Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 CrAccepted-AOC | ₹2.4 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹4.3 Cr+₹2.0 Cr (83.3%)Rejected-AOC 5TH FLOOR KAILASH BUILDING 26 K G MARG CANAUGHT PLACE CENTRAL DELHI DELHI 110001 | NEW DELHI | DELHI | 110001 | ₹4.3 Cr+₹2.0 Cr (83.3%) | 2 | Rejected-AOC L2 |
| 3 | Not Admitted-Fee 651 KIRAN ARCADE 1ST FLOOR 13TH CROSS 27TH MAIN HSR LAYOUT BENGALURU 560102 | BENGALURU URBAN | KARNATAKA | 560102 | - | - | Not Admitted-Fee Others-Non Responsive in Pre Qualification Criteria |
| 4 | Not Admitted-Fee | - | - | Not Admitted-Fee Others-Non Responsive in Pre Qualification Criteria |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
14 Sept 2023, 3:00 pmClosed
Superintending Engineer
office of Superintending Engineer, Contracts and Monitoring, Chennai Metropolitan Water Supply and Sewerage Board (CMWSSB), 4th Floor, No.1, Pumping Station Road, Chintadripet, Chennai 600 002.
Request for Proposal Appointment of Consultancy firm for Preparation of Feasilbility Report for Extending the Services of CMWSS Board to the entire Chennai Metropolitan Area (CMA) beyond Greater Chennai Corporation (GCC) Area.
2023_CMWSS_352721_1
CNT/WSS/NCB/MWB/3550/2023-24
Open Tender
Support/Maintenance Service
Item Rate
365 days
chennai
Refer Tender Document
10 documents required · 10 mandatory
₹0
₹1.3 L
Chennai
24 Jul 2024
1 Aug 2023
15 Sept 2023
1 Aug 2023
14 Sept 2023
15 Aug 2023
11 Aug 2023
Amount
Form F5 - Schedule of Prcie Bid
Form F5 - A-1 Cost Estimate of Services
I.Remuneration to Staff
Key Professional
Team Leader
Water Supply Expert
Used Water Expert
Municipal Finance Expert
Valuer
Legal Expert
GIS Expert
Support staff
Structural Expert
STP Process Expert
Electro-Mechanical Expert
CAD Engineer (2 Nos - 6 months)
Quantity Surveyor
Field Engineer (4 Nos- 6 months)
Out-of-Pocket Expenses
Office Administrative/ Support and Clerical staff for 12 months
Cost of maintenance of office premises including Electricity, Water, Safety etc. for 12 months
Cost of office equipments including maintenance
Cost of office consumables and communications for 12 months
Cost of monthly rental of 2 vehicle for 12 months (ie 24 Vehicle months) including fuel, Maintenance & Insurance, Driver cost and misc
Insurance & Others
Cost of printing and submission of documents
Inception Report
Interim Report
Draft Report
Final Report
Others ( if any mention in the annexure enclosed)
WAPCOS LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .