Loading…
Loading…
Tender Value
₹7.7 L
EMD Value
₹7,710
Closing Date
15 Apr 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Chief Officer Bhuj Nagarpalika
Providing, Supplying and Fixing 300 mm Dia. Drainage RCC NP-3 Pipe Line At Prabhu Nagar, Ward No.08, At Bhuj - Kutch
292713
2025-26
Open
Civil - All
Kutch
2 documents required · 2 mandatory
₹900
Chief Officer, Bhuj Nagar Palika
₹7,710
2 Apr 2026
2 Apr 2026
2 Apr 2026
15 Apr 2026
2 Apr 2026
NAME OF WORK :- Providing, Supplying and Fixing 300 mm Dia. Drainage RCC NP-3 Pipe Line At Prabhu Nagar, Ward No.08, At
Quantities Tendered Rate Total Amount
Quantities Tendered Rate Total Amount
Item of work Unit according to
Rate in Figure estimated quantities
RCC NP-3 300 MM DIA PIPE LINE
Providing and supplying ISI Standard R.C.C. pipes(of Sulphate Resisting
Cement) in standard lengths of following class and diameter suitable for
either collar joints or rubber ring joints including all taxes, insurance,
transportation, freight charges, octroi, inspection charges, loading,
unloading, conveyance to departmental stores, stacking etc.
300 MM DIA RCC NP-3
Providing , Suppliying and Fixing R.C.C. Precast M.H. Frame and Cover in C.C.M-
10.00 200, M.S. angle & M.S. Bars as per Drawaing Suitable for 50 Cm opening. 1121.00 NOS
Frame suitable for 50cm opening of MH
10.00 Cover suitable for 50cm opening of MH 1173.00 NOS
Excavation for pipe line trenches for water supply, sewerage line, manhole etc.
all with shoring and struting if required as per required gradient and line
including safety provisions using site rails and stacking excavated stuff including
55.08 up to all required lead cleaning the site etc. complete for all lifts and strata as 102.35 CMT
specified. Upto 1.50 mt depth
a)Excavation for pipe line trenches 0 to 1.5 m Depth Ordinary soil & Soft
55.08 b) Hard murrum 155.25 CMT
220.32 c) Soft Rock 187.45 CMT
82.62 d) Hard Rock / C.C Road 427.80 CMT
Excavation for pipe line trenches for water supply, sewerage line, manhole etc.
all with shoring and struting if required as per required gradient and line
275.40 including safety provisions using site rails and stacking excavated stuff including 205.85 CMT
up to all required lead cleaning the site etc. complete for all lifts and strata as
specified. Upto 1.50 to 3.0 mt depth
Quantities Tendered Rate Total Amount
Quantities Tendered Rate Total Amount
Item of work Unit according to
Rate in Figure estimated quantities
Lowering, laying and jointing R. C. C. pipes in C. M. 1:1 1/2 of following diameters
225.00 in proper position, grade and alignment at all level as directed by Engineer-in- 136.85 RMT
charge including conveyance from stores to site of work, labour, giving hydraulic
testing as per ISI code. 300mm dia RCC NP-3 Pipe
Refilling the pipeline trenches incl. ramming, watering, consolidating desposal of
surplus stuff as directed within a radius of 3 km.
Providing and constructing Sewer manholes, scraper manholes and unit house
connection chamber, as per the type design in brick masonry in C. M. 1:5 and
inside and outside 20mm thick plastering in C. M. 1:3 necessary 100 mm coping
with reinforcement in R.C.C.M. 200 fixing C. I. steps and fixing manhole frame
10.00 and covers (But excluding supply of manhole frame and covers) over manholes 24283.40 NOS
and house connection chambers and fixing Manhole covers (but excluding
supplying of manhole covers) over scraper manhole etc. complete, providing and
fixing safety chain wherever necessary as per the stipulations in the type design
complete as per latest CPHEEO manual. (excl. excavation). 1) Manhole type "B"
Extra butbeyond
but upto 4.0 M depth for "B" type manhole above. 14159.95 NOS
Note : gst will be paid as per government rules.
I/We am/are willing to carry out the work @............... % above/below ( Percent should be written in figures and
words ) The tendered amount mentioned above amount of my /our tender works out as under
Tendered amount Rs……………………….. Tendered amount Rs………………………..
Add ……...% above Rs…………………. Deduct ……...% Below Rs………………….
(Please strike out which ever is not applicable )
All work shall be carried out as per public works department handbook and other specifications of division or as directed.
Rates quoted inclusive of clearance of sight (prior to commencement of work and at its close) in all respect
and hold good for work under all conditions , sight, moisture, weather etc
one percent labor cess will be deducted from the valued work done as per ' Bulding and other construction
work welfare cess act' G.R. No. GHR - 2005/04/CWA/2004/841/M-3 Dt. 31/01/2005
Signature of the Contractor.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Standard Bidding Document Book.pdf
2.Invitation.pdf
3. Sch-B.pdf
4Terms and Conditions..pdf
5.PQ Criteria.pdf
Download all tender documents and submit your bid