINGS/ ETC.
FITMENT OF NEW MAIN CONTROL PANEL AND REMOTE CONTROL PANEL REQUIRED FOR PROVIDING POWER SUPPLY TO BOAT DAVIT MOTORS. WHEATER PROOFING ARRANGEMNT TO BE MANUFACTURED AND FITTED FOR MOTORS AND CONTROL PANEL.
RESTORATION OF PAINT SCHEME IN ALL HOT WORK AFFECTED AREAS
CONDUCT OF SYSTEM TRIALS (HATS AND SATS) POST FITMENT AND SUPPLY OF DOCUMENTATION TO SS.
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
ABER CAT-II- ABER REPLACEMENT OF 3T RADIAL DAVIT/ 6.5M RIB DAVIT (AUTH - HQSNC APPROVAL NC/3000/01(ABER) DATED 08 JUN 18 Qty)
REMOVAL OF EXISTING DAVIT INCLUDING GEARBOX, MOTOR, WINCH AND FOUNDATIONS.
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
MANUFACTURING AND FITMENT OF NEW FOUNDATION BRACKETS/ STIFFNERS/ PILLERS BELOW DAVIT BASE.
INSTALLATION OF NEW DAVIT ALONG WITH GEARBOX, MOTOR, WINCH AND OTHER ASSOCIATED FITTINGS (ITEM WILL BE PROVIDED BY MO(K)
DEGUTTING AND REGUTTING OF LAGGING/ PANELING/ FITTINGS/ ETC.
FITMENT OF NEW MAIN CONTROL PANEL AND REMOTE CONTROL PANEL REQUIRED FOR PROVIDING POWER SUPPLY TO BOAT DAVIT MOTORS. WHEATER PROOFING ARRANGEMNT TO BE MANUFACTURED AND FITTED FOR MOTORS AND CONTROL PANEL.
RESTORATION OF PAINT SCHEME IN ALL HOT WORK AFFECTED AREAS
CONDUCT OF SYSTEM TRIALS (HATS AND SATS) POST FITMENT AND SUPPLY OF DOCUMENTATION TO SS.
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
ABER CAT-II- ABER REPLACEMENT OF 1.5T SINGLE ARM DAVIT/ GEMINI DAVIT HQSNC APPROVAL NC/3000/01 (ABER) DATED 11 JUN 18
REMOVAL OF EXISTING DAVIT INCLUDING GEARBOX, MOTOR, WINCH AND FOUNDATIONS.
PROVIDE HEAVY DUTY VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
MANUFACTURING AND FITMENT OF NEW FOUNDATION BRACKETS/ STIFFNERS/ PILLERS BELOW DAVIT BASE.
INSTALLATION OF NEW DAVIT ALONG WITH GEARBOX, MOTOR, WINCH AND OTHER ASSOCIATED FITTINGS (ITEM WILL BE PROVIDED BY MO(K)
DEGUTTING AND REGUTTING OF LAGGING/ PANELING/ FITTINGS/ ETC.
FITMENT OF NEW MAIN CONTROL PANEL AND REMOTE CONTROL PANEL REQUIRED FOR PROVIDING POWER SUPPLY TO BOAT DAVIT MOTORS. WHEATER PROOFING ARRANGEMNT TO BE MANUFACTURED AND FITTED FOR MOTORS AND CONTROL PANEL.
RESTORATION OF PAINT SCHEME IN ALL HOT WORK AFFECTED AREAS
CONDUCT OF SYSTEM TRIALS (HATS AND SATS) POST FITMENT AND SUPPLY OF DOCUMENTATION TO SS.
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
ABER CAT-II- ABER REPLACEMENT OF HYDROGRAPHIC DAVIT AS PER APPROVED BP. NC/3000/01/(ABER) DATED 06 JUL 18. Qty:0
REMOVAL OF EXISTING HYDROGRAPHIC DAVIT AND FOUNDATIONS.
PROVIDE A VEHICLE FOR SHIFTING OF ITEM FROM MO(K) TO SHIP
MANUFACTURING AND FITMENT OF NEW FOUNDATION FOR DAVIT.
INSTALLATION OF NEW DAVIT AND OTHER ASSOCIATED FITTINGS (ITEM WILL BE PROVIDED BY MO(K)
DEGUTTING AND REGUTTING OF LAGGING/ PANELING/ FITTINGS/ ETC.
STEEL WIRE ROPES AND GRIPES TO REPLACED
RESTORATION OF PAINT SCHEME IN ALL HOT WORK AFFECTED AREAS
CONDUCT OF SYSTEM TRIALS (HATS AND SATS) POST FITMENT AND SUPPLY OF DOCUMENTATION TO SS.
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
ABER CAT-II- ABER REPLACEMENT OF EXISTING ICCP SYSTEM WITH NEW GENERATION ICCP SYSTEM WITH DIVER REPLACEABLE ANODES AND ELECTRODES AS PER APPROVED BPS
REMOVAL OF EXISTING ICCP SYSTEM (ANODES-03 NOS, REFERENCE ELECTRODES-03 NOS, AUTO CONTROL UNIT- 01 NO, CABLES FROM ACU TO ANODES, Res AND SLIP RINGS OF SHAFT.
FITMENT OF NEW GENERATION ICCP SYSTEM WITH DIVER REPLACEABLE ANODES AND ELECTRODES (ANODES-04 NOS, REFERENCE ELECTRODES-02 NOS INCLUDING DI-ELECTRIC SHIELD, AUTO CONTROL UNIT-01 NO WITH PC INSTALLATION, LAYING OUT OF CABLES FROM ACU TO ANODES, REs AND SLIP RINGS OF SHAFT. HATS/ SATS AND DRY-DOCK/ POST UNDOCKING CHECKS TO BE UNDERTAKEN.
DEGUTTING/ REGUTTING OF LAGGING/ PANELING/ PERFORATTED SHEET/ BILGE PLATE TO BE UNDERTAKEN FOR FITMENT
HYDROPHOBIC POTTING COMPOUND TO BE FILLED IN ICCP ANODE AND RE COFFERDAMS I.A.W. NHQ/DNA NC/2614 DATED 14 DEC 23. MATERIAL TO BE SUPPLIED BY YARD (QTY- 06 NOS)
RENEWAL OF COFFERDAM OF RE AND ANODE TO BE UNDERTAKEN AND APT TO BE PROVED POST FITMENT OF NEW SYSTEM
CABLE GLAND TO BE SEALED POST INSTALLATION OF THE EQUIPMENTS
SUPPLY OF OBS, B& D SPARES, TALLIES, OPERATING MANUAL, DRAWINGS, TOOL KIT SPARES, BUDGETARY QUOTE FOR INCATTING OF SPARES (AS PER OEM LIST)
MINOR A's & A's FOR STANDARDISATION OF EDA DOOR AS PER APPROVED BP. DOOR TO BE PROVIDED BY SHIPYARD.
DEGUTTING OF EXISTING WT DOORS AND FITMENT OF NEW WT DOOR ( NEW DOOR TO BE PROVIDED BY YARD)
DEGUTTING AND REGUTTING OF MFMB LAGGING/ PANELING/ LIGHT FITINGS/ CABLE TRAY
CUTTING OF FRAMES OF OLD DOOR AND WELDING OF COAMING OF NEW DOOR AS SUPPLIED BY MO(K) BY CARRYING OUT NECESSARY ADJUSTMENT TO ACCOMMODATE THE DOOR.
CHALK TESTING AND ULTRASAUNIC LEAK DETECTOR (ULD) OF DOOR TO BE UNDERTAKEN
MINOR A's & A's- FITMENT OF WT SLUICE VALVES IN VENTILATION TRUNKING AS PER APPROVED BP. NC/3000/34 A DATED 05 MAR 20 (VALVES AND ALL SPARES TO BE PROVIDED BY YARD).
DEGUTTING OF EXISTING WTSV TO BE UNDERTAKEN
MANUFACTURING OF FLANGES AND CONNECTION/ WELDING OF FLANGES WITH TRUNKING
MANUFACTURING AND FITMENT OF DECK/ BULKHEAD PIECES FOR FITMENT OF WTSV AS PER SIZE
DEFUTTING AND RE-GUTTING OF PANELING/ LAGGING/ BUNKS AT FOR FITMENT OF WATER TIGHT SLUICE VALVES
MINOR MODIFICATION OF TRUNKING IN SITU FOR FITMENT OF WTSV
PRESSURE TESTING OF SLUICE VALVES POST FITMENT
MINOR A's AND A's FOR ACCOMMODATION OF WOMEN AGNIVEER AS PER APPROVED BP. ALL ITEMS ARE TO BE PROVIDED BY YARD (AUTH - NC/3000/34A DATED 30 JUL 24)
REMOVAL OF MINOR BULKHEAD BETWEEN SHIP'S OFFICE AND REGULATING OFFICE AND WELDING OF NEW BULKHEAD FOR BATHROOM/ WC
SHIFTING OF VENTILATION TRUNKING OF SMALL ARMS MAGAZINE ALONG WITH DECK PIECE TO FWD BY 800 MM FOR INSTALLATION OF WC CUBICLE.
REMOVAL OF EXISTING BUNKS, CUPBOARDS, TABLES FILE RACKS, WASH BASINS, SAFE LOCKERS AND 01 NWT DOOR.
BLANKING OF AC VENTILATION TRUNKING IN REGULATING OFFICE AND EXTENSION IN SHIPS OFFICE WITH 02 DIFFUSERS.
MANUFACTURING AND INSTALLATION OF FOUR NOS 2 TIER BUNKS AND 09 KIT LOCKERS, 01 COMMON SOAP LOCKER, 01 TV CABINET.
MANUFACTURING INSTALLATION OF 01 NWT DOOR WITH LOCKING ARRANGEMENT FOR BATHROOM 02 WC CUBICLE AND 01 BATH CUBICLE WITH STAINLESS STEEL DOORS AND SS PANELING WITH INSPECTION WINDOW.
MANUFACTURING AND FITMENT OF SOIL LINE. SOIL/ DRAIN LINE TO BE ROUTED FROM WC CUBICLE > 24 MEN MESS > ENGG SPDC > ELECTRONIC STORE.
DEGUTTING/ REGUTTING OF 02 THREE TIER BUNKS FROM 24 MEN MESS FOR FITMENT OF SOIL LINE AND DRAIN LINE.
PROVIDE AND INSTALLATION OF 01 NO GEYSER, 01 TWO CUBICLE SS WASH BASIN, SS 304 MIRROR (04 NOS) AND OTHER SANITARY FITTINGS GIVEN IN BILL OF MATERIAL IN THE BP'S (ALL ITEMS TO BE PROVIDED BY YARD).
PROVISIONONG AND INSTALLATION OF FRESH WATER LINE WITH ISOLATING VALVE FROM MAIN FRESH WATER SYSTEM IN ALLEYWAY.
PROVISIONING OF EXHAUST FAN (1 KW) IN BATHROOM WITH ONE VENTILATION GRILL IN EACH CUBICLE. EXHAUST TRUNKING TO BE ROUTED FROM BATHROOM > SURVEY OPS ROOM > STBD CATWALK.
FORCED SUPPLY TRUNKING TO BE MERGED WITH SR SAILOR BATHROOM THROUGH SHIPS LAUNDRY. CAPACITY OF THE EXISTING FAN TO BE INCREASED FROM 3.7 KW TO 5 KW. (ITEM TO BE PROVIDED BY YARD)
DECK COVERING (20 SQ MTR DRY, 20 SQ MTR WET), DADO CASTING (20 RMT) AND INSULATION (15 SQ MTR TO BE DONE POST MODIFICATION.
REMOVAL OF 01 CUPBOARDS FROM EXISTING GUNNERY OFFICE (PROPOSED REGULATING OFFICE)
MANUFACTURING AND FITMENT OF TWO BUNKS WITH ALL ACCESSORIES IN GUNNERY OFFICE
PROVISIONING AND FITMENT OF 01 FILE CABINET, 01 WORKING TABLE , 01 CUP BOARD AND 01 SAFE LOCKER IN NEW REGULATING OFFICE
REMOVAL OF LOCKERS AND REFRIGERATOR EXISTING SHIP’S CANTEEN (CONVERTED TO SHIP’S OFFICE)
MANUFACTURING AND FITMENT OF 02 WORKING TABLE, 04 LOCKERS, 03 FILE RACK AND 01 SAFE LOCKER IN SHIP'S OFFICE
REMOVAL OF CRCA WORKING TABLE EXISTING AMCO (CONVERTED TO SHIP’S CANTEEN)
INSTALLATION OF FOUNDATION FOR DEEP FREEZER AND REFRIGERATOR IN AMCO (CONVERTED TO SHIP’S CANTEEN)
PROVISION OF AC TRUNKING FROM WARDROOM LOBBY IN AMCO (CONVERTED TO SHIP’S CANTEEN)
INSULATION OF BULKHEADS AND DECK HEAD WITH MFMB LAGGING IN AMCO (CONVERTED TO SHIP’S CANTEEN)
REMOVAL OF WASH BASIN AND FRESH WATER LINE. BLANKING OF DRAIN LINE IN EXISTING CHIEF RECORDER ROOM (CONVERTED TO GUNNERY OFFICE)
PROVISION AND INSTALL 01 WORKING TABLE, 01 LOCKER AND 01 FILE RACK IN EXISTING CHIEF RECORDER ROOM (CONVERTED TO GUNNERY OFFICE)
APT OF CLUSTER NO 4 & 5 TO BE UNDERTAKEN POST MODIFICATION
MINOR A's AND A's FOR PROVISIONING OF GAS TIGHT DOOR IN AFT STP ( DOOR TO BE PROVIDED BY YARD) NC/3000/36A DATED 11 MAR 24
DEGUTTING OF EXISTING WT DOORS AND FITMENT OF NEW WT DOOR ( NEW DOOR TO BE PROVIDED BY YARD)
DEGUTTING AND REGUTTING OF MFMB LAGGING/ PANELING/ LIGHT FITINGS/ CABLE TRAY
CUTTING OF FRAMES OF OLD DOOR AND WELDING OF COAMING OF NEW DOOR AS SUPPLIED BY MO(K) BY CARRYING OUT NECESSARY ADJUSTMENT TO ACCOMMODATE THE DOOR.
CHALK TESTING AND ULTRASAUNIC LEAK DETECTOR (ULD) OF DOOR TO BE UNDERTAKEN
MINOR A's AND A's FOR FITMENT OF EYE PLATE FOR HOSE SECURING PENDENT AS PER APPROVED BP. NC/3000/34A DATED25 JAN 24.
REGUTTING/ DEGUTTING OF LAGGING/ PANELING/ CABLE TRAY/ SPEAKERS AND OTHER FITTING IN WOMEN AGNIVEER BATHROOM
MANUFACTURING AND WEDLING OF DECK EYE AS PER SAMPLE PROVIDED BY SHIP'S STAFF (MAT - MS)
DPT OF WELD JOINTS TO BE UNDERTAKEN
LOAD TEST OF DECK EYE POST FITMENT TO BE UNDERTAKEN IN SITU
ENGINEERING - PART I
MISSION CRITICAL EQUIPMENT Take crank shaft defelection on all webs and record in service log. Carry out alignment if readings are out of limits.
MISSION CRITICAL EQUIPMENT Remove cylinder heads, inspect all valves, guides and operating mechanism. Grind valve and valve seats. Replace worn out parts.
MISSION CRITICAL EQUIPMENT Decarbonise cylinder head and piston crown. Examine cylinder heads for crack and pittings.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Gauge all cylinder box with piston at BDC and record.
MISSION CRITICAL EQUIPMENT Refit indicator valves and cylinder relief valves.Replace valves if found defective.
MISSION CRITICAL EQUIPMENT Remove two pistons and connecting rods. Examine pistons, piston rings and scrapper rings. Measure wear down of rings and piston. Examine big end and small end bearings and piston pin for wear and record in service log. Note:-In case wear/ corrosion is abnormal, examine all cylinder liners and replace parts as required.
MISSION CRITICAL EQUIPMENTE Examine cam shaft drive gear for sign of wear. If found defective replace as necessary.
MISSION CRITICAL EQUIPMENT Examine all rollers and cams for sign of wear and hard mark.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Strip and examine fuel injection pump and carry out phasing calibration on assembly. Check all internal parts and replace worn out parts.
MISSION CRITICAL EQUIPMENT Remove and clean starting air line and relief starting valve and other associated valves in the system. Replace worn out parts.
MISSION CRITICAL EQUIPMENT Check clearances of connecting rod bearings with feeler gauge. Carry out remedial action if readings are out of limits.
MISSION CRITICAL EQUIPMENT Refit sea water and fresh water combined pump. (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Remove and dismantle all fuel injecters and service/ reset pressure on completion.Replace defective injectors
MISSION CRITICAL EQUIPMENT Examine cooling water space of cylinder head and remove dirt and deposits (degreasing). Carry out lapping of all cylinder heads as required.
MISSION CRITICAL EQUIPMENT Examine sea water side of lub oil, fresh water cooler & Fuel cooler, sight tubes and pressure test on assembly. Replace coolers if found damaged. Check corrosion plug for wear down and replace the worn out corrosion plugs.
MISSION CRITICAL EQUIPMENT Examine intake air cooler on sea water side and pressure test, examine corrosion plugs. Replace corrosion plugs Testing pr - 03 bar
MISSION CRITICAL EQUIPMENT Calibrate all pressure and temperature gauges of the engine. Electronic gauges-10, Scanner-07 Mechaniocal gauges-09. Defective gauges to be replaceed.
MISSION CRITICAL EQUIPMENT Calibrate engine tachometer.Replace if found defective.
MISSION CRITICAL EQUIPMENT Refit circulating water pumps suction and discharge valves. Type - SD Dia- 80 mm Replace worn out parts
MISSION CRITICAL EQUIPMENT Refit lub oil pump and associated relief valves post calibration. (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Undertake cleaning and overhauling of turbo charger.Replace worn out parts
MISSION CRITICAL EQUIPMENT Take crank shaft defelection on all webs and record in service log. Carry out alignment if readings are out of limits.
MISSION CRITICAL EQUIPMENT Remove cylinder heads, inspect all valves, guides and operating mechanism. Grind valve and valve seats. Replace worn out parts.
MISSION CRITICAL EQUIPMENT Decarbonise cylinder head and piston crown. Examine cylinder heads for crack and pittings.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Gauge all cylinder box with piston at BDC and record.
MISSION CRITICAL EQUIPMENT Refit indicator valves and cylinder relief valves.Replace valves if found defective.
MISSION CRITICAL EQUIPMENT Remove two pistons and connecting rods. Examine pistons, piston rings and scrapper rings. Measure wear down of rings and piston. Examine big end and small end bearings and piston pin for wear and record in service log. Note:-In case wear/ corrosion is abnormal, examine all cylinder liners and replace parts as required.
MISSION CRITICAL EQUIPMENTE Examine cam shaft drive gear for sign of wear. If found defective replace as necessary.
MISSION CRITICAL EQUIPMENT Examine all rollers and cams for sign of wear and hard mark.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Strip and examine fuel injection pump and carry out phasing calibration on assembly. Check all internal parts and replace worn out parts.
MISSION CRITICAL EQUIPMENT Remove and clean starting air line and relief starting valve and other associated valves in the system. Replace worn out parts.
MISSION CRITICAL EQUIPMENT Check clearances of connecting rod bearings with feeler gauge. Carry out remedial action if readings are out of limits.
MISSION CRITICAL EQUIPMENT Refit sea water and fresh water combined pump. (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Remove and dismantle all fuel injecters and service/ reset pressure on completion.Replace defective injectors
MISSION CRITICAL EQUIPMENT Examine cooling water space of cylinder head and remove dirt and deposits (degreasing). Carry out lapping of all cylinder heads as required.
MISSION CRITICAL EQUIPMENT Examine sea water side of lub oil, fresh water cooler & Fuel cooler, sight tubes and pressure test on assembly. Replace coolers if found damaged. Check corrosion plug for wear down and replace the worn out corrosion plugs.
MISSION CRITICAL EQUIPMENT Examine intake air cooler on sea water side and pressure test, examine corrosion plugs. Replace corrosion plugs Testing pr - 03 bar
MISSION CRITICAL EQUIPMENT Calibrate all pressure and temperature gauges of the engine. Electronic gauges-10, Scanner-07 Mechaniocal gauges-09. Defective gauges to be replaceed.
MISSION CRITICAL EQUIPMENT Calibrate engine tachometer.Replace if found defective.
MISSION CRITICAL EQUIPMENT Refit circulating water pumps suction and discharge valves. Type - SD Dia- 80 mm Replace worn out parts
MISSION CRITICAL EQUIPMENT Refit lub oil pump and associated relief valves post calibration. (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Undertake cleaning and overhauling of turbo charger.Replace worn out parts
Whenever any repair/ replaceal of exhaust system is undertaken, the replaceal/repaired system must be pressure tested upto 1.5 kgf/cm2 times the working pressure
Survey and replaceal of underwater exhaust pipes welded to the hull. Length - 05Mtrs , Material - MS
Check non-metallic parts, pipes, muffler and exhaust line for cracks and distortion. replace if required. Silencer - Qty - 03 each Air Intake Filters (non metallic) - 06 each Exhaust Lines - 10m each, Mat - MS
Check alignment of compensator.replace if damage.Type - Metallic, Size - 350mm, Qty - 04
Check and grease all support hangers of air induction and exhaust system. Details of grease - LG 280 Type - Spring Loaded, Approx Qty - 15 each Type - Non-spring Loaded, Approx Qty - 15 each
Check and grease all support hangers of air induction and exhaust system Replace defective parts.
Calibrate the thermo couples and temperature indicators. replace the defective components. Thermocouple - 26 (0-700 Deg C) Scanner - 02
Inspect for condition and overhaul cocks/ fittings for measurement of air intake depression and exhaust back pressure measurement in exhaust trunkings at appropriate locations. Replace damaged parts.
Application and restoration of recommended paint scheme on all components of the air intake system. 200 Sq mtr
(a) Inspect and clean all components of Air Induction System from weather deck opening to TC Rubber bellow.Replace the parts found damaged (b) Replace air filter.
Calibrate all pressure gauges.Replace damaged gauges Suction gauge - -1 to +5 bar Discharge gauge - -1 to +5 bar
Calibrate all pressure gauges.Replace damaged gauges Suction gauge - -1 to +5 bar Discharge gauge - -1 to +5 bar
Calibrate all pressure gauges of system. Replace damaged gauges. Range - 0 to 30 bar
Check security of threaded connections and foundation. replace damaged foundation.
Check Engine to R/G and R/G to output shaft coupling bolts for looseness. Tighten if necessary.Replace damaged parts
Check heat exchanger for leakage and replace seals, if necessary.
Refit suction and discharge valves.Carry out pressure testing of valves. replace BER valves Test pressure - 3 Bar Type - SD VV Dia - 40 mm
Replace coupling guards.
Survey protective coating of tail shaft and repair as necessary.
Check condition of shaft balance pads . Note:- Remove pads when approx. 2mm of lining remains.
Inspect proximity switches and terminal box for cleanliness, looseness and damage. Check for integrity of electrical connections, cables and contacts (Replace damage and broken switches).
Undertake sample inspection of plummer bearings on each shaft line for scoring/corrosion. In case any abnormality is observed, carry out inspection of balance plummer bearings on the same shaft line.Replace worn out parts
Carry out calibration of remote and local temperature indicator Type - RTD Range - 0-85 Replace dfective sensors.
Check clearance of cutless bearings & replace the bearing.
Examine propeller for damage and determine fitness for further use. Replace /repair as necessary. Propeller Blades. (a) Clean propellers and inspect propeller blades for pitting and surface deterioration. (b) Recondition propeller blades in order to achieve efficient operating conditions. (c) Check the condition of the blade O-rings. (d) Inspect blade bolts and locking strips
Replace SV Mounts.
Replace coupling guards.
Inspect condition of suction/ discharge compensators. replace the defective compensators as necessary.
Refit suction and discharge valves. Carry out pressure testing of valves. replace BER valves Test pressure - 3 Bar (a) Type - SD VV Dia - 65 mm (b) Type - NR VV Dia - 65 mm
Carry out performance trial of the pump including parameter checks(suction/discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects. replace defective parts.
Calibrate all instrumentation. replace if found defective. Suction pr gauge - - to +5 Discharge pr gauge - 0 to 12
Inspect the system and carry out onboard overhauling. replace defective parts.
MISSION CRITICAL EQUIPMENT Replace all Victaulic couplers.
MISSION CRITICAL EQUIPMENT Check anti vibration mounts of the HP pump mounting plate for bulging/ deterioration. Replace vibration mounts as required.
MISSION CRITICAL EQUIPMENT Check air regulator for operation. Calibrate/ repair as necessary.
MISSION CRITICAL EQUIPMENT Check non return valves of sand filter back wash and module permeate line. Replace if found defective.
MISSION CRITICAL EQUIPMENT Calibrate Torque wrench used for tightening of DT Module end nut. Replace if found defective.
MISSION CRITICAL EQUIPMENT Calibrate hand conductivity meter and panel mounted conductivity meter. Replace if defective.
MISSION CRITICAL EQUIPMENT Remove CIS-80 (Conductivity electrode) tip. Clean and calibrate with another conductivity meter. Replace if found defective.
MISSION CRITICAL EQUIPMENT replace DA filters media.
MISSION CRITICAL EQUIPMENT Replace pulsation damper charging plug seal ring. Recharge with nitrogen Recharge with nitrogen to 39 bar. Replace pulsation damper if found defective.
MISSION CRITICAL EQUIPMENT Check control panel fittings/ fuse for proper functioning. Replace items if found defective.
MISSION CRITICAL EQUIPMENT Check control equipments – Servo Motor Valve/ Pressure transmitter/ Solenoid valves / Flow and level switches and PLC for operation. Repair/ Replace as necessary.
MISSION CRITICAL EQUIPMENT Check HP relief valve for operation. Calibrate/ replace as required.
MISSION CRITICAL EQUIPMENT Clean and calibrate conductivity meter probe. Recalibrate/ Replace if found defective.
MISSION CRITICAL EQUIPMENT Calibration through CIT for all OLR/ MPU mechanism installed in the system. Replace if found defective.
MISSION CRITICAL EQUIPMENT Carryout Top overhaul of HP pump PP 60. Replace all LP and HP manifold seals, O rings and back up teflon washers. Check suction/ delivery valves and manifold for sealing area. If corroded replace as necessary.(Refer JIC : 42902/A5 and Chapter 5&7 of OEM manual)
MISSION CRITICAL EQUIPMENT Calibrate all gauges, panel modules and alarm /trip cutouts. Mechanical gauges-08, cutout-06 Replace defctive items.
MISSION CRITICAL EQUIPMENT Check wiring/contacts of the panel for wear/deterioration. Project specific defects for replaceal/replacement if necessary.
Open the top half of the bearing housing and examine the following:- (a) Top and bottom bearing shell halves for wear and scoring. (b) Dovel pin and the bearing shell securing ring. (c) Bearing Clearances Replace worn out parts
Examine shaft oil felt seal and replace if found defective.
Carry out complete Performance checks of the System. Replace worn out parts
Carry out calibration of Panel meters.Replace defective parts
MISSION CRITICAL EQUIPMENT replace/replace all mountings showing sign of deterioration of rubber and or as per records of 6 Monthly & PRT-1 routines.
MISSION CRITICAL EQUIPMENT Carry out 2000 Hourly routines as mentioned- (a) 2000H3 Inspect the flexible coupling for cracks and check alignment. And replace defective hoses. (b) 2000H4 Check fuel injection pump timing. Calibrate/ replace if found defect ive. (c) 2000H6 Calibrate fuel injectors. Reset injection spray pressure to 170 -180 kg/ sq.cm. pressure. Replace defective components. (d) 2000H11 Check the flexible coupling for deterioration. replace the defective parts. (e) 2000H12 Check alignment between engine and alternator. Adjust as necessary (f) 2000H13 Check operation of thermostat valve on lub oil cooler and heat exchanger. replace if found defective. (g) 2000H14 Chemically clean, replace all 'O' seals and gaskets. Pressure test following to the pressure mentioned against each :- (i) Heat Exchanger Seawater side 4.0 Kg/sq.cm. Fresh water side 4.0 Kg/sq.cm. (ii) Oil cooler Oil side 10.0 Kg/sq.cm. Water side 04.0 Kg/sq.cm. (iii) Inter cooler Air side 2.5 Kg/sq.cm. Water side 4.0 Kg/sq.cm. (h) 2000H17 Throughly clean turbocharger on both turbine and compressor sides. Examine turbine blade and compressor wheel for damage. Clean diffuser. Replace deffective parts. (j) 2000H20 Check insulation blankets of turbo supercharger air and exhaust system. replace defective components. (k) 2000H24 Check crankshaft end clearances. Carry out remedial action if found out of limits. (l) 2000H26 replace zinc anode on heat exchanger,after cooler and exhaust manifold. (m) 2000H28 Check and inspect drive gears for camshaft and auxiliaries. Replace parts defective/ worn out. Note: Record all measured dimensions and clearances in the engine log.
MISSION CRITICAL EQUIPMENT Remove all cylinder heads and dismantle valve gear. Decarbonise combustion spaces. Grind in valves. Check condition of valve guide and valves. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT Examine condition of valve gear bracket, parts and valve seat inserts. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT replace cylinder head joints, flexible hoses and cover joints.
MISSION CRITICAL EQUIPMENT Remove one piston assembly and cylinder liner at random and measure and record following in the engine log. a) Piston ring clearances b) Gauge liner internally for abnormal wear, pitting and corrosion of external surfaces. c) Big end bearing shells and crankpin for clearances and ovality respectively. Note:-In case wear/ corrosion is abnormal, examine all cylinder liners and replace parts as required.
MISSION CRITICAL EQUIPMENT Carry out water pressure test under gravity head from over head tank. Check bottom of the liners through crank case door for leakage.Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Examine pins and bushes of fuel control mechanism. Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Calibrate fuel injection pump Qty - 01. Overhaul fuel feed pump Qty - 02 (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate low lub oil pressure and high temperature protection devices and replace defective components. (a) Alarms: - (i) Lub Oil Pressure; Set Point – 2.2 bar; Qty – 01 (ii) Engine Sea Water Pressure; Set Point – 0.2 bar; Qty – 01 (iii) Coolant Temperature; Set point – 88C; Qty – 01 (iv) Lub Oil Temperature; Set Point – 118 C; Qty – 01 (v) Exhaust Temp; Set Point – 650 C; Qty -02 (b) Trips: - (xii) RPM: Set Point – 1726; Qty-01 (xiii) Lub OIL Pressure; Set Point – 1.5 bar; Qty-01 (xiv) Coolant Temperature; Set Point – 97 C; Qty-01 (xv) Lub Oil Temperature; Set Point – 122 C; Qty-01
MISSION CRITICAL EQUIPMENT Overhaul the pumps. replace worn parts as necessary. 01 sea water, 01 fw pump, 02 nos lub oil pumps (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate all temperature and pressure gauges and replace defective components. Pressure Gauge - 0-10 Bar Qty - 04 Pressure Gauge - 0-40 Bar Qty - 01 Temperature Gauge - 0-150 Bar Qty - 04 Temperature Gauge - 0-800 Bar Qty - 03
MISSION CRITICAL EQUIPMENT Inspect valves and rings of air starting valves. replace defective valve
MISSION CRITICAL EQUIPMENT TURBOCHARGER Check condition and measure bearing clearances, overhaul if necessary. PRE 8000 HOURLY ROUTINES: Check compression pressures of all cylinders, it should be more than 19 bar. replace piston rings of all those cylinders not confirming to specified compression pressure during 8000 Hourly routines.
MISSION CRITICAL EQUIPMENT Check and inspect drive gears for camshaft and auxiliaries. cam gear ,both lub oil pump drive ,fip drive Replace parts defective/ worn out.
MISSION CRITICAL EQUIPMENT replace all mountings showing sign of deterioration of rubber and or as per records of 6 Monthly & PRT-1 routines. Replace worn out parts
MISSION CRITICAL EQUIPMENT Carry out 4000 hourly routines. As per DL serial number 20096 - 20110 Note: Record all measurments and clearances in the engine log.
MISSION CRITICAL EQUIPMENT Remove all piston assemblies, decarbonise pistons and check ring clearances, replace piston rings and defective components
MISSION CRITICAL EQUIPMENT Measure big end bearing clearances and examine bearing shells, their bolts, nuts and washers. replace defective bearings .
MISSION CRITICAL EQUIPMENT Examine crank pin surfaces for scoring and check for ovality. Replace defective components.
MISSION CRITICAL EQUIPMENT Carry out crack detection test of gudgen pin, piston and cam shafts Repalce defective components.
MISSION CRITICAL EQUIPMENT Gauge all liners internally, extract one liner from each bank and examine for external corrosion and pitting. If required extract all liners and replace as necessary.
MISSION CRITICAL EQUIPMENT Remove and refit overspeed trip gear. Repalce defective components.
MISSION CRITICAL EQUIPMENT Check condition of cam shaft. Examine push rod sleeves, roller tappets and replace if worn out/ damaged.
MISSION CRITICAL EQUIPMENT Check all connecting rods for bend and twist. Clean and flush oil passages.Repalce defective components
MISSION CRITICAL EQUIPMENT Check torsional vibration damper. Repalce if found damaged.
MISSION CRITICAL EQUIPMENT Overhaul fuel feed pump and replace all seals.
MISSION CRITICAL EQUIPMENT Overhaul fuel injection pump, check governor assembly and replace the parts in case of excessive wear. replace all seals and O rings. Calibrate fuel pump and governor assembly together.
MISSION CRITICAL EQUIPMENT Overhaul turbo supercharger, replace the bearings. replace entire unit if parts are excessively worn.
MISSION CRITICAL EQUIPMENT Check operation of all alarms and safety devices. Replace defective components. (a) Alarms: - (i) Lub Oil Pressure; Set Point – 2.2 bar; Qty – 01 (ii) Engine Sea Water Pressure; Set Point – 0.2 bar; Qty – 01 (iii) Coolant Temperature; Set point – 88C; Qty – 01 (iv) Lub Oil Temperature; Set Point – 118 C; Qty – 01 (v) Exhaust Temp; Set Point – 650 C; Qty -02 (b) Trips: - (xii) RPM: Set Point – 1726; Qty-01 (xiii) Lub OIL Pressure; Set Point – 1.5 bar; Qty-01 (xiv) Coolant Temperature; Set Point – 97 C; Qty-01 (xv) Lub Oil Temperature; Set Point – 122 C; Qty-01
MISSION CRITICAL EQUIPMENT replace all flexible hoses.
MISSION CRITICAL EQUIPMENT Check air starting valve and clean starting air distributor. Repalce defective components
MISSION CRITICAL EQUIPMENT Carry out water pressure test of cooling water chambers and check for leaks (especially the packing of cylinder liners against the crank case). Repalce defective components
MISSION CRITICAL EQUIPMENT replace all mountings showing sign of deterioration of rubber and or as per records of 6 Monthly & PRT-1 routines. Replace worn out parts
MISSION CRITICAL EQUIPMENT Carry out 4000 hourly routines. As per DL serial number 20096 - 20110 Note: Record all measurments and clearances in the engine log.
MISSION CRITICAL EQUIPMENT Remove all piston assemblies, decarbonise pistons and check ring clearances, replace piston rings and defective components
MISSION CRITICAL EQUIPMENT Measure big end bearing clearances and examine bearing shells, their bolts, nuts and washers. replace defective bearings .
MISSION CRITICAL EQUIPMENT Examine crank pin surfaces for scoring and check for ovality. Replace defective components.
MISSION CRITICAL EQUIPMENT Carry out crack detection test of gudgen pin, piston and cam shafts Repalce defective components.
MISSION CRITICAL EQUIPMENT Gauge all liners internally, extract one liner from each bank and examine for external corrosion and pitting. If required extract all liners and replace as necessary.
MISSION CRITICAL EQUIPMENT Remove and refit overspeed trip gear. Repalce defective components.
MISSION CRITICAL EQUIPMENT Check condition of cam shaft. Examine push rod sleeves, roller tappets and replace if worn out/ damaged.
MISSION CRITICAL EQUIPMENT Check all connecting rods for bend and twist. Clean and flush oil passages.Repalce defective components
MISSION CRITICAL EQUIPMENT Check torsional vibration damper. Repalce if found damaged.
MISSION CRITICAL EQUIPMENT Overhaul fuel feed pump and replace all seals.
MISSION CRITICAL EQUIPMENT Overhaul fuel injection pump, check governor assembly and replace the parts in case of excessive wear. replace all seals and O rings. Calibrate fuel pump and governor assembly together.
MISSION CRITICAL EQUIPMENT Overhaul turbo supercharger, replace the bearings. replace entire unit if parts are excessively worn.
MISSION CRITICAL EQUIPMENT Check operation of all alarms and safety devices. Replace defective components. (a) Alarms: - (i) Lub Oil Pressure; Set Point – 2.2 bar; Qty – 01 (ii) Engine Sea Water Pressure; Set Point – 0.2 bar; Qty – 01 (iii) Coolant Temperature; Set point – 88C; Qty – 01 (iv) Lub Oil Temperature; Set Point – 118 C; Qty – 01 (v) Exhaust Temp; Set Point – 650 C; Qty -02 (b) Trips: - (xii) RPM: Set Point – 1726; Qty-01 (xiii) Lub OIL Pressure; Set Point – 1.5 bar; Qty-01 (xiv) Coolant Temperature; Set Point – 97 C; Qty-01 (xv) Lub Oil Temperature; Set Point – 122 C; Qty-01
MISSION CRITICAL EQUIPMENT replace all flexible hoses.
MISSION CRITICAL EQUIPMENT Check air starting valve and clean starting air distributor. Repalce defective components
MISSION CRITICAL EQUIPMENT Carry out water pressure test of cooling water chambers and check for leaks (especially the packing of cylinder liners against the crank case). Repalce defective components
MISSION CRITICAL EQUIPMENT replace/replace all mountings showing sign of deterioration of rubber and or as per records of 6 Monthly & PRT-1 routines.
MISSION CRITICAL EQUIPMENT Carry out 2000 Hourly routines as mentioned- (a) 2000H3 Inspect the flexible coupling for cracks and check alignment. And replace defective hoses. (b) 2000H4 Check fuel injection pump timing. Calibrate/ replace if found defect ive. (c) 2000H6 Calibrate fuel injectors. Reset injection spray pressure to 170 -180 kg/sq.cm. pressure. Replace defective components. (d) 2000H11 Check the flexible coupling for deterioration. replace the defective parts. (e) 2000H12 Check alignment between engine and alternator. Adjust as necessary (f) 2000H13 Check operation of thermostat valve on lub oil cooler and heat exchanger. replace if found defective. (g) 2000H14 Chemically clean, replace all 'O' seals and gaskets. Pressure test following to the pressure mentioned against each :- (i) Heat Exchanger Seawater side 4.0 Kg/sq.cm. Fresh water side 4.0 Kg/sq.cm. (ii) Oil cooler Oil side 10.0 Kg/sq.cm. Water side 04.0 Kg/sq.cm. (iii) Inter cooler Air side 2.5 Kg/sq.cm. Water side 4.0 Kg/sq.cm. (h) 2000H17 Throughly clean turbocharger on both turbine and compressor sides. Examine turbine blade and compressor wheel for damage. Clean diffuser. Replace deffective parts. (j) 2000H20 Check insulation blankets of turbo supercharger air and exhaust system. replace defective components. (k) 2000H24 Check crankshaft end clearances. Carry out remedial action if found out of limits. (l) 2000H26 replace zinc anode on heat exchanger,after cooler and exhaust manifold. (m) 2000H28 Check and inspect drive gears for camshaft and auxiliaries. Replace parts defective/ worn out. Note: Record all measured dimensions and clearances in the engine log.
MISSION CRITICAL EQUIPMENT Remove all cylinder heads and dismantle valve gear. Decarbonise combustion spaces. Grind in valves. Check condition of valve guide and valves. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT Examine condition of valve gear bracket, parts and valve seat inserts. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT replace cylinder head joints, flexible hoses and cover joints.
MISSION CRITICAL EQUIPMENT Remove one piston assembly and cylinder liner at random and measure and record following in the engine log. a) Piston ring clearances b) Gauge liner internally for abnormal wear, pitting and corrosion of external surfaces. c) Big end bearing shells and crankpin for clearances and ovality respectively. Note:-In case wear/ corrosion is abnormal, examine all cylinder liners and replace parts as required.
MISSION CRITICAL EQUIPMENT Carry out water pressure test under gravity head from over head tank. Check bottom of the liners through crank case door for leakage.Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Examine pins and bushes of fuel control mechanism. Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Calibrate fuel injection pump Qty - 01. Overhaul fuel feed pump Qty - 02 (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate low lub oil pressure and high temperature protection devices and replace defective components. (a) Alarms: - (i) Lub Oil Pressure; Set Point – 2.2 bar; Qty – 01 (ii) Engine Sea Water Pressure; Set Point – 0.2 bar; Qty – 01 (iii) Coolant Temperature; Set point – 88C; Qty – 01 (iv) Lub Oil Temperature; Set Point – 118 C; Qty – 01 (v) Exhaust Temp; Set Point – 650 C; Qty -02 (b) Trips: - (xii) RPM: Set Point – 1726; Qty-01 (xiii) Lub OIL Pressure; Set Point – 1.5 bar; Qty-01 (xiv) Coolant Temperature; Set Point – 97 C; Qty-01 (xv) Lub Oil Temperature; Set Point – 122 C; Qty-01
MISSION CRITICAL EQUIPMENT Overhaul the pumps. replace worn parts as necessary. 01 sea water, 01 fw pump, 02 nos lub oil pumps (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate all temperature and pressure gauges and replace defective components. Pressure Gauge - 0-10 Bar Qty - 04 Pressure Gauge - 0-40 Bar Qty - 01 Temperature Gauge - 0-150 Bar Qty - 04 Temperature Gauge - 0-800 Bar Qty - 03
MISSION CRITICAL EQUIPMENT Inspect valves and rings of air starting valves. replace defective valve
MISSION CRITICAL EQUIPMENT TURBOCHARGER Check condition and measure bearing clearances, overhaul if necessary. PRE 8000 HOURLY ROUTINES: Check compression pressures of all cylinders, it should be more than 19 bar. replace piston rings of all those cylinders not confirming to specified compression pressure during 8000 Hourly routines.
MISSION CRITICAL EQUIPMENT Check and inspect drive gears for camshaft and auxiliaries. cam gear ,both lub oil pump drive ,fip drive Replace parts defective/ worn out.
MISSION CRITICAL EQUIPMENT replace/replace all mountings showing sign of deterioration of rubber and or as per records of 6 Monthly & PRT-1 routines.
MISSION CRITICAL EQUIPMENT Carry out 2000 Hourly routines as mentioned- (a) 2000H3 Inspect the flexible coupling for cracks and check alignment. And replace defective hoses. (b) 2000H4 Check fuel injection pump timing. Calibrate/ replace if found defect ive. (c) 2000H6 Calibrate fuel injectors. Reset injection spray pressure to 170 -180 kg/sq.cm. pressure. Replace defective components. (d) 2000H11 Check the flexible coupling for deterioration. replace the defective parts. (e) 2000H12 Check alignment between engine and alternator. Adjust as necessary (f) 2000H13 Check operation of thermostat valve on lub oil cooler and heat exchanger. replace if found defective. (g) 2000H14 Chemically clean, replace all 'O' seals and gaskets. Pressure test following to the pressure mentioned against each :- (i) Heat Exchanger Seawater side 4.0 Kg/sq.cm. Fresh water side 4.0 Kg/sq.cm. (ii) Oil cooler Oil side 10.0 Kg/sq.cm. Water side 04.0 Kg/sq.cm. (iii) Inter cooler Air side 2.5 Kg/sq.cm. Water side 4.0 Kg/sq.cm. (h) 2000H17 Throughly clean turbocharger on both turbine and compressor sides. Examine turbine blade and compressor wheel for damage. Clean diffuser. Replace deffective parts. (j) 2000H20 Check insulation blankets of turbo supercharger air and exhaust system. replace defective components. (k) 2000H24 Check crankshaft end clearances. Carry out remedial action if found out of limits. (l) 2000H26 replace zinc anode on heat exchanger,after cooler and exhaust manifold. (m) 2000H28 Check and inspect drive gears for camshaft and auxiliaries. Replace parts defective/ worn out. Note: Record all measured dimensions and clearances in the engine log.
MISSION CRITICAL EQUIPMENT Remove all cylinder heads and dismantle valve gear. Decarbonise combustion spaces. Grind in valves. Check condition of valve guide and valves. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT Examine condition of valve gear bracket, parts and valve seat inserts. replace parts worn out as necessary.
MISSION CRITICAL EQUIPMENT replace cylinder head joints, flexible hoses and cover joints.
MISSION CRITICAL EQUIPMENT Remove one piston assembly and cylinder liner at random and measure and record following in the engine log. a) Piston ring clearances b) Gauge liner internally for abnormal wear, pitting and corrosion of external surfaces. c) Big end bearing shells and crankpin for clearances and ovality respectively. Note:-In case wear/ corrosion is abnormal, examine all cylinder liners and replace parts as required.
MISSION CRITICAL EQUIPMENT Carry out water pressure test under gravity head from over head tank. Check bottom of the liners through crank case door for leakage.Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Examine pins and bushes of fuel control mechanism. Replace parts damaged/ worn out.
MISSION CRITICAL EQUIPMENT Calibrate fuel injection pump Qty - 01. Overhaul fuel feed pump Qty - 02 (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate low lub oil pressure and high temperature protection devices and replace defective components. (a) Alarms: - (i) Lub Oil Pressure; Set Point – 2.2 bar; Qty – 01 (ii) Engine Sea Water Pressure; Set Point – 0.2 bar; Qty – 01 (iii) Coolant Temperature; Set point – 88C; Qty – 01 (iv) Lub Oil Temperature; Set Point – 118 C; Qty – 01 (v) Exhaust Temp; Set Point – 650 C; Qty -02 (b) Trips: - (xii) RPM: Set Point – 1726; Qty-01 (xiii) Lub OIL Pressure; Set Point – 1.5 bar; Qty-01 (xiv) Coolant Temperature; Set Point – 97 C; Qty-01 (xv) Lub Oil Temperature; Set Point – 122 C; Qty-01
MISSION CRITICAL EQUIPMENT Overhaul the pumps. replace worn parts as necessary. 01 sea water, 01 fw pump, 02 nos lub oil pumps (a) Dismantle and check the pump. (b) Replace the bearings, shaft seals and worn parts. (c) Inspect the driving gear.Replace worn out parts.
MISSION CRITICAL EQUIPMENT Calibrate all temperature and pressure gauges and replace defective components. Pressure Gauge - 0-10 Bar Qty - 04 Pressure Gauge - 0-40 Bar Qty - 01 Temperature Gauge - 0-150 Bar Qty - 04 Temperature Gauge - 0-800 Bar Qty - 03
MISSION CRITICAL EQUIPMENT Inspect valves and rings of air starting valves. replace defective valve
MISSION CRITICAL EQUIPMENT TURBOCHARGER. Check condition and measure bearing clearances, overhaul if necessary. PRE 8000 HOURLY ROUTINES: Check compression pressures of all cylinders, it should be more than 19 bar. replace piston rings of all those cylinders not confirming to specified compression pressure during 8000 Hourly routines.
MISSION CRITICAL EQUIPMENT Check and inspect drive gears for camshaft and auxiliaries. cam gear ,both lub oil pump drive ,fip drive Replace parts defective/ worn out.
Survey and replaceal of underwater exhaust pipes welded to the hull.
Check non-metallic parts, pipes, muffler and exhaust line for cracks and distortion. Undertake repair/ replaceal as required:- (a) Exhaust silencer(Muffler) (Two Qty for Each DA, Total - 02x03 = 06 Qty, size - 250mm) (b) Exhaust line inculding Lagging and cladding. Total 60 Mtrs Dia 350MM. Mat. - MS, Qty - 15 Mtrs
Check alignment of compensator. Adjust as necessary. (Two Qty for Each DA, Total - 02x03 = 06 Qty, size - 250mm)
Remove and inspect the lub oil drain cock of the exhaust gas expansion piece and clean it by blowing through compressed air
Check and grease all support hangers of air induction and exhaust system.
Calibrate the thermo couples and temperature indicators. Sensor Range : 0 to 700 Deg C,(Two Qty for Each DA, Total - 02x03 = 06 Qty
Inspect for condition and overhaul cocks/ fittings for measurement of air intake depression and exhaust back pressure measurement in exhaust trunkings at appropriate locations.
Application and restoration of recommended paint scheme on all components of the air intake system
(a) Inspect and clean all components of Air Induction System from weather deck opening to TC Rubber bellow. (b) Replace air filter.
MISSION CRITICAL EQUIPMENT Calibrate all gauges Qty - 13 each, panel modules qty - 1 each and alarms /trip cutouts Qty - 8 each. Calibrate all Relief valves.Qty - 3 each Replace defective components.
MISSION CRITICAL EQUIPMENT Carry out functionality checks of loading/ unloading mechanism of the compressor. Replace defective components.
MISSION CRITICAL EQUIPMENT Check operation of pilot operated solenoid valves, capacity control solenoid valves and pressure switches for set points. Reset/ Calibrate/Replace if deviation observed.
MISSION CRITICAL EQUIPMENT Check and clean the fouling condition of the condenser tubes.
MISSION CRITICAL EQUIPMENT Carry out PHE Cleaning and pressure testing post cleaning. Testing pressure - 05 Bar.
MISSION CRITICAL EQUIPMENT replace the system oil completely.
MISSION CRITICAL EQUIPMENT Replace parts as indicated of OEM manual at Annexure-A.
MISSION CRITICAL EQUIPMENT Remove side covers, inspect the compressor. Replace partsRemove side covers, inspect the compressor. Replace parts as indicated of OEM manual at Annexure-A
MISSION CRITICAL EQUIPMENT Check the tightness of all the fasteners mounted in the plant as per torque sheet at Chapter-6 of OEM Operation and Maintenance manual
MISSION CRITICAL EQUIPMENT Check for air/non-condensable gases in the system. Change the gas if required.
MISSION CRITICAL EQUIPMENT Replace parts as indicated of OEM manual at Annexure-A
MISSION CRITICAL EQUIPMENT Carry out vibration measurement and analysis. Replace if found defectivve.
Carry out performance trial of the pump including parameter checks(suction/discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects
Calibrate all instrumentation. Suction gauge (-1- 1.5 bar) Qty - 2 discharge gauge (0-05) Qty - 2
replace the suction strainer.
Carry out performance trial of the pump including parameter checks(suction/discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects
Calibrate all instrumentation. Suction gauge (-1- 1.5 bar) Qty - 2 discharge gauge (0-05) Qty - 2 Replace defective components.
replace the suction strainer.
MISSION CRITICAL EQUIPMENT Calibrate all Relief valves. replace/ replace defective components.
MISSION CRITICAL EQUIPMENT Calibrate all control instruments (gauges, pressure switches, temp switches). Defective instrumentations to be replaced. Temp transmiter - 12 each, Pressure transmitter - 2 each, Pressure gauges - 7 each
MISSION CRITICAL EQUIPMENT replace complete local wiring (sensor to JB)
MISSION CRITICAL EQUIPMENT Refit all isolating valve on gas system and cooling water system. (replace all nylon washer and sealing).
Check function of Pressure Relief Valve. Repair/ Replace if defective.
MISSION CRITICAL EQUIPMENT Following components to be replaced mandatorily on stripping for TOH/MOH:- (a) Neoprene ‘O’ rings. (b) Gaskets. (c) Dowty rings. (d) Sealing Rings.
MISSION CRITICAL EQUIPMENT Open Cylinder head and check for the following : (a) Valve ring plates, valve spring. Replace if required. (b) Piston ring (compression/oil). Replace if end gap (closed) is 0.8 mm. (c) Change gasket. Replace defective components.
MISSION CRITICAL EQUIPMENT Check clearances of main bearing and half section bearings, if and only if, there is a repeated occurrence/abnormal trend in performance parameters during exploitation and after a detailed analysis of the defect to rule out all other system related possible causes prior undertaking 6000H3 routine:- (a) Deterioration in quality of lub oil w.r.t. its viscosity and emulsification. (b) Gradual/undue drop in lub oil pressure. (c) Instances of liquid carry over in the suction line leading to hammer effect or damage to internals. Note:- Max. clearance permissible between main bearing bush dia seal end/pump end and crankshaft journal dia is 0.2mm. Replace the bearing bush if clearance exceeds 0.12 mm.
MISSION CRITICAL EQUIPMENT Check Cylinder liner Dia. Of Bore (65.03 - 65.00). Replace if wear limit exceeds 0.2 mm.
MISSION CRITICAL EQUIPMENT Check Shaft seal for oil droplet / leak. Replace if required.
MISSION CRITICAL EQUIPMENT Check Oil pump clearance / Axial play. Replace if clearance is beyond 0.12mm.
MISSION CRITICAL EQUIPMENT Check unloading frames, rocker arm and unloading cylinder assembly for free movement. Repair / replace if required.
MISSION CRITICAL EQUIPMENT Check oil pressure regulator. Set/repair/replace as required.
MISSION CRITICAL EQUIPMENT Check crankcase Heater for normal operation Replace defective components.
MISSION CRITICAL EQUIPMENT Check functioning of solenoid and expansion valves. Replace defective components.
Visually examine entire length of cold lagging and replace as necessary.
Check operation of thermostats in the chilled water line and calibrate/ replace if required.
Refit air relief valve in the expansion tank charging system Replace defective components.
Check and calibrate all instrumentation and safety cut-outs in the system. replace defective insrumentation. Instrumentation includes pressure gauges (Range 0-5 Bar, Qty 10) temperature gauges (Range 0-50 Deg C, Qty 10),
Carry out flushing of entire chilled water system with chemical. Post cleaning system to be proved for leakeges. Approx CW (DM Water) Qty - 15 Ton (Shipyard to provide DM Water).Additive Track 101-80 L
Refit all pressure gauges cocks. Survey associated pressure gauges pipes. Defective cocks and damaged pipe lines to be replaceed. Pressure Gauge Cocks Qty - 12, size - 1/4"
Carry out performance trial of the pump including parameter checks (suction/ discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects,
Calibrate all instrumentation. Suction gauge (-1 to 1.5 bar) Qty - 2 discharge gauge (0 to 05) Qty - 2
Inspect and replace if required the suction strainer.
Carry out functionality checks of all instrumentation and calibrate. (a) Trips (i) Low L/O Pressure Switch Qty - 01 (ii) Final Stage Discharge Air Temp (Set Point: 150 C), Qty - 01 (b) Relief Valve 1st Stage (Set Point: 5 bar), Qty - 01 (c) Relief Valve 2nd Stage (Set Point: 12 bar), Qty - 01 (d) Relief Valve 3rd Stage (Set Point: 32 bar), Qty - 01
Internal cleaning of air flow of intercooler/aftercooler
Carry out functionality checks of all instrumentation and calibrate. (a) Trips (i) Low L/O Pressure Switch Qty - 01 (ii) Final Stage Discharge Air Temp (Set Point: 150 C), Qty - 01 (b) Relief Valve 1st Stage (Set Point: 5 bar), Qty - 01 (c) Relief Valve 2nd Stage (Set Point: 12 bar), Qty - 01 (d) Relief Valve 3rd Stage (Set Point: 32 bar), Qty - 01
Carryout chemical cleaning of After cooler. Flush the tubes with warm water and allow them to dry after flushing. replace if found defective.
replace Compressor valves.
MISSION CRITICAL EQUIPMENT Check insulation and deterioration in local wiring (sensors to JB )on DA and cables from DA to the control panel. replace as necessary.
MISSION CRITICAL EQUIPMENT replace complete local wiring (sensor to JB) in case of any major routines falling due on the DA.
MISSION CRITICAL EQUIPMENT Check generator bearing, replace bearings post inspection. Carry out generator performance trials post work complition.
MISSION CRITICAL EQUIPMENT Replace the power assisted steering pump drive unit. (Console mounted steering helm with steering cable)
MISSION CRITICAL EQUIPMENT Replace the engine timing belt.
MISSION CRITICAL EQUIPMENT Clean the fuel tank. Replace tank manhole gasket and prove pressure testing upto 01 bar.
MISSION CRITICAL EQUIPMENT Clean the after cooler core.Replace cooler if found defective/ damaged.
MISSION CRITICAL EQUIPMENT Carry out top overhaul of the engine. Replace defective components and carry out performance trials upto rated RPM post overhauling.
MISSION CRITICAL EQUIPMENT Replace the power assisted steering pump drive unit. (Console mounted steering helm with both steering cables)
Check treads of inlet pipe and of oil pairing disc for damage and wear.Replace defective components.
Inlet Device (a) Check the flow indicator if clogged. Clean the sight glass. (b) Check the reducing valve cone for scratches and play. (c) Check the non-return valve cone for scratches and play. Replace defective components.
Dismantle and examine separator bowl assembly throughly. Clean all components and check following:- (a) Check Disc Stack Pressure (b) Check for corrosion, erosion and cracks (c) Galling of guide surface Replace defective components.
replace oil in gear housing. Check the teeth of worm wheel and worm for wear. Note:- Overhaul Kits prescribed by the OEM to be used.
Inspect the suction strainer. replace if found damaged
Inspect condition of suction/ discharge compensators. replace compensators if found damaged.
Carry out performance trial of the pump including parameter checks (suction/ discharge pressure), vibration trials, insulation/ SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects, it any. Overhaul pump if performance is suboptimal.
Check condition of coupling guards. Repair/ replace if required.
Carry out functional test of relief valve. Reset to specified lifting pressure.Replace defective components.
Calibrate all instrumentation. Suction gauge (-1- 1.5 bar) Qty - 1 discharge gauge (0-05) Qty - 1 Replace defective components.
Refit suction and discharge valves, Ball valves of size 80mm (Qty 02),BER valves.
Check treads of inlet pipe and of oil pairing disc for damage and wear.Replace defective components.
Inlet Device (a) Check the flow indicator if clogged. Clean the sight glass. (b) Check the reducing valve cone for scratches and play. (c) Check the non-return valve cone for scratches and play. Replace defective components.
Dismantle and examine separator bowl assembly throughly. Clean all components and check following:- (a) Check Disc Stack Pressure (b) Check for corrosion, erosion and cracks (c) Galling of guide surface Replace defective components.
replace oil in gear housing. Check the teeth of worm wheel and worm for wear. Note:- Overhaul Kits prescribed by the OEM to be used.
MISSION CRITICAL EQUIPMENT Test and adjust safety valve on rudder motor and pump unit as per manual i.e. 62.5 bar. respectively. Note:- Refer Drg. No. C-R-3956& C-R-2693-8 page no. 1, 3 and 8 (section 3.1.18) of technical manual hydraulic stearing gear type TK-275.
MISSION CRITICAL EQUIPMENT Change hydraulic oil and piston seals as per procedure given in the manual Replace defective components.
MISSION CRITICAL EQUIPMENT Calibrate all pressure and temperature gauges. Replace defective components.
MISSION CRITICAL EQUIPMENT Change coupling between pump and motor. Replace defective components.
MISSION CRITICAL EQUIPMENT Remove and clean magnetic filters mounted to the pump tanks. Replace defective components.
MISSION CRITICAL EQUIPMENT Visually check all hydraulic components, pipe couplings, etc. for leakage & abnormal noise from the pump Replace defective components.
MISSION CRITICAL EQUIPMENT Completely remove fairing epoxy compound to inspect the state of fasteners on the rudder. replace the fasteners. Re-apply fairing epoxy compound post inspection/ DR. Note – In addition to positive locking of fasteners, ensured by ‘L’ plates, split pins/ lock washers/ interlocking seizing wires are to be introduced.
MISSION CRITICAL EQUIPMENT Replace wiring/contacts of the control panel for wear/ deterioration.Replace defective components.
MISSION CRITICAL EQUIPMENT replace complete local wiring of the steering gear system.
MISSION CRITICAL EQUIPMENT Change coupling between pump and motor. . Note:- Para 5 page 3.8 of Tech. manual type TK- 275 Steering Gear Manual refers. Replace defective components.
Pump to be removed for complete reconditioning/ Overhaul a) Remove casing and examine for corrosion and erosion replace O seals as necessary. b) Withdraw impeller, examine for corrossion and errosion.replace O seals as necessary. c) Gauge impeller sealing ring clearances.replace worn parts as necesary.
The lubrication of mechanical seals should be checked. The lubricant might get contaminated with foreign material or get blackened due to overheating. In such cases, oil chamber should be flushed and filled with fresh oil. Before filling, heat the oil to 140 degrees C and cool it to 60 degrees C for removal of moisture in oil. Replace defective components.
Check for operation Change all steam joints. Replace defective components.
Carry out performance trial of the pump including parameter checks(suction/discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects, Replace defective components.
Calibrate all instrumentation.
Inspect and replace if required the suction strainer.
Weigh the CO2 cylinder using beam scale. If the weight falls below 10% of initial weight, recharge the cylinders. Maintain record in log book. NOTE:- Alternately use Portable Ultrasonic Level Detectors for undertaking this routine. (IHQ MoD (N) letter EG/4726/04/NBCD dated 30 Jan 09 regarding use of Portable Ultrasonic Liquid Level Indicator relevant)
Check operation of hand pumps in the system and overhaul, if required.Replace defective components.
Overhaul of all quick shut off valves of fuel system. replace defective valves. Carry out insitu system pressure testing upto 5 Bar.
Calibrate all instrumentation. Suction gauge (-1- 1.5 bar) Qty - 2 discharge gauge (0-05) Qty - 2 Replace defective components.
Visually examine entire length of cold lagging and replace as necessary. Carry out insitu system pressure testing upto 10 Bar.
Refit defective sea chest valves and carry out pressure testing post overhauling. replace defective valves
Check and calibrate all instrumentation in the system. Suction gauge (-1- 1.5 bar) Qty - 1 discharge gauge (0-05) Qty - 1 Replace defective components.
Check operation of hand pumps in the system and overhaul , if required.replace defective pumps. Carry out insitu system pressure testing upto 5 Bar.
replace all filter elements of AVCAT system.
Carry out trials of all pumps including hand pump and carry out overhaul based on performance.Replace defective components.
Carry out random survey of the system pipeline paying attention to pipes below bilge plates. replace as necessary. Carry out insitu system pressure testing upto 5 Bar.
Calibrate all pressure gauges and tank content gauges.
Check condition of the shock and vibration mounts of pumps. replace if defective.
Carry out performance trial of the pump including parameter checks(suction/discharge pressure), vibration trials, insulation/SPM checks on motor, motor starting-running current checks etc. Assess for satisfactory performance and defects. Replace defective components.
Calibrate all instrumentation.Replace defective components. Suction pr gauge - -2 to +2 Discharge pr gauge - 0 to 12
replace the suction strainer and discharge compensatorts. Replace defective components.
MISSION CRITICAL EQUIPMENT Carry out Annual routines on both OBMs as mentioned- (a) Replacement of external anodes (b) Inspection/ replacement of cooling water leakage (c) Inspection/ replacement of fuel pump, filter, tank and line (d) Replacement of gear oil (e) Replacement of impeller and water housing (f) Replacement of propeller, propeller nut nad cotter pin (g) Replacement of shift cable and throtle cable (j) Replacement of stop switch and wire harness connections
MISSION CRITICAL EQUIPMENT Carry out 1000 hrly routines on both OBMs as mentioned- (a) Engine overhauling Replace defective components. (b) Inspection/ replacement of cooling water leakage
ENGINEERING - PART II
REQUIRED ASSISTANCE FOR MANUFACTURING OF CUSTOM MADE STORAGE UNITS WITH LACHA LOCKS IN AFT SPDC AS PER DIMENSION: (A) 220 H X 270 W FRAME - 50 X 25 MM, 25 X 25 MM, 14 G MS PIPE SHEET - 18 G MS FOR DRAWER AND COVER FINISH - SPRAY PAINT , 02 NO. OF SLIDING DOORS ON TOP & 16 NO. OF DRAWERS ON BOTTOM. (B) 223 H X 217 W FRAME - 50 X 25 MM, 25 X 25 MM, 14 G MS PIPE SHEET - 18 G MS FOR DRAWER AND COVER FINISH - SPRAY PAINT , 02 NO. OF SLIDING DOORS ON TOP & 10 NO. OF DRAWERS ON BOTTOM
ASSISTANCE REQUIRED FOR DEGUTTING OF SPDC RACKS. JOB INVOLVES CUTTING AND MACHINING. QTY - 40, MAT - MS
LUB OIL LEAKAGE OBSERVED FROM CRANKCASE RELIEF DOOR DUE TO UNEVEN SURFACE. RA FOR DEFECT RECTIFICATION
S/W SYS PIPE LINES PASSING THROUGH BILGES OF MAIN ENGINE CORRODED. NEW PIPES TO BE MANUFACTURED, SCOPE OF WORK INVOLVE REMOVAL OF DEFECTIVE PIPE LINE AND MANUFACTURE AS PER SAMPLE PRESSURE TESTING TO BE CARRIED OUT AT 5 BAR AND FITMENT. PIPE DIA - 100 MM, 25 MTR -80 MM, MAT- CUNI, PAINTING- GREEN
PRESSURE LINE OF BOTH MAIN ENGINE FUEL SYSTEM PERISHED, PRESSURE LINE TO BE MANUFACTURED WITH END FITTING AS PER SAMPLE . DIA 15 MM, LENGTH- 20 MTR MATERIAL-MS
SERVICEABILITY CHECKS OF PORT MAIN ENGINE AIR STARTING VALVE.SCOPE OF WORK INVOLVE REMOVAL AND FITMENT OF VALVE, OVERHAULING AND PRESSURE TESTING ON COMPILITION FITMENT. SIZE 32 MM QTY 01
SERVICEABILITY CHECKS OF STBD MAIN ENGINE AIR STARTING VALVESCOPE OF WORK INVOLVE REMOVAL OF VALVE, OVERHAULING AND PRESSURE TESTING ON COMPILITION FITMENT.. SIZE 32 MM QTY 01
COMBINATOR RESPONSE SLUGGISH. SUSPECT SLUGGISH RESPONSE OF CONTROL AIR SYSTEM. SUSPECT PRESSURE REDUCING VALVE AND DIRECTION CONTROL VALVE OF CONTROL AIR SYSTEM DEFECTIVE. QTY - 20 RA FOR DEFECT RECTIFICATION . SCOPE OF WORK INVOLVE REMOVAL AND FITMENT OF DEFECTIVE COMPONENTS.
COMBINATOR RESPONSE SLUGGISH. SUSPECT SLUGGISH RESPONSE OF CONTROL AIR SYSTEM. SUSPECT PRESSURE REDUCING VALVE AND DIRECTION CONTROL VALVE OF CONTROL AIR SYSTEM DEFECTIVE. QTY - 20 RA FOR DEFECT RECTIFICATION . SCOPE OF WORK INVOLVE REMOVAL OF FITMENT DEFECTIVE COMPONENTS.
CONTROL AIR LEAKAGE OBESERVED FROM COMBINATOR OF BOTH MAIN ENIGNE. DEFECT RECTIFICATION HELD VIEW NON AVAILABILITY OF SPARES. COMBINATOR TO BE REMOVED AND REPLACED.
CONTROL AIR LEAKAGE OBESERVED FROM COMBINATOR OF BOTH MAIN ENIGNE. DEFECT RECTIFICATION HELD VIEW NON AVAILABILITY OF SPARES. COMBINATOR TO BE REMOVED AND REPLACED.
LUB OIL LEAKAGE OBSERED FROM BOTH LUB OIL HAND PUMP AND SUBOPTIMAL PERFORMANCE HAS BEEN OBSERVED. HAND PUMP TO BE REPAIRED/ replaceED. QTY-02
REQUIRE ASSITANCE FOR CARRYING OUT CALIBRATION, PHASING AND TUNNING OF GOVERNOR OF BOTH MAIN ENGINES VIEW SLUGGISH RESPONSE.QTY-02
CALIBRATION OF EXHAUST TEMP SCANNER (QTY 02) WITH THERMOCOUPLE OF BOTH MAIN ENGINES(QTY 26) VIEW ERRATIC READING SUSPECT TEMPRATURE SCANNER AND THERMOCOUPLES DEFECTIVE. DEFECTIVE ITEMS TO BE replaceED.
RA FOR CALIBRATION OF MCR GAUGES AND SCANNER VIEW ERRATIC READING OBSERVED IN MCR PANEL. DEFECTIVE TO BE replaceED. QTY-50
SCAVENGING AND PRESSURE LUB OIL PUMP INDICATOR FOR BOTH MAIN ENGINE NOT WORKING IN MCR CONTROL PANEL SUSPECT PRESSURE SWITCH DEFECTIVE. DEFECT TO BE RECTIFIED. RANGE- 0 TO 5 BAR
EXHAUST LAGGING AND CLADING OF BMEs EXHAUST TRUNKING TO BE replaceED POST COMPILITION OF ROUTINE. QTY- 100 SQ MTR
replaceAL OF OLD BULKHEAD GLAND PACKING SIZE - 25 MM , MATERIAL- ASBESTOS
MAIN SHAFT PLUMMER BLOCK TEMPERATURE INCREASING. RA FOR CARRING OUT SHAFT LOADING., BEARING- ROLLER TYPE
RENEWAL OF PIPE LINE OF BOTH RO PLANT PASSING THROUGH BILGES VIEW FAILING TO TAKE SUCTION FOR BOTH RO PLANT SUSPECT LINE DAMAGED/CORRODED. RA FOR MANUFACTURING OF PIPE LINE AS PER SAMPLE. DIA 32, DIA- 50 MM SCOPE OF WORK INVOLVE REMOVAL OF DEFECTIVE LINE AND MANUFACTURE AS PER SAMPLE AND FITMENT POST PRESSURE TESTING. MAT -CUNI LENGTH-30 MTR
RENEWAL OF PVC PIPES AND CONNECTOR OF BOTH RO PLANT VIEW DAMAGED AT VARIOUS LOCATION. SIZE- 32 MM LENGTH- 50 MTR
FLEXIBLE HOSES OF BOTH RO PLANT DAMAGED AT VARIOUS LOCATION. HOSES TO BE REPLACED. SIZE- 40 MM QTY-08
RENEWAL & CALIBRATION OF PRESSURE AND TEMPERATURE TRANSMITTER TO BE CARRIED OUT: QTY-50
ZINC PLUG OF ALL COOLER OF BME TO BE MANUFACTURED AS PER SAMPLE. QTY-50
CALIBRATION OF BOTH MAIN ENGINE FUEL RACK CONTROL LINKAGE ALONG WITH GOVERNER VIEW BOTH MAIN ENGINE INDIVIDUAL FIP RACK MISMATCH OBSERVED WITH MAIN FUEL RACK. QTY-02
BOTH GB AUTO CUT IN / CUT OFF MALFUNCTIONING. SUSPECT CONTROL WIRING AND SWITCH DEFECTIVE. TO BE REPLACED. SWITCH-04, WIRING- 20 MTR
SEA WATER LEAKAGE OBSERVED FORM PRIFILTER PUMP FLEXIBLE HOSE REPLACE FLEXIBLE HOSE QTY-04
BOTH RO PLANT REPLACEMENT OF DOLOMITE QTY-02
REPLACE ALL DAMAGE PVC PIPE LINE AT INDICATED LOCATION OF BOTH RO PLANT. LENGTH-10 MTR
SERVICIVILITY CHECKS OF MAIN ENGINE ALARM PANEL , CONTACTOR RELAY, TIMERS, SWITCH QTY-70 DEFECTIVE PART TO BE replaceED.
OIL BATH FILTER ELEMENTS OF BOTH MAIN ENGINE TO BE REPLACED VIEW AGEING OF ELEMENT QTY-04 ( 30 MICRON)
BOTH SHAFT STERN TUBE FWD AND AFT SEAL TO BE replaceED DUE TO EXCESSIVE POKER GAUGE READING. NO OF SEALS 10 SCOPE OF WORK- 1.REMOVE PROPELLER AND RUDDER 2.DRAIN LUB OIL 3.DISCONNECT TAIL SHAFT LOOSE COUPLING AND PULL THE SHAFT AROUND 1.5 MTS 4.REMOVE THE LOOSE COUPLING AND COUPLING KEY 5.PULL OUT TAIL SHAFT AND KEPT IN CHOCK 6.INSPECTION OF STERN TUBE SEAL AND LINER 7.POLISHING OF SHAFT
BOTH MAIN ENGINE COOLERS FRESHWATER COOLERS(02), LUBE OIL COOLERS(02), FUEL COOLERS(02), GEAR BOX LUB OIL COOLERS(020,CAC(02) RA FOR CHEMICAL CLEANING AND PRESSURE TESTING CARRIED OUT AND replaceED OF ZINC DISC. TESTING PR. - 03 BAR QTY- 02 EACH COOLER, DISC QTY -02 EACH , DIA - 15 CM
EMERGENCY COOLING REDUCER OF ME TO BE OVERHAULED. DIA – 100MM. SCOPE OF WORK INVOLVE REMOVAL OF REDUCER, OVERHAULING AND PRESSURE TESTING ON COMPILITION FITMENT.
MISSION CRITICAL EQUIPMENT TRIM INDICATOR OF RHIB ENGINE NOT WORKING DUE TO MALFUNCTIONING OF SENSOR. RA FOR REPLACEMENT.
FUEL SYSTEM VALVES OF BOTH MAIN ENGINE NOT HOLDING. RA FOR OVERHAULING. DIA – 20MM
MISSION CRITICAL EQUIPMENT SPEED SENSOR OF RHIB ENGINE NOT WORKING DUE TO SENSOR MALFUNCTIONING. RA FOR SENSOR REPLACEMENT.
MISSION CRITICAL EQUIPMENT RHIB ENGINE BATTERY SWITCH DAMAGED. RA FOR REPLACEMENT.
TRIM AND RUDDER ANGLE INDICATOR OF SMBs NOT WORKING DUE TO SENSOR DEFECTIVE. SENSOR TO BE REPLACED.
SPEED SENSOR OF SMBs NOT WORKING DUE TO SENSOR DEFECTIVE. RA FOR SENSOR REPLACEMENT. QTY - 01
OIL LEAKAGE FROM GEAR OIL MONITOR TANK OF SMB PARCHU. TANK FOUND DAMAGED. TO BE REPLACED. QTY - 02
OIL LEAKAGE FROM GEAR OIL MONITOR TANK OF SMB SIRSA. TANK FOUND DAMAGED. TO BE REPLACED. QTY - 02
FUEL TANK LEVEL SENSOR OF SMBs NOT WORKING. SENSOR TO BE REPLACED. QTY - 04
FUEL TANK LEVEL SENSOR OF 7 MTR RHIB NOT WORKING. SENSOR TO BE REPLACED. QTY - 01
AUTOMATIC 12 V DC BILGE PUMP DAMAGED , PUMP TO BE REPLACED. QTY- 02 MAKE -TMC O6602, CAPACITY- 2500GPH
AUTOMATIC 12 V DC BILGE PUMP DAMAGED , PUMP TO BE REPLACED. QTY- 02 MAKE -TMC O6602, CAPACITY- 2500GPH
ENGINE BELT DRIVEN BILGE PUMP NOT WORKING VIEW HARD TURNING AND ENGAGE SOLENOID MALFUNCTIONING. QTY -01 replace BILGE PUMP MAKE - DOCTOR ,MODEL - F24, CAPACITY- 5 TPH
ENGINE BELT DRIVEN BILGE PUMP NOT WORKING VIEW HARD TURNING AND ENGAGE SOLENOID MALFUNCTIONING. QTY -01 RA FOR replaceAL OF PUMP.MAKE - DOCTOR ,MODEL - F24, CAPACITY- 5 TPH
HAND BILGE PUMP DAMAGED, PUMP TO BE REPLACED. QTY- 02 MAKE - SEAFLO, MODEL -SFDHP-G720-01 CAPACITY -2724LPH
HAND BILGE PUMP DAMAGED, PUMP TO BE REPLACED. QTY- 02MAKE - SEAFLO, MODEL -SFDHP-G720-01 CAPACITY -2724LPH
STBD SEA CHEST VALVE SPINDLE OF SMBs DAMAGED, RA FOR REPLACEMENT OF VALVES. TYPE - BALL VALVE, SIZE- 32 MM, QTY- 0
LOAD BREACKER MCV MALFUNCTIONING , RA FOR REPLACEMENT OF LOAD BREACKER, QTY- 01, RATING - 11 KW
RA FOR OVERHAULING OF SMB FUEL TANK QUICK SHUTOFF VALVES QTY - 04 SIZE - 32 NB
RPM FLUCTUATION OBSERVED IN BOTH ENGINES ABOVE 2000 RPM VIEW TPS SENSOR DEFECTIVE RA FOR REPLACEMENT OF TPS SENSOR .QTY - 02
RPM FLUCTUATION OBSERVED IN BOTH ENGINES ABOVE 2000 RPM VIEW TPS SENSOR RA FOR TPS SENSOR REPLACEMENT
PROPELLER BLADES OF SMB FOUND DAMAGED. RA FOR PROPELLER REPLACEMENT. QTY - 02
PROPELLER BLADES OF SMB FOUND DAMAGED. RA FOR PROPELLER REPLACEMENT. QTY - 02
COOLANT LEAKAGE OBSERVED FROM SMB EXPANSION TANK. VIEW TANK DAMAGED TO BE REPLACED. QTY - 02
COOLANT LEAKAGE OBSERVED FROM SMB EXPANSION TANK. VIEW TANK DAMAGED TO BE REPLACED. QTY - 02
SEA WATER LEAKAGE OBSERVED FROM SMB SEA WATER PUMP. SUSPECT PUMP SEAL DAMAGED. RA FOR PUMP REPLACEMENT. QTY - 02
SEA WATER LEAKAGE OBSERVED FROM SMB SEA WATER PUMP. SUSPECT PUMP SEAL DAMAGED. RA FOR PUMP REPLACEMENT. QTY - 02
ENGINE FAILS TO CLUTCH IN AHEAD AND ASTERN WHILE OPERATION. SUSPECT ENGAGE MECHANISM DAMAGE. RA FOR REPLACEMENT OF THROTTLE WITH CABLE.
ENGINE FAILS TO CLUTCH IN AHEAD AND ASTERN WHILE OPERATION. SUSPECT ENGAGE MECHANISM DAMAGE.RA FOR REPLACEMENT OF THROTTLE WITH CABLE.
BOTH TRIMS HARD TO OPERATE UP AND DOWN WHILE OPERATION. RA FOR TRIM SERVICING AND SENSOR REPLACEMENT..
BOTH TRIMS HARD TO OPERATE UP AND DOWN WHILE OPERATION. RA FOR DEFECT RECTIFICATION..RA FOR TRIM SERVICING AND SENSOR REPLACEMENT.
EXHAUST LAGGING AND CLADING OF ALL 05 DAs EXHAUST TRUNKING TO BE replaceED POST COMPILITION OF ROUTINE. 100 RMT
HOT LAGGING OF DD COMPRESSOR EXHAUST TRUNKING DETERIORATED. HOT LAGGING TO BE replaceED. 30 RMT
HOT LAGGING OF ALL 05 DAs EXHAUST DRAIN PIPES TO BE replaceED POST COMPILITION OF ROUTINE. 50 RMT
SURVEY AND replaceAL OF DA SEA WATER SYSTEM PIPE LINE OF AER COMPT VIEW CORRESION HAS BEEN OBSERVED ON THE LINE PASSING THROUGH BILGES 100 RMT
CARRY OUT SERVICEABILITY CHECKS OF LUB OIL HAND PRIMING PUMP OF ALL 05 DA VIEW PUMP PERFORMANCE FOUND SUB OPTIMAL .RENEW PUMPS QTY - 5 NOS
EXHAUST LEAKAGE OBSERVED FROM FUNNEL AREA IN MER AND AER COMPARTMENT WHILE STARING DAs SUSPECT EXHAUST COMPENSATOR AND GASKETS ARE CRACKED. RA FOR COMPENSATOR replaceAL.SCOPE OF WORK INVOLVE REMOVAL OF EXHAUST LAGGING INSPECTION OF EXHAUST TRUNKING AND replaceAL OF COMPENSATORS AS AND ON COMPLETION PT OF SYSTEM AND FITMENT OF LAGGING AND CLADDING QTY - 5 NOS AREA - 10 SQ MTR
RA FOR REPLACEMENT OF NON-RETURN VALVE IN FUEL RETURN LINE FOR ALL 05 DA . SIZE- 25 MM 5 NOS
S/W LINE OF DA CORRODED AT VARIOUS LOCATION. RA FOR MANUFACTURING OF LINE AS PER SAMPLE WITH END FLANGES. DIA -50MM AND 40 MM. MAT- CUNI. SCOPE OF WORK INVOLVE REMOVAL OF DEFECTIVE LINE AND MANUFACTURE AS PER SAMPLE AND FITMENT POST PRESSURE TESTING. 40 NOS
PERFORMANCE OF LATHE MACHINE FOUND SUBOPTIMAL AND JAW OF LATHE NOT HOLDING JOB PROPERLY AND FREQUENT SLIPPAGE OBSERVED IN GEAR BOX. LATHE MACHINE TO BE OVERHAULED. 1 NOS
SHAFT LOCKING GEAR OF BOTH SHAFT HARD TO OPERATE. SUSPECT THREADS WORN-OUT. RA FOR RETHREADING. SIZE- 40 MM 2 NOS
MAINTENANCE AND SPARES SUPPORT NOT AVAILABLE FOR STERN THRUSTER FROM OEM AS WELL FROM YARD. RA FOR REMOVAL OF STERN THRUSTER. QTY 01 SYSTEM SCOPE OF WORK INVOLVE REMOVAL OF STERN THRUSTER AND AUXILERY FROM ASP, THRUSTER CONTROL ROOM, MCR AND BRIDGE AND ISSUE OF BER CERTIFICATE FOR SURVAYING OF EQUIPMENT.
COLD LAGGING REQUIRED ON MULTIPLE LOCATION OF CHILLED WATER SYSTEM IN VIEW OF HEAVY CONDENSATION, 150 MTR
AC S/W SYSTEM STRAINER BODY AND ELEMENT CORRODED, TO BE replaceED AS PER SAMPLE. 4 NOS, MAT-BRASS,DIA-100MM
COLD LAGGING REQUIRED ON MULTIPLE LOCATION OF AC & REF GAS SYSTEM VIEW HEAVY CONDENSATION., 40 RMT
FOLLOWING OBD VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: -100mm ,SDNR,QTY-5 NOS
FOLLOWING OBD VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: -80mm ,SDNR,QTY-8
FOLLOWING OBD VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: -65mm ,SDNR,QTY-10
FOLLOWING OBD VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: -50mm ,SDNR,QTY-8
FOLLOWING OBD VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: -32mm ,SDNR,QTY-4
OIL THROW WITH EXCESSIVE SMOKE OBSERVED IN 37 TPH DD PP WHILE OPERATING. OVERHAULING OF DD PP WITH ENGINE TO BE CARRIED OUT, QTY- 02
DIVING AIR COMPRESSOR PERFORMANCE IS SUB OPTIMAL. COMPLETE UNIT OF DIVING AIR COMPRESSOR ALONG WITH ENGINE TO BE OVERHAULED. ALL DEFECTIVE PARTS TO BE RENEWED
TANK DIGITAL METERS SHOWING ERRATIC READING AT LOCAL AND REMOTE INDICATION PANEL. INDICATORS QTY 24 NOS ALONG WITH LEVEL PRESSURE SENSORS QTY 24 NOS TO BE replaceED, CALIBRATED AND PROVEN IN SITU.QTY 48
FOLLOWING SEA CHEST VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: - 200mm ,SDNR,QTY-3
FOLLOWING SEA CHEST VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: - 100mm ,SDNR,QTY-7
FOLLOWING SEA CHEST VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: - 65mm ,SDNR,QTY-9
FOLLOWING SEA CHEST VVs OF VARIOUS SYS AT VARIOUS LOCATIONS NOT HOLDING, TO BE replaceED: - 32mm ,SDNR,QTY-10
ZINC PLUG TO BE MANUFACTURED AS PER SAMPLE OF VARIOUS SIZES. 120 NOS
COLD LAGGING OF FIREMAIN SYS TO BE replaceED POST REPAIR WORK ON FIRE MAIN SYSTEM. 200 RMT
ROD GEARING MECHANISM FOR REMOTE OPERATION OF BOTH SEA TUBE AND FUELLING POINT PORT SIDE DEFECTIVE. COMPLETE MECHANISM TO BE OVERHAULED. LENGTH 20
SERVICEABILITY CHECKS OF ROD GEARINGS , DEFECTIVE ROD GEARING MECHANISM TO BE OVERHAULED. QTY - 29 NOS
HYDRAULIC OIL LEAK OBSERVED FROM STEERING GEAR SYS BOTH ACTUATOR. SCOPE OF WORK INVOLVE OVERHAULING OF ACTUATOR replace DEFECTIVE PARTS. PROVE IN-SITU. 2 SET
HYDRAULIC OIL LEAKAGE OBSERVED FROM HAND PUMP. PUMP TO BE OVERHAULED. 1 NOS
S/W INGRESS OBSERVED FROM BOTH RUDDER GLAND. GLAND PACKING OF BOTH RUDDER GLANDS TO BE replaceED. 2 NOS
STUDS OF RUDDER GLANDS FOUND LOOSE. SCOPE OF WORK INVOLVE RE TAPPING OF STUDS TO BE replaceED POST TAPPING. 16 NOS
CALIBRATION OF INCLINOMETER OF MCR AND CTO TO BE UNDERTAKEN. QTY - 02
PERFORMANCE OF DRILL MACHINE FOUND SUB OPTIMAL. OVERHAULING OF DRILL MACHINE TO BE CARRIED OUT. 1 NOS
MANUFACTURING OF 50 CONICAL FASTENERS (STUDS & NUTS) FOR AVCAT STORAGE AND LO TANKS AS PER SAMPLE, MAT- BRASS. 50 NOS
MANUFACTURING OF GAUGE LINE WITH END FITTINGS OF AC CHILLED WATER AND SEA WATER PUMP. LENGTH –40 MTR, CPPER TUBE 40 RMT
DA S/W SYS STRAINER BODY AND STRAINER ELEMENT CORRODED. STRAINER BODY AND STRAINER ELEMENTS TO BE MANUFACTURED AS PER SAMPLE. STRAINER BODY, QTY- 04. 4 NOS, DIA- 80 MM, 2000 MICRON
DA S/W SYS STRAINER BODY AND STRAINER ELEMENT CORRODED. STRAINER BODY AND STRAINER ELEMENTS TO BE MANUFACTURED AS PER SAMPLE. STRAINER ELEMENTS, QTY- 10. DIA- 80 MM, 2000 MICRON
DISTANCE PIECE TO BE MANUFACTURED AS PER SAMPLE. QTY- 04, SIZE - 100 m, MAT- CUNI.
CALIBRATION OF SHAFTING TEMP GAUGE ALONG WITH SENSOR. RENEW DEFECTIVE PARTS, QTY – 20
SUPPORTING BRACKETS IN AC COMPATRMENT OF AC & REF S/W SYSTEM NEEDS TO BE REPLACED ALONG WITH RUBBER INSERT. 15 NOS
DOOR JOINTS OF MANHOLE DOORS ARE PERISHED, JOINT CUTTING TO BE UNDERTAKEN AS PER SAMPLE. MAT OIL/ LEATHER JOINT 30 NOS
STEERING GEAR PANEL FITTED IN MCR SHOWING ERRATIC INDICATION (QTY 12). SERVICEABILITY CHECKS OF PANEL TO BE UNDERTAKEN, DEFECTIVE PART TO BE replaceED. 12 NOS
DEGUTTING OF SECURING CLAMPS AND SUPPORTING BRACKETS TO BE UNDERTAKEN IN MACHINERY COMPARTMENTS (AER, MER, ASP AND GLAND COMPARTMENTS). 100 NOS
BREATHER PIPES OF ALL FUEL OIL AND FRESH WATER TANKS CORRDED, BREATHR PIPES ARE TO BE replaceED AND IDENTIFICATION TALLEY TO BE FITTED. 35 NOS,MAT-SS, DIA-80MM, PAINT-GREY
ABNORMAL SOUND AND LOW SUCTION OBSERVED FROM BILGE PUMP, OVERHAUL BILGE PUMP
ABNORMAL SOUND AND LOW SUCTION OBSERVED FROM BILGE PUMP, OVERHAUL BILGE PUMP
TEMPRATURE OF COLD ROOM AND COOL ROOM NOT HOLDING THEREFORE INCREASING RUNNING HOUR OF REF PLANT, UNDERTAKE HEAT INPUT TEST OF COLD ROOM AND COOL ROOM APPROX AREA 250 MTR CUBE
replaceAL OF FOLLOWING PUMPS FOUNDATION WITH MOUNTS AND ALIGNMENT POST JOB COMPLETION :- 1 REF SEA WATER PUMP - 02 2 AC SEA WATER PUMP - 02 3 RO PLANT PRE FILTER PUMP - 02 4. BILGE PUMP - 02 5 AC CW PUMP - 02 QTY-40
SEA WATER LEAKAGE OBSERVED FROM FIREMAIN LINE,CARRY OUT RANDOM SURVEY OF FIREMAIN SYSTEM PIPES FOR INTERNAL AND EXTERNAL CORROSION. replace DEFECTIVE PIPES. LENGTH - 100 RMT, MAT - CUNI, DIA-80 MM, 65 MM 100 RMT
LUB OIL LEAKAGE OBSERVED FROM FUEL LINE IN MER AND AER --SURVEY SYSTEM PIPES WITH FOCUS ON PIPES RUNNING IN BILGES. replace DETERIORATED PIPESS, PRESSURE TEST ON COMPLITION TO IDENTIFY LEAKS. 60 RMT,DIA-65MM,MAT-SS
FUEL OIL LEAKAGE OBSERVED FROM FUEL LINE IN MER AND AER -SURVEY SYSTEM PIPESWITH FOCUS ON PIPES RUNNING IN BILGES. replace DETERIORATED PIPESS, PRESSURE TEST ON COMPLITION TO IDENTIFY LEAKS. 150 RMT DIA-60MM,MAT-SS
SERVICIBLITY CHECK,TO BE UNDERTAKEN ON MODULER FIRE FIGHTING SYSTEM FOR BOSUN STORE, LAUNDRY, BATTERY CHARGING 3 COMPT
ABNORMAL SOUND AND SUB OPTIMAL PERFORMANCE OBSERVED FROM REF SEA WATER PUMPS REQUIRED ASSISTANCE FOR PUMP OVERHAULING AND PERFORMANCE TRIALS.
OVERHAULING OF INLINE INDUCTORS AND PORTABLE EDUCTORS TO BE CARRIED OUT. DEFECTIVE PART TO BE replaceED. 7 NOS
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - FIREMAIN CHEST VV CONSISTING OF 05 IN NO. s 100MM VVS. QTY - 02. PR TEST - 12 BAR.
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - FIREMAIN CHEST VV CONSISTING OF 03 IN NO. S 100MM VVS. QTY - 01. PR TEST - 12 BAR.
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - FUEL SYS CHEST VV CONSISTING OF 06 IN NO. s 100MM VVS. QTY - 02. PR TEST - 06 BAR.
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - EDUCTOR SUCTION MANIFOLDS CONSISTING OF 04 IN NOS VALVES 65MM, QTY - 04
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - LUB OIL SYSTEM CHEST VALVE CONSISTS OF 06 IN NOS 40 MM VALVE. QTY 04. PRESSURE TEST 06 BAR.
CHEST VALVE NOT HOLDING OVERHAULING OF THE FOLLOWING VALVE SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING.: - EDUCTOR SUCTION CHEST VALVE OF 04 IN NOS, 65MM QTY 02, 40 MM QTY 04
AC SEA CHEST VALVES NOT HOLDING. RA FOR VALVES OVERHAULING INCLUDING REMOVAL AND FITMENT. QTY - -02 DIA - 100 NB TESTING PRESSURE - 4 BAR
REF SEA CHEST VALVES NOT HOLDING. RA FOR VALVES OVERHAULING INCLUDING REMOVAL AND FITMENT. QTY - -02 DIA - 32 NB TESTING PRESSURE - 4 BAR
REF PLANT SEA WATER CONDENSER INLET AND OUTLET VALVES NOT HOLDING. SUSPECT VALVE SHEET DAMAGED/ PERISHED. RA FOR VALVE OVERHAULING/ REPLACEMENT. DIA 32 NB. TYPE - SDNR QTY - 04
AC CHILLED WATER VALVES NOT HOLDING. SUSPECT VALVE SHEET DAMAGED/ PERISHED. RA FOR VALVE OVERHAULING/ REPLACEMENT INCLUDING REMOVAL AND FITMENT. DIA 80 NB. TYPE - SDNR QTY - 03
VALVE WHEEL OF VARIOUS SYSTEMS BROKEN/ DAMAGED. REQUIRED ASSISTANCE FOR MANUFACTURING OF VALVES SPINDLE WHEELS AS PER SAMPLE. QTY - 50 MAT - MS
PROPELLER COATING TO BE UNDERTAKEMN AS PER HQ SNC DIRECTIVE EG/3000/NHQ DT 22 JAN 24 2 NOS DIA-2430MM
CARRY OUT LEAK TEST AND PRESSURE TESTING OF 7 BAR CONTROL BOTTLE (02 NOS TESTING PRESSURE 11 BAR) AT MCR AND LOCAL STATION (01NOS) VIEW LOW CONTROL AIR INDICATION AND MALFUNCTIONING OF THROTTLE HAS BEEN OBSERVED .QTY 3 NOS
LOW CONTROL AIR FAILURE OBSERVED, replace/ REPLACEMENT OF CONTROL AIR PIPELINE (200 MTRS COPPER GAUGE LINE) ) . SCOPE OF WORK INVOLVE replaceAL DEFECTIVE GAUGE LINE WITH NEW GAUGE LINES. MAT COPPER GAUGE LINE, SIZE 3/4 INCH 200 RMT
LOW CONTROL AIR FAILURE OBSERVED, replace OF CONTROL AIR PIPELINE WITH END FITTINGS (300 NOS) . SCOPE OF WORK INVOLVE replaceAL DEFECTIVE GAUGE LINE WITH NEW GAUGE LINES. MAT COPPER GAUGE LINE, SIZE 3/4 INCH 300 NOS
RA FOR MANUFACTURING OF FUEL HP LINES WITH ADAPTOR AS PER SAMPLE. QTY 10 SIZE- 15 MM, MAT - SS 10 NOS
PORTABLE GEN SET IS TRIPPING INTERMITTENTLY. RA FOR CARRYING OUT OVERHAULING OF GEN SET. 01 NOS
REQUIRES ASSISTANCE FOR replaceAL OF MAIN ENGINE ROOM BILGE PLATES FROM MS TO ALUMINUM. SCOPE OF WORK INCLUDES replaceAL AND SECURING OF BILGE PLATES WITH RUBBER BIDING. MAT - ALUMINUM AREA - 45 SQUARE METER
REQUIRES ASSISTANCE FOR replaceAL OF AFT ENGINE ROOM BILGE PLATES FROM MS TO ALUMINUM. . SCOPE OF WORK INCLUDES replaceAL AND SECURING OF BILGE PLATES WITH RUBBER BIDING. MAT - ALUMINUM AREA - 20 SQUARE METER
CHEMICAL CLEANING AND PRESSURE TESTING OF THREE FAN COIL UNITS TO BE CARRIED OUT. VIEW TEMPRATURE OF RESPECTIVE COMPATMRNTS NOT AS PER CHILLED WATER TEMPRATURE. 3 NOS
3 WAY PLUG VALVES OF MAIN ENGINE LUB OIL SYSTEM TO BE OVERHAULED VIEW VALVES ARE HARD TO OPERATE. SIZE 100 MM- 03 80MM- 05 NOS, 65 MM- 04 SCOPE OF WORK INVOLVE REMOVAL OF VALVE AND FITMENT POST OVERHAULING AND PRESSURE TESTING. 12 NOS
BILGE PUMPING OUT SYS STRAINER BODY CORRODED, TO BE replaceED ALONG WITH ELEMENT.STRAINER ELEMENT, MAT- BRASS, QTY- 05. STRAINER BODY, MAT- GUN METAL: -80MM
BILGE PLATE FRAMES TO BE PASTED WITH VIBRO ACOUSTIC DAMPING LINERS IN MER , AER, GLAND COMP AND ASP (MAT- IRP1075, STYRENE BUTADIENE RUBBER), THICKNESS-04mm. ADHESIVE NMR 88C/ NMR 51K TO BE USED FOR PASTING. LENGTH 550 MTRS
DZUS FASTNERS FITMENT TO BE UNDERTAKEN IN ALL MACHINERY COMPARTMENT ( AER, MER, ASP AND GLAND COMPARTMENTS) TO BE UNDERTAKEN. QTY – 1000 NOS.
MISSION CRITICAL EQUIPMENT COOLANT LEAKAGE OBSERVED FROM CYLINDER HEADS OF BOTH MAIN ENGINE WHILE OPERATION. SUSPECT PITTING/ DETERIORATION. REQUIRED ASSISTANCE FOR LAPPING BETWEEN CYLINDER HEADS AND LINERS. QTY - 16
LO PRESSURE LINE( GAUGE LINE) OF PORT GEAR BOX FOR PRESSURE SWITCHES PERISHED, TO BE replaceED WITH END FITTINGS. LENGTH -25 M, MAT- BRASS, CU.
LO PRESSURE LINE( GAUGE LINE) OF STBD GEAR BOX FOR PRESSURE SWITCHES PERISHED, TO BE replaceED WITH END FITTINGS. LENGTH -50 M, MAT- BRASS, CU.
FOLLOWING REDUCERS OF FIREMAIN SYS NOT HOLDING, LEAKING FROM BODY, REFIT AND replace DEFECTIVE PARTS. (A) SIZE - 65 mm, QTY - 02. (B) SIZE - 100 mm, QTY - 02.
FOLLOWING SIZE BLANKS TO BE MANUFACTURED. MAT- MS, THICKNESS- 5mm. (A) DIA - 150 mm, QTY - 02. (B) DIA - 100mm, QTY - 05. (C) DIA - 80mm, QTY - 04. (D) DIA - 65mm, QTY - 04. (E) DIA - 32mm, QTY - 02. (F) DIA - 25MM, QTY- 05.
SYS PIPE SUPPORTING BRACKETS (MS) BROKEN AT VARIOUS LOCATIONS IN MER & AER COMPT. SAME TO BE replaceED ALONG WITH RUBBER INSERTS AND SS NUT BOLTS. QTY - 80
SAFETY MACHINERY GUARD OF LUB OIL PRESSURE PUMP AND SCAVENGE PUMP DAMAGED. UNDERTAKE MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE/DIMENSIONS. QTY - 02, MAT- MS
SAFETY MACHINERY GUARD OF BILGE PUMP NO. 1 AND 2 DAMAGED. UNDERTAKE MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE/DIMENSIONS. NOS 2,MAT-SS
SAFETY MACHINERY GUARD OF FUEL OIL TRANSFER PUMP DAMAGED. UNDERTAKE MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE/DIMENSIONS. NOS 1,MAT-SS
SAFETY MACHINERY GUARD OF FRESH WATER PUMP NO. 1 AND 2 DAMAGED. UNDERTAKE MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE/DIMENSIONS. NOS 2,MAT-SS
SAFETY MACHINERY GUARD OF DD COMPRESSOR DAMAGED. UNDERTAKE MANUFACTURING OF MACHINERY GUARD AS PER SAMPLE/DIMENSIONS. LOCATION- MER NOS 2 MAT-MS
BOTH STERN TUBE OIL LEVEL SHOWING ERRATIC VALUE. SUSPECT LEVEL SENSOR MALFUNCTIONING/WIRING DAMAGED. RA FOR SENSOR REPLACEMENT QTY - 02
S/W SYSTEM UNDER WATER VALVES OF FOLLOWING TYPE/SIZE NOT HOLDING. VALVES TO BE OVERHAULED AND PRESSURE TESTED.TEST PRESSURE - 5.0 BAR. (A) SD VALVE, QTY -04, SIZE - 65MM (B) SDNR, QTY - 03, SIZE - 80 MM (C) GATE VALVE, QTY - 02, SIZE - 40 MM (D) GATE VALVE, QTY - 04, SIZE - 65 MM (E) ANGLE VALVE, QTY- 03, SIZE - 100 MM NOS 16
FITMENT OF FLOW SWITCH IN CHILLED WATER SYSTEM TO BE CARRIED OUT EVAPORATOR INLET TO BE ISERTED VIDE MTU FAX MTU/3000/5 DATED 12 AUG 22. NOS 3
EMERGENCY DA ENGINE RPM NOT AVAILABLE. REQUIRED ASSISTANCE FOR FITMENT OF RPM SENSOR/ TACHOMETER WITH DIGITAL DISPLAY. QTY 01 RANGE 0-1800
TRIM INDICATOR AT MCR SHOWING ERRATIC READINGS. REQUIRED ASSISTANCE FOR FITMENT OF DIGITAL TRIM INDICATOR TO IMPROVE ACCURACY.
AC AND REF INDICATION PANEL AT MCR NOT WORKING. REQUIRED ASSISTANCE FOR replaceAL OF WIRING AND INDICATION PANEL. DIA- 8 MM, LENGTH- 60 MTR 3 CORE CABLE
MCR CHAIR AND SOFA DAMAGED. REQUIRED ASSISTANCE FOR replaceAL OF MCR CHAIR AND SOFA. QTY - 03
MAIN ENGINE EXHAUST TEMPRATURE SCANNER SHOWING ERRATIC READING FREQUENTLY VIEW EARHTING AND GROUNDING OF WIRING,EXISTING WIRING TO BE REPLACED WIT WITH 3 CORE WIRING FOR DEFECT RCTIFICATION 200 MTR
CHANGE OVER VALVE OF DUPLEX STRAINER NOT WORKING, OVERHAULING AND CHEMICAL CLEANING OF STRAINERS TO BE UNDERTAKEN, SIZE 150 MM QTY - 5 NOS
CUMMINS ONAN DG FITTED TRIPPING FREQUENTLY WHILE SMB DEPLOYED FOR SURVEY OPERATION, OVERHAULING OF DG IS TO BE UNDERTAKEN.
HIGH SMOKE OBSERVED FROM CUMMINS ONAN DG FITTED ON SMB. REQUIRED ASSISTANCE FOR OVERHAULING OF DG .
ABNORMAL SOUND AND VIBRATION OBSERVED FROM CUMMINS ONAN DG FITTED ON SMB. REQUIRED ASSISTANCE FOR OVERHAULING OF DG .
ABNORMAL SOUND AND VIBRATION OBSERVED FROM CUMMINS ONAN DG FITTED ON SMB. REQUIRED ASSISTANCE FOR OVERHAULING OF DG .
AC PLANT SEA WATER CONDENSER INLET VALVES NOT HOLDING. SUSPECT VALVE SHEET DAMAGED/ PERISHED. RA FOR VALVE REPLACEMENT DIA 65 NB. TYPE - SDNR QTY - 03
REQUIRED ASSISTANCE FOR FITMENT OF 100 MM SEA WATER PRESSURE REDUCER FOR EMERGENCY COOLING OF AC PLANT. RANGE : 6-3 BAR QTY - 01 SIZE - 100 MM, MAT- Cu-Ni
REF PLANT CONTROL PANEL WIRING PERISHED DUE TO WAER AND TEAR. REQUIRED ASSISTANCE FOR REWIRING OF INTERNAL CABLES. WORK INVOLVE REPLACEMENT OF INDICATION LAMP QTY - 15, ROTARY SWITCHES - 12, CONTACTOR - 06, RELAY - 09 AND TIMER - ,2.5 MM SINGLE CORE CAB TOTAL LENGTH- 300 MTR
SUB OPTIMAL PERFORMANCE OF REF PLANT VIEW RATED TEMP OF COOL AND COLD ROOM NOT ACHIEVED. SUSPECT MINOR LEAKAGE FROM PLANT. SYSTEM MAY BE PRESSURE TESTED AND PROVED IN SITU. TESTING PRESSURE - 13 BAR
REQUIRED ASSISTANCE FOR FITMENT OF 32 MM SEA WATER PRESSURE REDUCER FOR EMERGENCY COOLING OF REF PLANT. RANGE : 6-1.5 BAR QTY - 01 SIZE - 32 MM
REQUIRED ASSISTANCE FOR CHEMICAL CLEANING AND PRESSURE TESTING OF COOL ROOM AND COLD ROOM AIR COOLING UNITS. QTY- 02
REQUIRED ASSISTANCE FOR MANUFACTURING OF AC AND REF PLANT ANGLE VALVE CAPS AS PER SAMPLE. QTY - 15 MAT - MS
REQUIRED ASSISTANCE FOR CALIBRATION OF ALL TEMPERATURE AND PRESSURE GAUGES OF ATUs. REPLACE IF DEFECTIVE. QTY - 12
AUTO CUT IN CUT OFF OF BOTH REF PLANTS NOT WORKING/ MALFUNCTIONING. REPLACE CUT OUTS. QTY - 02 MAKE - DANFOSS, RANGE -CUT IN (-5)DEGREE CELCIUS,CUTOUT (-10)DEGREE CELCIUS
REQUIRED ASSISTANCE FOR CHEMICAL CLEANING AND PRESSURE TESTING OF BOTH REF PLANT SEA WATER CONDENSERS. TUBE DIA -10 CM
COOL ROOM AND COLD ROOM TEMPERATURE GAUGES NOT WORKING IN AC COMPARTMENT. REQUIRES ASSISTANCE FOR FITMENT OF DIGITAL INDICATORS .
DIESEL ALTERNATOR SEA WATER PUMPS SUCTION AND DISCHARGE VALVES NOT HOLDING PRESSURE. RA FOR DEFECT RECTIFICATION. replace DEFECTIVE.VALVES QTY – 08 , DIA – 65 MM, TYPE- SDNR
DIESEL ALTERNATOR FUEL VALVES NOT HOLDING. RA FOR replaceAL OF NON-RETURN VALVE IN FUEL RETURN LINE FOR ALL 05 DA . SIZE- 25 MM
DIESEL ALTERNATOR HP AIR STARTING VALVES NOT HOLDING VIEW VALVES DAMAGE/ DETERIORATED. REQUIRED TO replace ALL AIR STARTING VALVES. QTY - 10 SIZE - 32 NB, TYPE- BALL VALVE
HP AIR BOTTLES DISCHARGE VALVES NOT HOLDING VIEW VALVES DAMAGE/ DETERIORATED. REQUIRED TO replace HP AIR DISCHARGE VALVES. QTY - 10 SIZE - 65 NB,TYPE-GATE VALVE
DIESEL ALTERNATORS FRESH WATER CHARGING VALVE NOT HOLDING. replace DEFECTIVE VALVES QTY – 03, DIA – 25 MM,TYPE- SD VALVE
DIESEL ALTERNATOR EMERGENCY COOING VALVES NOT HOLDING PRESSURE. RA FOR OVERHAULING OF VALVE. replace DEFECTIVE VALVES QTY - 04, DIA – 65 MM, TYPE- SDNR
S/W LINE OF DA CORRODED AT VARIOUS LOCATION. RA FOR MANUFACTURING OF LINE AS PER SAMPLE WITH END FLANGES. DIA -50MM AND 40 MM. MAT- CUNI. SCOPE OF WORK INVOLVE REMOVAL OF DEFECTIVE LINE AND MANUFACTURE AS PER SAMPLE AND FITMENT POST PRESSURE TESTING.LENGTH- 05 MTR
CARRY OUT SERVICEABILITY CHECKS OF DRAIN VALVE OF HPAC. replace DEFECTIVE .VALVES QTY -02, DIA-10 MM TYPE-BALL VALVE
CARRY OUT OVERHAULING OF 25 % (18 OUT OF 75) FUEL SYSTEM VALVES AS FOLLOWS: (A) TYPE - SD VV DIA - 100 NB QTY - 06 (B)TYPE - QS VV DIA - 80 NB QTY - 07 (C)TYPE - QS VV DIA 100 NB QTY - 05
CARRY OUT OVERHAULING OF 25 % (11 OUT OF 45) FRESH WATER SYSTEM VALVES AS FOLLOWS: (A) TYPE - SD VV DIA - 100 NB QTY - 05 (B)TYPE - SD VV DIA - 32 NB QTY - 06
CARRY OUT OVERHAULING OF 25 % (20 OUT OF 80) FIRE MAIN SYSTEM VALVES AS FOLLOWS: (A) TYPE - GATE VV DIA - 100 NB QTY - 07 (B)TYPE - ANGLE VV DIA - 100 NB QTY - 03 (C)TYPE - SDNR VV DIA 100 NB QTY - 05 (D)TYPE - SDNR VV DIA 65 NB QTY - 05
CARRY OUT OVERHAULING OF 25 % (12 OUT OF 48) LUB OIL SYSTEM VALVES AS FOLLOWS: (A) TYPE - SD VV DIA - 100 NB QTY - 02 (B)TYPE - SD VV DIA - 25 NB QTY - 07 (C)TYPE - SD VV DIA 32 NB QTY - 03
CARRY OUT OVERHAULING OF 25 % (07 OUT OF 28) AVCAT SYSTEM VALVES AS FOLLOWS: (A) TYPE -3 WAY COCK DIA - 100 NB QTY - 01 (B)TYPE - 2 WAY COCK DIA - 65 NB QTY - 02 (C)TYPE - SDNR VV DIA - 65 NB QTY - 04
CARRY OUT OVERHAULING OF 25 % SEA WATER SYSTEM PIPE LINES AS FOLLOWS: (A) LENGTH - 09 MTR DIA - 100 MM MAT - CUNI (B)LENGTH - 06 MTR DIA - 80 MM MAT - CUNI (C)LENGTH - 05 MTR DIA - 65 MM MAT - CUNI (D)LENGTH - 10 MTR DIA - 10 MM MAT - CUNI
MANUFACTURING OF UNDERWATER BLANKS AS PER DRAWING FOR SEA CHEST GREATING TO BE FITTED BY DIVERS DURING REPAIR WORK ON UNDERWATER VALVE WHEN SHIP IS IN AFLOT CONDITION. AS PER FOST GUIDELINE. MAT ALUMINIUM, RUBBER AND J BOLT. BLANKS TO BE CHECKED WHEN SHIP IS ON DRY DOCK. QTY 4 NOS,SIZE-125MM
RUBBERIZED LP HOSES IN 04 IN NUMBER SMBs (SURVEY MOTOR BOATS) DETERIORATED/ DAMAGED VIEW SERVICE LIFE. SCOPE OF WORK INCLUDES SURVEY, INSPECTION AND RENEWAL OF ALL RUBBERIZED HOSES FITTED IN SMBs.
OIL LEAKAGE AND SUB OPTIMAL PERFORMANCE OBSERVED OF STERN DRIVES FITTED ONBOARD 04 SMBs. SCOPE OF WORK INCLUDES INSPECTION AND SERVICING OF 08 IN NUMBER STERN DRIVE INCLUDING SPARES .
SLUGGISH MOVEMENT/ FAILURE OF STEERING OBSERVED ON STEERING SYSTEM, FITTED ONBOARD 04 SMBs VIEW LONG OPERATIONAL PERIOD . SCOPE OF WORK INCLUDES RENEWAL AND TRIALS OF.STEERING HELM (QTY - 04) FITTED IN CONSOLE PANEL WITH STEERING CABLES ( LENGTH 28 AND 32 FEET QTY - 04 EACH)
12 V DC BILGE PUMPS DEFECTIVE/ SUB OPTIMAL PERFORMANCE FITTED ONBOARD 04 SMBs. SCOPE OF WORK INCLUDES replaceAL AND TRIALS OF.BILGE PUMPS (QTY - 08)
REQUIRED ASSISTANCE FOR CLEANING AND PRESERVATION OF FUEL STORAGE AND RU TANKS. TOTAL TANKS - 10 + 03,AREA- 1500 SQ MTR
REQUIRED ASSISTANCE FOR CLEANING AND PRESERVATION OF LUB OIL STORAGE AND RU TANKS. TOTAL TANKS - 02 + 02, AREA-300 SQ MTR
REQUIRED ASSISTANCE FOR CLEANING AND PAINTING OF FRESH WATER STORAGE TANKS. TOTAL TANKS - 09, AREA-1300 SQ MTR
REQUIRED ASSISTANCE FOR CLEANING AND PAINTING OF AVCAT STORAGE AND SERVICE TANK TANKS. TOTAL TANKS - 02, AREA-400 SQ MTR
REQUIRED ASSISTANCE FOR MECHANICAL CLEANING AND PAINTING OF MAIN ENGINE ROOM (MER) BILGES AND UNDER WATER FITMENTS INCLUDING PIPES AND VALVES. 1700 SQ FT
REQUIRED ASSISTANCE FOR MECHANICAL CLEANING AND PAINTING OF AUXILIARY ENGINE ROOM (AER) BILGES AND UNDER WATER FITMENTS INCLUDING PIPES AND VALVES.
REQUIRED ASSISTANCE FOR EXTENSION OF FUEL FILLING LINE FOR BOATS FROM BAMBOO DECK TO SMB DEVITS. SCOPE OF WORK INCLUDES PIPING TO 04 BOAT DEVITS AND RHIB DEVIT WITH ISOLATING COCKS. PIPE DIA - 40 MM LENGTH - 60 MTR COCKS - 40 NB QTY - 05
REQUIRED ASSISTANCE FOR REPLACEMENT OF FUEL RU TANKS SIGHT GLASSES WITH VALVES. QTY - 03,LENGTH OF EACH SIGHT GLASS-1.2MTRS WITH 02 COCKS
REQUIRED ASSISTANCE FOR REPAIR/ REPLACEMENT OF LUB OIL RU TANKS SIGHT GLASSES WITH VALVES. QTY - 08 LOCATION: MER -01, AER- 01, ASP - 03, GLAND COMPT - 02, STLO - 01 ,LENGTH OF EACH SIGHT GLASS-1.2MTRS WITH 02 COCKS
REQUIRED ASSISTANCE FOR REPAIR/ REPLACEMENT OF INHIBITOR TANKS SIGHT GLASSES WITH VALVES. QTY - 03 LOCATION: MER,LENGTH OF EACH SIGHT GLASS-1.5 MTRS WITH 02 COCKS
REQUIRED ASSISTANCE FOR FITMENT OF SIGHT GLASSES WITH VALVES IN AVCAT STORAGE AND SERVICE TANKS. QTY - 02,LENGTH OF EACH SIGHT GLASS-1.5 MTRS WITH 02 COCKS
REQUIRED ASSISTANCE FOR REPLACEMENT OF BUCKET VALVES OF FUEL FILLING SYSTEM WITH DISTANCE PIECE. LENGTH - 01 MTR QTY - 05,DIA-80MM
REQUIRED ASSISTANCE FOR REPLACEMENT OF BUCKET VALVES OF FRESH WATER FILLING SYSTEM WITH DISTANCE PIECE. LENGTH - 01 MTR QTY - 07,DIA-80MM
REQUIRED ASSISTANCE FOR replaceAL AND FITMENT WIRE MESH OF MACHINERY COMPARTMENT VENTILATION TRUNKING. QTY - 50 AREA - 100 SQ MTR (APPROX),
REQUIRED ASSISTANCE FOR CLEANING AND MACHINERY PAINTING OF DIESEL ALTERNATORS BODY. QTY - 05
FRESH WATER BOOSTER PUMP IN CAPTAIN LOBBY NOT DEVELOPING SUFFICIENT PRESSURE.SCOPE OF WORK INCLUDES REPLACEMENT OF BOOSTER PUMP WITH VALVES AND PIPE LINE. LENGTH 16 RMT.
DIESEL GENERATOR GOVERNING SYS (TBD 2V12) WOODWARD | 417351 SHOWING CONTROLS FAILURE DUE TO WHICH N/A REQUIRED ASSISTANCE FOR SERVICEABILITY CHECK OF ELECTRONIC GOVERNOR ASSEMBLY – 01 (PATT NO – EG3030B-123206549026)
CLEARANCE OF THORDON BEARINGS FOUND OUT OF LIMITS. REQUIRES ASSISTANCE FOR replaceAL OF RUBBER STAVES OF THORDON BEARING.
REQUIRED ASSISTANCE FOR RENEWAL AND PRESSURE TESTING OF ASTERN FUELING HOSE. QTY - 02 TESTING PRESSURE - 08 BAR
REQUIRED ASSISTANCE FOR RENEWAL AND PRESSURE TESTING OF AVCAT TRANSFER HOSE. QTY - 01 TESTING PRESSURE - 08 BAR
BASE FRAME OF RO PLANT DAMAGED/ PERISHED. REQUIRED ASSISTANCE FOR RENEWAL OF BASE FRAME WITH GRP COATING.
SUB OPTIMAL PERFORMANCE AND ABNORMAL SOUND OBSERVED FROM 02 IN NUMBER 20 TPH SUBMERSIBLE PUMPS REQUIRED ASSISTANCE FOR OVERHAULING.
SUB OPTIMAL PERFORMANCE AND ABNORMAL SOUND OBSERVED FROM 02 IN NUMBER 40 TPH SUBMERSIBLE PUMPS REQUIRED ASSISTANCE FOR OVERHAULING.
100 TPH SUBMERSIBLE PUMP NOT DEVELOPING SUFFICIENT DISCHARGE PRESSURE REQUIRED ASSISTANCE FOR OVERHAULING QTY - 01
MODIFICATION OF REF SEA WATER PUMP DISCHARGE MANIFOLD. REQUIRED ASSISTANCE OF FITMENT OF DISCHARGE VALVES WITH END FITTINGS. QTY - 02 TYPE - SDNR DIA - 32 NB
REQUIRED ASSISTANCE FOR SHIFTING OF SHIPS SIREN FROM MAST DECK TO BRIDGE TOP WITH AIR LINE FOR EASY ACCESS FOR INSPECTION/ DEFECT RECTIFICATION.
DIESEL ENGINE FOR DD COMPRESSOR (TA1) KIRLOSKAR | 41016 HARD TO TURN REQUIRED ASSISTANCE FOR OVERHAULING
HIGH SMOKE OBSERVED FROM BASSCA CHARGING COMPRESSOR ENGINE AND COMPRESSOR NOT DEVELOPING SUFFICIENT PRESSURE. REQUIRED ASSISTANCE FOR OVERHAULING OF COMPRESSOR WITH ENGINE.
AC COMPARTMENT EDUCTOR SUCTION AND DISCHARGE VALVE NOT HOLDING PRESSURE. RA FOR OVERHAULING OF VALVE. QTY – 03, SIZE – 65MM. TYPE – SDNR AND GLOBE VALVE.
ISOLATING VVs (GATE VV) OF FIRE MAIN SYS NOT HOLDING, TO BE replaceED.SIZE 100 MM (QTY - 05) AND 65 MM (QY-02). PRESSURE TEST-12 BAR, QTY- 07.
AFT FRESH WATER PUMP NOT DEVELOPING SUFFICIENT PRESSURE. PUMP TO BE OVERHAULED
DOMESTIC FRESH WATER SYSTEM VALVES NOT HOLDING/ LEAKING. REQUIRED ASSISTANCE FOR replaceAL OF VALVES SIZE - 40 NB MAT - BRASS QTY- 08,TYPE- SD VV
SPRINKLERS FITTED IN SHIPS SPRINKLING SYSTEM DAMAGED/ DETORIATED. TO BE REPLACED
MAIN ENGINE ROOM EDUCTOR SUCTION AND DISCHARGE VALVE NOT HOLDING PRESSURE. RA FOR OVERHAULING OF VALVE. QTY – 03, SIZE – 65MM. TYPE – SDNR AND GLOBE VALVE.
HYDRANT VALVES NOT HOLDING PRESSURE/ LEAKING AT MAIN PASSAGE WAY . RA FOR replaceAL OF HYDRANT VALVE. QTY – 07 SIZE – 65MM. TYPE – SD VALVE.
ABNORMAL NOISE OBSERVED FROM FWD FRESH WATER PUMP. REQUIRED ASSISTANCE FOR PUMP OVERHAULING.
SUCTION AND DISCHARGE VALVE OF FWD FRESH WATER PUMP NOT HOLDING. VALVES TO BE replaceED. SIZE - 40 NB QTY - 04,TYPE- SDNR VV
REPLACE AL OF FRESH WATER LINE AT BRIDGE FOR WINDOW WIPER INCLUDING NOZZLES. LENGTH - 20 MTR. SIZE - 10 MM, MAT- Cu-Ni. NOZZLES - 30
APPLICATION OF OM-750 MAY BE UNDERTAKEN IN ALL FUEL TANKS IAW EXTANT POLICY NORMS. JOB INVOLVES REMOVAL OF EXISTING LLPS,CUTTING OF TECHNICAL WINDOW, SURFACE PREPARATION OF SA 2.5 STANDARD,RESTORATION OF TECHNICAL WINDOW AND PRESSURE TESTING OF TANK POST COMPLETION OF WORK.
APPLICATION OF LLPS MAY BE UNDERTAKEN IN ALLFRESH WATER TANKS IAW EXTANT POLICY NORMS. JOB INVOLVES REMOVAL OF EXISTING LLPS,CUTTING OF TECHNICAL WINDOW, SURFACE PREPARATION OF SA 2.5 STANDARD,RESTORATION OF TECHNICAL WINDOW AND PRESSURE TESTING OF TANK POST COMPLETION OF WORK.
APPLICATION OF OM-750 MAY BE UNDERTAKEN IN ALL FUEL TANKS IAW EXTANT POLICY NORMS. JOB INVOLVES REMOVAL OF EXISTING LLPS,CUTTING OF TECHNICAL WINDOW, SURFACE PREPARATION OF SA 2.5 STANDARD,RESTORATION OF TECHNICAL WINDOW AND PRESSURE TESTING OF TANK POST COMPLETION OF WORK.
ENGINEERING - PART III
ABER CAT-I- REPLACEMENT OF LO CENTRIFUGE HQSNC ABER CERTIFICATE NO. EG/ 3000/ ABER 11/19 DATED 25 MAR 19. Qty:2
ABER CAT-I- REPLACEMENT OF FUEL OIL PURIFIER HQSNC ABER CERTIFICATE NO. EG/ 3000/ ABER 10/19 DATED 25 MAR 19 Qty:2
ABER CAT-I- REPLACEMENT OF AVCAT FUELING PUMP HQSNC ABER CERTIFICATE NO. EG/ 3000/ ABER 18/18 DATED 08 NOV 18. Qty:1
ABER CAT-I- REPLACEMENT OF AVCAT TRANSFER PUMP HQSNC ABER CERTIFICATE NO. EG/ 3000/ ABER 18/18 DATED 08 NOV 18. Qty:1
REMOVAL & REPLACEMENT of existing five. 200 kW DAs of M/s Cotton Greaves with four 250 kW DAs of M/s Cummins, Model - NTA 855 DM as per Board Proceedings.
ELECTRICAL - PART I
SR 1-REPLACE ALL CONTACTORS AND WIRING FOR WEAR/DETERIORATION FROM CONTROL PANEL TO MOTOR.(MT-58349)
SR 2- RENEW BRAKE LININGS.(MT-58349)
SR 4-CARRY OUT COMPLETE OVERHAULING OF THE WINDLASS MOTOR AND CONTROLLER PANEL. CHECK ALIGNMENT, IF FOUND MIS ALIGNED, RELAIGNMENT TO BE UNDERTAKEN. RE-FITMENT AND CARRY OUT LOAD TRIALS FOR 4 HOURS.(MT-58349)
SR 2 -EXAMINE VISCOUS FLUID DAMPERS FOR LEAKAGE AND CHECK THAT MOVEMENT OF THE SUSPENDED ASSEMBLY IS POSITIVELY TRANSMITTED TO THE DAMPERS. (MT-57317)
SR 3 BALANCE WEIGHTS TO BE SECURELY BOLTED TO THE OPTICAL RAILS.(MT-57317)
SR 4 CARRY OUT COMPLETE OVERHAULING OF EDA. OVERHAULING OF VOLTAGE REGULATORS/COMPENSATOR:- (A) REMOVAL FROM SHIP. (B) STRIPPING. (C) REPAIR/ REPLACE DEFECTIVE UNITS. (D) RE-PAINTING CASES. (E) RE-PACKING OF GLANDS. (F) TESTS AFTER RE-INSTALLATION..(MT-51312)
SR 1 REMOVE AND EXAMINE SEA-WATER SIDE OF ALTERNATOR AIR COOLER FOR CORROSION, EROSION AND FOULING. CLEAN TUBE PLATE AND TUBES WITH WATER JET. CARRY OUT CHEMICAL CLEANING. FITMENT TO BE UNDERTAKEN AND PRESSURE TEST TO BE CARRIED OUT.(MT-51000)
SR 5 CHECK AVR FOR SERVICEABILITY. CARRY OUT CALIBRATION. IN CASE OF ANY TUNING/ CALIBRATION UNDERTAKEN ON AVR, THE VOLTAGE CONTROL TEST AND PARALLELING TRIALS TO BE UNDERTAKEN.(MT-51000)
SR 9 CHECK SECURING ARRANGEMENT OF POWER AND CONTROL CABLES TO BUS BAR/ AVR. ALL LOOSE SCREWS TO BE TIGHTENED. DEFECTIVE SCREWS TO BE REPLACED.(MT-51000)
SR 10 -REPLACE THE THERMO-COUPLE (MT-51000)
SR 10- REPLACE THE ELECTRICAL TEMPERATURE INDICATOR.(MT-51000)
SR 10- REPLACE THE TACHO-METER TRANSMITTER.(MT-51000)
SR 10- REPLACE THE BEARING OF LUB OIL PUMP MOTOR AND ROTATING RECTIFIER ASSEMBLY.(MT-51000)
SR 11 CARRY OUT SPM CHECKS, PHASE BALANCING, INSULATION MEASUREMENT. OVERHAUL GENERATOR AND REPLACE BEARINGS OF ALTERNATOR, AND CARRY OUT LOAD TRIALS AND RECORD RESULTS IN LOG BOOK. (MT-51000) AND RECTIFY DEFECTS, IF ANY. LIQUIDATE PENDING LOAD TRIAL OBSERVATIONS OF ETMU.
SR 12 CARRY OUT CALIBRATION OF OVER VOLTAGE PROTECTION UNIT (OVPU), REVERSE POWER RELAY AND OVER SPEED TRIP. (MT-51000) AND RECTIFY DEFECTS, IF ANY.
SR 1 & SR 2 - COMPLETE OVERHAUL THE FIREMAIN MOTOR AND STARTERS. SPM TRENDING TOWARDS YELLOW ZONE. REPLACE THE BEARING. CALIBRATE THE OVER-LOAD MECHANISM OF STARTER.(MT-58000)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR .(MT-58200)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 6 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER AND CARRY OUT COMPLETE OVERHAULING OF THE STARTER.(MT-58200)
SR 2 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER. .(MT-58000)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR.(MT-58200)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 6 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER AND CARRY OUT COMPLETE OVERHAULING OF STARTER. (MT-58200)
SR 3-CARRY OUT IN-SITU SERVICEABILITY CHECKS OF BREAKERS(AIR CIRCUIT BREAKER - 05, BUS COUPLER -03, INTERCONNECTOR - 04). CARRY OUT SERVICEABILITY CHECKS OF GSK RELAY AND OTHER PROTECTION CIRCUITS.(MT-53000)
SR 5 CARRY OUT FOLLOWING ROUTINES ON SWITCHBOARD AND BUSBARS(MT-53000):- (I) INSPECT LUGS/ CONNECTORS/ CT/ PT AND OTHER COMPONENTS AND UNDERTAKE REPAIR DETERIORATION/ DAMAGE OF MSB CABLES/ WIRING AS NECESSARY. (II) REPAIR/ REPLACE BUSBARS INSULATORS IF NECESSARY (III) CLEAN AND DECARBONIZE THE BUSBARS. (IV) CARRYOUT FUNCTIONAL CHECKS OF MSB AND PARALLELING TRIALS WITH ALL COMBINATIONS OF GENERATOR SUPPLY.
SR 1-CARRY OUT ADJUSTMENT OF RELAY CONTACTS IN AUXILIARY RELAY AND MEASURING INSTRUMENTS.(MT-53152)
SR 2- CALIBRATE THE VOLTMETER AND AMMETER.(MT-53152)
SR 1 CARRY OUT COMPLETE OVERHAULING AND SPM CHECKS OF DRYING TUMBLER MOTOR. REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58100)
SR 2 CARRY OUT CALIBRATION OF OVERLOAD RELAY (OLR)/ THERMAL PROTECTION (TP) OF STARTER.(MT-58100)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR .(MT-58200)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 6 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER AND CARRY OUT COMPLETE OVERHAULING OF STARTERS.(MT-58200)
SR 1 CARRY OUT COMPLETE OVERHAULING OF STARTER AND CALIBRATE THE OVERLOAD RELAY (OLR)/ THERMAL PROTECTION (TP) OF STARTER.(MT-58004)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR .(MT-58200)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 6 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER AND CARRY OUT COMPLETE OVERHAULING OF STARTERS.(MT-58200)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR.(MT-58200)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 6 -CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER AND CARRY OUT COMPLETE OVERHAULING OF STARTER.(MT-58200)
SR 1 - CARRY OUT COMPLETE OVERHAULING OF STARTERS AND CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58004)
SR 1 - CARRY OUT COMPLETE OVERHAULING OF STARTERS AND CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58004)
SR 1 - OVERHAUL THE MOTOR AND STARTERS.RENEW BEARING SUBJECT TO QC CHECKS AND IF SPM READINGES FOUND IN YELLOW/ RED ZONE (MT-58000)
SR 2- CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58000)
SR 2- CARRY OUT THE ALLIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR .(MT-58200)
SR 6 - CARRY OUT COMPLETE OVERHAULING OF STARTERS AND CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER. .(MT-58200)
SR 2- CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58000)
SR 1 - CARRY OUT COMPLETE OVERHAULING OF STARTERS AND CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58004)
SR 2- CARRY OUT COMPLETE OVERHAULING OF STARTERS AND CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER.(MT-58000)
SR 2- CARRY OUT COMPLETE OVERHAULING OF THE TRANSRECTIFIER(MT-52400).
SR 1- OVERHAUL THE SIREN MOTOR, STARTER AND DYNAMO. CALIBRATE ALL MEASURING INSTRUMENT.(MT-57600)
SR 1- OVERHAUL THE EQUIPMENT COMPLETELY AND DO AS MENTIONED BELOW:- (A) 08 IN NO. OF HEATING ELEMENT SHOWING LOW INSULATION. REPLACE THE HEATING ELEMENT.(MT-57101) (B) GALLEY HOT PLATE WIRING SHOWING LOW INSULATION AND CABLES ARE SIGN OF DETERIORATION .RENEW THE INTERNAL WIRING.(MT-57101) (C) CHECK TEMPERATURE CUT-OUT OF WATER HEATERS FOR SATISFACTORY OPERATION AND ADJUST AS REQUIRED.(MT-57101)
SR 1 OVERHAUL THE EQUIPMENT COMPLETELY AND DO AS MENTIONED BELOW:- 08 IN NO OF ROTARY SWITCHES DAMAGED, CHANGE WITH NEW ONE.(MT-57101)
CARRY OUT FOLLOWING OPERATIONAL CHECKS AND ADJUSTMENTS AS PER PARA 3.3. OF TECHNICAL MANUAL.(UNDER AMC) (A) SERVICEABILITY CHECKS OF THE JUNCTION BOX AND AC-DC POWER SUPPLY UNIT (QTY 01 EACH). (B) SERVICEABILITY CHECKS OF ANTENNA UNIT (QTY 01). (C) SERVICEABILITY CHECKS OF TERMINAL UNIT (QTY 01). (D) CHECK THE SHOCK/VIBRATION MOUNTS AND RENEW IF REQUIRED. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT INTERNAL CLEANING AND CHECK FEEDER CABLE CONNECTORS. REPLACE DEFECTIVE CONNECTORS. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CHECK ALL PCBS, PRINTING HEAD AND OTHER COMPONENTS FOR DAMAGE/ DEFECT. POST INSPECTION , THE DEFECTIVE ITEMS TO BE REPLACED Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT THROUGHLY INTERNAL CLEANING OF THE EQUIPMENT. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
INSPECT THE SHOCK MOUNTS FOR DAMAGE/ DETERIORATION. RENEW THE DAMAGED SHOCK MOUNTS. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT CLEANING OF ANTENNA. PAINT ANTENNA WITH RF PAINT.(QTY-04) APPROX QTY 05 LITRES Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT THE FOLLOWING PERFORMANCE AND PARAMETERS CHECKS AS PER SECTION 4.2 & 4.3 OF MAINTENANCE MANUAL:- (A) CURRENT CONSUMPTION TST IN RX/TX MODE (B) POWER OUTPUT LEVEL METER TEST (C) BATTERY CONDITION INDICATION TEST (D) FREQUENCY ACCURACY TEST (E) RECIEVER SENSITIVITY TEST (E) RX/TX OUTPUT POWER TEST (F) WHIP OUTPUT TEST (G) COMMUNICATION TEST PROCEDURE Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
MEASURE ANTENNA VSWR USING NETWORK ANALYSER . IF VSWR IS MORE THAN 2, THEN ANTENNA IS TO BE REPLACED / REPAIRED . Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CHECK CABLE HEALTH USING TIME DOMAIN REFLECTOMETER (TDR) OR USING SPECIAL TEST SETUP WITH NETWORK ANALYSER AS PER PROCEDURE IN JIC-PAE 3060-2. WHENEVER TRANSMITTER POWER AT ANTENNA IS LESS THAN 12 WATT REPAIR/REPLACE CABLES / CONNECTORS AS NECESSARY. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT VISUAL INSPECTION OF THE MOUNTINGS. IF CORRODED REPLACE Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
MEASURE TRANSMITTER POWER OUTPUT AT THE INPUT OF THE ANTENNA USING ‘THRU-LINE WATTMETER’. IF MEASURED POWER IS LESS THAN 12 WATT, EACH CONNECTORS ENROUTE IS TO BE OPENED, CLEANED AND RE-MADE. IF THE POWER AT THE ANTENNA IS STILL LESS THAN 12 WATT, THEN THE CABLE RUNS ARE TO BE CHECKED FOR DAMAGES AND CHANGE IF REQUIRED. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
MEASURE ANTENNA VSWR, WHENEVER ANTENNAE ARE REMOVED FOR PAINTING BY DOCKYARD. IF VSWR IS MORE THAN 2, THEN ANTENNA IS TO BE REPLACED / REPAIRED Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
INSPECT THE SHOCK MOUNTS FOR DAMAGE/ DETERIORATION, RENEW IF DAMAGED. APPLY NECOL LACQUER ON SHOCK MOUNTS. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT CALIBRATION OF THE EQUIPMENT, PERFORM SELF-CHECKS AND PROVE THE SYSTEM FOR ITS OPERATION Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT CALIBRATION OF THE EQUIPMENT, PERFORM SELF-CHECKS AND PROVE THE SYSTEM FOR ITS OPERATION Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
INSPECT THE SHOCK MOUNTS FOR DAMAGE/ DETERIORATION, RENEW IF NECESSARY. APPLY NECOL LACQUER ON SHOCK MOUNTS. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT OVERHAULING OF ANTENNA SYSTEM. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
INSPECT THE SHOCK MOUNTS FOR DAMAGE/DETERIORATION, RENEW IF DAMAGED. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT SERVICEBILITY CHECKS OF ALL RF MODEM CARDS, SERIAL CARDS, POWER SUPPLY CARDS AND RAID CARD IN SERVER AND SADL. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CLEAN AND EXAMINE WHIP ANTENNA FOR PITTING/ CAVITIES. FILL-UP PITTING/ CAVITIES BY METAL DEPOSITION. PAINT THE WHIP ANTENNA WITH RF PAINT. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CARRY OUT VISUAL INSPECTION OF THE SHOCK MOUNTS OF BELOW DECK EQUIPMENT. REPLACE THE DEFECTIVE SHOCK MOUNTS. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 1 CARRY OUT THE NO LOAD TEST (MT - 674421). Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 1 RENEW SUPPORTING LIQUID, DISTILLED WATER AND CARRY OUT FOLLOWING CHECKS:- (I) SWITCH ON GYRO COMPASS AND CHECK ITS PERFORMANCE. (II) CHECK FOLLOW-UP SYSTEM WITH GYRO COMPASS. (III) CHECK SENSITIVITY OF FOLLOW-UP SYSTEM, IT SHOULD NOT BE LESS THAN 70 DEGREES/ SECOND. (MT-670068) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 1- CARRY OUT CALIBRATION OF INDICATING INSTRUMENTS & SAFETY DEVICES.(MT - 543005) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 2 CHECK THE CONDITION OF SHOCK/VIBRATION MOUNTS, RENEW IF DAMAGED .(MT-543005) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 3 REPLACE MICRO SWITCHES MOUNTED TO THE NFU STEERING LEVERS, OUTPUT RELAYS AND POTENTIOMETERS, IF FOUND DEFECTIVE. (MT-543005) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 5-CARRY OUT SPM CHECKS. LUBRICATE/REPLACE BEARINGS OF THE MOTOR IF FOUND IN YELLOW/ RED ZONE Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 1 CARRY OUT OVERHAULING OF MAGNETIC COMPASS AND RENEW SUPPORTING LIQUID.(MT - 67154) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 2 CARRY OUT SWING CHECK AND CALIBRATE THE COMPASS. (MT - 67154) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 4 CARRY OUT SURVEY OF ALL CABLES, BY ISOLATING EACH JUNCTION BOX AND RENEW DEFECTIVE CABLES.(MT-57400) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SR 5 DEGAUSSING- RA FOR SERVICEABILITY CHECKS AND CALIBRATIONS OF 12 METERS (0-300V DC VOLTMETER QTY-05, 0-40A DC AMMETER QTY-03, 0-60A DC AMMETER QTY-03, 0-150V DC VOLTMETER QTY-01).(MT-57400)
SR 12-CARRY OUT OPEN LOOP FULL LOAD TEST AND CONFIRM SATISFACTORY WORKING OF AUTO CONTROL UNIT.(MT-11523)
SR 13 -CARRY OUT DUMMY LOAD TEST OF CONTROL PANEL (MT-11523)
SR 1 - CARRY OUT SERVICEABILITY CHECK OF ALL UNITS AND OVERALL CHECK-UP OF SYSTEM INCLUDING ACOS, PCBS, MANUAL CALL POINTS, DETECTORS & HOOTERS (WHERE APPLICABLE). (MT-54525)
SR 2 - OVERHAUL THE RECTIFIER AS NECESSARY(1. INPUT MCB, MAIN CONTACTOR CONC1, 2. MAIN TRANSFORMER T1, 3. CONTROLLED BRIDGE RECTIFIER, 4. CONTROL CIRCUIT). (MT-52400)
A 2 - CARRY OUT CALIBRATION/CHECKS OF LCD DISPLAY. (MT-1151002)
SR2 SCOPE OF WORK FOR ECDIS 4000 (TRANSAS): - (A) CARRY OUT FUNCTIONAL/ PERFORMANCE CHECKS OF THE SYSTEM. (B) CARRY OUT SERVICEABILITYCHECKS OF UPS, PCB IN INTERFACE UNIT AND PROCESSOR. (C) REPAIR OR REPLACE IF FOUND DEFECTIVE. Repair/Routines of the equipment must be undertaken through OEM reps only.
SR1 SOW OF AUTOMATIC IDENTIFICATION SYSTEM (AIS) : - (A) SERVICEABILITY CHECKS OF THE JUNCTION BOX AND BUFFER UNIT (QTY 01 EACH). (B) SERVICEABILITY CHECKS OF BOTH ANTENNAE V/UHF AND GPS (QTY 05 EACH). (C) SERVICEABILITY CHECKS OF MAIN DISPLAY UNIT (QTY 05). (D) CHECK THE SHOCK/VIBRATION MOUNTS AND RENEW. (E) REPAIR OR REPLACE IF FOUND DEFECTIVE. Repair/Routines of the equipment must be undertaken through OEM reps only.
ELECTRICAL - PART II
SR 1 COMPLETE OVERHAUL THE MOTOR AND STARTER. RENEW BEARING SUBJECT TO QC CHECKS AND IF SPM READINGS OBSERVED IN YELLOWOR RED ZONE(MT 58000)
SR 1-CALIBRATION OF METER :- VOLTAGE METER-05, KW METER -10, POWER FACTOR METER-05, AMMETER- 05, FREQUENCY METER -05, DOUBLE VOLTAGE METER-02, DOUBLE FREQUENCY METER-02, PHASE SEQUENCE METER-02, INSULATION METER-04(MT-53000)
SR 3- CARRY OUT SPM CHECKS AND REPLACE BEARINGS SPM READING TRENDING TOWARDS YELLOW ZONE.(MT-58200)
SR 1 - OVERHAUL THE MOTOR AND STARTERS. RENEW BEARING SUBJECT TO QC CHECKS AND IF SPM READINEGS FOUND IN YELLOW/ RED ZONE (MT-58000)
SR 1 - OVERHAUL THE MOTOR AND STARTERS. RENEW BEARING SUBJECT TO QC CHECKS AND IF READINGES OF SPM FOUND IN YELLOW/ RED ZONE (MT-58000)
XBT TEST CANISTER 7° & 34° DEGREE GIVING ERRATIC DATA. RA FOR CALIBRATION CHECKS OF TEST CANISTER.
THE EXISTING UPPER DECK CCTV CAMERAS CAT 6A CABLE HAS BEEN PERISHED AT VARIOUS LOCATION. RA FOR RENEWAL OF CABLING (TOTAL CAMERA-09, (CABLE TYPE- CAT6A 650 MHZ FTP SOLID ETHERNET BARE COPPER CABLE), LENGTH- 500 Mtr).
THE EXISTING FOUNDATIONS OF CCTV CAMERAS FITTED ON UPPER DECKS HAS BEEN CORRODED AT 11 LOCATIONS AND THE SAME ARE REQUIRED TO BE RENEWED. DIMENSIONS OF THE FOUNDATIONS ARE AS FOLLOWS: - (A) LENGTH 15.5 X 22 CM X 04 MM, (QTY-04). (B) LENGTH 51 X 26 CM X 04 MM, QTY-04. (C) VERTICAL LENGTH 30 CM, QTY-01. (D) VERTICAL PIPE LENGTH 4 CM AND PLATE LENGTH 15 CM X 02 CM X 04 MM, QTY-02), MAT – MS.
FLEXIBLE METALLIC CONDUITS SURROUNDING THE CABLE ON WEATHER DECK ARE CORRODED. PROVISIONING OF FLEXIBLE METALLIC CONDUIT (DIAMETER- 2.5 CM) FOR CCTV CABLES ON WEATHER DECK WITH GROUNDING (APX. LENGTH 100 MTRS).
TARGET BELOW 2-3 NM INTERMITTENTLY PAINTING FOR BOTH THE RADARS ON DISPLAY. RA FOR SERVICEABILITY CHECKS OF THE RADAR TO BE CARRIED OUT AND DEFECT TO BE RECTIFIED. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
INTERMITTENT FAILURE OF LAN SWITCH IN RADAR MFC. SUSPECT ISSUE IN LAN SWITCH. RA FOR SERVICEABILITY CHECKS TO BE CARRIED OUT AND LAN SWITCH TO BE REPLACED. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
TOUCH SCREEN OF AIS (MAKE- JATRON 8000) DISPLAY ERRATIC. SERVICEABILITY CHECKS TO BE CARRIED OUT AND REPLACE THE DISPLAY.
THE EXISTING TRANSPARENT GLASS OF ECDIS SLAVE DISPLAY BOX FITTED IN BRIDGE WINGS (PORT&STBD) HAVE BEEN CORRODED. NEW TRANSPARENT GLASS OF DIMENSIONS (60 CM X 45CM X 02MM) TO BE RENEWED.
SOFTWARE UPGRADATION AND HARDISK CAPACITY TO 10TB IS REQUIRED TO BE UNDERTAKEN TO INCREASE THE STORAGE CAPACITY OF RECORDINGS UPTO 20 DAYS AGAINST THE EXISTING STORAGE CAPACITY OF 2TB (M/S WISKA PVT LTD). Upgradation must be undertaken through OEM/OEM reps only.
RA FOR INSTALLATION OF ONE CCTV CAMERA IN DCHQ FOR CAPTURING OF MAGAZINE MONITORING DEVICE AS PER NHQ/DSR LETTER PP-08/2024/SB-I/INMER DATED 20 AUG 24. THE SCOPE OF WORK INVOLVED: - (A) FITMENT OF CAMERA IN DCHQ. (B) MANUFACTURING AND FITMENT OF CAMERA BASE PLATE (LENGTH 15.5 CM X 22 CM X 04 MM, MAT – MS) (C) LAYING OF CABLE FROM TELEPHONE EXCHANGE TO DCHQ (APP. LENGTH - 50 MTRS, CABLE TYPE- (CAT6A 650 MHZ FTP SOLID ETHERNET BARE COPPER CABLE). (D) INTEGRATION OF CCTV CAMERA WITH EXISTING CCTV NETWORK (MAKE- M/S WISKA PVT LTD).
ERRATIC READING OBSERVED FROM SINGLE BEAM TRANSDUCER (12 KHZ & 210 KHZ). RA FOR INSPECTION TO BE CARRIED OUT OF TRANSDUCER AND REPLACE IF DEFECTIVE. QTY-02 Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 5 KVA UPS OF RADAR. BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. FOLLOWING ARE REQUIRED: - (A) SERVICEABILITY CHECKS OF UPS. (QTY – 01) (B) REPLACEMENT OF OLD SMF BATTERIES (QTY - 10 ,12V 26 AH). (C) TRIALS OF THE EQUIPMENT OPERTING UPON BATTERIES FOR ATLEAST 30 MIN POST FITMENT OF NEW SMF BATTERIES. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 3 KVA UPS (QTY-03) OF CCTV AND AIS. BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. FOLLOWING ARE REQUIRED: - (A) SERVICEABILITY CHECKS OF UPS. (B) REPLACEMENT OF OLD SMF BATTERIES (QTY – 18, 12V 65 AH). (C) TRIALS OF THE EQUIPMENT OPERTING UPON BATTERIES FOR ATLEAST 30 MIN POST FITMENT OF NEW SMF BATTERIES. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 1.5 KVA UPS (QTY-01) OF ECDIS. BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. FOLLOWING ARE REQUIRED: - (A) SERVICEABILITY CHECKS OF UPS. (B) REPLACEMENT OF OLD SMF BATTERIES (QTY - 10, 12V 07 AH). (C) TRIALS OF THE EQUIPMENT OPERTING UPON BATTERIES FOR ATLEAST 30 MIN POST FITMENT OF NEW SMF BATTERIES. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
RA FOR CARRY OUT VSWR MEASUREMENT AND RADIATION PATTERN TEST OF THE ANTENNA FOR CHECKING THE HEALTH OF THE ANTENNA.
PTZ OUTDOOR CAMERAS (MAKE-WISKA) ARE NOT WORKING VIEW NO VIDEO OUTPUT AND DEFECTIVE MOTOR ASSEMBLY RA FOR REPLACEMENT OF CAMERA AND MOTOR ASSEMBLY. (QTY-06) Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
FIX OUTDOOR CAMERAS (MAKE-WISKA) ARE NOT WORKING VIEW NO VIDEO OUTPUT MODULES. RA FOR REPLACEMENT OF CAMERA (QTY-03). Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
JUNCTION BOXES (MAKE-WISKA) OF OUT DOOR CAMERAS ARE NOT WORKING VIEW POWER SUPPLY PCB DEFECTIVE. RA FOR REPLACEMENT OF CAMERA (QTY-09). Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
ABNORMAL NOISE AND VIBRATION OBSERVED IN ATU MOTORS . OVERHAULING OF ATU MOTORS AND STARTERS TO BE UNDERTAKEN.
ABNORMAL NOISE AND VIBRATION OBSERVED IN ATU MOTORS . OVERHAULING OF ATU MOTORS AND STARTERS TO BE UNDERTAKEN.
SPM READINGS IN RED ZONE. REPLACE THE BEARINGS AND CARRY OUT OVERHAULING OF PRIMING PUMP MOTOR. MOTORS QUANTITY - 05. DRIVEN END BEARING NUMBER 6204 2Z. NON DRIVEN END BEARING NUMBER 62042Z
PAINT FROM ANTENNAS PEELED OFF AND METAL IS VISIBLE AT MULTIPLE LOCATIONS A. RF PAINT RENEWAL OF THE HK-014 (QTY - 05 ) ANTENNAS IS REQUIRED (APPROX QTY - 05 LTRS OF RF PAINT)
04 IN NOS SEARCH LIGHT ROTATORY PARTS ARE DAMAGED AND DEFECTIVE. REPAIR OF SEARCH LIGHT ROTARY PARTS TO BE UNDERTAKEN.
SHORE SUPPLY BREAKER TIRPPING INTERMITTENTLY. CARRY OUT IN-SITU SERVICEABILITY CHECKS OF SHORE SUPPLY BREAKERS. CARRY OUT FOLLOWING ROUTINES ON SCB AND BUS BARS:- (A) INSPECT LUGS(QTY- 12)/ CONNECTORS/ CT(QTY- 06)/ PT AND OTHER COMPONENTS AND UNDERTAKE REPAIR DETERIORATION/ DAMAGE OF SCB CABLES/ WIRING AS NECESSARY. (B) REPAIR/ REPLACE BUS BARS INSULATORS(QTY- 06) IF NECESSARY (C) CLEAN AND DECARBONIZE THE BUS BARS.
EK 896 AERIAL EXCHANGE NOT WORKING DURING WHIP/WIRE ANTENNA CHANGEOVER. SUSPECT AERIAL EXCHANGE DEFECTIVE. DEFECTIVE MODULES/SPARES TO BE REPLACED.
ACOS UNITS MALFUNCTIONING. CALIBRATION AND COMPLETE CHECKS OF THE SAME IS REQUIRED.
GUIDE ROLLER ASSEMBLY OF WINDOW WIPER MOTOR DAMAGED AND GETS STRUCK WHILE WIPPING THE WINDOW. WINDOW WIPER ARM BROKEN. CARRY OUT COMPLETE OVERHAULING OF WINDOW WIPER MOTORS DUE TO SUB-OPTIMAL PERFORMANCE. REPLACE ALL ROLLER OF GUIDE ROLLER ASSEMBLY. WINDOW WIPER ARM AND BLADE DAMAGED/ DEFECTIVE, REPLACE ALL WINDOW WIPER ARM AND WINDOW WIPER BLADE.
ATRX-1000 CONFIGURATION WITH RCU SUB-OPTIMAL. SUSPECT EXCITER UNIT DEFECTIVE. DEFECTIVE MODULE TO BE REPLACED.
ABNORMAL NOISE FROM THE WASHING MACHINE. SUSPECT BEARING DAMAGED AND HEATING ELEMENT BURN OUT. RA FOR REPLACEMENT OF BEARING AND OVERHAULING OF WASHING MACHINE INCLUDING REPLACEMENT OF HEATING ELEMENT(BEARING QTY.- 02 & NO.- 62052Z / 6203 2Z)
LOW INSULATION AND INTERFERENCE IN COMMUNICATION OBSERVED IN WIRE AERIAL (QTY-01 NOS.). CLEANING OF WIRE AERIAL TO BE UNDERTAKEN
LOW INSULATION AND INTERFERENCE IN COMMUNICATION OBSERVED IN WHIP AERIALS (QTY-03 NOS.). REPLACE WHIP AERIALS IF FOUND DEFECTIVE
PORTABLE EXHAUST MOTORS NON-OPS. SUSPECT WINDING BURNT. CARRY OUT COMPLETE OVERHAULING OF MOTORS. REPLACE BEARING, CENTRIFIGUAL SWITCH AND CAPACITORS. MOTORS QTY - 03. (BEARING NO.- 6204 2Z, BEARING QTY.- 06 & CAPACITOR QTY- 06)
TRANSFORMER (230 V/ 24 V) OF 24 V AC LEAD LAMPS ARE DEFECTIVE / SUB-OPTIMAL. RA FOR SERVICEABILITY CHECKS OF TRANSFORMERS AND REPLACEMENT OF DEFECTIVE PARTS. (QTY. 08)
INTERMITTENT FAILURE IN TACTICAL SECONDARY (TS) DATA COMMUNICATION. SUSPECT CONNECTORSDEFECTIVE IN WTO AND BRIDGE. REPLACE CONNECTORS (QTY - 01)
INTERMITTENT INTERRUPTION OF THE OUTPUT VOLTAGE OBSERVED WHILE OPERATING THE EQUIPMENT. CARRY OUT COMPLETE OVERHAULING OF 24 V DC PANEL OF CMR COMPARTMENT. FOLLOWING WORKS TO BE UNDERTAKEN: (A) CALIBRATE ALL VOLTMETER AND AMMETER, QTY.- 06 (B) REPLACE ALL DEFECTIVE D/CONNECTORS(QTY-20) (C) REPLACE DEFECTIVE ROTARY SWITCHES(QTY- 02) (D) REPLACE DEFECTIVE FUSE LINK(QTY-04)
INTERMITTENT FAILURE IN MSS DATA TRANSMISSION/RECEPTION, SUSPECT ANTENNA DEFECTIVE. ANTENNA TO BE REPLACED.
RA FOR REWIRING FROM NLCP PANEL TO NAVIGATION LIGHT SOCKETS AT BRIDGE, FOXLE AND QTR DECK VIEW CABLE DAMAGED. CABLE TO BE PROVIDED BY REFITTING AGENCY (EBXL 2 CORE CABLE 1.5 SQ MM). GLAND OPENING AND SEALING TO BE UNDERTAKEN AS NECESSARY. (QTY.- 300 MTRS)
SOCKET OF EMERGENCY SUPPLY CONNECTION BOXES DEFECTIVE. RA FOR ONE TO ONE REPAIR / REPLACEMENT OF ESCB SOCKET (QTY.- 20)
RA FOR SERVICEABILITY CHECKS AND REPAIR OF DEFECTIVE PARTS OF SUBMERSIBLE PUMP STARTER (QTY.- 17)
WATER SUPPLY LINE AT THE INPUT END DEFECTIVE. BASE OF THE EQUIPMENT CORRODED. VIBRATION AND EXCESSING HEAT OBSERVED IN THE MOTOR WHILE OPERATION CARRY OUT OVERHAULING OF MOTOR DUE TO SUB-OPTIMAL PERFORMANCE. CALIBRATE OVER LOAD MECHANISM OF STARTER. (QTY - 01)
LAN & MODEM OF RUKMANI SSST NOT LOCKING INTERMITTENTLY. DEFECTIVE MODULES TO BE REPAIRED BY OEM.
SCRENING OF THE INTERNAL CABLE OF GALLEY HOT PLATE FOUND TO BE DETERIORATED. CABLES TO BE REPLACED. CONNECTORISATION TO BE UNDERTAKEN AND THE EQUIPMENT NEEDS TO BE PROVED
GALLEY HOT PLATES / MAKE-SUSHMA - CABLE FROM GALLEY RANAGE TO HOT PLATE CONTROL PANEL PERISHED. RA FOR RENEWAL OF OLD CABLES OF GALLEY RANGE FROM HOT PLATE CONTROL PANEL TO ELEMENT. (CREWS AND OFFICERS GALLEY) (EBXL 4 CORE CABLE 2.5 SQ MM).(QTY.- 80 MTRS)
SATELLITE CALL NOT ESTABLISHED IN UHF SATCOM TERMINAL. SERVICEABILITY CHECKS OF THE SYSTEM TO BE UNDERTAKEN AND THE DEFECTIVE COMPONENTS TO BE REPLACED
GALLEY HOT PLATES / MAKE-SUSHMA - RA FOR RENEWAL OF INDICATIONS LAMP(QTY-12) AND CONTACTORS(QTY-02) OF GALLEY RANGE INDICATION PANELS. (CREWS AND OFFICERS GALLEY) (TOTAL 02 PANEL)
FREQUENT ERROR IN LOS TRANSMISSION IN UHF SATCOM TERMINAL. SUSPECT INTERFACE UNIT/ PA LOS DEFECTIVE. DEFECTIVE MODULES TO BE REPLACED BY OEM.
HOT PLATE AND OVEN OF OFFICERS GALLEY IS SUB-OPTIMAL. RA FOR PROVISIONING AND REPLACEMENT OF ELEMENT.(QTY. 02)
RA FOR TUNING / REPAIRS OF GOVERNOR(QTY-05), AVR(QTY-05), AVR PANEL AND SWITCH BOARD. LOAD TRIALS, PARALLELLING TRIALS, VOLTAGE / FREQUENCY TRIALS, POWER QUALITY CHECKS ARE TO BE OFFERED TO NAVAL TRIAL TEAM.(QTY.- 05)
NLCP MALFUNCTIONING VIEW DEFECTIVE RELAYS AND PCBS OF NAVIGATIONAL LIGHT. RA FOR PROVISIONING AND REPLACEMENT / REPAIRS OF RELAYS AND PCBS OF NAVIGATIONAL LIGHT. (QTY : 20 EACH)
TR 2400 DECLARED OBSOLETE. EQUIPMENT ALONG WITH CABLING AND ACCESSORIES TO BE DEGUTTED AND REMOVED
ANTENNA IS NOT ABLE TO TUNE AT A DISTANCE BEYOND 120 NM FROM SHORE. SUSPECT ANTENNA RECIEVER UNIT DEFECTIVE . DEFECTIVE UNITS TO BE REPLACED
AIR CIRCUIT BREAKER (ACB) OF G1 DA TRIPPED WHILE DE-ENERGISING OF G1 DA. RA FOR REPAIR FOR THE SAME.
(I) CHECK THE OPERATION OF THE SWITCHES ON BREAST TRANSMITTER SWITCH BOXES. OIL IF NECESSARY WITH OIL OM-13 WHERE APPLICABLE. (II) CHECK FOR CORRECT OPERATION OF CALL-UP LAMPS AND FLAG INDICATORS. (III) CHECK THAT ALL THE PANEL ILLUMINATION LAMPS AND DIMMERS ARE SERVICEABLE. (QTY - 51)
INTERMITTENT BREAKDOWN IN SATELLITE VOICE COMMUNICATION AT SEA. SUSPECT ANTENNA UNIT MALFUNCTIONING. DEFECTIVE MODULES TO BE REPLACED.
CCS MK-II ITU'S INTERMITENTLY HANGING (QTY-05 NOS), DELAY OBSERVED IN EXECUTION OF TASKS ASSIGNED TO ITU. SUSPECT DISPLAY CARD/ CONTROL PANEL CARDS DEFECTIVE. DEFECTIVE CARDS TO BE REPLACED.
CCS MK- II CONCENTRATORS MALFUNCTIONING DUE TO NETWORK 1 & 2 NOT LOCKING. SUSPECT MODEM (QTY-06 NOS) DEFECTIVE. DEFECTIVE MODEMS TO BE REPLACED.
UPDATION OF MFCR (MULTIFUNCTION COLOUR REPEATER) OS VERSION 1.2.2 AND MIU (METROLOGICAL INTERFACE UNIT) OS VERSION 1.0.7 TO LATEST AVAILABLE VERSION BY OEM. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
BATTERIES NOT HOLDING CHARGE IN AUTOMATIC EMERGENCY LANTERN (AEL) AT VARIOUS LOCATIONS (QTY-45 NO'S). DEFECTIVE BATTERIES TO BE REPLACED.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 3 KVA UPS OF AUTOPILOT & STEERING( COMPILOT-20) VOLTAGE FLUCTUATIONS OBSERVED AT THE OUTPUT END OF UPS. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF 3 KVA UPS. (B) REPLACEMENT THE DEFECTIVE COMPONENTS OF UPS. (C) TRIALS OF THE UPS FOR ATLEAST 30 MIN POST REPAIRS.
AEL (QTY- 34 NOS) MALFUNCTIONING, RESULTING IN CONTINOUSLY ON AND FLICKERING EVEN IF POWER SUPPLY IS AVAILABLE. SUSPECT INTERNAL PCB'S DEFECTIVE. DEFECTIVE PCB'S TO BE REPLACED.
NFU INDICATION NOT AVAILABLE ON DISPLAY FITTED ON OPERATOR UNIT IN AUTO PILOT NP 5000 COMPILOT-20 CONSOLE WHEN MOTOR NO 2 IS OPERATED . REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
FREQUENT HANGING OF MAIN BROADCAST (MB) STATIONS AT 08 LOCATIONS OBSERVED. SUSPECT AUDIO BOARD DEFECTIVE(QTY-08). COMPLETE OVERHAUL OF SYSTEM BY OEM AT 08 LOCATIONS IS REQUIRED. DEFECTIVE PCBS TO BE PROVIDED AND REPLACED BY OEM.
MICS (QTY-15 NOS) OF INTERCOM DEFECTIVE. DEFECTIVE MICS TO BE REPAIRED BY OEM.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 1 KVA UPS OF ADDRESSABLE FLOOD ALARM SYSTEM VOLTAGE FLUCTUATIONS OBSERVED AT THE OUTPUT END OF UPS. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF 1 KVA UPS. (B) REPLACEMENT THE DEFECTIVE COMPONENTS OF UPS. (C) TRIALS OF THE UPS FOR ATLEAST 30 MIN POST REPAIRS.
MACHINERY INTERCOM OF AER, MCR, FWD SWBD HANGING INTERMITTENTLY. SUSPECT AUDIO BOARD DEFECTIVE. COMPLETE OVERHAUL OF SYSTEM BY OEM REQUIRED. DEFECTIVE PCBS TO BE PROVIDED AND REPLACED BY OEM.
SURVEY INTERCOM HANGING INTERMITTANTLY AT VARIOUS LOCATIONS. SUSPECT AUDIO BOARD DEFECTIVE. COMPLETE OVERHAUL OF SYSTEM BY OEM AT VARIOUS LOCATIONS IS REQUIRED. DEFECTIVE PCBS TO BE PROVIDED AND REPLACED BY OEM.
CARRY OUT THE SERVICEABILITY CHECKS OF THE FOLLOWING SUB UNITS AND REPLACE IF FOUND DEFECTIVE. (A) ALARM PANEL IN MCR (QTY-01). (B) NAUTO ALARM IN MCR (QTY-01). (C) OPERATING UNIT IN MCR (QTY-01). (D) AUTOPILOT NP 5000 COMPILOT-20 IN BRIDGE (QTY-01). REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
DISTURBANCE/ VERY LOW VOICE IS OBSERVED IN INTERCOM SYSTEM WHILE CONNECTING TO THE DMR 16A. SUSPECT AUDIO ATTENUATOR DEFECTIVE. AUDIO ATTENUATOR TO BE REPLACED BY OEM.
FALSE ALARM OBSERED ON MULTIPLE OCCASSIONS THROUGH SENSORS (QTY-10). REPLACE THE SENSORS.
AERIAL EXCHANGE INTERMITTENT WHEN SWITCHING BETWEEN WIRE AERIAL AND WHIP AERIAL. LOW INSULATION OBSERVED IN CABLE FROM ANTENNA TO EXCHANGE. RENEWAL OF THE CABLE TO BE UNDERTAKEN. SCOPE OF WORK INVOLVES GLAND PIERCING, LAYING OF CABLE AND GLAND PACKING. ( CABLE TYPE- RG 213F 50Ω CO-AXIAL CABLE, QTY-200 MTRS). CABLE TO BE PROVIDED BY OEM
BATTERIES (16 NOS, 12V, 26 AH) IN THE UPS OF TELEPHONE EXCHANGE NOT HOLDING CHARGE. DEFECTIVE BATTERIES TO BE REPLACED.
BATTERIES (16 NOS, 12V, 42 AH) IN THE UPS OF TELEPHONE EXCHANGE NOT HOLDING CHARGE. DEFECTIVE BATTERIES TO BE REPLACED
BATTERIES (20 NOS, 12V, 120 AH ) IN THE UPS OF TELEPHONE EXCHANGE NOT HOLDING CHARGE. DEFECTIVE BATTERIES TO BE REPLACED.
SYSTEM PERFORMANCE SUB-OPTIMAL, FREQUENTLY HANGING DURING CONFIGURING WITH CCS MK II AND ASSIGNING WITH RCU, AUTOMATICALLY RESTARTS AFTER 40-45 MIN OF OPERATION. SUSPECT BASE BAND MODULE DEFECTIVE. DEFECTIVE MODULE TO BE REPLACED.
FOLLOWING CRETE EQUIPMENT DUE FOR CALIBRATION AND THE SAME IS REQUIRED TO BE UNDERTAKEN. (A) CONTAMINATION MONITOR ( QTY - 02 NOS) (B) RADIATION SURVEY METER (QTY-01 NOS) (C) POCKET DOSIMETER (QTY- 06 NOS) (D) DMM FLUKE 179 TRUE RMS (QTY- 04 NOS) (E) FLUKE 376 TRUE RMS AC DC CLAMP METER (QTY- 04 NOS) (F) INSULATION TESTER (QTY- 05 NOS) (G) ELECTRIC MOTOR CHECKER (QTY- 02 NOS)
BAD LOAD INDICATION IN HF POWER AMPLIFIER. SUSPECT HF ANTENNA DEFECTIVE. DEFECTIVE ANTENNA UNITS TO BE REPLACED.
CONNECTORS OF EMERGENCY CABLES AT VARIOUS LOCATION DAMAGED. RA FOR REPAIR OF EMERGENCY CABLES CONNECTORS (QTY.- 30 SET)
CARRY OUT COMPLETE OVERHAULING OF EDA CONTROL PANEL. FOLLOWING WORK INVOLVES: (A) CALIBRATION OF VOLTMETER AND AMMETER, REPAIR/ REPLACE IF FOUND DEFECTIVE, QTY.-02 (B) REPLACE ON/ OFF PUSH BUTTON, QTY.- 02 (C) REPLACE ON/ OFF ROTARY SWITCH, QTY - 01
EXCESSIVE HEAT OBSERVED DURING THE OPERATION OF EQUIPMENT. SUSPECT DETRIORATION OF WINDING. CARRY OUT OVERHAULING OF MOTOR DUE TO SUB-OPTIMAL PERFORMANCE AND CALIBRATE OVER LOAD MECHANISM OF STARTER. (QTY - 01)
06 IN NO FUSE PANELS ARE DEFECTIVE. REPLACEMENT OF ALL FUSE PANELS WITH REQUIRED RATING OF 3 POLE MCBS. RATING : 415V, 63A, 50HZ (QTY - 30). RATING : 230V, 63A, 50HZ (QTY - 30)
08 IN NOS WINDOW WIPER OF SMBS ARE CORRODED AND DEFECTIVE. RA FOR PROVISIONING AND REPLACEMENT WITH NEW WINDOW WIPER ARMS.
CARRY OUT CALIBRATION OF ALL METERS. REPAIR/ REPLACE DEFECTIVE METERS.
CABIN LIGHTS 230V,50 HZ, 1 PHASE ( QTY- 30) WEATHER DECK LIGHTS, 24V DC (QTY - 30) & ENGINE LIGHTS, 24V DC (QTY - 20) ARE DAMAGED AND NON OPERATIONAL DUE TO SEA WATER INGRESS. PROVISIONING AND REPLACEMENT WITH NEW LIGHT FITTING. (TOTAL QTY.- 80)
GENERAL LIGHTING MESS DECKS MAKE-ZEAL TECH MUMBAI - LED LIGHTS DEFECTIVE IN MESS DECKS. RA FOR PROVISIONING AND REPLACEMENT OF LIGHTS (230V).(QTY.- 30)
REWIRING OF LIMIT SWITCH CABLE AND REPLACEMENT OF LIMIT SWITCHES OF BOAT DAVITS, RHIB DAVIT, GEMINI DAVIT, ACCOMODATION LADDERS AND HELO HANGER (2 CORE CABLE 1.5 SQ MM).(TOTAL CABLE LENGHT - 500 MTR ANF TOTAL LIMIT SWITCH - 32)
24V DC FAN ARE NON OPERATIONAL IN ALL O4 SMBS. RA FOR PROVISIONING AND REPLACEMENT WITH NEW 24 V DC FAN (QTY.- 24)
TEMPERATURE INCREASING INSIDE COMBISTEAMER BEYOND PERMISSIBLE LIMITS. SUSPECT FAULT IN CONTROL SYSTEM AND THERMOSTATS. RA FOR REPAIR BY OEM.
SUPPLY AVAILABLE INDICATION MALFUNCTIONING OF SINGLE ISOLATION SWITCH. DEFECT RECTIFICATION IN THE CONTROL CIRCUIT TO BE UNDERTAKEN.
INDICATION OF SINGLE ISOLATION SWITCH FOR OFFICERS & CREWS GALLEY ARE NOT SHOWING AT OUTSIDE GALLEY AND DCHQ. INDICATION LAMPS (QTY-12) AND CONTACTORS (QTY-04) TO BE REPLACED. TOTAL PANELS - 04
PROVISIONING AND PROPER GROUNDING OF ALL ELECTRICAL EQUIPMENT, DBS, JBS, STARTERS ETC WITH CABLE AND LUGS (GREEN COLOR CABLE, SINGLE CORE X 4.0 SQ MM). (QTY.- 400 MTRS)
PROVISIONING AND SEALING OF GLAND / TERMINAL BOX OF MOTORS ON UPPER DECK WITH SILICA GEL / GLAND PACKING MATERIAL. (QTY.- 100 NOS)
CABLE TRAY ON WEATHER DECK AT VARIOUS LOCATION DAMAGED DUE TO CORROSION. RA FOR MANUFACTURING AND REPLACEMENT OF CABLE TRAY ON WEATHER DECK. DIMENSIONS: WIDTH- 17 CM & 10 CM, THICKNESS - 1.5 MM, MATERIAL - MS. (QTY.- 200 MTRS)
CHARGING CIRCUIT OF DC TORCHES ARE MALFUNCTIONING AND INTERNAL WIRING OF DC TORCHES PERISHED. RA FOR REPAIR OF DC TORCHES AND REPLACEMENT OF BATTERIES, PUSH BUTTON AND TOGGLE SWITCHES. JOB INCLUDES PROPER FUNCTIONING OF DC TORCHES. (QTY.- 10)
BRAKE SUPPLY CABLE FROM STARTER PANEL TO DRUM CONTROLLER OF ALL 04 SMB DAVITS PERISHED DUE TO FAIR WEAR AND TEAR & & REQUISITE OUTPUT VOLTAGE NOT AVAILABE AT BRAKE COIL. RA FOR PROVISIONING AND REWIRING OF BRAKE SUPPLY CABLE FROM STARTER PANEL TO DRUM CONTROLLER OF ALL DAVITS. REQUIRED CABLE - 2 CORE 2.5 SQ MM, LENGTH - 250 MTRS.
THE BASE PLATE OF WEATHER DECK LIGHT AND SWITCH SOCKETS DAMAGED DUE TO CORROSION. FABRICATION AND FITMENT OF NEW BASE PLATE OF ALL WEATHER DECK LIGHT AND SWITCH SOCKETS TO BE UNDERTAKEN. WORKS INVOLVES REMOVAL OF OLD BASE PLATE AND WELDING OF NEW BASE PLATE. (DIMENSIONS 20CM X 10CM, MATERIAL SS). (QTY.- 80)
ABRUPT STOPPAGE OF TRANSMISSION AND RECEPTION ENCOUNTERED AND MUTE/ PTT INDICATION OBSERVED IN PAE 3060 SET (QTY-03 NOS.). SUSPECT VARIOUS CARD AS MENTIONED BELOW TO BE DEFECTIVE:- (A) TX CONTROL CARD - 03 (B) SYNTHESIZER CARD - 03 (C) RX IF CARD - 03 REPLACE THE ABOVE CARDS
RE-FITMENT OF LED LIGHT FITTING AT VARIOUS LOCATIONS DUE TO EXISTING CLAMPS NOT SUITABLE FOR NEW LED FITTINGS. WORK INVOLVES: 1. MANUFACTURING AND FITMENT OF CLAMPS AS REQUIRED. 2. REMOVAL AND RE-FITMENT OF LED LIGHT FITTING AFTER FITMENT OF CLAMPS AND RUBBER SHOCK MOUNTS. (QTY.- 350), MAT-MS.
SUPPLY CABLE FROM CONTROL PANEL TO CABIN FAN PERISHED ON 04 SMBS. REWIRING OF SUPPLY CABLE (EBXL 2 CORE CABLE 2.5 SQ MM) FROM CONTROL PANEL TO DC FAN TO BE UNDERTAKEN.(QTY.- 250 MTRS)
WARDROOM LED LIGHTS NON-OPS( 230V). PROVISIONING AND REPLACEMENT OF LIGHTS TO BE UNDERTAKEN.(QTY. 20)
LED LIGHTS DEFECTIVE(230 V). RA FOR REPLACEMENT OF LIGHTS.(QTY.- 20)
6A DIPOLE SWITCH DEFECTIVE AT VARIOUS LOCATIONS. RA FOR PROVISIONING AND REPLACEMENT WITH NEW DOUBLE POLE SWITCHES.(QTY.- 50)
SUPPLY CABLE FROM CONTROL PANEL TO SWITCH SOCKET DAMAGED ON 04 SMBS. RA FOR REWIRING OF SUPPLY CABLE (EBXL 3 CORE CABLE 2.5 SQ MM) FROM CONTROL PANEL TO SWITCH SOCKET.(QTY.- 400 MTRS)
SWITCH SOCKETS ARE DEFECTIVE IN ALL 04 SMBS. RA FOR PROVISIONING AND REPLACEMENT OF ALL SWITCH SOCKETS WITH COVER.(QTY.- 96 SET)
NAVIGATIONAL LIGHTS ARE DEFECTIVE IN ALL 04 SMBS. RA FOR PROVISIONING AND REPLACEMENT OF ALL NAVIGATIONAL LIGHTS (24V DC).(QTY.- 35)
BUNK LIGHTS OF MESS DECKS ARE DEFECTIVE. RA FOR PROVISIONING AND REPLACEMENT WITH NEW BUNK LIGHTS. INPUT SUPPLY - 230V (QTY.- 50)
RA FOR PROVISIONING AND REPLACEMENT OF UPPER DECK SWITCH AND SWITCH SOCKETS AT VARIOUS PLACES.(QTY.- 50 EACH)
CABLING INSIDE WARDROOM PANELLING DAMAGED. RA FOR REWIRING. CABLE LENGTH 100 MTR.(EBXL 3 CORE CABLE 1.5 SQ MM). GLAND OPENING AND SEALING TO BE UNDERTAKEN AS NECESSARY. (QTY.- 200 MTR)
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CHECK CONTACTS AND WIRINGS FOR WEAR/DETERIORATION. RENEW AS NECESSARY. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
SUB-OPTIMAL PERFORMANCE OBSERVED IN 1 KVA UPS OF ANSCHUTZ GYRO STD 22M VOLTAGE FLUCTUATIONS OBSERVED AT THE OUTPUT END OF UPS. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF 1 KVA UPS. (B) REPLACEMENT THE DEFECTIVE COMPONENTS OF UPS. (C) TRIALS OF THE UPS FOR ATLEAST 30 MIN POST REPAIRS.
SUB-OPTIMAL PERFORMANCE OBSERVED IN BATTERIES of AFDS PANEL. BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. LOCATION - DCHQ. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF BATTERIES. (B) REPLACEMENT OF OLD BATTERIES (QTY - 2,12V 27 AH). (C) SERVICEABILITY CHECKS POST FITMENT OF NEW SMF BATTERIES.
DISPLAY OF MAIN CONTROL PANEL (DCHQ) HANGS FREQUENTLY WHILE OPERATING. SERVICEABILITY CHECKS OF THE DISPLAY TO BE UNDERTAKEN AND THE SOFTWARE TO BE UPGRADED TO THE LATEST VERSION. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
FALSE ALARM OBSERED ON MULTIPLE OCCASSIONS THROUGH SENSORS (QTY-10). REPLACE THE SENSORS.
CARRY OUT SERVICEABILITY CHECKS AND OVERHAULING OF THE SENSORS, MIU AND MFCR. IF ANY DAMAGE/ WEAR/ DETERIORATION. REPAIR THE DEFECTIVE SENSORS
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CARRY OUT THE ALIGNMENT OF THE PUMP DRIVEN UNIT WITH THE MOTOR REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CARRY OUT SPM CHECKS. REPLACE BEARINGS IF SPM READINGS ARE FOUND IN ORANGE/RED ZONE. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
HELO STARTING RECTIFIER -RA FOR SERVICEABILITY CHECKS AND CALIBRATIONS OF 03 METERS (0-500V AC VOLTMETER QTY-01, 0-50V DC VOLTMETER QTY-01, 0-1500/75mV DC AMMETER QTY-01)
DEGAUSSING- RA FOR SERVICEABILITY CHECKS AND CALIBRATIONS OF 12 METERS (0-300V DC VOLTMETER QTY-05, 0-40A DC AMMETER QTY-03, 0-60A DC AMMETER QTY-03, 0-150V DC VOLTMETER QTY-01).
AUTO PILOT & STEERING (COMPILOT-20)- RA FOR SERVICEABILITY CHECKS AND CALIBRATIONS OF 02 METERS ( 0-100A AC AMMETER QTY-02).
ACTIVE SHAFT GROUNDING -Carry out complete Performance checks of the System.
ACTIVE SHAFT GROUNDING-Carry out calibration of Panel meters.
AUTO PILOT & STEERING (COMPILOT-20) RATHEON MARINE- CARRY OUT SPM CHECKS. REPLACE THE BEARING IF SPM VALUES FOUND GREATER THAN 20. (A) DRIVED END BEARING NO 6312/Z (QTY - 02). (B) NON DRIVEN END BEARING NO 6212/Z (QTY - 02)
AUTO PILOT & STEERING (COMPILOT-20) RATHEON MARINE-Examine rubber seals on covers of various units and replace where necessary.
RA FOR CARRY OUT CLEANING AND LUBRICATION OF CONTROL VALVE SPINDLE AND THROTTLE.
HIGH VOLTAGE ALARM OBSERVED. RA FOR CHECK REFERENCE CELL POTENTIAL AS PER EQUIPMENT MANUAL PAGE 16.
ANODE AND REFERENCE CABLES SHOWING LOW INSULATION. RA FOR CHECK ALL ANODES AND REFERENCE ELECTRODES FOR SATISFACTORY INSULATION TO HULL USING 500V MEGGER TO ENSURE THAT THERE IS NO PHYSICAL SHORTING OF THE ANODE TO HULL. THE ANODE TO HULL INSULATION SHOULD BE AT LEAST IN ORDER OF FEW MEGA OHM.
CABLE GLANDS FOUND DISLOGED FROM ITS LOCATION. RA TO CHECK ICCP CABLE GLANDS FOR FIRM MECHANICAL TIGHTNESS OF CONNECTIONS AND ENSURE CONTINUITY OF CIRCUITS. CHECK FOLLOWING :- (A) CABLE ENTRY INTO COFFERDAMS. (B) CABLE CONNECTIONS IN CONTROLLER. (C) CABLE CONNECTIONS IN JUNCTION BOX. (D) CABLE RUNS IN CONDUITS
FREQUENT COMMUNICATION FAILURE IN PAE 3060 SET (QTY-03 NOS.). SUSPECT ANTENNA DEFECTIVE. REMOVE ANTENNA FOR VSWR MEASUREMENT AND CHECKS. REPLACE COMPONENTS IF VSWR >2 OR FOUND DEFECTIVE.
ABRUPT STOPPAGE OF TRANSMISSION AND RECEPTION OF VOICE COMMUNICATION OBSERVED WITH PAE M7 SET. SUSPECT DEFECT IN MODULES AS MENTIONED BELOW:- (A) RF CONTROL MODULE- 01 (B) RECIEVER MODULE- 01 DEFECTIVE MODULES TO BE REPLACED.
VLF-HF RX EK 896 (QTY-08 NOS.) MALFUNCTIONING DURING RECEPTION. SUSPECT VARIOUS MODULES DEFECTIVE AS MENTIONED BELOW:- (A)SYNTHESIZER MODULE- 08 (B) PROCESSOR MODULE -08 DEFECTIVE MODULES TO BE REPAIRED
BATTERY OF PRC 6020 NOT HOLDING CHARGE (QTY- 16 NOS, SEALED CYLINDRICAL, 12V, 04 AH) MAKE- M/S BEL BANGLORE, MODEL- BATTERY SECONDARY PORTABLE NICKEL CADMIUM. SUSPECT BATTERY DEFECTIVE. REPLACEMENT OF LI-ION BATTERIES REQUIRED.
PRC 6020 MALFUNCTIONING VIEW ANTENNA LOW INSULATION. DEFECTIVE ANTENNA TO BE REPLACED.
ABNORMAL NOISE OBSERVED WHILE OPERATING THE MOTOR. CARRY OUT OVERHAULING OF MOTOR. REPLACE BEARINGS (Bearing no.- 6003 2Z, QTY - 04) SUBJECT TO QC CHECKS.
FM 8900S V/UHF HANDSET NOT WORKING DURING TX/RX. SUSPECT HANDSET UNIT DEFECTIVE. RECEIVER HANDSET TO BE REPLACED.
ECOS OF AC PLANT DAMAGED DUE TO CORROSION AND SHOWING LOW INSULATION. RA FOR REPLACEMENT OF ECOS.
LOCKING ARRANGEMENT OF FIREMAIN STARTER DEFECTIVE. RA FOR REPLACEMENT OF LOCKING ARRANGEMENT OF FIREMAIN STARTERS.
ONE HCOS OF VENTILLATION SYSTEM IS DEFECTIVE VIEW CONTACTS BURNED. RA FOR REPAIR OF HCOS.
RA FOR REWIRING OF CONTROL CABLE IN CONTROL PANEL FROM MAIN INCOMING ON/ OFF SWITCH TO ELEMENT (EBXL 3 CORE CABLE 1.5 SQ MM) (QTY.- 50 MTR)
FOOD WARMER ELEMENTS ARE DEFECTIVE AND NOT WORKING PROPERLY IN SHIPS GALLEY. RA FOR PROVISIONING AND REPLACEMENT OF ELEMENTS.(QTY.- 04)
DEPTH DATA NOT BEING PRINTED BY ECHSOUNDER. SUSPECT RECORDER UNIT PRINTER ASSEMBLY ( QTY - 04 ) DEFECTIVE. RA FOR DEFECT RECTIFICATION. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
RECORDER UNIT SHOWING ERRATIC DEPTH DATA. RA FOR DEFECT RECTIFICATION. QTY -02. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CABLES SHOWING LOW INSULATION AND ACU SHOWING CONTINOUS HIGH ALARM. RA FOR CARRYOUT PRE-DOCKING CHECKS AND CONFIRM STATE OF EACH ICCP ANODE, REFERENCE ELECTRODE AND AUTO CONTROL UNIT WHEN ALONGSIDE (ABOUT ONE WEEK PRIOR ENTERING DRY-DOCK) AS PER NAVY ORDER AND INBR-372/84.
OPEN LOOP FULL LOAD TEST ROUTINOUS CARRIED OUT AND WE FOUND THAT CURRENT WAS NOT SHOWING IN AUTO MODE AT ACU. RA FOR CARRYOUT OPEN LOOP FULL LOAD TEST AS PER INBR-372/84 CHAPTER 4 PARA 4.10 AND 4.13 AND CONFIRM SATISFACTORY WORKING OF AUTO CONTROL UNIT.
OVERLAY PICTURE NOT AVAILABLE ON ECDIS FROM BOTH RADARS. SUSPECT RIB (RADAR INTERFACE BOARD) UNIT (QTY-02, MAKE-TRANSAS) DEFECTIVE. RA FOR SERVICEABILITY CHECKS TO BE CARRIED OUT AND REPLACE IF DEFECTIVE. Repair/Routines of the equipment must be undertaken through OEM/OEM reps only.
CONTROL CABLE FROM STARTER PANEL TO DRUM CONTROLLER OF ALL 04 SMB DAVITS PERISHED DUE TO FAIR WEAR AND TEAR. PROVISIONING AND REWIRING OF CONTROL CABLE FROM STARTER PANEL TO DRUM CONTROLLER OF ALL DAVITS TO BE UNDERTAKEN. REQUIRED CABLE - 18 CORE 2.5 SQ MM, LENGTH - 250 MTRS.
CURRENT INDICATION NOT AVAILABLE IN AUTO MODE AT ACU. RA FOR CARRYOUT DUMMY LOAD TEST OF CONTROL PANEL.
FREQUENT DEFECTS OBSERVED FROM THE CONTROL CIRCUIT OF SMB DAVITS DUE TO INTERNAL CABLE OF DRUM CONTROLLER PERISHED. COMPLETE OVERHAULING OF DRUM CONTROLLER TO BE UNDERTAKEN. WORKS INVOLVES REWIRING OF INTERNAL CABLES, REPLACEMENT OF D-CONNECTORS/ ELMAX AND CABLE MARKING WITH CABLE TAG NUMBERING.
FILTER BAKC DEFECTIVE. RA FOR CARRY OUT ROUTINE ON FILTER BAKC IF APPLICABLE:- (A) TURN OFF THE FILTER FROM THE POWER SUPPLY. (B) CLEAN THE FILTER WITH COMPRESSED AIR 1.5 X 105 PA AFTER EVERY 3000 HRS. (C) CHECK THE RELIABILITY OF CONTACT CONNECTIONS AND FIXING OF CAPACITORS. (D) CHECK THE FILTER INSULATION RESISTANCE. IT SHOULD NOT BE LESS THAN 50 M OHMS.
CONTROL PANEL OF PORT ACCOMMODATION LADDER DAMAGED DUE TO CORROSION. RA FOR FOLLOWINGS: (A) REMOVAL OF OLD CONTROL PANEL(QTY-01) (B) MANUFACTURING AND FITMENT OF NEW CONTROL PANEL, MAT- MS (QTY-01)(DIMENSIONS- 54cm x 44cm x 15cm) (C) FABRICATION OF CLAMPS FOR FITMENT OF ACCOMMODATION LADDER STARTER PANEL (QTY-04) (D) WELDING AND FITMENT OF CLAMPS FOR ACCOMMODATION LADDER STARTER PANEL (QTY-04) WORK INVOLVES DISCONNECTION AND CONNECTION OF ASSOCIATED MOTORS WITH OLD AND NEW CONTROL PANELS.
RA FOR SERVICEABILITY CHECKS OF THE FOLLOWING PCBs. (A) MOTHERBOARD CPU (QTY-02). (B) DISPLAY PCB FOR TRANSMITTER (QTY-02). (C ) IC CONTROLLER (QTY-02). (D) RELAY 24 V DC (QTY-02). (E ) IC 74 HC 374 (QTY-02). (F) IC 74 HC 373 (QTY-02).
EARTHING STRAPS FOUND DAMAGED. RA FOR REPLACEMENT OF EARTHING STRAPS. ENSURE ALL NUTS ARE TIGHT AND EARTHING STRAPS INTACT. TEST CONTINUITY RESISTANCE OF EARTHING STRAPS WITH BRIDGE MEGGER, SHOULD BE LESS THAN 0.05 OHMS.
METALLIC COUNDUITS FOUND BROKEN LEADING TO DAMAGE OF CABLES. RA FOR CHECK CABLE INLETS CONDUIT SEAL FOR PROPER CONDITION, REPLACE IF NECESSARY.
FUSE BLOWN DUE TO HIGH CURRECT THROUGH ANODE. RA FOR REMOVE THE FUSE FROM EACH ANODE SIDE OF THE FUSE TERMINAL AND MEASURE RESISTANCE. RESISTANCE SHOULD BE 0.5 TO 1 OHM.
FUSE BLOWN DUE TO HIGH CURRECT THROUGH ANODE.RA FOR TEST EACH ANODE FOR NO OPEN CIRCUIT OR PARTIAL SHORT CIRCUIT AS PER EQUIPMENT MANUAL PAGE 14 & 15.
DIFFERENCE OF 4-5 KNOTS OBSERVED WRT SOG. RA FOR RAISE THE TRANSDUCER AND EXAMINE THE PICK UP HEAD FOR ANY MARINE GROWTH AND CLEAN WITHOUT SCRATCHING THE SURFACE, USING LINT FREE CLOTH AND ZERO PAPER.
DIFFERENCE OF 4-5 KNOTS OBSERVED WRT SOG. RA FOR CARRY OUT SPEED AND DISTANCE RUN FOR THE MASTER UNIT.
ONE RT 6222 & HAND SET NOT WORKING DURING TX/RX INTERMITTENTLY. HANDSET UNIT TO BE REPLACED.
ERROR PORT SENSOR INDICATION DISPLAYED ON MFCR PANEL OF WSDS. RA FOR CHECK SENSOR FOR CONTAMINATION DUE TO EXHAUST GASES, WASH IT WITH FRESH WATER AND MILD SOAP SOLUTION AS NECESSARY.
