Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.4 LAccepted-AOC | L1 | Accepted-AOC LOWEST TENDER QUOTED | |
| 2 | L2₹13.3 L+₹83,919 (6.76%)Rejected-Finance | L2 | Rejected-Finance OTHER THAN LOWEST TENDER | |
| 3 | L3₹14.5 L+₹2.1 L (16.7%)Rejected-Finance | L3 | Rejected-Finance OTHER THAN LOWEST TENDER | |
| 4 | Rejected-Technical | - | Rejected-Technical not Qualified |
Tender Value
₹13.8 L
EMD Value
₹14,000
Closing Date
16 Dec 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Divisional Engineer(H) C and M, Trichy
O/o. the Divisional Engineer(H) C and M, TVS Tollgate, Tiruchriappalli-620 020.
Preparation of Detailed Project Report for the Formation of Bypass to Manachanallur town (Phase II) Km 0/0-2/830 starting at Km 2/2 of Tiruchirapalli - Thuraiyur road (SH 62) and ends at Km 2/2 of Samayapuram- Keelakannukulam(via) Mnlr-Thirupanjili
2021_HWAY_215143_1
TN26/2021-22/SDO/02
Open Tender
Consultancy
Percentage
180 days
Manachanallur
As per Tender Document
5 documents required · 5 mandatory
₹0
₹14,000
22 Mar 2022
27 Nov 2021
20 Dec 2021
27 Nov 2021
16 Dec 2021
27 Nov 2021
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reconnaissance Survey & Inception Report | 2.83 | Kilo Metre | 4,200 | ₹11,886 |
| 2 | Topographic Survey including fixing of GPS pin | 2.83 | Kilo Metre | 12,600 | ₹35,658 |
| 3 | Conducting survey for L.S. & C.S. | 2.83 | Kilo Metre | 2,625 | ₹7,428.75 |
| 4 | Fixing Horizontal Alignment and Vertical Alignment as per IRC standards | 2.83 | Kilo Metre | 1,575 | ₹4,457.25 |
| 5 | Conducting 7-days traffic volume study at 4 locations | 2 | Numbers | 26,250 | ₹52,500 |
| 6 | Conducting Origin- Destination study at 4 locations | 3 | Numbers | 15,750 | ₹47,250 |
| 7 | Clearing the light jungle to a width of 30m | 50,940 | Square metre | 4.1 | ₹2,08,599.3 |
| 8 | Soil sample collection and conducting atterber limits and CBR for road work | 6 | Numbers | 7,686 | ₹46,116 |
| 9*Only if applicable Exploratory Bores at the locations of interchanges, Bridges, ROB's etc., and other cross Drainage works | |||||
| 9.01 | Sub soil exploration machine boring | 50 | Running Metre | 2,359.94 | ₹1,17,997 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
Tender Document • 0.13 MB
DPRMNLRretenderDocument.pdf
Tender Document • 0.38 MB
BOQ_254677.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .