Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-Finance 16 1 1 1 H 71 B B GHOSH SARANI KOLKATA 67 WEST BENGAL | KOLKATA | KOLKATA | WEST BENGAL | 700067 | ₹5.1 L | L1 | Accepted-Finance L1 |
| 2 | L2₹5.4 LRejected-Finance 1 1E KHODAGONGE ROAD KOLKATA 700 010 | KOLKATA | KOLKATA | WEST BENGAL | 700010 | ₹5.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹5.6 LRejected-Finance 17 23 K P ROY LANE KOLKATA 700 031 | KOLKATA | KOLKATA | WEST BENGAL | 700031 | ₹5.6 L | L3 | Rejected-Finance L3 |
Tender Value
₹5.4 L
EMD Value
₹10,797
Closing Date
14 Aug 2026, 6:00 pmClosed
General Manager (Electrical)
Hidco Bhaban Kolkata-156
Non Comprehensive Annual Maintenance Contract AMC for Electrical HVAC and ELV Systems Installed at Smart Work Space Newtown Kolkata under WBHIDCO
2026_HIDCO_1035608_1
HIDCO/GM (Elec)_eNIT-17/2026-27
Open Tender
Support/Maintenance Service
Percentage
365 days
New Town Kolkata
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹10,797
24 Aug 2026
31 Jul 2026
17 Aug 2026
31 Jul 2026
14 Aug 2026
3 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Day to day operation and maintenance of Electrical, HVAC, and ELV Systems Installed at Smart Work Space. The engaging 1 (One) No. Skilled as per declaration of EIC. All labour payment should be maintain as per labour commission order No 38/Stat/14/RW/24/2023/LCS/JLC of Dt. 04.12.2024 including PF,ESI, and Bonus,PF,ESI,& Bonus paid separatly by the agency as per rule. should be equipped with all types of instruments including
tools,tackels.The defective Spares as & when required to the supplied by the department.
Additional Labour charge will not be
Entertained for replacement of Spare Parts. | 365 | Per Day | 650.93 | ₹2,37,589.45 |
| 2 | Day to day operation and maintenance of Electrical, HVAC, and ELV Systems Installed at Smart Work Space. The engaging 1 (One) No. Semi-skilled as per declaration of EIC. All labour payment should be maintain as per labour commission order No 38/Stat/14/RW/24/2023/LCS/JLC of Dt. 04.12.2024 including PF,ESI, and Bonus,PF,ESI,& Bonus paid separatly by the agency as per rule. should be equipped with all types of instruments including
tools,tackels.The defective Spares as & when required to the supplied by the department.
Additional Labour charge will not be
Entertained for replacement of Spare Parts. | 365 | Per day | 592 | ₹2,16,080 |
| 3 | Added GST@18% and Cess @1% | 1 | Each | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
BOQ_2543916.xls
BOQ • 0.26 MB
2911_Form.pdf
Tender Documents • 0.66 MB
GTC.pdf
Tender Documents • 0.56 MB
STC.pdf
Tender Documents • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].