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CARRY OUT INSPECTION OF RUBBER GASKETS BETWEEN THE COVERS AND SHELL BODY OF STARTERS. CHECK MOTOR TERMINAL BOX SEALING. RENEW, IF REQUIRED. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CARRY OUT PROPER TIGHTENING OF SEALS IN WATER TIGHT MODULES. REPLACE IF NECESSARY. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
STEERING GEAR MOTORS ,M/S GEETA ENGNEERING CALIBRATE THE OVER-LOAD MECHANISM OF THE STARTER. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
RESISTANCE BETWEEN THE NEGATIVE TERMINAL AND THE EARHT IS NOT INDICATING AS ZERO. EXAMINE VISUALLY THE CONNECTION BETWEEN THE MAIN NEGATIVE TERMINAL AND THE MAIN EARTH CONNECTION OF THE HULL. CHECK WITH MEGGER THE RESISTANCE OF THE MAIN NEGATIVE TERMINAL. IT SHOULD BE ZERO. REPAIR/ROUTINES OF THE EQUIPMENTS MUST BE UNDERTAKEN THROUGH OEM/OEM REPS ONLY.
RE-CABLING IS REQUIRED FROM COMPILOT-20 AT BRIDGE TO STEERING GEAR AMPLIFIER STARTER AT ASP VIEW LOW INSULATION OBSERVED. (CABLE 3 CORE, 0.75 SQMM AND CABLE LENGTH -150 MTR). WORK INVOLVES OPENING OF GLANDS, LAYING OF CABLE, REPACKING OF GLANDS.
RA FOR ABNORMAL NOISE OBSERVE FROM PENDULUM IN GYRO MASTER COMPASS 2 . OVERHAUL OF THE GYRO ALONG WITH SERVICEABILITY CHECKS OF TRANSMISSION CHAIN AND REPEATERS OF GYRO (QTY - 02 ) TO BE UNDERTAKEN.
BACK UP OF 15 MIN OBSERVED AS AGAINST MINIMUM OF 30 MIN FOR AUTOPILOT & STEERING( COMPILOT-20). LOCATION- PLOTING ROOM. FOLLOWING ARE REQUIRED:- (A) VOLTAGE CHECKS OF THE BATTERIES. (B) REPLACEMENT OF OLD BATTERIES (QTY-6, RATING-12V, 26AH). (C) SERVICEABILITY CHECKS OF BACKUP SUPPLY POST FITMENT OF NEW BATTERIES.
BACK UP OF 15 MIN OBSERVED AS AGAINST MINIMUM OF 30 MIN FOR ANSCHUTZ GYRO STD 22M. LOCATION- GYRO ROOM. FOLLOWING ARE REQUIRED:- (A) VOLTAGE CHECKS OF THE BATTERIES. (B) REPLACEMENT OF OLD BATTERIES (QTY-4, RATING-12V, 9AH). (C) SERVICEABILITY CHECKS OF BACKUP SUPPLY POST FITMENT OF NEW BATTERIES.
BACK UP OF 15 MIN OBSERVED AS AGAINST MINIMUM OF 30 MIN FOR ADDRESSABLE FLOOD ALARM SYSTEM .LOCATION- DCHQ(QTY-02), CTO LOBBY( QTY-02), WARDROOM LOBBY( QTY-02), SHIPS OFFICE LOBBY( QTY-02). PLOTING ROOM( QTY-02). FOLLOWING ARE REQUIRED:- (A) VOLTAGE CHECKS OF THE BATTERIES. (B) REPLACEMENT OF OLD BATTERIES (QTY-10, RATING-12V, 7AH)). (C) SERVICEABILITY CHECKS OF BACKUP SUPPLY POST FITMENT OF NEW BATTERIES.
ELECTRICAL - PART III
UPGRADATION OF NAV RADAR TO NAV RADAR ECDIS MFC THROUGH M/S ELCOME. SCOPE OF WORK INCLUDES (A) PROVISIONING OF ECDIS SOFTWARE. (B) INSTALLATION OF SOFTWARE ON RADAR MFC/DISPLAY. (C) CONFIGURATION OF SYSTEM (D) INSTALLATION OF CHARTS PROVISIONED BY NAVY . (E) SETTING TO WORK (STW) OF ECDIS. (F) TRAINING OF OPERATORS AND MAINTAINERS. (G) TRIALS OF SYSTEM.
SCOPE OF WORK FOR INSTALLATION OF HD VLF - HF RECIEVER INCLUDES. (A) REMOVAL OF EXISTING VLF HF RECEIVER EK 896 SYSTEM (SYSTEM & FILTER RACK). (B) REMOVAL OF EXISTING OLD ANTENNA CABLE AND ITS ACCESSORIES. (C) FITMENT OF NEW UNITS OF HD VLF HF RECEIVER(SYSTEM RACK, MONITOR PC, ANTENNA) (D) CABLE TRACING OF EXISTING LAYOUTS AND REMOVAL OF PANELING. (E) INSTALLATION OF CABLE GLANDS/ CASING AND DECK GLANDS AS REQUIRED. (F) GLAND PACKING TO BE DONE FOR NEW & DAMAGED GLANDS. WELDING, DEGUTTING AND MAUFACTURING OF FOUNDATION/ FRAMED BASE PLATE. REOMVAL OF OLD CABLES. (G) LAYING OF CABLES (USING CABLE TRAYS AS NECESSARY) FOR ANTENNA, INTERFACING UNITS, INTERCONNECTED UNITS AND POWER SUPPLY UNIT ETC. (H) CABLE LAYING/ SECURING INCLUDING CABLE TALLIES. (J) CONNECTORISATION AND INSTALLATION WITH EXTERNAL SYSTEMS AND ACCESSORIES. (K) PROVE THE SYSTEM BY CARRYING OUT FUNCTIONAL CHECKS, TRIALS AND COMMISSIONING OF SYSTEM. (L) INTERFACING WITH MSK DEMODULATOR, HSDM, AVLF DEMODULATOR, MONITOR PC, CCS MK II, MB SRE AND DMR 16A. (M) APT OF ALL CLUSTERS WHEREIN GLAND OPENING/ CLOSING HAS BEEN UNDERTAKEN FOR INSTALLATION OF THE SYSTEM. (N) SURVEY OF ALL REMOVED UNITS/ EQUIPMENT. (P) IIS, HATS AND OPS CHECKS OF EQUIPMENT.
SCOPE OF WORK FOR INSTALLATION OF SDR TAC 1A & 1B INCLUDES. (A) REMOVAL OF EXISTING PAE 3060 AND TR2400 SYSTEM AND RACKS IN WTO OFFICE. DEGUTTING OF EXISTING RACKS. REMOVAL OF PAE 3060 ANTENNA IN MAIN MAST. REMOVAL OF TR 2400 ANTENNA IN BRIDGE WING. REMOVAL OF PAE 3060 RCU IN BRIDGE. (B) INSTALLATION OF NEW SDR (TAC) SYSTEM IN WTO OFFICE. FABRICATION OF NEW RACKS. FABRICATION AND INSTALLATION OF NEW YARD ARMS IN MAIN MAST AS PER APPROVED WLDs. INSTALLATION OF SDR(TAC) ANTENNAS (V/UHF AND L BAND) IN MAIN MAST. INSTALLATION OF SDR (TAC) VER 1A RCU IN BRIDGE AND VER 1B RCU IN LSO. (C) CABLE TRACING OF EXISTING LAYOUT, REMOVEING OF PANELING, OPENING OF EXISTING CABLE GLANDS AS NECESSARY. INSTALLATION OF CABLE GLANDS/ CASING AND DECK GLANDS AS REQUIRED. GLAND PACKING TO BE DONE FOR NEW & DAMAGED GLANDS. WELDING, DEGUTTING AND MANUFACTURING OF FOUNDATION/ FRAMED BASE PLATE. REMOVAL OF OLD CABLES. (D) LAYING OF CABLES (USING CABLE TRAYS AS NECESSARY) FOR ANTENNA, RCU, INTERFACING UNITS, INTERCONNECTED UNITS AND POWER SUPPLY UNIT ETC. (E) CABLE LAYING/ SECURING INCLUDING CABLE TALLIES. (F) CONNECTORISATION, INSTALLATION AND INTERFACING WITH EXTERNAL SYSTEM (LINK II, GPS, AND CCS MK II) (G) PROVE THE SYSTEM BY CARRYING OUT FUNCTIONAL CHECKS, TRIALS AND COMMISSIONING OF SYSTEM.
SRCG TO BE INSTALLED AS PER APPROVED BOARD PROCEEDINGS. SCOPE OF WORK:-INVOLVES (A) REMOVAL OF EXISTING HMG'S (QTY - 01) INSTALLATION OF PEDESTAL FOUNDATION (HEIGHT 100 CM) FOR SRCG IN BRIDGE WING PORT SIDE. INSTALLATION OF BASE FOUNDATION (HEIGHT 2.2 MTRS AND SRCG GUN DIMENTION- 1352X660X1660 MM ) AND PEDESTAL FOUNDATION (HEIGHT 2 MTRS AND SRCG GUN DIMENTION- 1352X660X1660 MM) FOR SRCG AT FOXEL. COVERING BOX (QTY-02) FOR MFDU (MULTI FUNCTIONAL DISPLAY UNIT) AND SCP (SYSTEM CONTROL PANEL) AND ASSOCIATED EQUIPMENT, LAYING OF INTER DEVICES CABLES ,STW, INSTALLATION INSPECTON (IIS) , HATS , INITIAL TEST FIRING (ITF), AND SATS A. ALL DIMENSION ARE IN MM. B. ALL WELDMENTS ARE TO BE CONTINUOUS AND SHALL BE CONFORMED TO NES 706. C. ADDITIONAL DECK SUPPORT TO BE GIVEN IF REQUERED. D. ITEM NO. 14 TO BE FABRICATED OR PLACED AS PER AVAILABITY IN THE MARKET. E. ITEM NO. 11 TO BE PROVIDED AS STIFFENER BRACKETS. F. LADDER SUPPORT TO BE PROVIDED FOR CLIMBING THE BASE FOUNDATION. G. SUITABLE BIMETALLIC TO BE PROVIDED BETWEEN DISSIMILAR MATERIALS,WHEREVER REQUIRED. H. BRACKET/TRIPPING BRACKET/NUT AND BOLTS TO BE PROVIDED WHEREVER NECESSARY. J. ALL CABLES ARE TO BE ROUTED THROUGH CABLE GLANDS. K. ALL SYSTEM CABINETS ARE TO BE PROPERLY GROUNDED AS PER NEC-STD-1101 PEDESTAL INCLUDING WEAPON, SIZE:-1352X660X166, QTY:-2,LOCATION :-FOXEL,BRIDGE WING PORT AFT POWER SUPPLY UNIT, SIZE:-377X290X291, QTY:-2,LOCATION :-PLOTTING ROOM, GUNNERY OFFICE SYSTEM CONTROL PANEL(SCP), SIZE:- 498X150X196, QTY:-2,LOCATION :-PLOTTING ROOM, GUNNERY OFFICE MULTI FUNCTION DISPLAY UNIT (MFDU), SIZE:- 262X206X93, QTY:-2,LOCATION :-PLOTTING ROOM, GUNNERY OFFICE DECK SAFETY SWITCH (DSS), SIZE:- 100X65X65, QTY:-2,LOCATION :-FOXEL,BRIDGE WING PORT AFT DISTRIBUTION BOARD WITCH MCCBs 16A, SIZE:- 600X500X180, QTY:-2,LOCATION :-PLOTTING ROOM AUTOMATIC TRANSFER SWITCH, SIZE:- 500X400X150, QTY :- 1, LOCATION:- CONVERSION MACHINERY ROOM 7.5 KVA STEP DOWN TRANSFORMER, SIZE:- 600X600X600, QTY:- 1, LOCATION:- CONVERSION MACHINERY ROOM INTERFACE/BIFFER UNIT, QTY:-2, LOCATION:- PLOTTING ROOM
MATERIAL LIST 1. MANUFACTURES INSERT PLATE AND FITMENT DIMENSION 1300X1300X10 thk (QTY-01) 2. MANUFACTURES PAD PLATE AND FITMENT DIMENTION 100X100X5 thk (QTY-16) 3. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk L-757 (QTY-8) 4. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk, L-300 (QTY-24) 5. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk,L-840 (QTY-8) 6. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk, L-480 (QTY-8) 7. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk, L-490 (QTY-8) 8. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk, L-340 (QTY-2) 9. MANUFACTURES BASE PLATE AND FITMENT DIMENTION 940X610X22 thk (QTY-2) 10. MANUFACTURES PLATE AND FITMENT DIMENTION 110X70X4 thk (QTY-2) 11. MANUFACTURES BRACKET PLATE AND FITMENT DIMENTION 2192X860X8 thk (QTY-8) 12. MANUFACTURES ROUND PAD PLATE AND FITMENT DIA 2308,8 thk (QTY-1) 13. MANUFACTURES ROUND PLATE AND FITMENT DIA 2108,8 thk (QTY-1) 14. MANUFACTURES ROUND PAD PLATE AND FITMENT DIA 400,L-2192,8 thk (QTY-1) 15. MANUFACTURES SQUARE TUBE AND FITMENT DIMENTION 80X80X6 thk, L-1413 (QTY-8) 16. E BAR AND FITMENT DIMENTION 50X50X6 thk, L-295 (QTY-2) 17. MANUFACTURES PLATE AND FITMENT DIMENTION 375X375X6 thk (QTY-2) 18. MANUFACTURES PAD PLATE AND FITMENT DIMENTION 70X70X6 thk (QTY-2) 19. MANUFACTURES MS FLAT AND FITMENT DIMENTION 600X100X6 thk (QTY-2) 20. MANUFACTURES MS FLAT AND FITMENT DIMENTION 500X100X5 thk (QTY-2) 21. MANUFACTURES ISMC CHANNEL AND FITMENT DIMENTION 75X4.4 thk 40X4.4 thk, L-600 (QTY-2)22. MANUFACTURES ANGLE BAR AND FITMENT DIMENTION 50X50X6 thk,L-600 (QTY-2) 23. MANUFACTURES PLATE AND FITMENT DIMENTION 600X100X5 thk (QTY-2)
Description of Work / Item(s)
Amount
LIST OF SPARES TO BE QUOTED BY THE SHIPYARDS
Anchor
Chain Cable (F)
Chain Cable (H)
Lug less joining shackle
Swivel Adapter
Screw Stopper
Blake Stopper
Worm reducer motor shaft assembly
Worm shaft bearing
Wheel shaft bearing
Slipping clutch cum coupling
Slipping clutch bearing
Brake lining upper part
Cable lifter
Dog clutch
Packing sleeve
BALL BEARING SKF 6222/C3
BREAK LINER
GAUGE GLASS
OIL SEAL 200-230-13
OIL SEAL 70-100-12
SPLIT PIN SS 5X80MM
SPLIT PIN SS 6X100MM
SPRING WASHER SS M12
SS GREASE NIPPLE 1/4" BSP BUTTON TYPE
TAPER ROLLER BEARING 32215 J2Q
GEAR BOX OIL OEP 220
BOLT & NUT FULL THREAD SS M12X40
BOLT & NUT FULL THREAD SS M10X30
BOLT & NUT FT (W.Q) M6X50 CSK BRASS
TAPER ROLLER BEARING
ROLLER BEARING
BALL BEARING
SLIPPING CLUTCH
OIL LEVEL INDICATOR
OIL LEVEL INDICATOR SEA
PACKING
PACKING
BEARING
LOCKING WASHER
PACKING
OIL SEAL
RETAINING RING
BEARING
PACKING
THRUST WASHER
PACKING
OIL SEAL
THRUST WASHER
RETAINING RING
BAND BRAKE
THRUST WASHER
Grease nipple
Torque tube assembly
Bearing gear box input shaft
Bearing gear box output shaft
Oil seal gear box input shaft
Oil seal gear box output shaft
Anchor
Chain Cable (F)
Chain Cable (H)
Lug less joining shackle
Swivel Adapter
Screw Stopper
Blake Stopper
Spring
Centre pin
Handle
Bottom bush
Top bush
RATCHET
SPRING
CIRCLIP
BUILT IN FILTER 1.5T PN:SR.7.1
BUILT IN FILTER 2.5T PN:SR.7.2
BUILT IN FILTER 6.5T PN:SR.7.3
FILTER 1.5T PN:SR.5.1
FILTER 2.5T PN:SR.5.2
FILTER 6.5T PN:SR.5.3
GASKETS KIT CYL(DRW150/4369) PN:50098053
GASKETS KIT CYL(DRW150/4413) PN:50098054
GASKETS KIT CYL(DRW150/4421) PN:50098051
GASKETS KIT CYL(DRW150/4422) PN:50098052
GASKETS KIT CYL(DRW150/4493) PN:50098055
GASKETS KIT CYL(DRW150/4494) PN:50098056
HYDRAULIC HOSES PN:SR.21.1
HYDRAULIC HOSES PN:SR.21.2
HYDRAULIC HOSES PN:SR.21.3
LATERAL PAD PN:21503399
LATERAL PAD PN:21503399
LATERAL PAD PN:SR.22.5
PIPE LINE WITH ADAPTOR PN:SR.30.1
SHEAVE BLOCK - 1.5 T PN:SR.29.1
SHEAVE BLOCK - 2.5 T PN:SR.29.2
SHEAVE BLOCK - 6.5 T PN:SR.29.3
SLIDING PAD PN:21502849
SLIDING PAD PN:21503399
SLIDING PAD PN:21504435
SLIDING PAD PN:21504441
SLIDING PAD PN:21504502
SLIDING PAD PN:21504503
WIRE ROPE:16 MMØ, L = 80M PN:21504510
PIPE SECURING CLAMPS
BEARING FOR SHEAVES
CHANGEOVER VALVE
HAND PUMP SEAL KIT
PIPE END FITTING1/2", 3/4", 1"
HYDRAULIC HOSES
CABLE FOR CABLE REEL
SCREW M24 WITH NUTS & WASHERS
EMERGENCY PUSH BUTTON
PUSH BUTTON
SET OF FUSES
SET OF LAMPS
BREATHER
HYDRAULIC OIL SS 46
FILTER ELEMENT
SEALS
GEAR OIL AGIP BLASIA 150
BUILT IN FILTER
RELAY 2.5T
BRNG & SEAL KIT 2.5T
SEAL KIT FOR SLEW GEARBOX
BEARINGS FOR SLEW GEAR BOX
SEAL KIT FOR WINCH ASSY
BEAIRNGS FOR WINCH ASSY
SS CHAIN WITH D SHACKLE 6MM
GASKETS
GASKETS
Anti-friction bearing
Anti-friction bearing
Anti-friction bearing
BALL BEARING
O-RING
CIRCLIP INTERNAL
BALL BEARING
OIL SEAL
OIL SEAL
O-RING
SPRING WASHER
DOWEL SPRING PIN
SPRING WASHER
O-RING
CIRCLIP EXTERNAL
CIRCLIP INTERNAL
SPRING WASHER
ALLEN SCREW
ALLEN SCREW
ALLEN SCREW
OIL LEVEL INDICATOR
PACKING
PACKING
Anti-friction bearing
Oil seal
Spring
Centre pin
Handle
Bottom bush
Top bush
Swivel leading sheave assembly
Accumulator sheave assembly
Fixed leading sheave assembly
Measuring sheave assembly
Accumulator springs
Flexible drive unit
Counter box unit
BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
BRAKE LINING
DIAMOND GREASE PACKING
OIL SEAL
OIL SEAL
OIL SEAL
LEAF SPRING
BEARING
BEARING
BEARING
BEARING
BEARING
BEARING
OIL SEAL
BOTTOM BUSH
TOP BUSH
RATCHET
SPRING
CIRCLIP
ENGINEERING
PISTON RINGS SET * TD/TBD
LINER-PLATEU HONED FINISH
O-RING VITON 125X4
CONN ROD BRG TOP+BOTTOM
SPRING DOWEL PIN M4X20MM
CONN ROD BIG END BOLT
BUSH-CONNROD -S/END
SET OF GASKET-TBD V12 HE
SET OF O RINGS TBD V12 HE
SET-SEALING RINGS TBD2V12
SET OF HOSES * TBD V12 HE
SET OF HOSECLIPS-TBDV12HE
FUEL PUMP SHAFT
HEX_BOLT_M8X20
KEY WOODRUFF. KEY
BALL BRGS 6204/2RS/C3
OIL SEAL (FLYWHEEL SIDE)
O RING RUBR 14X3 D/234
POLY ACRYLIC RUBBER BELOW
RUBBER BELLOW DRY SUMP
CYLINDER HEAD SEALING
SEGMENTED GASKET-V12 SUMP
GASKET IN PERMANITE
GASKET IN PERMANITE
GASKET- OIL FILLER NECK
O' RING
O'-RING NBR 32X4
O-RING DIPSTICK
O'-RING NBR 140X4
O' RING 33X3.5
HEXSCREW=M8X1.25X25 CL8.8
SPRING WASHER B-8
O'-RING SILICON 20 X 4
SPRING WASHER M-10
O-RING NBR 124X3
OILSEAL=110X90X12 MM THK
GASKET-GEAR END COVER
ADJ.SCREW=M10X1.5X39 LG.
HEX. NUT M10 DIN 934M-10
BRASS SLEEVE
CU.SLEEVE
O-RING SILICON 18.2X3.4
COPPER WASHER
INSERTS V S INL/EXH
VALVE SPRING=61MM HEIGHT
VALVE SPRING
ROTOCAP SOLID
VALVE GUIDE D2
VALVE EX D2 KV 2994
VALVE STEAM SEAL - TBD2 ENGINE
HALF COLLET
Stud Injector Cu Coated
SLEEVE FOR CYLINDER HEAD
GASKET-AIR INTAKE MANIFOD
GASKET EXHAUST MANIFOLD
SLEEVE CYL.HEAD FOR OIL
COVER=25X1.5X11MM WIDTH
HEXBOLT=M8X1.25X55 8.8CL
HEXBOLT=M16X150 10.9 D931
WASHER-CYL.HEAD=28X2.0
GASKET CYL HEAD COVER
O-RING VITON-18MMX5.0MM
O RING VITON 9X4.5MM
COPPER_WASHER
AIR FILTER 100 MM
H O S E 75 X 45
HOSECLIP 70-90/4
HOSE 22DIA.X 80L SILICON
HOSECLIP 70-90/4
HOSE 76 ID X65L.SILICON.
A V MOUNTG-A2T/4030B
STUD BOLT M10X16.5.8/CL
HOSE 50DIA.X55L.SILICON
HOSECLIP 60-80/3X
HOSE 90DIA.X 65L.SILICON
HOSE CLIP AIR FLTR 87MM
HEX-BOLT-M10X25
HEX SCREW M10X30LG
ZINC ANODE 1/2" BSP ASSLY
GASKET-AFTERCOOLER COVER
GASKET - A/COOLER
GASKET - A/COOLER
GASKET IN TALBRITOL
GASKET-EXH MANIFOLD FLANG
GASKET IN D'CEMJO
GASKET IN TALBRITOL
ZINC ANODE ASSLY
OVER HAUL T/C KIT K27 -53277110008
STUD M10X180X8.8
GASKET-EXH. JUNCTION
GASKET - TURBOCHARGER
GASKET-TURBOOIL DRAINPIPE
GASKET-TURBO OIL SUPPLY
O-RING VITON 80X3.8
STAR WASHER-OIL COOLER
O-RING VITON 101X4.5
O-RING VITON 20X4
COMP SPRING CYLINDRICAL D2 LOC
SAFETY VALVE ASSY
O-RING SILICON 35X3
RING 28X3.5
O RING SILICON 24X3.5
LUB OIL FILTER(232V12)
ROUND PACKING RING
O RING-CHANGE OVER LUB.
PACKING RING MICO FILTERCAP
Filter Element(Max10)(S3209T)
FILTER PLASTIC BOWL(RK30051)
INJ.OVER FLOW PIPE (EMI)D2V12
BALLBRG.55X90 /6011/22
BALLBRNG /6206/C3
CU-WASHER
INJ HOLDING BKT D3/D4/D4I
M.S.WASHER 20X4.6 SEALING
O RING NBR 20X3
O' RING-NBR 80X3
OIL SEAL - 30X52X10
SCREWED ROD 95 MMLG
PSF-8-M6X1 SWIVEL JOINT
PSFL-8-M6X1 SWIVEL JOINT
RUBER SEAL INJECTOR
FRESH WATER PUMP SPARES
COGGED BELT AX-40
HOSE-80DIA.X 70L.
HOSE 40 DIA.X60L.
HOSE CLIP40-60(2X)9THK.
HOSE CLIP 25-40/1X
HOSE 30DIA.X55L
GASKET
GASKET-WATER PIPE OILCOOL
GASKET-COOLING WATER PIPE
RAD.CAP+NECK-TANK PLUG
GASKET-3-THERMOSTAT CASNG
GASKET
GASKET
Cover for mounting
STUD BOLT M8X20-5.8 CL
GASKET WATER MANIFOLD
OVAL GASKET
GASKET
GREAVES LUB OIL 50 LTR CI-4
GREAVES LUB OIL 20 LTR CI-4
COOLANT ADDITIVE 10LTPACK
MAG.PICK UP-5/8"UNF 50mm
CU. WASHER 16X22X1.5THK
HEXNUT COPR.PLATED M8 10G
HEXBOLT=M12X1.75X50 8.8/C
SPRING CAP
CAP BRASS
HEX PLUG M14X1.5
HEXBOLT=M10X1.5X90 8.8/CL
ALN SCREW M8X30 912 12.9
PLUG 3/8 BSP
STUD BOLT M10X70 8.8/CL
STUD BOLT M12X35 12.9CL
PISTON(TBD2)+GPIN+CIRCLIP
PUSH ROD TUBE(MODF)195MM
HEX SCREW M10X60 8.8/CL
HEX SCRREW-M10X40-933-8.8
S T U D B O L T S
BANJO BOLT (DIN-7623)
STUD=M8X110 5.8/CL
SHC SCREW=M10X30
LOT GAUGE 40/130DEG 2445L
WATER TEMP GAUGE 3.0MT LG
L. O. PIPE 12X1.5X397
SOCKET 12MM PMS COUPLING
SPRING DOWEL PIN M6X14MM
PLAIN WASHER A10.5 (M10)
SHC SCREW=M10X1.5X20
STEEL BALL 3/4" DIA.
tbd2v12 jacketed pipe set
O RING FOR HE CAP.
THERMOSTAT ELEMENT
RUBBER RING
STUD-M8X16-CL/5.8
RING NBR 53 X 4
PUMP SHAFT
BEARING
MECHANICAL SEAL
OIL SEAL
IMPELLER BRONZE
IMPELLER SCREW WITH WASHER
GASKET
INTERMEDIATE COVER
BRASS PLUG 1/4"
FLEXIBLE PIPE 580MM
FLEXIBLE PIPE 530MM
FLEXIBLE PIPE 450MM
FLEXIBLE PIPE 1500MM
FLEXIBLE PIPE 1000MM
FLEXIBLE PIPE 1050MM
FLEXIBLE PIPE 720MM
FLEXIBLE PIPE 600MM
FLEXIBLE PIPE 800MM
FLEXIBLE PIPE 600MM
FLEXIBLE PIPE 3000MM
FLEXIBLE PIPE 2500MM
INJ.CMPL F002C7Z116 (F002C70020)
FUEL INJ. PUMP DRIVE
PRESSURE GAUGE.
W.T.GAUGE 1380MMT CAPIL.
BATT. CHRG. ALT. 24V, 55AMPS LUCAS
COUPL FOR"P"TY.PUMP V12
CAM SHAFT WITH234F/ORDER
CAM GEAR ASSLY
3-THERMOSTAT CASING MARIN
Turbocharger TEL 53279706457
LUB.OIL PUMP
WATER PUMP ASSEMBLY D4/D4-I
PUSH ROD TUBE(MODF)195MM
TAPPET D2 ENGINE
PISTON COOLING NOZZLE STD
RING FOR CRANKSHAFT
THRUST WASHER BRONZE
RING HALF
BOLT M B M18X2.5X135
BOLT MAIN BRG=M18X2.5X165
MAIN BRGS TOP +BOTTOM (*)
ROCKER LEVER ARM
ROCKER BLOCK FOR R/ARM
SEGMENT SUR NITR TREAT
AIR DISTRIBUTER V12 (*)
AIR STARTING VALVE (IMP)
AIR STARTING PIPES
AIR STARTING PIPES
AIR STARTG PIPE
VALKAN COUP.L-2613 .
ACTUATOR ADC 225 S 24V
CHANGE OVER FILTER HEAD ASSY(CI)
AIR STARTING PIPES
AIR STARTING PIPES
AIR STARTG PIPE
PUSH ROD
LUB OIL PUMP SCAVANGE DRY SUMP
LUB OIL TEMP. GAUGE
Governor DPG2201
PISTON RINGS SET * TD/TBD
CONN ROD BIG END BOLT
BUSH-CONNROD -S/END
CONN ROD BRG TOP+BOTTOM
SPRING DOWEL PIN M4X20MM
SET OF GASKET-TBD V12 HE
SET OF HOSES * TBD V12 HE
SET OF HOSECLIPS-TBDV12HE
SET OF O RINGS TBD V12 HE
SET-SEALING RINGS TBD2V12
FUEL PUMP SHAFT
HEX_BOLT_M8X20
SHC SCREW=M10X1.5X20
KEY WOODRUFF. KEY
BALL BRGS 6204/2RS/C3
OIL SEAL (FLYWHEEL SIDE)
PUSH ROD TUBE(MODF)195MM
O RING RUBR 14X3 D/234
POLY ACRYLIC RUBBER BELOW
RUBBER BELLOW DRY SUMP
CYLINDER HEAD SEALING
SEGMENTED GASKET-V12 SUMP
GASKET IN PERMANITE
GASKET IN PERMANITE
GASKET- OIL FILLER NECK
O' RING
O'-RING NBR 32X4
O-RING DIPSTICK
O'-RING NBR 140X4
O' RING 33X3.5
HEXSCREW=M8X1.25X25 CL8.8
SPRING WASHER B-8
O'-RING SILICON 20 X 4
SPRING WASHER M-10
O-RING NBR 124X3
OILSEAL=110X90X12 MM THK
GASKET-GEAR END COVER
ADJ.SCREW=M10X1.5X39 LG.
HEX. NUT M10 DIN 934M-10
BRASS SLEEVE
CU.SLEEVE
O-RING SILICON 18.2X3.4
COPPER WASHER
INSERTS V S INL/EXH
VALVE SPRING=61MM HEIGHT
VALVE SPRING
ROTOCAP SOLID
VALVE GUIDE D2
VALVE EX D2 KV 2994
VALVE STEAM SEAL - TBD2 ENGINE
HALF COLLET
Stud Injector Cu Coated
SLEEVE FOR CYLINDER HEAD
GASKET-AIR INTAKE MANIFOD
GASKET EXHAUST MANIFOLD
SLEEVE CYL.HEAD FOR OIL
COVER=25X1.5X11MM WIDTH
HEXBOLT=M8X1.25X55 8.8CL
HEXBOLT=M16X150 10.9 D931
WASHER-CYL.HEAD=28X2.0
GASKET CYL HEAD COVER
O-RING VITON-18MMX5.0MM
O RING VITON 9X4.5MM
COPPER_WASHER
AIR FILTER 100 MM
H O S E 75 X 45
HOSECLIP 70-90/4
HOSE 22DIA.X 80L SILICON
HOSECLIP 70-90/4
HOSE 76 ID X65L.SILICON.
A V MOUNTG-A2T/4030B
STUD BOLT M10X16.5.8/CL
HOSE 50DIA.X55L.SILICON
HOSECLIP 60-80/3X
HOSE 90DIA.X 65L.SILICON
HOSE CLIP AIR FLTR 87MM
HEX-BOLT-M10X25
HEX SCREW M10X30LG
ZINC ANODE 1/2" BSP ASSLY
GASKET-AFTERCOOLER COVER
GASKET - A/COOLER
GASKET - A/COOLER
GASKET IN TALBRITOL
GASKET-EXH MANIFOLD FLANG
GASKET IN D'CEMJO
GASKET IN TALBRITOL
ZINC ANODE ASSLY
OVER HAUL T/C KIT K27 -53277110008
STUD M10X180X8.8
GASKET-EXH. JUNCTION
GASKET - TURBOCHARGER
GASKET-TURBOOIL DRAINPIPE
GASKET-TURBO OIL SUPPLY
O-RING VITON 80X3.8
STAR WASHER-OIL COOLER
O-RING VITON 101X4.5
O-RING VITON 20X4
STEEL BALL 3/4" DIA.
COMP SPRING CYLINDRICAL D2 LOC
SAFETY VALVE ASSY
O-RING SILICON 35X3
RING 28X3.5
O RING SILICON 24X3.5
LUB OIL FILTER(232V12)
ROUND PACKING RING
O RING-CHANGE OVER LUB.
PACKING RING MICO FILTERCAP
Filter Element(Max10)(S3209T)
INJ.OVER FLOW PIPE (EMI)D2V12
FILTER PLASTIC BOWL(RK30051)
BALLBRG.55X90 /6011/22
BALLBRNG /6206/C3
CU-WASHER
INJ HOLDING BKT D3/D4/D4I
M.S.WASHER 20X4.6 SEALING
O RING NBR 20X3
O' RING-NBR 80X3
OIL SEAL - 30X52X10
SCREWED ROD 95 MMLG
PSF-8-M6X1 SWIVEL JOINT
PSFL-8-M6X1 SWIVEL JOINT
RUBER SEAL INJECTOR
FRESH WATER PUMP SPARES
COGGED BELT AX-40
HOSE-80DIA.X 70L.
HOSE 40 DIA.X60L.
HOSE CLIP40-60(2X)9THK.
HOSE CLIP 25-40/1X
HOSE 30DIA.X55L
GASKET
GASKET-WATER PIPE OILCOOL
GASKET-COOLING WATER PIPE
O RING FOR HE CAP.
RAD.CAP+NECK-TANK PLUG
GASKET-3-THERMOSTAT CASNG
GASKET
RUBBER RING
GASKET
Cover for mounting
STUD-M8X16-CL/5.8
STUD BOLT M8X20-5.8 CL
GASKET WATER MANIFOLD
RING NBR 53 X 4
OVAL GASKET
GASKET
COOLANT ADDITIVE 10LTPACK
GREAVES LUB OIL 50 LTR CI-4
GREAVES LUB OIL 20 LTR CI-4
SOCKET 12MM PMS COUPLING
CU. WASHER 16X22X1.5THK
HEXNUT COPR.PLATED M8 10G
HEXBOLT=M12X1.75X50 8.8/C
SPRING CAP
CAP BRASS
HEX PLUG M14X1.5
HEXBOLT=M10X1.5X90 8.8/CL
ALN SCREW M8X30 912 12.9
PLUG 3/8 BSP
STUD BOLT M10X70 8.8/CL
STUD BOLT M12X35 12.9CL
HEX SCREW M10X60 8.8/CL
HEX SCRREW-M10X40-933-8.8
S T U D B O L T S
PLAIN WASHER A10.5 (M10)
ADAPTOR PR. GAUGE
THERMOSTAT ELEMENT
FLEXIBLE PIPE 1050MM
PUMP SHAFT
BEARING
MECHANICAL SEAL
OIL SEAL
INTERMEDIATE COVER
IMPELLER BRONZE
IMPELLER SCREW WITH WASHER
GASKET
FLEXIBLE PIPE 580MM
FLEXIBLE PIPE 530MM
FLEXIBLE PIPE 450MM
FLEXIBLE PIPE 1500MM
FLEXIBLE PIPE 1000MM
FLEXIBLE PIPE 1050MM
FLEXIBLE PIPE 720MM
FLEXIBLE PIPE 600MM
FLEXIBLE PIPE 800MM
FLEXIBLE PIPE 600MM
FLEXIBLE PIPE 3000MM
FLEXIBLE PIPE 2500MM
BRASS PLUG 1/4"
PISTON(TBD2)+GPIN+CIRCLIP
INJ.CMPL F002C7Z116 (F002C70020)
FUEL INJ. PUMP DRIVE
PRESSURE GAUGE.
W.T.GAUGE 1380MMT CAPIL.
BATT. CHRG. ALT. 24V, 55AMPS LUCAS
COUPL FOR"P"TY.PUMP V12
CAM SHAFT WITH234F/ORDER
CAM GEAR ASSLY
3-THERMOSTAT CASING MARIN
Turbocharger TEL 53279706457
LUB.OIL PUMP
WATER PUMP ASSEMBLY D4/D4-I
PUSH ROD TUBE(MODF)195MM
TAPPET D2 ENGINE
PISTON COOLING NOZZLE STD
RING FOR CRANKSHAFT
THRUST WASHER BRONZE
RING HALF
BOLT M B M18X2.5X135
BOLT MAIN BRG=M18X2.5X165
MAIN BRGS TOP +BOTTOM (*)
ROCKER LEVER ARM
ROCKER BLOCK FOR R/ARM
SEGMENT SUR NITR TREAT
AIR DISTRIBUTER V12 (*)
AIR STARTING VALVE (IMP)
AIR STARTING PIPES
AIR STARTING PIPES
AIR STARTG PIPE
VALKAN COUP.L-2613 .
ACTUATOR ADC 225 S 24V
CHANGE OVER FILTER HEAD ASSY(CI)
AIR STARTING PIPES
AIR STARTING PIPES
AIR STARTG PIPE
PUSH ROD
LUB OIL PUMP SCAVANGE DRY SUMP
LUB OIL TEMP. GAUGE
Governor DPG2201
MECHANICAL SEAL P # 105
SLEEVE GASKET P # 37
SEAL KIT
VALVE SET
ANODE PLUG(ZINC ANODE)
SEAL RING,CHARGING
'O'RING FOR HEAD DISTRIBUTOR ASSEMBLY
`O`RING CARTRIDGE FILTER HOUSING
CARTRIDGE FILTER ELEMENT
O RING HP CONNECTION
O RING UNION 32 MM
PL-4 HOSE
PU9 HOSE
COUPLER FOR VICTAULIC COUPLING 1"
VICTAULIC COUPLERS 1.1/4"
PERMEATE MALE ELBOW
1/4" MXPU4 ELBOW
TEE PU9
TEE PU4
STRAIGHT CONNECTOR 3/8"
NON RETURN VALVE PVC 3/8" BSP(F)
6 MM PVC REINFORCED HOSE
LP HOSE (FOR AIR LINE)
PRODUCT WATER FLEX HOSE
HP FLEXIBLE HOSE
HP HOSE PT 60
HP HOSE 3/8"IDX1/2"UNFM X580L, SAF2507
BRINE R/W HP FLEXIBLE HOSE-XL
H.P PUMP C`CASE OIL
JUBILEE CLIPS, 00,(13 MM TO 20 MM)
S.S JUBILEE CLIPS, 1X , (30 MM TO 40 MM)
SS JUBILEE CLIPS, 2X , (45 MM TO 60 MM)
DOLOMITE
1/4" FXPU4 ELBOW
RUBBER HOSE FROM C/F OUTLET TO HP PUMP INLET
HIGH PRESSURE PUMP DRIVING BELT SET(5 NOS)
E-SPARE KIT RO 30 TPD
A/V MOUNT FOR HP PUMP TROLLY
O-RING, OIL FILLER CAP
WEAR PART KIT / REPAIR KIT
PRESSURE GAUGE
FILTER CARTRIDGE
PRESSURE VALVE
NON RETURN VALVE (EACH)
THREADED PIN WITH NUT
LOCKING PLATE
HEXAGON BOLT WITH SPRING WASHER
SHAFT SEAL RING
PRESSURE SRING
HEXAGON BOLT WITH SPRING RING
LOCKING PLATE
THREADED PIN WITH NUT
CASING NUT
THREADED PIN WITH STUD
SHAFT SEAL RING
ANTIFRICTION BEARING
ANTI FRICTION BEARING
ANTI FRICTION BEARING
SHAFT SEALING RING
OIL DISTRIBUTOR
GEAR WHEEL FOR PUMP
GEAR WHEEL FOR SHAFT
THREADED PIN
CYLINDRICAL BOLT
TAPPERED PIN WITH THREADED STUD
RING NUT
LOCKING PIN
HEXAGON BOLT WITH SPRING WASHER
ANTIFRICTION BEARING
HEXAGON BOLT WITH SPRING RING
ANTIFRICTION BEARING
ANTIFRICTION BEARING
CYLINDRICAL BOLT WITH SPRING RING
CYLINDRICAL BOLT WITH SPRING RING
CYLINDRICAL BOLT
ANTIFRICTION BEARING
ANTIFRICTION BEARING
CLUTCH SUPPORT
CIRCLIP
SCREW PLUG
CYLINDRICAL BOLT
RETURN SPRING
RECTANGULAR RING INSIDE
HEXAGON BOLT
NON RETURN VALVE
HEXAGON BOLT WITH SPRING WASHER
ANNALER PISTON
RECTANGULAR RING OUTSIDE
INSIDE DISC
OUTSIDE DISC
CARRIER PIN
CARRIER PIN
CYLINDRICAL BOLT
CLAMPING SLEEVE
HEXAGON BOLT WITH SPRING WASHER
THREADED PIN
CYLINDRICAL BOLT WITH SPRING RING
CIRCLIP
FITTED KEY
ANTIFRICTION BEARING
ANTIFRICTION BEARING
ANTIFRICTION BEARING
SHAFT NUT
HEXAGON SCREW
ANTI FRICTION BEARING
ANTI FRICTION BEARING
ANTI FRICTION BEARING
CIRCLIP
CLAMP RING
CYLINDRICAL BOLT
VALVE SLIDE
PRESSURE SPRING
FITTED KEY
FITTED KEY
SHAFT NUT
LOCKING PLATE
THREADED PIN
FITTED KEY
THREADED PIN
LOCKING BOLT
FITTED KEY
THREADED PIN
FITTED KEY
SPACER BUSH
CYLINDRICAL BOLT
FITTED KEY
CYLINDRICAL BOLT WITH SPRING RING
THREADED PIN
CIRCLIP
LANTERN RING
NEOSPRINE RUBBER5 x 25
NEOSPRINE RUBBER5 x 25
RUBBER PACKING 785 OD x 685 ID x 3 THICK
RUBBER PACKING 721 x 621 ID x 3 THICK
COMPRESSOR RING (RUBBER)
SEALS
BULB SEALING RING (FORWARD)
RUBBER RING
LINER
BULB SEALING RING (AFT)
RUBBER RING
LINER
RUBBER SIGMENTS
SIMPLEX SEALS AFT
STERN TUBE BEARING
A-BRACKET BEARINGS
HULL AND NECK BEARINGS
RUDDER SEALS
O-RING
GASKET-COPPER WASHER
GASKET-FRAME END COVER
LOCK WASHER, SPRING 1-3/8
VALVE, PILOT
WASHER, COPPER
O-RING
GASKET-COPPER WASHER
SEAL, OIL VITON O.D.
GASKET, SHAFT END COVER
BUSH CRANK PIN
VALVE SAFETY 1/2" x 1200
VALVE NEEDLE 1/4"
GASKET, AIR HEAD
GASKET, AIR HEAD
GASKET, COPPER WASHER
GASKET, AIR HEAD-TOP/BOTTOM
GASKET, AIR HEAD
GASKET, COPPER WASHER
GASKET, AIR HEAD - TOP / BOTTOM
GASKET, AIR HEAD
GASKET, COPPER WASHER
RING LOCK
PIN PISTON
SET PISTON RING 1.625 HP
RING LOCK
PIN PISTON
SET PISTON RING 3"
RING LOCK
PIN PISTON
SET PISTON RING 5.5" LP
VALVE 35 GA COMPLETE
VALVE 55 GA COMPLETE
VALVE, SAFETY 60 PSIG
VALVE, SAFETY 260 PSIG
SAFETY V/V ON AIR RECIEVER
Cylinder head
Liner
Piston
Connecting rod
Drive shaft
Oil seal
Bearing
HP air bottle chest valve spindles.
`O' RING
MECHANICAL SEAL
INTERNAL BEARING
GASKET
CIRCLIP
`O' RING
GASKET
GASKET
POWER SCREW BALANCING BUSH
IDLER SCREW BALANCING BUSH
INSERT
FASTNER
FASTNER
FASTNER
Vertical filter water separator unit with cartridges.
Filter water absorber
Oil pairing disc
Gravity disc
Bearings of worm wheel shaft.
Bowl spindle. (Vertical Drive)
Buffer and ball bearing housing.
Ball bearing
top bearing spring
Brake shoe
Friction pad
Brake plug
Friction coupling
Lip seal ring
Fuel oil centrifuge.
hexagonal nut
hexagonal nut
hexagonal nut
Piston
Piston ring
Piston ring
Oil scraper ring
piston pin
clamping piece
Screw plug
cotter pin
set of brg halves
Fitting Bolt
Castallated Nut
lock pin
seal ring (1.8 mm thick)
Round seal ring
Copper seal ring thickness 1.2 mm
STAR KNOB
CYL.SPLINED PIN
HAND WHEEL NUT
GASKET
LOCK WASHER
Valve protecting cap complete
gasket
gasket
gasket
gasket
WARM SCREW
pump element
vent screw
vent screw
central sleeve
control rod
upper spring plate
spring washer
thrust spring
lower spring plate
guide sleeve
sanp ring
stud screw
pointer
valve cone
thrust spring
thrust piece
seal ring
flange
gasket
plate
roller bolt
roller with bush
thrust piece
set of shims
valve casing
thrust spindle guide
needle guide with needle
clamping sleeve
round seal ring
thrust spindle
spring plate
spring
adjusting screw
washer
feeler pin
snap ring
washer
spring
distance pipe
delivery pipe socket
fuel delivery pipe with jacket
nozzle with orifices
distance bush
rotery wheel
air wheel
butting ring
butting ring
shaft
slide ring seal
simmer ring
simmer ring
slide ring seal
deep groove ball brg.
penduium ball bearing
fitting key air wheel
fitting key rotery wheel
butting ring air stage
fitting key pinion
rubber ball
cord seal
bearing cap intre.brg
ball bearing bush
hex .head screw
segger ring
simmer ring
deep groove ball brg.
fitting key
rotery wheel
rotery wheel nut
rotery wheel nut
locking washer
locking washer
slide ring seal
notched taper pin
threaded pin with point
locking washer
butting ring ceramics
slide ring seal coal
cord seal
simmer ring
hex .head screw
gasket
gasket
rotary gear wheel
lock nut
taper pin
castellated nut
taper pin
front cover bush
rear cover bush
starting air pressure gauge
charging air pressure gauge
L O pressure gauge
gasket for air staring pipe
gasket for fuel pump inlet pipe
corner union screw
cocks for nozzle cooling pipe
Ball type cock
cocks for nozzle cooling pipe
ermeto bulkheadscrew conections
ermeto corner union
coller bush
cylindrical pin
cotter pin
collar bush
suspension strap
core hole plug
Castelated nut
Cotter pin
valve seat insert
hexagon bolt
Cylinder head
hex nut
cooling water transition piece
hexagon bolt
GASKET
Seal ring
Gasket
hex.head screw
dowel pin
taper pin
threaded pin
hex.head screw
spherical seat
roller
locking ring
ball piece
ball head
push rod
roller pin
guide piece
hex. Head screw
seals
hex.head srew
hex.head srew
hose clip
tappet
roller with bush
tappet guide
sealing ring
bellows
hose sleeve
hose sleeve
inlet valve cone
valve guide
spring plate
feather key
clamping piece comp
cylindrical screw
spring ring
hexagon bolt
lock washer
thrust piece
snap ring
outer spring
inner spring
outlet valve cone
valve guide
spring plate
feather key
clamping piece comp
cylindrical screw
spring ring
hexagon bolt
lock washer
thrust piece
snap ring
outer spring
inner spring
seal ring
filter element
gasket
collar bolt
Gasket
Grooved Ring
Hexagonal Screw
Gasket
gasket
gasket
hex.bolt
gasket
gasket
hex.bolt
hex.bolt
Expansion piece
Expansion piece
seal ring
disc filter element
sealing ring
coller screw
sealing ring
Safety valve
Hand wheel
INDICATING VALVE
Special Gasket
Special Gasket
Ermeto Screw connect
ermeto corner union
ermeto corner union
Ermeto bulkhead screw connection
ermeto T screw connect
corner union screw
corner union screw
corner union screw
corner union screw
gasket
Cocks
Cocks
Cocks
Cocks
corner union screw
ball type cock
valve stem with bush
cap nut
spring plate
thurst spring
round buna ring
piston
screw plug
gasket
valve case
thermocouple
pressure control switch
temperature switch
Gravity disc.
Bearings of worm wheel shaft.
Bowl spindle. (Vertical Drive)
Buffer
Ball bearing housing
Ball bearing
Top bearing spring
Brake shoe
Friction pad
Brake plug
Friction coupling
Lip seal ring
Mandatory spare parts kit for 24000 hourly routines of 80 TR AC Plant containing HSW 205 or HSS 4221 compressor
Internal oil filter element
Oil filter replacement gasket & O-ring set
Capacity control solenoid valve kit (Asco) (kit includes 2 valves & 2 coils)
Motor terminal plastic insulators
Integral oil separator heater kit 220V 250W (incs packet)
Core for filter drier Sporlan RC4864
Filter drier for POSV
Differential pressure gauge-switch Hirlekar DPG 200 (0 to 0.5 kg/cm2)
Pressure gauge 65 dial -1 to 15 Kg/cm2 for R134a
Pressure gauge 65 dial 0 to 25 Kg/cm2 for R134a
Pressure gauge 65 dial 0 to 10 Kg/cm2 for water
Cathodic bolt
Set of gaskets for condenser for 80 TR AC Plant
Coil for Pilot operated solenoid valve Sporlan Type 180S with 230 V AC coil
Refrigerant suction filter (Axial suction)
Temperature Transeducer MCS T100-20
Current Transformer MCS CT-250
Pilot operated solenoid valve Sporlan Type 80S with 230V AC coil
Pressure transeducer MCS TI500-20
Valve Angle type 1/4" NPT x 1/4" flare
Valve Three way type 1/4" NPT x 1/4" flare
Teflon seat washer 4-1/8''
Teflon seat washer 2-1/8''
Teflon seat washer 1-5/8''
Teflon seat washer 5/8''
Kit for Power Contactor
Lubrication Oil For Compressor ( Savita Chemicals SAVSYN2068 )
SET OF GASKET FOR SMC-2-65V
SET OF NEOPRENE O RINGS FOR SMC-2-65V
SET OF SEALING RING FOR SMC-2-65V
CASTLE NUT
SPLIT PIN
CONNECTING ROD BEARING
SUCTION VALVE RING PLATE
VALVE SPRING
SHAFT SEAL ASSEMBLY
OIL PRESSURE REGULATION VALVE ASSEMBLY
CYLINDER LINER WITH SUCTION VALVE
CRANK CASE HEATER ASSEMBLY
CONNECTING ROD ASSEMBLY
SUCTION VALVE RETAINING RING
DISCHARGE VALVE ASSEMBLY
MAIN BEARING
OIL PUMP ASSEMBLY
Ll UID LINE FILTER DRIER
V-BELTS
PISTON WITH PIN & RING SET
CRANK SHAFT ASSEMBLY
CONNECTING ROD BOLT
CONNECTING ROD BUSH
COUPLING PIECE
BEARING BUSHING
SPRING FOR UNLOADING RING
THREE WAY SOLENOID VALVE- 230 V
UNLOADING CYLINDER HOUSING
OIL STRAINER
SET OF SEALING/DOVWY RING
MAGNETIC PLUG ASSEMBLY
COUPLING PIN
CONDENSER ZINC PLUG
ROCKER FOR UNLOADING MECHANISM
OIL SEPERATOR
OIL CHARGING VALBR ASSEMBLY
COMPRESSOR FRONT & REAR BEARING ASSEMBLY
Ll UID LINE "Y" STRAINER
GASKET SET FOR CONDENSER
Suction Stop Valve 1*1/8"
Discharge Stop Valve 1*1/8"
Discharge pressure gauge for R- 134a Gas
High Pressure Switch / Cutout
Low Pressure switch I Cutout
il Pressure Switch / Cutout
hermostatic Expansion Valve
Solenoid Valve
Back Pressure Valve
Liquid Line sight Glass
Solenoid Valve
Non Return valve
Liquid Line sight Glass
hermostat for Cool Room
hermostat for Cold Room
Shock Mounts for compressor
ater Pressure Cut Off switch
16 Bar Qty 04 No, Range 2-1 to 21 Bar Qty 02 Nos Range 301
Ref Gas System (0 - 25 Kg/cm2)
Ref S/W System (0-6 Kg/Cm2)
Gas system pressure guage valve (1/4" brassomatic)
Gas S stem Valves 3/18"
ELECTRICAL
BEARING 6310
MAIN CONTACTOR
CONTACTOR KIT
TIME DELAY RELAY
INDICATION LAMP
ROTARY SWITCH
FUSES 100A
TIMER
POWER SUPPLY MODULE
RF MODEM
MEDIA CONVERTER
PATCH CORD
SWITCH -8 PORT
MIC PRE AMPLIFIER
RELAY PANEL
INPUT INTERFACE CARD
RELAY PANEL PCB
HAND HELD MICROPHONE WITH PRE AMP AND 7 PIN CONNECTOR
LOUD SPEAKER 4W(NWT) PAN 9604
LOUD SPEAKER 4W PAN 9602
LOUD SPEAKER 4W PAN 9601
LOUD SPEAKER 1W(NWT) PAN 9608
HAND HELD MICROPHONE WITH (PREAMPLIFIER)
LINE INTERFACE CARD
RELAY PANEL
INPUT INTERFACE CARD
RELAY PANEL PCB
LOUDSPEAKER 4W PAN 9608
LINE INTERFACE CARD
HAND HELD MICROPHONE
L/S 1/2/4W(NWT)
PCB ASSY III SRE/MB
3- POLE 3-WAY JB
3- PIN MICROPHONE
ALARM POINT (AUDIOCOM)
HEADSET CONNECTION BOX
DISPLAY CONTROLLER CARD
CABLE CONNECTOR (PATCH CORD)
BASE PLATE FOR JB & SPEAKER
SPEAKER 4W (NWT)- AHUJA
CONTROL UNIT PCB
IF/AF PROCESSOR PCB
SYNTHESIZER PCB
HF UNIT PCB
PROCESSOR
ADAPTER IF
INTERFACE
POWER SUPPLY UNIT
GH 890 LINE CURRENT SOURCE
FUSE TL 250V 0.63 A
FUSE TL 250V 1.25 A
HF RECIEVER
I/O CONTROLLER CARD
LAN CONTROLLER CARD
MUX/DEMUX CARD
VDIC- ITU CARD
VDIC - CCT CARD
VDIC - RAD - SER
PCB ASSY FOR AF MONITORING UNIT
PCB ASSY FOR RADIO RELAY UNIT
PCB ASSY FOR HF POWER MONITORING UNIT
PCB ASSY FOR INTERCOM UNIT
PCB ASSY FOR DISPLAY BOARD (CCT - ITU)
PCB ASSY CONTROLLER BOARD (CCT - ITU)
PCB ASSY SIGNAL SWITCHING BOARD
LED BOARD (CCT - ITU)
SIGNAL SWITCHING BOARD
CONTROLLER CARD
DISPLAY BOARD
LED BOARD
OBS FOR INTELLIGENTER (ITU)
OBS FOR CONCENTRATOR
OBS FOR ETHERNET ROUTING SWITCH
OBS FOR INTELLIGENT TERMINAL UNIT (ITU)
BUC 16W KU BAND EXTENDED LINEAR
CCU WITH BDMX FOR ONE SYSTEM
WIDE BAND LNB KU-BAND
INTER CONNECTION CABLE
MODEM
NETWORK ACCELERATOR
ROUTER 1841
VOIP GATEWAY 2811
SPECTRUM ANALYSER
RUKMANI BUC
SATELLITE MODEM
RUKMANI CCU
DIGITAL LINK CABLES
TOOL KIT
ROUTER1841
BEARING 6205ZZ
FUSES 10A
LAMP 230V/65W
LAMP 24V/40W
TOGLE SWITCH 5A
TRIMMER
ROTATING RACTIFIER ASSEMBALY
RRA DIAODE (SIX SET)
ALL LUGS
BEARING 6310
BEARING 6312
BEARING 7212
TIMER
HAND CHANGE OVER SWITCH
CONTACTOR KIT
CONTACTOR
ROTARY SWITCH
FUSES 32A
INDICATION LAMP
BEARING 6310ZZR
TIME DELAY RELAY
CONTACTOR
INDICATION LAMP
ROTARY SWITCH
GOVERNOR CONTROL SWITCH
EARTH FAULT PCB
KW METER
EARTH FAULT PCB
SMOOTH CHANGEOVER PCB
BUC CONTACTOR
800A MCCB
VOLT METER
ROTARY SWITCH
INDICATION LAMP
FUSES 10A
BARING 6206ZZ
BIMETALLIC OLR 4.5A-7.4A
LIMIT SWITCH FOR TRAVERSE
SWITCH FUSE UNIT
CONTACTOR 70AMPS
TIMER DELAY RELAY
BEARING 6209ZZ
SWITCH FUSE UNIT
BEARING 6209ZZ
SWITCH FUSE UNIT
MAIN CONTACTOR
FUSES 100A
INDICATION LAMP
MAIN ROTARY SWITCH
BEARING 6209ZZ
MCB D.P 32A
INDICATION LAMP
SWITCH FUSE UNIT
MAIN CONTACTOR
FUSE 20MM 50 MILLI AMPS
FUSE 20MM 4 MILLI AMP
FUSE 4AMP SEMI DELAY
FUSE SIZE 0 20AMP
IF COIL KAC6184A
IF COIL KANK3335R
SYNTHESIZER MODULE
REMOTE CONTROL MODULE
L/S 0.5W, 8 OHM
ZENER DIODE 5.1V, 0.4W
RECEIVER MODULE 3
MASTER PROCESSOR UNIT
AF POWER AMP
INTERFACE MODULE
RELAY 12V DC 1.25A
TX CONTROL CARD
RX IF AND AUDIO
FRONT PANEL ASSY
IF COIL KAC6184A
SYNTHESIZER CARD
REMOTE CONTROL CARD
RF RF CARD
RX IF CARD
FRONT PANEL ASSY
REAR PANEL ASSY
FILTER COUPLER ASSY
POWER AMLPLIFIER
ECCM FILL GUNWITH OPERATING MANUAL
WIDE BOARD DUMMY LOAD
POWER SUPPLY MODULE
RF MODEM
MEDIA CONVERTER
PATCH CORD
SWITCH -8 PORT
EXTENDER CARD
POWER SUPPLY +5V
POWER SUPPLY +15V
MICRO PROCESSOR AND RS422 CARD
DRC CARD
B.A. CARD P
DISCRETE CARD
DISPLAY CARD
MICRO CONTROLLER CARD ASSEMBLY
FD CARD ASSEMBLY
CALIBRATION CARD ASSEMBLY
ANALOG INTERFACE CARD ASSEMBLY
OSCILLATOR CARD ASSEMBLY
OSCILLATOR AMPLIFIER CARD ASSEMBLY
FUSE 2A
MICRO SWITCH
LINE FILTER
COOLING FAN
FUSE 6A
FUSE 1A
POWER SUPPLY +5V, 30W
POWER MODULE
EXTENDER CARD
CPU PCB (RS 422/485)
I/O PCB AUTO PILOT
FUSE T 2A 250V
POTENTIOMETER
SWITCH
SWITCH, 1 POLE
POWER FILTER,3A 250V AC
TILLER NFU
MICRO SWITCH
SENSOR PART FOR FEED BACK UNIT
SENSOR PART FOR FEED BACK UNIT
FU AMPLIFIER, SOLID STATE
SIGNAL PCB FOR OVER RIDE SIGNAL UNIT
DIMMERSTAT COIL
PHASE FAILURE PCB
GLASS FUSE HOLDER
SILICON DIODE ALONG WITH HEAT SINK
LAMPS
AMPERE TURN METER
PLATINUM TITANIUM ANODE
INPUT MCB
OUTPUT MCB
POWER SUPPLY CARD
SMPS MODULE
SERVO AMPLIFIER PCB
SERVO AMPLIFIER PCB
POWER SUPPLY PCB
INCANDESCENT LAMP 24 V DC
NEON LAMP 24 V DC
PUSH BUTTON 1 NO. GREEN BUTTON
PUSH BUTTON 1 NO RED BUTTON
TOGGLE SWITCH
AUTO/MANUAL SWITCH
SHOCK MOUNTS
SYNCHRO
MOTOR TACHO GEAR HEAD
DIODE
RESISTOR 56 OHMS,10W
CENTRE PIVOT FOR AZIMUTH DEVICE
RUBBER GASKETS & FILLING SCREW GASKETS
PIVOTS
ADDITIONAL PANEL MOUNTED AC DIMMER
SUPPORTING LIQUID
FRONT PANEL PCB
POWER SUPPLY CARD
TAKE-UP MOTOR
SUPPLY MOTOR
PRINTER HEAD
TRANSDUCER 33KHZ
TRANSDUCER 210KHZ
TRANSDUCER 12 KHZ
CASING TRANSDUCER 33KHZ
CASING TRANSDUCER 210KHZ
CASING TRANSDUCER 12 KHZ
SUPPORTING LIQUID 148162
STEP MOTOR,COMPL
OUTER SPHERE PCB
RUBBER SEALS OF GYRO
HINGE
REPEATER
RELAY MODULE 120VAC/DC2XWS
FUSE 1A MT G250V
FUSE 10A T L250V
12V, 65 AH MAINTANANCE FREE BATTERY
1 KVA UPS
HEATER COMPL
SUPPORTING LIQUID (1000ml)
DISTILLED WATER (250ml)
FILLER PIPE
TEMP FUSE(TCO)
SET OF GASKET
TOOTHED BELT
POWER SUPPLY DC
HEADING SPEED PCB
12V POWER SUPPLY
CPU-PCB, PROGRAMMED
STD 20 EXTENSION PCB
POWER SUPPLY UNIT DC E01
POWER SUPPLY UNIT 12V
INTERFACE ELECTRONICS
TRANSFER MODULE RS422
FILLER GROUP
TRANSFER MODULE SERIAL
DC/DC MODULE GYRO
TRANSFER MODULE STD20M
TRANSFER MODULE HEADING/SPEED TMC
DSC PCB PROGRAMMED
COURSE PCB PROGRAMMED
POWER UNIT
BEARING REPEATER COMPASS
BEARING TELESCOPIC SIGHT
REPEATER COMPASS 133-556 STEPPING MOTOR WITH CARDS
DVR UNIT
PAN/TILT CONTROLLER
DISPLAY
CAMERAS
DC VOLT REGULATOR
SPARE PCB FOR CAMERA
WIPER BLADES FOR WEATHER PROOF HOUSING
RG 59 VIDEO CABLE
CABLE TRAY 100MM WIDTH
8 CORE LAN CABLE
SEMI CONDUCTOR FUSE
DIODE 150A
LED LAMP 12V DC
THYRISTOR
CONTROL CARD
LED LAMP 24V DC
FUSE LINK 2A
COCHIN SHIPYARD LIMITED (BID ID -3346777)
hindustan shipyard limited (BID ID -3346659)
COCHIN SHIPYARD LIMITED (BID ID -3346777)
hindustan shipyard limited (BID ID -3346659)
COCHIN SHIPYARD LIMITED (BID ID -3346777)
hindustan shipyard limited (BID ID -3346659)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid