Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance B 10 KRISHNA INDUSTRIAL ESTATE OPP B I D C GORWA ESTATE VADODARA 390016 GUJARAT | VADODARA | GUJARAT | 390016 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹2 L
Closing Date
16 Aug 2021, 9:00 amClosed
CE AF ALD
HQ CE AF ALD
consultancy services of addl alternationto miniature range with night firing facilities and moving target at AF Stn Bareilly
2021_MES_452576_2
953001/EP/Q/06/E3
Open Tender
Consultancy Services
Lump-sum
45 days
HQ CE AF ALD
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
20 Sept 2021
2 Aug 2021
17 Aug 2021
2 Aug 2021
16 Aug 2021
2 Aug 2021
Amount
Additional/ Alternation to miniature range with night firing facilities and moving targets at AF Stn Bareilly:- (a) Scope of work includes following structure,(refer Arch drgs for details:- (i) Mini first aid room, workshop service room and range store – RCC framed structure. (ii) Airmen briefing room – RCC framed structure. (iii) Firing point , Ammunition allotment room and central panel room – RCC framed structure. (iv) Butt wall with I class burn clay bricks in cement mortar 1:4, as shown in Arch drg. (b) Preparation and submission of:- (aa) Structural designs & drgs including structural details, structural notes conforming to standards IS-456, IS- 14458, IS-816, IS-875, IS-1893, IS-2062, IS-4326, IS-13920, IS- 2212(1991), IS- 1077(1992) and any other latest and relevant Indian Standard of the building as per the arch drg provided. Details for parameters for structural including Dimensions and P.A. The design shall include the following parameters:- (ba) Reinforcement steel shall Fe-500/500D/Fe550D grade TMT bars. The grade of concrete shall be M-25(design mix), laced reinforced concrete. (bb) Foundation shall be RCC isolated/combined footing/ Raft stilt fdn/ mat fdn as per requirement and existing site condition (bc) Seismic Zone – III Area Bareilly. (bd) SBC (Tentative) 70/80KN/Sqm (Tentative) at 1.5/2.0m depth. The actual SBC shall be given respectively by GE at later stage. The designer shall change the foundation detail after actual SBC is provided. No Extra claim shall be given for the same. (be) Butt wall is to be designed as a Retaining wall & should be structurally sound to take impact loads. Any other relevant details for structure details required shall be taken from Dir (Design)/ SO-1 (Design) of HQ CE(AF) Allahabad. (c) Preparation of detailed Estimate. (d) Supply of drawings, design calculations folders along with STAAD output file both in hard and soft copy-01 (Copy each).
(e) Drawing & Design shall be scrutinized/ approved by Dir (Design)/ SO-1 (Design) HQ CE (AF) Allahabad for their respective portion of the consultancy report. (f) The Estimate shall be scrutinized/ approved by the Dir (Contract), HQ CE (AF) Allahabad. (g) Scale & specifications for the Blast Pens shall be as per MES SSR-2009 and other superior scale with prior approval of CE (AF) Allahabad. (h) Supply of 01 set of original tracing hard copy (A1 size) on ‘Gateway’ brand tracing paper along with a soft copy of drawings, as directed. The design prepared by one designer shall be checked by another designer and both the persons shall sign the design calculations and drawings along with date. (i) The supplier shall give free of cost clarification, if any, during complete execution period of the building. (j) Any amendment required during execution shall be made by the consultant and requisite copies of amended sheets shall be submitted free of cost. (k) The designer shall discuss the preliminary design and drg before final structural design and drawings with Dir (Design) & SO-1 (Design) of HQ CE (AF) Allahabad. (l) The responsibility for the structural design & drawings prepared rests with the supplier. In case of any defect/ damage detected in the designed structure during, its design life and the same is attributed to faulty drawing/ design, the supplier will be liable for penalty of 10% of the total project cost.
(m) Third party vetting/ proof checking. The supplier shall be responsible for third party vetting/ proof checking from IITs/NITs/ other Govt Institute duly signed by authorised signatory on behalf of the institute and not from a professor/ individual of the institute in his personal capacity. The third party vetting the designs, drawings shall also be liable for ensuring that the designs & drawings are in compliance as per the laid down standards, regulations, adherence to NBC norms and sound engineering practices. The bidder is responsible for obtaining clarification from the vetting agency till the completion of project. (n) A certificate that all details have been thoroughly checked and are in compliance to standards, codes, regulations in respect of safety, soundness and economy shall be obtained from the vetting agencies. (o) The bidder on being issued the Job Order shall send his architect & design team to HQ CE AF Allahabad to liaise with E2 Design Section to discuss and finalize the design parameters and obtain clarifications on any architectural and design issues. The date of visit of the bidder’s team shall be decided in consultation with the E2 Design Section of HQ CE AF Allahabad.
Integral Solutions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .