Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.7 LAccepted-AOC HIMACHAL PRADESH | SHIMLA | HIMACHAL PRADESH | 171001 | ₹8.7 L | L1 | Accepted-AOC As per commitee |
| 2 | L2₹9.5 LRejected-Finance GOVT E CONT VILL PATAN PO MATLAHAR TEHSIL JAWALI DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹9.5 L | L2 | Rejected-Finance Rates Quoted Higher Than L1 |
| 3 | L3₹10.1 LRejected-Finance | ₹10.1 L | L3 | Rejected-Finance Rates Quoted Higher Than L1 |
| 4 | L4₹10.5 LRejected-Finance VPO BARI TEHSIL FATEHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹10.5 L | L4 | Rejected-Finance Rates Quoted Higher Than L1 |
Tender Value
Refer Docs
EMD Value
₹11,210
Closing Date
19 Jan 2026, 9:00 amClosed
Sr. Executive Engg. HPSEBL ED FAtehpur
Sr. Executive Engg. HPSEBL ED FAtehpur
Tender for prov. SOP to PWD dept.. by shifting 11KV HT line, LTline and 25KVA transformer in section Sathana ESD Rey.
2026_HPSEB_125394_1
FED-71/2025-26
Open Tender
Supply and Erection
120 days
ESD REY
as per SBD
3 documents required · 3 mandatory
₹590
₹11,210
29 Jan 2026
9 Jan 2026
19 Jan 2026
10 Jan 2026
19 Jan 2026
10 Jan 2026
10 Jan 2026 - 19 Jan 2026
Prov.Steel Tubular Poles (9 m, Working Load > 200 kgf/m²)
Prov.Muffs with concerete filling
Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov.MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA's
Prov.X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Prov.X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
Prov.X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
Prov.MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
Prov.MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
Prov.MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
Prov.MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
Prov.MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
Prov.GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
Prov.D.O Fuse Unit
Prov.Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov.Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Prov.Stay set complete
Prov.Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)
Prov.Pipe Earthing Set
Prov.LT Distribution Panel Box With MCCB(40A, 25KA, 4P) & SFU(16A, 4No, rewirable)
Prov.Half Clamp (M.S. Flat 50X6 mm)
Prov.Full Clamps (M.S. Flat 50X6 mm)
Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov.Aluminium Thimble
Prov.Copper Thimble (35mm2)
Prov.Danger Plate
Prov.Barbed Wire
Prov.LT Cable (3.5 Core) 120 mm²
Prov.Energy Meter 3-ɸ, 4 wire CT operated Static Tri-Vector meter with Box(CT-200/5A)
Prov.Aluminium Paint.
Erection of 11/.4KV 25 KVA transformer completed in all respects.
Prov. Transportation of DTR and associated material
Prov. Transportation of DTR and associated material
Prov.Steel Tubular Poles (11 m, Working Load > 227 kgf/m²) (with Ruling Span 90 m, 8 No. Run thro' and 3 No. Double Pole Dead End Structures)
Prov.Muffs with concerete filling
Prov.Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure
Prov.Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
Prov.Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
Prov.11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
Prov.Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
Prov.X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
Prov.X-Arm (Horizontal) - MS Channel Iron: 100X50x6, Length: 2340 mm x 2 No.] ∆ Formation
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)
Prov.11 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
Prov.Stay set complete in all respect (1No. / Single Pole , 4 No. / Double Pole Structures)
Prov.Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
Prov.HT Earthing set complete (REC Constr. Stand. J-1)
Prov.Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 1% (Sag and wastage)} @ 0.102 kg/m
Prov.Eye Hook for earth wire
Prov.Earth Wire Clamp
Prov.Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]
Prov.Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]
Prov.Danger Plate (250X200X1.6 mm)
Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov.Barbed Wire
Prov.Red Oxide
Prov.Aluminium Paint
Prov.GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm
Prov.GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
Erection Charges of Conductor 50mm2 (6/1/3.35mm2) including laying, stringing and sagging a/w binding with insulators complete in all respects
Erection Charges of GI Wire including laying, stringing and sagging a/w binding with insulators complete in all respects
Erection Charges of Single Poles 9 Mtr
Erection Charges of Double Poles 9 Mtr
Erection Charges of HT Stay
Erection of HT Earthing
Erection of G.O switch and D.O Fuse unit
Prov. transportation of associated material in 11KV HT line
Prov.Conductor AAAC 7/3.15 mm2
Prov.Steel Tubular Poles 9 Mtr
Prov.Muffs with concerete filling
Prov.Angle Iron (75x40x6) [Length- 600mm]
Prov.Shackle Insulator (16 kN)
Prov.D-Iron (U- Clamps)
Prov.LT Stay Set (i/c stay clamp)
Prov.Stay Wire (7/3.15 m) (6.0 kg Per Stay Set)
Prov.Full Clamps [ 2 No for A.I + 1 No for Stay Set]
Prov.Earth Wire (GI, 8 SWG)
Prov.Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mmΦ or more (with flat and spring washers)]
Prov.AluminiumPaint
Prov.Red oxide
Erection Charges of Conductor (7/3.15mm2) including laying, stringing and sagging a/w binding with insulators complete in all respects
Erection Charges of GI Wire including laying, stringing and sagging a/w binding with insulators complete in all respects
Erection Charges of ST Poles
Erection Charges of LT Stay
Prov. transportation of associated material in LT line
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
SBD.pdf
Tender Documents • 2.79 MB
BOQ_184663.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid