Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
8 Mar 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
COMMANDANT B SABARISH
HEADQUARTERS COAST GUARD DISTRICT NO.1, PORBANDAR
DEFECT RECTIFICATION ON VARIOUS DEFECTS ONBOARD ICGS C-445
2022_ICG_511477_1
344/445/07/21-22
Limited
Miscellaneous Services
Turn-key
60 days
HEADQUARTERS COAST GUARD DISTRICT NO.1
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
9 Mar 2022
2 Mar 2022
9 Mar 2022
2 Mar 2022
8 Mar 2022
2 Mar 2022
90 days
Amount
H-036: Bridge door hydraulic ram broken. To be renewed as per sample (Mat – SS). Defect to be rectified and proved for satisfactory performance. All in way jobs included.
L-028: Ships fire/bilge pump (Make-SPX/KGENFN 15-16, 5.5 KW) not working due to low insulation of winding w.r.t. R,Y, B. Further, DI/DR carried out by ship’s staff and found contactor blow out, suspect motor winding may be grounded. Defect to be rectified and system to be proved for satisfactory performance. All in way job included.
H-040: 02 in nos. bridge window wiper were corroded and broken. To be renewed as per sample.
H-042: 01 in no. bridge door locking catch removed from base. To be renewed as per sample (Mat-SS).
H-043: 01 in no. Transparent acrylic flag locker, door hinges and lock broken and placed at flag deck. To be fabricated as per sample with securing arrangement {Mat: Transparent acrylic sheet (Thickness-8MM) length-2.5 FT, Width-2 FT breath-8 Inch}
L-032: Main Engine battery charger and DA battery charger (Make- Master volt, Model- Mass 24/25) malfunctioning. Suspect AC to DC convertor defective. Defect to be rectified and proved for satisfactory performance. All in way jobs included.
L-038: Ship’s boat davit (Hemant Engineering) is not working. Suspect motor break is malfunctioning and system to be proved for satisfactory operations. All in way jobs included.
H-045: 01 in no. Deck washing machine hose damaged and broken. Defective hose to be repaired/renewed as per sample. Defect to be rectified and system to be proved for satisfactory performance. All in way job included.
H-047: 03 in nos. Toilet faucet shower and release hose pipe are leaked and damaged. Defect to be rectified and system to be proved for satisfactory performance. All in way job included.
E-031: Main Engine Stbd sea chest valve opening and closing gear mechanism (Material-MS) stuck in position. DI/DR carried out by ship’s staff and suspected valve opening and closing gear mechanism chocked. Overhauling of gear mechanism to be carried out and system to be proved for satisfactory performance. All in way job included.
L-033: Ship’s steering wheel in bridge not retaining zero position. Suspect malfunctioning of spring mechanism. Defect to be rectified and system to be proved for satisfactory performance. All in way jobs included.
L-034: Insulation of shore supply cable (Make- Unika, Length- 50 Mtrs, 4 core, 50 sq-mm, Type- Non-Armoured, rating- 200Amps, Mat- Copper) is not able to take onload view insulation peeling off from various places. The cable to be rectified and made operational.
L-035: Ship’s Humphree servo motor 1 & 2 (Make – Sweden, SU 201) not working. DI/DR carried out by ship’s staff and suspected servo motor’s PCBs may be defective. Defect to be rectified and system to be proved for satisfactory performance. All in way jobs included.ations.
L-037: Ship’s Loud Haller (Make: HPA-60) is not working. DI/DR carried out by ship staff and suspected speaker of loud haller may be defective. Defect to be rectified and system to be proved for satisfactory performance. All in way job included.
H-049: 09 in nos. Fire extinguishers are due for annual servicing as on 16 Feb 22. Following jobs to be carried out:- (i) Servicing and recharging of 06 nos. 9 Ltrs AFFF extinguisher. (ii) Serving and recharging of 03 in nos. DCP extinguisher.
L-028 : Ship’s fire/bilge pump (Make- SPX/KGENFN 15-16,5.5 KW) not working due to insulation of winding w.r.t. to R,Y,B. Further, DI/DR carried out by ship’s staff and found contractor blow out, suspects motor winding may be grounded. Defect to be rectified and system to be proved for satisfactory performance. All in way job included.
VYAS AND SONS ENTERPRISE
MITRA MARINE WORKS
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .