| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹25.3 L
Closing Date
19 Dec 2019, 10:00 amClosed
ASD
NAVAL DOCKYARD VISAKHAPATNAM
SR OF TUG AJRAL
2019_NAVY_298883_1
COM/0333/TUG AJRAL/SR OL-19/A
Open Tender
Marine Services
90 days
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹25.3 L
Yes
NAVAL DOCKYARD VISAKHAPATNAM
21 Feb 2020
18 Nov 2019
20 Dec 2019
18 Nov 2019
19 Dec 2019
28 Nov 2019
18 Nov 2019 - 19 Dec 2019
6 Dec 2019
HULL WORK PACKAGE 001 Docking- Vessel to be docked in both versions. Note 1:- Firms not to quote view docking, undocking and dock blocks preparation will be done by Navy and the job is required to be carried out in Navy Premises (i.e ND(V) slipway). Note 2:- Last Un dock -06 Mar 17
002 Hull Cleaning (a) Under Water and Boot Top Area HP jet clean entire under water area and boot top area (with a pressure not exceeding 3000 PSI) including ship side and remove the marine growth/barnacles and prepare for survey.(a) U/W area: 250 Sqm,(b) Boot Top area: 130 Sqm
002 Hull Cleaning (b) Fresh Water Gravity Tanks Manually clean two in no. Fresh water gravity tank and present for survey.
002 Hull Cleaning (c) Fresh Water Tanks Manually clean two in no. Fresh water gravity tank and present for survey.
002 Hull Cleaning (d)Foam tank Manually clean fire fighting foam tank and present for survey.
002 Hull Cleaning (e) Ballast Tanks Manually clean two in no. Ballast tanks and present for survey.
002 Hull Cleaning (f) Cable locker Manually clean Cable locker and present for survey.
002 Hull Cleaning (g) Fore Peak Tank, Manually clean two in no. Fore peak tank and present for survey.
002 Hull Cleaning (h) Machinery compartments Manually clean following internal compartments and present for survey. (i) Engine room (Bilges: 300 Sqm) (ii) SRP compt (Bilges: 120 sqm)
002 Hull Cleaning (j) Fuel Tanks Manually clean two in no. Fuel tanks and present for survey.
002 Hull Cleaning (k) RUTanks Manually clean two in no. RU tanks and present for survey.
002 Hull Cleaning (l) Lube oil tanks and dirty oil tanks Manually clean LO tank and dirty oil tank and present for survey.
003 Hull survey Visual survey External and Internal Hull survey. Carry out visual and hammer survey/UTG survey in accordance with NO 01/15 of under water hull , boot top area, above water hull, super structure, weather decks and all internal compartments(i.e. FW tanks, ballast tanks, fore peak tank, engine room, steering compartment, FO tanks, cofferdams, all stiffeners and deck fittings etc..All manholes to be inspected and repaired to ensure water tightness, chalk impression test to be carried out. Approx. area:3000 Sqm Firm to submit 07 copies of Hull survey report . Firm to prove the welds by non-destructive tests and by hose test on completion of welding
004 Hull survey UTG Survey External and Internal Hull survey Quote for UTG survey points at various locations .
005 Steel Renewals Quote for steel renewal at various locations as per survey report. Note 1:- Quoted repair cost shall include cost of both sides blasted and primed Grade `A’ quality ship building steel for shell and IS 2062 Grade `B’ quality steel for non structural works, degutting/regutting/ renewal of all obstructions in way of steel renewals including lagging/panelling, minor fittings/ equipments with their foundations, ventilation systems, staging etc., as indicated by survey team / RMT, proving of the weld runs by non-destructive tests and by hose test on completion of welding, pressure testing and proving of tanks where steel renewal undertaken etc. Note 2:- Firms to indicate cost of new panelling(2mm thick) and Lagging (2" MFMB) material in the budgetary cost for 50 sqm each.
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (a) 25 x 25 mm - 300 Nos
006 Build ups Carry out build ups as indicated by the Hull survey team/ Surveyor (b) 50 x50 mm - 150 Nos
007 Fairing Carryout fairing of deformed structures as indicated by Hull Survey Team/ Surveyor
008 Re-welding run Carry out re-welding runs on weld seams as indicated by Hull survey team/ QC/ RMT.
009 Sea tubes (a) Hydro jet blasting, survey and pressure testing of sea tube including sea chest to be carried out. Dia - 300mm
009 Sea tubes (b) carryout renewal of defective seatubes, OD-300mm, schedule 80.
010 Draught Marks Draught marks corroded/eaten away, to be renewed and painted. Both Roman and Numeric.
011 Sacrificial Anodes (a) Renew Sacrificial anodes (MK I-Nos-25) those consumed more than 50% Note:- Anodes Navy/COY supply.
011 Sacrificial Anodes (b) Renew Sacrificial anodes MK- V(15) those consumed more than 50% Note:- Anodes Navy/COY supply.
012 Surface preparation with Grit Blasting Under Water area including Boot top area (a) Spot blasting to SA 2.5 on paint damaged areas/ renewed plate areas as per the paint OEM rep recommendation for paint application. (areas include 'C' channel for rubber fenders)
012 Surface preparation with Sweep Blasting Under Water area including Boot top area (b) Sweep blasting to SA 1 on the rest of the underwater areas for removal of anti-fouling and applicationof tie coat and 03 coats of anti-fouling.
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Primer - penguard primer - 50 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anti Corrosive - Jotacote Universal (Aluminium) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anti Corrosive - Jotacote Universal (grey) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Tie Coat: Safeguard ES - 125 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (e) 5th Coat: A/F: Seaquantum Ultra(Brown/Light Red) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (f) 6th Coat: A/F: Seaquantum Ultra(Red Brown/Dark Red) - 150 microns
013 Painting - Jotun Scheme Under Water area including Boot top area Paint under water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (g) 7th Coat: A/F: Seaquantum Ultra(Brown/Light Red/ Black) - 150 microns
014 Surface Preparation Above Water Area and Bulwark (a) Carry out surface preparation with mechanical cleaning on above water area to ST3 standard under the suprvision of paint OEM.
014 Surface Preparation Above Water Area and Bulwark (b) Carry out surface preparation with sweep blasting on above area to ST1 standard for paint application as recommended by paint OEM.
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard primer - 50 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
015 Painting - JOTUN Scheme Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations: Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Jotamastic(Grey/ Red Brown) - 125 microns DFT
015 Painting - JOTUN Scheme. Above Water Area and Bulwark Paint above water area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top XP Grey - 60 microns DFT
016 Surface Preparation Super Structure and Deck Fittings . (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application.
016 Surface Preparation Super Structure and Deck Fittings. (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application.
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations: Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: primer - penguard primer -50 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 80 red brown - 125 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jotamastic 80 grey- 125 microns DFT
017 Painting - JOTUN Scheme Super Structure and Deck Fittings. Paint super structure area area with following paint scheme as per OEM recommendations:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Hard Top GREY 7040- 150 microns DFT
018 Surface Preparation Weather Decks and Fittings (a) Carry out mechanical cleaning to ST3 standard as per survey report of Paint OEM for paint application for entire weather deck, wheel house deck, flag deck and life raft deck.
018 Surface Preparation Weather Decks and Fittings (b) Carry out mechanical cleaning to ST1 standard as per survey report of Paint OEM for paint application for entire weather deck, wheel house deck, flag deck and life raft deck.
019 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer -50 microns DFT
019 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Jotamastic 87 of 200 microns
019 Painting - JOTUN Scheme Weather Decks and Fittings Paint weather decks and fittings with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Jota Armour Dark grey of 800 microns
020 Surface Preparation Internal Compartments (a)Fresh Water Tanks (02 Nos) and Fire fighting foam tank:- Carry out mechanical cleaning to ST1 standard as survey report of Paint OEM for paint application.
020 Surface Preparation Internal Compartments (b) Fresh Water Tanks (02 Nos) and Fire fighting foam tank:- Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: Penguard HB (white) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: Penguard HB(Grey) -100 microns DFT
021 Painting - JOTUN Scheme. Fresh Water Tanks (02 Nos) and Fire fighting foam tank Paint two in no. fresh water tanks and one fire fighting foam tank with following paint scheme:- Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Penguard HB (white) -100 microns DFT
022 Surface Preparation Tanks Fore Peak Tanks, Ballast Tanks(02 No), cable locker (a) Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
022 Surface Preparation Tanks Fore Peak Tanks, Ballast Tanks(02 No), cable locker (b) Carry out mechanical cleaning to ST 1 standard as survey report of Paint OEM for paint application.
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(02 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: primer - Penguard Primer -50 microns DFT
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(02 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive Balloxy (HB light) - 150 microns
023 Painting - JOTUN Scheme Fore Peak Tanks, Ballast Tanks(02 No), cable locker Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (c) 3rd Coat: Anticorrosive Balloxy (HB light) - 150 microns
024 Surface Preparation Machinery Compartments- Engine room and SRP (a) Carry out mechanical cleaning to ST 3 standard as per survey report of Paint OEM for paint application ( Bilges).
024 Surface Preparation Machinery Compartments -Engine room and SRP (b) Carry out mechanical cleaning to ST 1 standard as per survey report of Paint OEM for paint application (Bulkheads).
025 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme.Note:- Quoted repair cost shall be inclusive of cost of paints also (a) 1st Coat: primer - Penguard Primer -50 microns DFT
025 Painting - JOTUN Scheme Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (b) 2nd Coat: Anticorrosive - Jotacote Universal (Aluminium) - 150 microns DFT
025 Painting - JOTUN Scheme. Machinery Bilges Paint Bilges of Engine room and SRP compartment with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also (c) 3rd Coat: Anticorrosive - Jotacote Universal (Grey) - 150 microns
025 Painting - JOTUN Scheme. Machinery Bilges Paint bilges of Engine room and SRP compartment with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (d) 4th Coat: Penguard Top Coat - 50 microns.
026 Painting- Jotun Scheme. Machinery Compartments Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Penguard Primer - 50 microns DFT
026 Painting- Jotun Scheme. Machinery Compartments Bulkheads Of Engine Room And ASP Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (b) 2nd Coat: White interior fire retardant paint 100 microns DFT
026 Bulkead Painting. Painting - Jotun Scheme. Paint bulkheads of Engine room and SRP compartments with following paint scheme:- (c) 3rd Coat: White interior fire retardant paint 100 microns DFT
027 Cleaning and Application of Oil (a) Fuel Tanks Manually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks:- Note:- Quoted repair cost shall be inclusive of cost of oil also Fuel Tank (02nos) .
027 Cleaning and Application of Oil (b) RU (FODS) Tanks Manually scrap and clean to bare metal and apply two coats of OM 750 oil in following tanks:- Note:- Quoted repair cost shall be inclusive of cost of oil also RU Tank (02nos)
028 Surface Preparation LO tanks and dirty oil tank Carry out mechanical cleaning to ST3 standard as survey report of Paint OEM for paint application.
029 Painting - JOTUN Scheme LO tanks & dirty oil tanks Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (a) 1st Coat: primer - Tankguard HB-125 microns DFT
029 Painting - JOTUN Scheme LO tank & dirty oil tank Paint fore peak tanks,ballast tanks (02 in no.) and cable locker with following paint scheme. Note:- Quoted repair cost shall be inclusive of cost of paints also. (b) 2nd Coat: primer - Tankguard HB-125 microns DFT
030 Gratings Open underwater gratings, present for survey, carry out necessary repairs and refit back.
031 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and refitment. a) Chain cable (Dia 17.5mm)
031 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and b) Swivel piece
031 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting c) Lug less joining shackles
031 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and d) Cable stopper
031 Anchor and Anchor chain cable Anchor and Anchor chain cable and associated fittings are to be hydro jet blasted to bare metal, eased for free movement and to present for survey at NDV\MFAB Dept.Paint with black bituminous paint post survey IAW NO 12/2001 and refit back. Note : -The job involves removal of anchors and accessories, laying out for cleaning,painting and e) D Shackles
032 Anchor windlass Completely strip & overhaul anchor windlass (including lub oil renewals), renew brake linings, refit and prove for satisfactory operation. Note :- Overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. Oil-SYS-46/HP80
033 Capstan Completely strip & overhaul Capstan and prove for satifactory operation. Note :- Overhaul involves removal of drum, gearbox, brake lining, motor and ovrhaul of all these items and refitment. Oil-SYS-46/HP80
034 Bollards (a) Single bollards Following Single bollards corroded, thinned. Entire bollard to be repair/ renewed as per Hull survey report Single bollards, Size: 290 mm dia, 10 mm thickness, 1300 mm length. schdule-80 pipe
034 Bollards (b) Twin bollards FollowingTwin bollards corroded, thinned. Entire bollard to be repaired/renewed as per Hull survey report. Dia of bollard pipe 290 MM. Height of bollard 515 MM. Size of bollard base/ foundation1163X125X380 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1230X480X10 MM, thickness: 10 mm,
035 Large Twin bollards Large Twin bollards corroded, thinned. Entire bollard to be repaired/ renewed as per Hull survey report. Dia of bollard pipe 340 MM. Height of bollard 1400MM. Size of bollard base/ foundation1575X575X10 MM: , Thickness of pipe: 10 mm. Doubler plate size: 1575X575X10 MM , thickness: 10 mm, TRIPING BRACKET 150X10 MM
036 Mushroom head Mushroom type ventilators to be removed, cleaned/ overhauled and fitted back. Renew if required. (a) Details- Mush room head dia-1000 mm, Height-800 mm
037 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (a) SS taps ½’’
037 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (b)cu -ni supply pipes
037 Bathroom fittings Bathroom fittings damged/broken in crew bathrooms and master bathroom , to be renewed as per sample (c) Shower head
038 Key Fender (a) Head and stern key fenders perished/ cracked. Coaming plate, securing nuts/ bolts and partition plates in between fenders corroded, thinned and holed. All fittings to be renewed wherever damaged. Note: - All Head and Stern Key Fenders to be renewed with White colour fenders post preparation of the fender as per sizes. Specification - EPDM rubber as per NES 170 Top and bottom securing brackets/ plates and plate partition plates size: 130mm x 8mm thick
038 Key Fende (b) Removal of head and stern key fenders for hull survey and repiair/ renewal of partition plates, prepare the fender as per sizes and fitment of the fenders post renewal.
038 Key Fender (c) Head key fenders. Crossection size 250mmx250mm. Length of fenders varies between 729mm to 633 mm. Note: Quote for material only view services covered at sl (b)
038 Key Fender (d) Aft key fenders Crossection size 250mmx250mm. Length of fenders varies between 1126mm to 520 mm. Note: Quote for material only view services covered at sl (b)
038 Key Fender (e) Nuts and bolts - 20 mm dia, Length of bolt rod varies between 1225mm to 620 mm.
039 Tyre Fender Tyre fender damaged on P&S side, to be renewed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (a) Tyre fender OD-1000 mm ID -800 mm Width -350 mm
039 Tyre Fender Tyre fender damaged on P&S side, to be renewed with used aircraft tyre fenders moulded with 8 mm white natural rubber. Mat- Rubber, colour-white. No painting or coating of any other form will be permitted. Vendors to adhere to SoW (b) Tyre fender OD 750mm; ID 450 mm , width - 350 mm
039 Tyre Fender Tyre fender to be secured with 16 mm dia chain on ship side (c) Securing chains: 16mm dia(Mat-GI)
039 Tyre Fender Tyre fender to be secured with d shakles on ship side (d) D Shackles 16 mm dia(Mat-GI)
039 Tyre Fender Tyre fenders securing chain is to be pass through securing pipes (e) Securing pipes of dia 03 inch and length 500mm (Mat MS pipe of 06mm thick)
040 Bulwark coaming (a)Bulwark at various places dented/damaged. To be included in hull in survey and renew as per survey report. Thickness-6 mm
040 Bulwark coaming (b)Bulwark coaming pipes corroded and thinned. To be included in hull in survey and renew as per survey report. Dia 3 " schedule-80 pipe
041 Sky light (a) Sky light at various places damaged including glass. Skylight/port holes is to be repaired/renewed as per sample.
041 Sky light (b) Butterfly nuts. Sky light- SS butterfly nuts and tumbler bolt of engine room sky light &exhaust flaps broken. To be renewed. Dia of bolt : 18 mm & 6 inch length
042 Metalic half pipe fender Metallic half pipe fender around the shipside to be repaired/renewed. (a) size :50 mtrsx 150mm,50 mtrsx 160mm.a) 150 mm dia 10mm Thick
042 Metalic half pipe fender Metallic half pipe fender around the shipside to be repaired/renewed. (b) 160 mm dia 10mm Thick
043 Rubber beading. Rubber beading of doors at various places perished/cracked to be renewed and chalk test to be proved. (EPDM Rubber with shorehardness 50 + 5o A) (a) WT door
043 Rubber beading. Rubber beading of hatches at various places perished/crackedto be renewed and chalk test to be proved. (EPDM Rubber with shorehardness 50 + 5o A) (b) WT hatch
043 Rubber beading. Rubber beading of skylight perished/crackedto be renewed and chalk test to be proved. (EPDM Rubber with shorehardness 50 + 5o A) (c) Ventilator/Sky light
043 Rubber beading. Rubber beading of funnel vantilator perished/crackedto be renewed and chalk test to be proved. (EPDM Rubber with shorehardness 50 + 5o A) (d) Funnel ventilator
044 Wire mesh SS Wire mesh and MS flaps of engine room exhaust opening corroded and broken. To be renewed. (Size of opening :01 m x 0.5 m)
045 Seating arrangement Metalic seating arrangement on foxle corroded, thinned and holed. To be renewed. Size: 1500x750x700MM. Mat: MS Plate: 06MM thickness, Stand made of Angles and welded on deck.
046 Fish plate Fish plate and securing brackets corroded, thinned and holed. Mat: MS plate (a) Fish plate size: 20x20 inch, 10mm thickness
046 Fish plate Fish plate and securing brackets corroded, thinned and holed. Mat: MS plate (b)Doubler plate size:28x28inch, 10 mm thickness
046 Fish plate Fish plate and securing brackets corroded, thinned and holed. Mat: MS plate (c) Angle bar 3 x1.5 inch
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (a) Fresh Water Tank
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (b) Ballast Tank
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (c) Forepeak Tank (02)
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (d) Fuel Tank
047 APT Air Pressure Test the following tanks and rectify the defects any observed during pressure testing and prove to 0.14 kg/ cm2. Note:- APT and proving of those tanks wherein steel renewal undertaken as part of steel renewal DL. 0003(c) above is that of Firm's liability with No Additional Cost and those tanks where no steel renewals undertaken only would be considered for payment as per the indicated rates under this DL. Serial. (e) Firefighting Foam Tank
048 BIilge Platform (a) Renew bilge platform plate. Material- chequered aluminium, thickness- 05 mm
048 BIilge Platform (b) Bilge platform supporting brackets to be renewed where ever required. Mat - ms
049 Under water Fenders (a)Underwater fenders to be removed, inspected and surveyed and necessary repairs to be attended on fender securing brackets(C Channel) and associted hull. Note : Quote for Fenders only. Services covered under serial D
049 Under water Fenders (b)All underwater Fenders to be renewed as per sample with white colour fenders. Specification - EPDM rubber as per NES 170, D fenders Size--D Fender 250x250x1000mm
049 Under water Fenders (c) Replace the fender and secure with proper nut, bolt and washers as per sample. Nut & Bolt Dia -20 mm, bolt Length-370 mm, Washer dia-22mm (Note: QUOTE FOR NUTS BOLTS AND ASSOCIATED ACCESSORIES ONLY).
049 Under water Fenders (d)Carry out fitment of the underwater fenders post requisite repairs/renew on fender securing brackets (c channel) and associated hull, work involves modification of size / cutting of fenders as per sample to suit C Channel bracket and fitment of fenders Note : Quote for Services only materials covered under Sl-(a), (b) and (c)
050 Cleats MS cleats perished/thinned to be renewed/REPAIRED BY HEAT TREATMENT (Size-28 mm).
051 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe) (a) Pipe dia 2 1/2 inch
051 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe) (b) Distance piece and flanges: Dia 150mm (including rubber joints)
052 WT Hatch clips (a) WT Hatch clips broken / damaged. To be renewed. Mat. MS
052 WT hatches (b) WT Hatch clips at various places jammed , to be lubricated including washer and fitted back
052 WT Doors (c) Clips of WT. Doors Jammed to be removed lubricated including washer, nut and fitted back
053 WT Hatch metal coaming Metallic coaming of 05 in no WT Hatches on weather deckand various locations corroded and thinned. To be renewed as per survey report. Area - 20 Sqm.
054 NWT doors NWT wooden doors including frames of wheel house/crew cabin, master cabin perished /damaged. To be renewed/repaired
055 Drainage System MS Scupper lips (as per sample) with rubber packing corroded, to be renewed.on No.1 deck
056 Ventilation Mushroom type ventilators on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. Dia: 550mm (a) 550mm dia
056 Ventilation Mushroom type ventilators on weather deck jammed ,to be removed, cleaned/ overhauled and fitted beck. Dia:360 mm (b) 360mm dia
056 Ventilation (c) Air cleaning of ventilation trunking to be carried out. Location:- fitted at crew rest room , masters cabin, ED rest room galley/dinning hall . Mat-GI sheet
056 Ventilation (d) Ventilation trunking perished to be repaired/ renewed. Location: - crew rest room , masters cabin, ED rest room galley/dinning hall and fitted back . Mat-GI sheet
057 Breather pipe Breather pipe on weather deck perished/damage.To be renewed
058 Towing Hook Towing hook to be overhauled and load tested to 25 Tons . note 1 -The job involves overhaul of operating handle, renewel of steel wire rope and in way pullies. note 2 - Firm to project for load testing to CoY. Load testing will be undertaken by ND(VZG). Any defects occurred during load testing will be rectified by the firm.
059 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed.(Mat. GI pipe) (a) Pipe dia 2 1/2 inch
059 Tank/Vent Pipe Vent pipes of various tanks on upper deck corroded and thinned, to be renewed. (Mat. GI pipe) (b) Distance piece and flanges: Dia 150mm (including rubber joints)
060 Lifebuoy Lifebuoys to be painted as per sample including lettering and symbols. Size: 300mmx100mmx06mm , vessel name is to be painted on the lifebuoy
061 Liferaft Securing stand of Life rafts perished and damaged. To be renewed alongwith rubber lining and supporting frame, including fitment of HRG Mat-DMR2062 , Thickness- 06mm.
062 Nav Light Nav light foundation (Port & Stbd) corroded, to be repaired/renewed. Size: 620mmx620mmx300mm and thickness 6mm, Mat MS
063 Drainage System (a)Deck Drain pipes corroded/ holed, to be renewed. Dia 2 1/2 inch. Mat: GI note : Pipes / fittings should be secured with rubber packing’s and clamps uniformly
063 Drainage System (b)Scupper with coaming of drain pipe ( leading from 01 deck to No. 1 deck and bridge top to platform deck ) corroded/ thinned, to be renewed. Size: 250mmx200mm
063 Drainage System (c) Deck drain pieces on upper deck corroded, to be renewed. Dia 2 1/2 inch, each of length 01Mtr. note-The job involves removal/renewal and fitment of pipes/ panelling/ lagging/ trunking in the way.
063 Drainage System. (d) Soil pipes of Crew, ED's and Master's bathroom to be removed chemically cleaned and fit back.
063 Drainage System. (e) Repair of 4" soil pipes to be carried out
064 Extinguishers Provision of following extinguishers to be undertaken (a) 9 Ltr AFFF extinguisher
064 Extinguishers Provision of following extinguishers to be undertaken (b) 2 Kg CO2 Extinguisher
064 Extinguishers Provision of following extinguishers to be undertaken (c) 10 Kg DCP extinguisher
065 FF Hoses Provision of following fire hoses to be undertaken Fire hoses
066 Foam solution Supply of Type 3% AFFF concentrate for forming mechanical foam and filling it in the foam tank
067 H2S Sensors (a) Fixed H2S Sensor Provision of Fixed H2S sensors in the vicinity of STP compartment. (OEM - Hi-Point Services Pvt. Ltd.) Including installation of sensors and control pannel. Note:- Trial report along with H2S sensors calibration certificate by OEM to be submitted.
067 H2S Sensor (b) Portable H2S Sensor Provision of Portable H2S sensors . (OEM - Hi-Point Services Pvt. Ltd.) Note:- Trial report alongwith H2S sensors calibration certificate by OEM to be submitted.
068 Sofa/cushion Upholstery fabric cover of Sofa cushion in master and engineer rest rooms torn/perished, to be renewed
069 WC/Commode WC commode and base plate in crew wash room perished/corroded, to be renewed. Mat - SS
070 Panelling (a) Wooden panels in crew accommodation , Eng. rest room, master rest room and other places , damaged to be renewed
070 Panelling (b) SS panels in wet compartments broken and damaged. Panels need to be renewed. (Mat - SS)
071 Furniture (a) CRCA kit locker at various places broken/damaged. To be renewed. (Mat : CRCA)
071 Furniture (b) CRCA standing lokers in crew accommodation/master room, crew galley and Eng. room damaged to be renewed. (Mat-CRCA)
071 Furniture (c) Wooden table damaged/broken at varios places to be renwed.
072 Guard Rails Guard rails damaged/ perished at various locations. To be renewed. Material - GI Pipe/ 4-5 mm dia chain.
073 Stanchion (a) Stanction on upper deck damaged/deformed at various loaction , to be repaired/renewed, Size- , l- 970 mm and dia - 50 mm Mat- GI pipe
073 Stanchion (b) Securing chain of stanchion on upper deck damaged.To be renewed. Mat - MS, Size - 5 mm dia
074 Pipelines Carry out chemical cleaning, pressure testing & repairs of soil pipe/drainaige pipe/fresh water lines fitted at various locations
075 Name board Following Tug name board perished/damaged, to be renewed/repaired. (a) Repair/renewal of vessel name board including electroplating to be carried out on ship side -02
075 Name board Following Tug name board perished/damaged, to be renewed/repaired. (b) Painting of tug name on bulwark in both Hindi and English at stem and stern with fluorescent paint -03
075 Name board Following Tug name board perished/damaged, to be renewed/repaired. (c) Vessel illuminated board with Perspex sheet - 01
076 Door locks (a) Mortise lock of non WT door defective at various locations, All defective mortise locks to be renewed. including 03 set of keys
076 Door locks (b) Locking arrangement is to be provided for wt doors at various locations, including hasp & staples and pad locks
077 Chairs Chairs in bridge and master/crew cabin damaged/ broken/ including cushion & roller wheels, Chairs is to be replaced as per sample.
078 Deck covering floor mat Deck Covering chequered anti-skid floor mat at various location perished/ damaged/ faded to be renewed as per sample
079 Sanitary system SS Wash basin damaged in crew batroom and wc to be repaired as indicated (a) Wash basin
079 Sanitary system SS tap damaged in crew batroom and wc to be repaired as indicated (b) SS tap: 1/2 inch
079 Sanitary system Supply pipes damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated (c) Supply pipe: Mat : Cu-Ni, dia: ½’’
079 Sanitary system drain pipes damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated (d) Drain pipe: Mat-MS,dia- 2’’
079 Sanitary system Flush valves damaged-corroded/thinned/holed in crew batroom and wc to be repaired as indicated (e) Flush valves - Mat - Brass, Dia - 2"
079 Sanitary system PVC Wash basin Drain Pipe Line Damaged To Be Renewed As Indicated (f) PVC drain pipe Note:- Quoted repair cost shall include cost all items.
080 Water purifier Provision Of Drinking Water Purifier of 9 Ltr Capacity For Domestic Use In Galley And Crew Dinning Hall. Work Also Involves Fitment, Piping Arrangement And Commissioning Of The System. –With 02 Set Of Spares Including Filter And Membrane. Work Includes Provisioning Of Following Spares Also :- (a) RO Membrane Welded -02 , (b) RO Membrane High Flow-02 (c) Inline Carbon filter-02 , (d) Inline Sediment Filter- 02 , (e) Activated Carbon Filter (Excel Elite) , (f) Post Carbon Filter-02
081 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments. NOTE:- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (a) Surface preparation and application of EROP. As per NCD 3717
081 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (b) Application of Underlay as per NCD 3717
081 Deck underlay Deck Covering to be repaired/ renewed at uprooted/ damaged/ steel renewed places, accommodation areas, Wheel house and wet compartments NOTE;- Dry Compt area-110 SQM, Wet Compt Area-30 SQM, Dadoes area- 15 SQM (c) Application of sealer coat on entire area As Per NCD 3717.
082 Bunk Cushion/ Mattress Bunk mattress torn/damaged, to be renewed as per sample including maroon colour rexine covers.
083 Foundation Foundation of deck machinery / deck fittings corroded/thinned/perished , to be renewed as per survey report
084 Wooden platform Wooden platform in wheel house to be manufactured , mat-hard wood , size- 3X2 mtr , Height- 300 mm
085 Awning Shade Repair of damaged awning shade frame at Foxle of Gi pipes and fitment of the same on fwd. (a) Size: 2m x 5.5 m Approx. Mat: GI pipe
085 Awning Shade Repair of damaged awning shade frame at aft side of Gi pipes and fitment of the same on fwd. and aft on weather deck area. (b) SIZE - 6 X 3 M Approx
086 PVC Awning PVC Awning at Foxle and at aft side (c) Renewel of PVC awning over the frame using securing rope. Mat - As per sample.
087 Water cooler Provision of water cooler in Galley/Crew Dinning Hall. Work also involves fitment, piping arrangement, installation and commissioning of the system. Capacity-20 ltr
088 OBD Valves All over board discharge valves are to be overhauled. Existing valves are to be removed , overhauled and fitted back with new gaskets and nut bolts. All valves are to be pressure tested before fitment. Pressure to be applied: 6 Kg/cm2. (Diameter - 140/120 mm, Material - cu-ni)
089 Lagging Lagging at indicated places to be removed to facilitate structural repairs and to be renewed with new lagging post completion of repairs. (Mat-SS)
090 Deck head panelling/ Sunmicia Panelling at indicated places to be removed to facilitate structural repairs and to be refitted post completion of repairs. (Mat : wooden)
091 Panelling Panelling at indicated places to be removed to facilitate structural repairs and to be refitted post completion of repairs. Mat : SS
092 Bunks Bunks at crew rest room corroded/thinned/holed , to be renewed/repaired, mat-ms and wood
093 Curtains Curtain torned in Rest room and master cabin. curtain to be renewed
094 Wet compartment Dadoe area Dadoe areas of wet compartments corroded, thinned and holed to be renewed. (Mat- MS)
ENGINEERING WORK PACKAGE 1001 EQPT/SYSTEM: GS PUMPS MAKE/MODEL : B.EPumps,MA843KK-DGS2-316 Type-Motor driven self priming centrifugal pump. CAP: 40Cu.M/Hr. (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1001 EQPT/SYSTEM: GS PUMPS (a) Pump to be overhauled.(complete pump to be dismentled check for pitting of body condition all internal parts renew all wear down parts)
1001 EQPT/SYSTEM: GS PUMPS (b) Suction and discharge pressure gauges to be renewed. range 0-300psi and 30”-30psi
1001 EQPT/SYSTEM: GS PUMPS (c) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1001 EQPT/SYSTEM: GS PUMPS (d) Greasing cups of both pumps to be renewed
1001 EQPT/SYSTEM: GS PUMPS (e) Both pump to be proved for optimum performance insitu.
1002 EQPT/SYSTEM: FUEL TRANSFER PUMPS, MAKE/ MODEL: RAYSONS,SURE-FLO-SFGP-38MF, TYPE: ROTARY GEAR PUMP, CAP: 06 CuM/hr (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1002 Fuel Transfer Pumps (a) Pump to be overhauled.(complete pump to be dismentled check for pitting of body condition all internal parts renew all wear down parts)
1002 Fuel Transfer Pumps (b)Suction and discharge pressure gauges to be renewed. range 30”-0” and 0-07 bar
1002 Fuel Transfer Pumps ( c)Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1003, FRESH WATER PUMPS, MAKE/MODEL: BE PUMPS,SELF PRIMING-A03110K-DGS2-316-MS5 , TYPE: SINGLE, SELF PRIMING,CENTRIFUGAL CAP:2cu.m/hr (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1003, Fresh Water Pumps, (a)Pump to be overhauled.(complete pump to be dismentled check for pitting of body condition all internal parts renew all wear down parts)
1003, Fresh Water Pumps, (b)Suction and discharge pressure gauges to be renewed. range 0-100psi
1003, Fresh Water Pumps, (c ) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1003, Fresh Water Pumps, (d)Greasing cups of both pumps to be renewed
1003, Fresh Water Pumps, (e)Renewal of coupling rubber pads
1003, Fresh Water Pumps, (f)Pump to be proved for optimum performance insitu.
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP MAKE/MODEL:BE PUMPS A5110kk/DGS TYPE: SINGLE,SELF PRIMING,CENTRIFUGAL CAP: 15 M3/hr. (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP (a)Pump to be overhauled.(complete pump to be dismentled check for pitting of body condition all internal parts renew all wear down parts)
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP (b)Suction and discharge pressure gauges to be renewed. range 0-10bar and 0-7 bar
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP (c) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP (d) Coupling rubber pad to be renewed
1004 EQPT/SYSTEM: SRP COOLING SEA WATER PUMP (e) Performance of Pump to be proved post Overhauling.
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS MAKE/MODEL: BE PUMPS M2022kk/RR-DGS2-316, TYPE: TWO STAGE,NON SELF PRIMING,CENTRIFUGAL PUMP,CAP: 3000CuM/hr (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (a)Pump to be dismantled completely.
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (b) Impeller and casing to be checked for pitting.
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS ( c)Metal building up to be carried out where possible
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (d)Mechanical seals to be renewed.
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (e) Bearings to be renewed.
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (f)Suction and discharge pressure gauges to be calibrated. Range30”-0 bar and 0-100 bar
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (g) Instrumentation gauges pipes with suitable end fittings to be renewed. mat: CuNi dia:1/4”
1005,EQPT/SYSTEM: ENGINE DRIVEN FIRE PUMPS (h) Pump to be boxed back and proved for satisfactory performance
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE MAKE/MODEL: GREAVES TYPE: SINGLE CYLINDER (FIRM NOT TO QUOTE here. requested quote againist sub serials below) Followed Jobs to be carried out on Engine:- (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (a)Renewal of injector nozzle to be carried out. Injector to be calibrated thereafter.
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (b) Luboil pump of engine to be renewed
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (c ) Luboil sump to be drained, cleaned and new oil to be charged in sump
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (d)Sump strainers/filters to be renewed
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (e)Fuel oil filters to be renewed.
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (f)Luboil pressure gauge to be renewed
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (g)Renewal of air inlet filter element of engine to be carried out
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (h)Complete insulation of the exhaust pipe to be renewed.
1006 EQPT/SYSTEM: DD COMPRESSOR ENGINE (j)Engine to be boxed back and proved for satisfactory performance
1007 EQPT/SYSTEM: AIR COMPRESSOR MAKE/MODEL: ELGI,HP 05 300,Cap-12.4m3/hr@30kg/cm2. (FIRM NOT TO QUOTE here. requested quote againist sub serials below) TYPE: 2 STAGE RECIPROCATING TYPE, CAP: 200LPM Complete overhaul of compressors to be carried out involving the following:- (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1007 EQPT/SYSTEM: AIR COMPRESSOR (a)Lub oil pump of compressor to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (b)Cylinder liner to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (c )Both big end and small end bearings of connecting rod to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (d)Bearings of shaft to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (e)Lub oil sump to be drained, cleaned and new oil to be charged in sump
1007 EQPT/SYSTEM: AIR COMPRESSOR (f)Sump strainers/filters to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (g)Cylinder valve plates and strips to be renewed.
1007 EQPT/SYSTEM: AIR COMPRESSOR (h)Piston rings to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (j)Lub oil pressure gauge to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (k)Compressor to be boxed back and proved for satisfactory performance
1007 EQPT/SYSTEM: AIR COMPRESSOR (l)Air inlet filter element of compressor to be renewed
1007 EQPT/SYSTEM: AIR COMPRESSOR (m)Instrumentation gauges pipes with suitable end fittings to berenewed mat: CuNi dia:1/4”
1007 EQPT/SYSTEM: AIR COMPRESSOR (n)Pressure gauges to be renewed. range 0-60kg/cmsq
1007 EQPT/SYSTEM: AIR COMPRESSOR (p)Pressure switches to be renewed 02 each
1007 EQPT/SYSTEM: AIR COMPRESSOR (q)Oil and water separator of compressors to be renewed 20mm 01 each
1007 EQPT/SYSTEM: AIR COMPRESSOR (r)Chemical cleaning and pressure testing of air bottles to be carried out capacity: 250ltrs TP: 45 bar
1007 EQPT/SYSTEM: AIR COMPRESSOR (s)Relief valves on air bottles to be renewed. 2.5mm(Relief Pr.-45 Kg).
1007 EQPT/SYSTEM: AIR COMPRESSOR (t)Cooling fan to be cleaned inspected and fitted back
1007 EQPT/SYSTEM: AIR COMPRESSOR (u)Drive belts of both compressors to be renewed size B71
1008 EQPT/SYSTEM: HAND PUMPS,MAKE/MODEL: BHARGAV, CAP: 91 lpm and 25 lpm (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1008 EQPT/SYSTEM: HAND PUMPS (a)Pumps to be dismantled completely and cleaned internally
1008 EQPT/SYSTEM: HAND PUMPS (b)Machining of suction and discharge flaps to be carried out.
1008 EQPT/SYSTEM: HAND PUMPS (c )Securing pins of suction and discharge flaps to be renewed
1008 EQPT/SYSTEM: HAND PUMPS (d)Wooden handles of all pumps to be manufactured and fitted
1008 EQPT/SYSTEM: HAND PUMPS (e)Pump to be boxed back and proved for satisfactory performance
1009 EQPT/SYSTEM: VALVES (FIRM NOT TO QUOTE here. requested quote againist sub serials below) Following valves to be overhauled and pressure tested. TP 5 kg
1009 EQPT/SYSTEM: VALVES (a)300mm Valves
1009 EQPT/SYSTEM: VALVES (b)200mm Valves
1009 EQPT/SYSTEM: VALVES (c )100mm valves
1009 EQPT/SYSTEM: VALVES (d)80mm valves
1009 EQPT/SYSTEM: VALVES (e)65mm Valves
1009 EQPT/SYSTEM: VALVES (f)50mm Valves
1009 EQPT/SYSTEM: VALVES (g)40mm Valves
1009 EQPT/SYSTEM: VALVES (h)32mm Valves
1009 EQPT/SYSTEM: VALVES (j)25mm And Below Valves
1009 EQPT/SYSTEM: VALVES (k)Reducers (50mm and Below)
1009 EQPT/SYSTEM: VALVES (l)Relief Valves (50mm and Below)
1010 EQPT/SYSTEM: STRAINERS (FIRM NOT TO QUOTE here. requested quote againist sub serials below) Following system strainers opened, cleaned, repaired / renewed and fitted back with suitable rubber joints, strainers material: brass (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1010 EQPT/SYSTEM: STRAINERS (a)Main supply manifold strainers
1010 EQPT/SYSTEM: STRAINERS (b)Main engine cooling water strainers
1010 EQPT/SYSTEM: STRAINERS (c )Main fire pump suction strainers
1010 EQPT/SYSTEM: STRAINERS (d)Bilges pumping out strainers
1010 EQPT/SYSTEM: STRAINERS (e)E/D sea water pump main suction strainers
1010 EQPT/SYSTEM: STRAINERS (f)Foam system inline strainer
1011, Eqpt/System: System Pipes for CC & Renewal (FIRM NOT TO QUOTE here. requested quote againist sub serials below) Following sea water system pipes to be removed chemically cleaned and pressure tested. (Jobs involves renewal of approximately 20% renewal of pipes)
1011, Eqpt/System: System Pipes for CC & Renewal (a)300mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (b)200mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (c )80mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (d)100mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (e)65mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (f) 50mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (g)32mm Pipe
1011, Eqpt/System: System Pipes for CC & Renewal (h)25mm Pipe
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (a)Foam gunsand accessories to be completely overhauled. All perished rubber fittings to be renewed.
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (b)Foam gun drive gearboxes to be overhauled.
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (c )Foam tank isolating valves to be overhauled 50mm SDNR
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (d)Worm gear assembly to be dismantled cleaned and fitted back.
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (e)Couplings shaft locking pins to be renewed.
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (f)Three way flushing valve to be overhauled 50mm
1012 EQPT/SYSTEM: FOAM SYSTEM/ FOAM GUNS (g)Overhauling of foam system propotionator to be carried out.
1013 EQPT/SYSTEM: CO2 EXTINGUISHING SYSTEM, MAKE: NEW FIRE ENGINEERS PVT LIMITED (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1013, CO2 Fire Extinguishing System (a)All CO2 cylinders to be weighed in situ ( 45 Kgs each ) and recharged with CO2 to the required level if required.
1013, CO2 Fire Extinguishing System (b)Non return valves on cylinder heads to be overhauled.
1013, CO2 Fire Extinguishing System (c)All CO2 discharge nozzles to be opened,cleaned, checked for blockages and fitted back.
1013, CO2 Fire Extinguishing System (d)Overhaul of shuttle valve and relief valve assembly
1013, CO2 Fire Extinguishing System ( e) Overhaul of pressure operated switches
1013 , CO2 Fire Extinguishing System ( f) All flexible hoses to be checked for leakages and renew if required.
1013, CO2 Fire Extinguishing System (g)Complete drenching system piping to be blown through using HP air to prove system free of blocks.01System
1014, MISCELLANEOUS: (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1014, Misc (a) 02 in no portable pumps of 1 HP not taking suction to be renewed. Along with suction and discharge hoses, ( size 1 1/2 " & 1" of 50 mtrs each) 02 in no Float valves for the above pumps required.
1014, Misc (b) 01 in no portable gear pump 1HP to be renewed.
1014, Misc c) 5 in no Racks to be manfactured for stowing of ready use spares in Ajral store at COY complex. Mat GI, Size 8ft x 4ft x 2.6ft, 05 partitions to be provided with 5mm thickness plates at equal disrance.
1015, EQPT/SYSTEM:DIESEL GENERATORS ,MAKE/MODEL: CUMMINS NT495MG, following 12000 hrly routines to be carried out, Running Hours: 11109(Port), 11381(Stbd) (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1015, Eqpt/Sys: DGs (a)Remove all cylinder heads and dismantle valve gear, de corbonise combuction spaces. Grind in valves and removal of pistons.
1015, Eqpt/Sys: DGs (b)Clean and calibrate injectors and also change injector inlet screen
1015, Eqpt/Sys: DGs (c )Adjust valve tapped clearances wihthin limits
1015, Eqpt/Sys: DGs (d)Replace fuel pump fitter ( screen and magnet) and calibrate PT fuel pump
1015, Eqpt/Sys: DGs (e)Clean turbocharger compressor wheel and diffuser. Check turbocharger radial /end bearing clearance insite Renew/O ring Teflon gasket when turbocharger is opened for checking clearances
1015, Eqpt/Sys: DGs (f)Torque manifold nuts or caps screws as per specifications
1015, Eqpt/Sys: DGs (g)Drain coolant Flush through using rediwash as laid down in operating manual. Renewed coolant
1015, Eqpt/Sys: DGs (h) Check S/W pump and F/W pumps for performance defects and replace if required (replacement only)
1015, Eqpt/Sys: DGs (j)Checking thickness of vibration damper at 0, 90, 180, & 270 degree positions. Replace damper if vibrations of 4 readings exceeds 0.010 and 0.25 mm or exceeds maximum allowances thickness. Check to be undertaken in coupled condition
1015, Eqpt/Sys: DGs (k)Check crank end clearance with a dial indicator attaching against damper main 0.13mm Max 0.5mm
1015, Eqpt/Sys: DGs (l)Undertake alignment checks between the generator and the engine and restore radial / axial limits
1015, Eqpt/Sys: DGs (m)Remove and chemically clean lub oil and fresh water cooler and carry out pressure testing. Renew gasket and O seal
1015, Eqpt/Sys: DGs (n)Gauging and inspection all liners for corrosion pitting post
1015, Eqpt/Sys: DGs (p) Extraction of connecting rod and big end bearing clearances and examination of big and shell for the cylinder opened
1015, Eqpt/Sys: DGs (q)Examine crank pin surface and check for ovality and wear
1015, Eqpt/Sys: DGs (r) Examine piston for wear and gauge piston ring clearance. Renew rings if necessary
1015, Eqpt/Sys: DGs (s)Inspect holset/valcan/centmax flexible coupling and torque tighten inner/ outer members check rubber block side for deterioration, Renew if necessary
1015, Eqpt/Sys: DGs (t)Lub oil sump to be drained opened and cleaned.New oil to be charged in sump post boxing up OMD 113(Oil to be supplied by OEM)
1015, Eqpt/Sys: DGs (u)Both lub oil filters and strainers to be renewed
1015, Eqpt/Sys: DGs (v)Both fuel system filter (water separator and filter elements) to be renewed
1015, Eqpt/Sys: DGs (w)Air inlet filter elements to be renewed
1015, Eqpt/Sys: DGs (x) Hydraulic governor oil to be renewed
1015, Eqpt/Sys: DGs (y) Fresh water pump to be inspected and renewed if required
1015, Eqpt/Sys: DGs (z)Sea water pump, lub oil pump to be renewed.
1015, Eqpt/Sys: DGs (aa)Offering DA for cold checks / hot checks to trial agencies. Connecting the safety devices post calibration Renewal (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1015, Eqpt/Sys: DGs (ab) Luboil pressure gauge to be renewed (0-7bar)
1015, Eqpt/Sys: DGs (ac) Fresh water temperature gauges to be renewed (40-110 deg c)
1015, Eqpt/Sys: DGs (ad)Luboil temperature gauges to be renewed (40-130 deg c)
1015, Eqpt/Sys: DGs (ae) Exhaust temperature gauges to be renewed. (0-1000°C)
1015, Eqpt/Sys: DGs (af)Overspeed trip
1015, Eqpt/Sys: DGs (ag) Low Lub Oil Pressure Alarm and Trip
1015, Eqpt/Sys: DGs (ah) High Fresh Water Temp Alarm and Trip
1015, Eqpt/Sys: DGs (ah)Droop setting and load trials, Performance trials of the post completion.
1016 ,EQPT/SYSTEM:SRP SYSTEM,MAKE/MODEL: ROLLS ROYCE AQUAMASTER US1201, (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1016 ,EQPT/SYSTEM:SRP SYSTEM (a)Chemical cleaning and pressure testing of lub oil coolers to be carried out.
1016 ,EQPT/SYSTEM:SRP SYSTEM (b) Coolers to be boxed up with new zinc anodes. Anodes to be manufactured as per sample.
1016 ,EQPT/SYSTEM:SRP SYSTEM ( C)Check the seals of the propeller shaft, seals of the steering tube and of the input shaft. Renew if required
1016 ,EQPT/SYSTEM:SRP SYSTEM (d)Check the condition of the gears through the inspection hatches.
1016 ,EQPT/SYSTEM:SRP SYSTEM (e)Lub oil in sump to be completely drained and new oil charged SP 150. Oil to be provided by the firm.
1016 ,EQPT/SYSTEM:SRP SYSTEM (f)Hydraulic oil to be drained and new oil charged SERVO System 46.Oil to be provided by the firm.
1016 ,EQPT/SYSTEM:SRP SYSTEM (g)Renew hydraulic oil filter elements
1016 ,EQPT/SYSTEM:SRP SYSTEM (h)Renew lub oil filter elements
1016 ,EQPT/SYSTEM:SRP SYSTEM (j)Renew all drive belts
1016 ,EQPT/SYSTEM:SRP SYSTEM (k)Greasing of universal shaft joints to be carried out
1016 ,EQPT/SYSTEM:SRP SYSTEM (l)Intermediate shaft bearings to be dismantled and old grease removed. Greasing of bearing to be carried out thereafter Grease type EP-2
1016 ,EQPT/SYSTEM:SRP SYSTEM (m)All flexible hoses/ durettes to be checked and renewed if required.renewed
1016 ,EQPT/SYSTEM:SRP SYSTEM (n)Lub Oil pressure switches to be renewed, Set pressure 17 bar (Part No A 7429733 )
1016 ,EQPT/SYSTEM:SRP SYSTEM (m)Following instrumentation gauges and thermometers to be calibrated/ renewed. (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1016 ,EQPT/SYSTEM:SRP SYSTEM (i)Clutch oil pressure gauge. (0-40bar)
1016 ,EQPT/SYSTEM:SRP SYSTEM (ii)Luboil pressure gauge. (0-6bar)
1016 ,EQPT/SYSTEM:SRP SYSTEM (iii)Thermometers local reading
EQPT/SYSTEM:MAIN ENGINES, MAKE/MODEL:CUMMINS KTA-38-M,following 6000 hrly routines to be carried out, Running Hours 21103(Port), 21101(Stbd) (FIRM NOT TO QUOTE here. requested quote againist sub serials below)
1017, Eqpt/System : Main Engines, (a) Clean float tank and fuel tank internally.
1017, Eqpt/System : Main Engines, (b)Clean breather of float tank,
1017, Eqpt/System : Main Engines, (c )Change fuel filters.
1017, Eqpt/System : Main Engines, (d)Change all lub oil filters including bypass filters.
1017, Eqpt/System : Main Engines, (e)Clean the Sump,Change engine oil and hydraulic governaor oil. ( OMD 113)
1017, Eqpt/System : Main Engines, (f)Check all flexible hoses of lub oil system and replace if required.
1017, Eqpt/System : Main Engines, (g)Check all flexible hoses of fuel system and replace if required.
1017, Eqpt/System : Main Engines, (h)Replace coolant filters.
1017, Eqpt/System : Main Engines, (j)Change Air filters.
1017, Eqpt/System : Main Engines, (k)Clean and calibrate injectors and record test pressure in service log. Also change injector inlet screen . Calibrate PT fuel pump and record in service log. Replace fuel pump filter (screen and magnet)
1017, Eqpt/System : Main Engines, (l)Replace rocker cover gaskets
1017, Eqpt/System : Main Engines, (m)Adjust valve tappet clearances within limits abd record in service log.
1017, Eqpt/System : Main Engines, (n)Clean turbocharger compressor wheel and diffuser
1017, Eqpt/System : Main Engines, (p)Check turbocharger radial/end bearing clearance insite Renew / O ring Teflon gasket when turbocharger is opened for checking clearances
1017, Eqpt/System : Main Engines, (q)Torque manifold nuts and cap screws as per specification.
1017, Eqpt/System : Main Engines, (r)Drain coolant Flush through using rediwash as laid down in operating manual. Renewed coolant
1017, Eqpt/System : Main Engines, (s)Chemical clean low temperature after coolers
1017, Eqpt/System : Main Engines, (t)Remove and chemically clean lub oil and fresh water cooler and carry out pressure testing. Renew gasket and O seal
1017, Eqpt/System : Main Engines, (u)Check SW and FW pumps for performance / defects and overhaul if required. Sea water pumps to be replaced with new.
1017, Eqpt/System : Main Engines, (v)Checking thickness of vibration damper at 0, 90, 180, & 270 degree positions. Replace damper if vibrations of 4 readings exceeds 0.010 and 0.25 mm or exceeds maximum allowances thickness. Check to be undertaken in coupled condition.
1017, Eqpt/System : Main Engines, (w)Check crank end clearance with a dial indicator attaching against damper main 0.13mm Max 0.5mm
Anticipatory: 1017 Eqpt/System : Main Engines (x) Serviceability checks , repairs, replacement of instrumentation components, control panel, sensors, pressure and temperature switches , transmitters and proving the system .
1017 Eqpt/System : Main Engines (y)Check all safety controls for their functioning.
1017 Eqpt/System : Main Engines (y) (i) Overspeed trip
1017 Eqpt/System : Main Engines(y) (ii) Low Lub Oil Pressure Alarm and Trip
1017 Eqpt/System : Main Engines (y) (iii) High Fresh Water Temp Alarm and Trip
1017 Eqpt/System : Main Engines(y) (iv) Temparature Sensors & Switches (Freshwater, Lub oil,& Exhaust)
1017 Eqpt/System : Main Engines (y) (v) Pressure Sensors & Switches (Freshwater, Lub oil,& Exhaust)
1017 Eqpt/System : Main Engines (y) (vi) Performance trials of the post completion.
ELECTRICAL WORK PACKAGE All electrical power components / spares like contactors, overload relays, etc are to to be sourced from Navy approved vendors.
IMPORTANT NOTE:- Following points are applicable for all relevant DL's and shipyards/Firms to consider and quote accordingly. (a) Renewal of Items / Spares:- (i) Renewal of items / spares wherever mentioned in the QDL to be undertaken by shipyard / firm as per the sample / drawing / details provided by SS / COA / RMT. (ii) Shipyard / Firm should undertake the routines / overhaul of the equipment including the mandatory spares required for undertaking the same, irrespective of the spares mentioned in the mandatory spares list provided by ND(V). (iii) Further, the cost should include the degutting of existing item, supply of new item, fitment and proving of the system post renewal.
The definition of overhaul of motors/alternators includes the following:- (a) Dismantle the motor. The motors/alternators has to be dismantled and landed by Yard for overhauling. (b) Undertake trueness checks of rotors/alternators on the lathe. Repair observed Defects (c) Check for ovality in bearing housing. Repair observed Defects. (d) Clean the rotor and stator thoroughly with alcohol, air, varnish and bake. There should be no dust particles or other foreign particles observed after cleaning (e) Measure the insulation of windings of rotor and stator. In case insulation is below one mega ohm rewind the rotor / stator (f) Replace heater and thermistor units. (g) Assemble the motor with new bearings (h) In case of repairs to shaft trueness or replaced of winding,undertake dynamic balancing of the rotor (j) Check and rectify phase imbalance in insulation of windings (k) Undertake test bed Trials and confirm no load starting and running currents, speed, SPM readings apart from other standard checks. SPM reading are to be in green zone post overhaul. (l) All motors/alternators and machinery body/ cabinets to be painted as per the original colur. (m) Brass Marking talleys to be provided for all equipment( 8x2 cms)- Qty 1500 nos apprx total. (n) Wiring/ cabling which are removed during gutting/ degutting to be re wired whereever applicable. (p) All motors/alternators with monoblock pumps are to be proved in situ. (q) All terminal boxes rubber beading to be replaced to achieve water tight integrity.
Following 'As Fitted' drawings need to be prepared and handed over to ships staff (a) Foundations of new equipment (b) Electrical cabling (c) All As and A's including internals of control panel (Hull, Engineering & Electrical). (d) ABER replacement (Hull, Engineering & Electrical ).
2001 Eqpt/System: MAIN SWITCH BOARD Make:Marine Electricals Location:Engine room,
2001 Eqpt/System: MAIN SWITCH BOARD (a) Carryout overhauling of main switch board and prove them for satisfactory performance. Worn out parts to be changed. (calibration certificates/test reports from NABL recognised Labs are to be submitted) Note:- Machinery body to be Clean to bare metal and painted with one coat of primer and two coat of powder coating
2001 Eqpt/System: MAIN SWITCH BOARD (b) All MCBs are to be calibarated. Rating:- MCBs 6 to 100 Amps
2001 Eqpt/System: MAIN SWITCH BOARD (c) Four in no's MCB fitted in main switch board malfunctioning, to be change along with its accessories. (Rating :-415V, 50Hz,3Ph,40A, Tripple pole)
2001 Eqpt/System: MAIN SWITCH BOARD (d) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. Electronic protection Relay, Range 104-160, Type- STR22SE.
2001 Eqpt/System: MAIN SWITCH BOARD (e) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. Motor Mechanism, 240V AC, Type - MT 29434
2001 Eqpt/System: MAIN SWITCH BOARD (f) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. Auxiliary Contacts (0F), Type - 29450
2001 Eqpt/System: MAIN SWITCH BOARD (g) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. Plug in base, Type - BTP 29289
2001 Eqpt/System: MAIN SWITCH BOARD (h) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. 9 Wire fixed connector, Type - 29273
2001 Eqpt/System: MAIN SWITCH BOARD (i) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. 9 Wire moving connector, Type - 29274
2001 Eqpt/System: MAIN SWITCH BOARD (j) Renew electrically operated MCCB (415V, 3 Phase, 50 Hz, Triple Pole) alongwith all accessories and prove it for satisfactory operation. Rated 160Amps. Make: Merlin Gerin Model-NS160N 30770. List of accessories is as follows. 1 Support for 2 moving connectors, Type - 29275.
2001 Eqpt/System: MAIN SWITCH BOARD (k) Check & Calibrate all parameters of Reveres Power Relays. Make:Selco, Model:T2000 Operating parameters of Revers Power Relay is as follows:- (A)Voltage Tolarance :- 50+10% (B) Power Consumption :Voltage 5VA Un & Current 0.3VA at In (C) Frequency Range :- 45 - 65Hz (D) Operating Temperature Range :-20+70ºC (E) Contact rating :AC 2A,380V,250VA & DC 35V,8A, 150W (F) Dielectric test :2500V,50Hz (G) Repeatabilty :±1% (H) Overall Accuracy signal :± 5% (I) Preset Level 8% (J) Delay time 2-20sec
2001 Eqpt/System: MAIN SWITCH BOARD (l) Check & Calibrate all parameters of Insulation Monitoring Relay. Make:Selco, Model:T3200 renew if defective (A) Voltage Tolarance :+10-20% of Un (B) Power Consumption :2VA max (C) Frequency Range :45 - 65Hz (D) Operating Temperature Range :-20+70ºC (E) Contact rating :AC 2A,380V,250VA & DC110V,2A, 150W (F) Dielectric test :2500V,50Hz (G) Presetting 0-5M Ohm (H) Accuracy signal :± 5%(of preset valve) (I) Instrument scale 0-5 M ohm (J) Instrument Resistance Max 100 Ohm
2001 Eqpt/System: MAIN SWITCH BOARD (m) Check & Calibrate all parameters of Paralleling Relay. Make:Selco, Model:T5000 Operating parameters of Paralleling Relay (A) Voltage Tolarance :-30+10% (B) Power Consumption :2 X 5VA max (C) Frequency Range :45 - 65Hz (D) Operating Temperature Range :-20+70ºC (E) Contact rating :AC 8A,380V,2000VA & DC 150W (F) Dielectric test :2500V,50Hz (G) Time for Closing signal <50 msec. (H) Phase difference for cloasing signal :<± 6ºC
2001 Eqpt/System: MAIN SWITCH BOARD (n) Rubber mat : Insulating Rubber Mat deteriorated. To be Renewed with oil resistance & very high voltage resistance Electrical rubber mat in front of MSB.(Thickness- 3mm) Make vardhaman model class c
2001 Eqpt/System: MAIN SWITCH BOARD (p) Machenary body to be Clean to bare metal and painted with one coat of primer and two coat of Powder coating (originol colour)
2002 Eqpt/System: Control Panels The following Control Panels are to be over hauled SPP, OLR to be renewed. Worn out part to be changed. Prove it for satisfactory performance. job involve securing of wiring and fitted item
2002 Eqpt/System: Control Panels (a) Oilly Bilge Water Seperator System Control Panel 415V,3Ph,50Hz
2002 Eqpt/System: Control Panels (b) Anchor wind loss control panel (including mastor controler) 415V,3Ph,50Hz.Size:17.5mm Dia Chain; Make: Bhavani Eng.works.,Thane.
2002 Eqpt/System: Control Panels (c) Eqpt/System: Capstan Motor Control Panel &Remote Controls Make:Varun Conustruction OLRs (14-23A)-2Nos;type-MN2,Make-L&T Timer- 1no,Type LCDO93-A-60A,Make Telimech/ABB, Spp-1no Type VSP-1 Make Minilec
2002 Eqpt/System: Control Panels (d) Machinary control panel Make:Tebma Ship Yard,Chennaih
2002 Eqpt/System: Control Panels (e )Machinary control panel consists of the following items:- 1).Indication Lamps-20nos. 2)Push Buttons for ON/Off-5nos 3)Toggel Switch-1no 4)DP 2Way Rotary switch 16A-1no, 5)DP 2Way Rotary switch 6A-1no 6)10 Channel Alaram Rack Make:Dyna tek,Model:AB10-3NOs
2002 Eqpt/System: Control Panels (f)Renewal of control wiring (multi core cable 2.5 sq mm)
2003 Eqpt/System: Transformer Fuse Link Box Make;Marine electricals 415V,3ph,50Hz/230V,3ph,50Hz
2003 Eqpt/System: Transformer Fuse Link Box . (a) Carryout overhaul routines renew defective parts and prove them for satisfactory performance / made operational
2003 Eqpt/System: Transformer Fuse Link Box . (b) Machenary body to be Clean to bare metal and painted with one cote of primer and two coat of powder coat
2003 Eqpt/System: Transformer Fuse Link Box . (c) Renew the internal wiring (in between the connectors to fuse units)
2003 Eqpt/System: Transformer Fuse Link Box . (d) Fuse base along with fuse carrier to be renewed.(Rating - 10A)
2004 Eqpt/System:Renewal of Window Wiper Systems/ CVC Make Lucas TVS; Size:Stroke 500mm,Blade 600mm, Motor data- Make:Suntrans enterprise DC 24V;0.1HP;3500RPM;
2004 Eqpt/System:Renewal of Window Wiper Systems/ CVC (a) Window wiper fitted onboard perished, body parts corroded,required renewal.
2004 Eqpt/System:Renewal of Window Wiper Systems/ CVC (b) CVC (clean view cleaner) fitted on board to be renewed.
2005 Eqpt/System: Navigational Lighting Panels(Combined for AC & DC) Make:Edna Associate. 230V for AC,24V for DC Carryout routines mentioned below and prove them for satisfactory performance
2005 Eqpt/System: Navigational Lighting (a) Clean & Tighten the all connections with proper lugs, ferrules & connecters
2005 Eqpt/System: Navigational Lighting (b) Check the functions of all fuse units,control cards, indication lamps & horn.
2005 Eqpt/System: Navigational Lighting (C)If deffective repair them
2005 Eqpt/System: Navigational Lighting (d) If un repairable than renew them.
2005 Eqpt/System: Navigational Lighting (e ) Check the control cards functions and prove for satisfactory performance
2005 Eqpt/System: Navigational Lighting (f) Renew the fault detection module cards.
2005 Eqpt/System: Navigational Lighting (g) Renew the LED indication lamps with holders
2005 Eqpt/System: Navigational Lighting (h) Renew the Internal cabling (Multi stand copper 2core marine cable,2.5sr.mm) to be carried out.for navigational light panel to navigational light fittings via jb
2005 Eqpt/System: Navigational Lighting (j)Renew the Fuse Units in clip on type connectors
2005 Eqpt/System: Navigational Lighting (k)All fasteners to be electroplated
2006 Eqpt/System: Light fittings / Lamps
2006 Eqpt/System: Light fittings / Lamps (i) Renew Navigational Light bulbs 230V,AC,36W
2006 Eqpt/System: Light fittings / Lamps (ii) Renew Navigational Light bulbs 24V,DC,36W
2006 Eqpt/System: Light fittings / Lamps (iii) Renew the LED Emergency Bulbs. Opereating voltage -13V to 28V, DC 10w.
2006 Eqpt/System: Light fittings / Lamps (iv) Renew the LED 2' tube lights 15W,230V,AC,Make:Syska/philips
2006 Eqpt/System: Light fittings / Lamps (v)Renew Watertight U Glass light fitting incandeescent lamp fittings. 230V,60W LEC make Cat no MLF 610A -26Nos
2006 Eqpt/System: Light fittings / Lamps (vi)Renew Watertight sarchlight bulbs 230V,1000W lamp
2006 Eqpt/System: Light fittings / Lamps (vii)Renew LED Flood Light Fitting 200W,230V,AC; Make:syska
2006 Eqpt/System: Light fittings / Lamps (viii) Renew LEDflash mount type light fittings 20 watts 230V,AC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam Make:Kirloskar Cummins,Type:NT 495 MG 127BHP
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (a) D/G (port & stbd) AV Alaram panel System to be compleat overhauled, defective part to be renewed.calibrate it and prove it for satisfactory operation.
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (b) Renew following cutouts as per their rating and prove it for satisfactory performance.
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam ( c)Fresh Water temperature cut outs for Alaram Set point 92ºC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (d)Fresh Water temperatur cut outs for Tripping Set point 97ºC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam ( e)Lub oil Pressure cut out for Alaram Set point 1.5 kg/sq cm
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (f)Lub oil Pressure cut out for Tripping Set point 0.5 kg/sq cm
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (g)Over Speed Cut out for tripping Set point 1650RPM
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (h)Over temperature of Alternator for tripping Set point 70ºC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam ( I )Check & Calibrate the following sensors
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (j)Temperatur sensors
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (k) Pressure Sensors
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (l))Check & Calibrate the following units
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (m)Contactors relays 24V DC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam Flasher Light 24V,DC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (n)Alaram 24V,DC
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (p)calibrate the flash & alaram pcb circuit board if found defective rectify it.
2007 Eqpt/System: D/G (port & stbd) Alarm panel Systyam (q)Machenary body to be Clean to bare metal and painted with one cote of primer and two coat of enamil paint(originol colour)
2008 Eqpt/System:Foam Gun Fire Fighting System (including control panel) (fire guns -2 Nos & control panel-1 no) Make:Counter Fire Limited Type:MONITOR,3.0" SUPER LOW-PRO;,Motors-2Nos,Limit switches-4Nos (for each gun)
2008 Eqpt/System:Foam Gun Fire Fighting System (a)Carryout overhaul routines rectify the defect and prove them for satisfactory performance/made operational
2008 Eqpt/System:Foam Gun Fire Fighting System (b) Fire monitor/guns motor gear system & mechanical units to be overhauled
2008 Eqpt/System:Foam Gun Fire Fighting System (c ) Renew the motors 3Ph,415V,0.5Hp for rotating of gear systems.
2008 Eqpt/System:Foam Gun Fire Fighting System (d)Check & Calibrate the OLRs,/Timers/MCBs as per their ratings
2008 Eqpt/System:Foam Gun Fire Fighting System (e )Renew all rubber packings.
2008 Eqpt/System:Foam Gun Fire Fighting System (f) Renew limit swiches.
2009 Eqpt/System: Lighting circuits & cable trays (a)Carryout insulation checks of all lighting circuits and improve it, if it is less than 2m-ohm.
2009 Eqpt/System: Lighting circuits & cable trays (b)List of Circuits mentioned below.
2009 Eqpt/System: Lighting circuits & cable trays (c)Engine Room lighting DB to all tube lights Via junction boxes in engine room
2009 Eqpt/System: Lighting circuits & cable trays (d)Engine Room lighting DB to accommodation tube lights.
2009 Eqpt/System: Lighting circuits & cable trays (e )Alleyway LDB to Master cabin & Drivers cabin circuits
2009 Eqpt/System: Lighting circuits & cable trays (f)Alleyway PDB to Master cabin & Drivers cabin circuits
2009 Eqpt/System: Lighting circuits & cable trays (g) Clean with air & alcohol
2009 Eqpt/System: Lighting circuits & cable trays (h)All connections at end points to be clamped with proper lugs
2010 Eqpt/System: CO2 Existinguishing system. Make:New Fire Engineers pvt ltd Mumbai
2010 Eqpt/System: CO2 Existinguishing system Make:New Fire Engineers pvt ltd Mumbai (a)carry out complete overhauling of Co2 system control panel,fire detecting sensors,smoke detect sensors, and prove to operational.
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph (a)Renew the indication lamps with holders-3Nos
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph (b ) Check & Calibrate the MCCB-100amps
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph (c)Renew defective voltmeter.
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph (d)Renew defective phase sequence meter.
2011 Eqpt/System: Shore Supply Box. Make:Marine Electrical,100amps,415V,3ph (e )mechanical cleaning of supply panel board is to be done & painted with one cote of primer and two coat of powder coating (originol colour)
2012 Eqpt/System: Lead Acid Batteries. Make:Exide,180AH,12V
2012 Eqpt/System: Lead Acid Batteries (a)Renew the Batteries. Make EXIDE 12V,200AH SMF (Sealed Maintance Free)
2012 Eqpt/System: Lead Acid Batteries (b)Clean & Tighten the all connections with proper lugs, ferrules & connecters
2012 Eqpt/System: Lead Acid Batteries (c)Renew the Battery connectors
2012 Eqpt/System: Lead Acid Batteries (d)Renew the Short link cable (15sq.mm multi stand copper cables,Length 0.5mtr ) connectors
2012 Eqpt/System: Lead Acid Batteries (e )Renew the Parallel link cable connectors in emergency batteries bank
2012 Eqpt/System: Lead Acid Batteries (f)Remould the battery connecting poles if battery is fit in serviseble checks
2012 Eqpt/System: Lead Acid Batteries (g)Renew the complete box along with top opene door type(for accommodate 2 in nos 180AH 12V batteries in each box) with 12mm Hylam sheet & provide led sheet as inside layer for every box (i.e bottem & sides) & painted the boxes with gray color for outside
2013 Eqpt/System: Loud Hailer. Make:Philips,Type:VRC-10M-50 /A100K10070
2013 Eqpt/System: Loud Hailer. (a)Loud hailer system fitted onboard producing frequent onusual sounds.Routines to be done for amplifier and 7 in nos speakers along with cablining.and finally made it operational.
2013 Eqpt/System: Loud Hailer. (b)Check all the call back stations functions, if found defective repair it.
2013 Eqpt/System: Loud Hailer. (c )Body parts,door clamps,locks to be welded/Renew if it is broken/rusted Otherwise repair and apply paints
2013 Eqpt/System: Loud Hailer. (d) Check all micro switches & Push buttons
2014 Eqpt/System: Shore Supply Cable. Rating:- 3 core, 30 sqmm multistrand cable.
2014 Eqpt/System: Shore Supply Cable (a)Shore supply cable fitted onboard perished to be renewed.
2015 Non W/T Switche Sockets 6A,240V Make:Commercial
2015 Non W/T Switche Sockets 6A,240V (a)Renew the switches and connect in circuits and prove it for satisfactory performance
2016 Non W/T Switche Sockets 16A,240V Make:Commercial
2016 Non W/T Switche Sockets 16A,240V (a)Renew the switches and connect in circuits and prove it for satisfactory performance
2017 Eqpt/System: Wall mounted Electrical fans (Oscillating) Make:C&G, Type- 400 mm Sweep
2017 Eqpt/System: Wall mounted Electrical fans (a)Wall mounted fan fitted on board perished, required renewal.
2018 Eqpt/System: Control Panel for Fuel Oil Seperator
2018 Eqpt/System: Control Panel for Fuel Oil Seperator (a)Carryout compleat overhaul routines renew defective and prove it for satisfactory performance.
2018 Eqpt/System: Control Panel for Fuel Oil Seperator (b)Mechanical cleaning of Control panel body & painted with one cote of primer and two coat of powder coating (originol colour)
2018 Eqpt/System: Control Panel for Fuel Oil Seperator (c )check control PCB if found defective rectify it.
2018 Eqpt/System: Control Panel for Fuel Oil Seperator (d)SPP and OLR to be renewed.
2019 Eqpt/System: Distribution Boards (PDB-2Nos,LDB-3Nos,DC DBs-3) Make:Marine Electrical Carryout compleat overhaul routines renew defective parts and prove it for satisfactory performance. Check insulation of all cables If it is less than 2 M-ohm rectify it. for the following DBs
2019 Eqpt/System: Distribution Boards (a) power Distribution board
2019 Eqpt/System: Distribution Boards (b) Lighting Distribution board
2019 Eqpt/System: Distribution Boards (c ) DC Distribution board
2019 Eqpt/System: Distribution Boards (d)Indication lamp to be renewed, if found defective rectify it. Door locking arrangement is to checked
2019 Eqpt/System: Distribution Boards (e )mechanical cleaning and painting is to be done. if found defective rectify it.
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter (a)Carryout complete overhaul routines and prove them for satisfactory performance / Made operational.
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter (b)Check & Calibrate the OLRs,/SPPs/Timers/MCBs as per their ratings if defective replace them.
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter (c)check all the fuse units if defective replace them
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter (d)Renew the Neoprene Rubber Gasket.
2020 Eqpt/System: Submersible Pump(40 TPH) motor & Its Starter (e )winding of one motor burnt, required rewinding.
2021 Eqpt/System: Aqua Guard cum Cooling Water Drinking System Make Blue star,Model:TN 10;10ltrs capacity,230V,1Ph,50Hz Aqua guard system to be renewed.
2022 Eqpt/System: Battery chargering Units Make:edna Associates Input;415V,3phase,50Hz. Out put 24V,DC
2022 Eqpt/System: Battery chargering Units (a) Battery Charging unit. (1.5kw) 415V AC / 24V DC Carryout compleat overhaul routines renew defective part and prove it for satisfactory performance / Made operational.
2022 Eqpt/System: Battery chargering Units (b)Renew the Battery Charger. (In Put 415V,50 Hz, 3 ph, 1.5KW) out put 75V/50V/24V DC (75,50,24voltages required as output)
2023 Eqpt/System: Call Bell Unit 24V,DC; Make:Lite shine Electricals
2023 Eqpt/System: Call Bell Unit 24V,DC (a)Carryout compleat overhaul routines and proove them for satisfactory performance / Made operational
2023 Eqpt/System: Call Bell Unit 24V,DC (b)Renew the Push buttens
2023 Eqpt/System: Call Bell Unit 24V,DC (c)Renew the indication lamp with holder
2024 Eqpt/System: Renewal of Self Starter for Starting of Generator Primemover Make;TVS , Rating :- 5 hp, 24v DC. Self starter for starting of generator, causing frequent problem to be renewed.
2025 Eqpt/System: 24V,Dynamo Make:TVS Carryout compleat overhaul routines and prove it for satisfactory performance / Made operational.
2026 Eqpt/System: Gong Bell Make-KHERAJ,Type-Chromium Gong, Model--NQ-GB-15,24V,DC
2026 Eqpt/System: Gong Bell (a)Overhaul the Gong bells & made it operational
2026 Eqpt/System: Gong Bell (b)Check all circuits continuities & Rectify if there is any problems
2026 Eqpt/System: Gong Bell (c)Machenary body to be Clean to bare metal and painted with one cote of primer and two coat of enamil paint(originol colour) / Steel coating./Polishing where ever necessary
2027 Eqpt/System: Bench Grinding Machine 230V,0.5HP,2900RPM Make:Toolex Industries (india) Machine producing high vibration beyond permisible limit during running. Machine to be renewed.and proved to operational with out vibration.(Modification to be required to foundation Bed)
2028 Eqpt/System:Motors Over hauling: carry out complete over hauling of the following motors and prove for satisfactory operation. All bearing is to be renewed with ZZ bearing. (total 23 Nos) Note: Job involves renewal of broken connection terminal, terminal box, hooks and impeller. Note: Brake system to be overhauled and prove it for satisfactory operation.(for windloss motor & captain motor)
2028 Eqpt/System:Motors (a)Engine room supply & Exaust fan motors 415v,3ph,50Hz,7.5HP,
2028 Eqpt/System:Motors (b)SRP supply fan motor/blower 415V,3Ph,50Hz,0.25HP
2028 Eqpt/System:Motors (c)Lub Oil Priming Pump Motors (Port & Stbd). 415v,3ph,50Hz,3HP,Make:ABB Motors,
2028 Eqpt/System:Motors (d)Fuel Oil Transfer Pump Motor. 415v,3ph,50Hz,3HP,
2028 Eqpt/System:Motors (e)Air Compressor Motor. 415v,3ph,50Hz,5HP,
2028 Eqpt/System:Motors (f) Bilge/GS Pump Motors.415v,3ph,50Hz,12.5HP,
2028 Eqpt/System:Motors (g)SRP Cooling Pump Motor.415v,3ph,50Hz,7.5HP,
2028 Eqpt/System:Motors (h)Fresh Water Pump Motors . 415v,3ph,50Hz,1HP,
2028 Eqpt/System:Motors (j)DD Compresser Motor cum Dynamo 12V,DC
2028 Eqpt/System:Motors (k) Galley supply & exhaust blowers motor.415v,3ph,50Hz,0.5HP,
2028 Eqpt/System:Motors (l) Co2 compt supply fan 415v,3ph,50Hz, 0.5 HP.
2028 Eqpt/System:Motors (m) Toilet Exhaust blower, 415v,3ph,50Hz,0.5HP,
2028 Eqpt/System:Motors (n) Wheel house supply blower, 415v,3ph,50Hz,0.5HP,
2028 Eqpt/System:Motors (p) Accommodation supply blower, 415v,3ph,50Hz, 03HP,
2028 Eqpt/System:Motors (q) Capstan motor,415v,3ph,50Hz, 10HP,
2028 Eqpt/System:Motors ® Anchor Windlass motor,415v,3ph,50Hz,7.5HP,
2028 Eqpt/System:Motors (s)Water spray Pump Motor for window wiper System.230V,3Ph,0.25HP,50Hz
2029 Eqpt/System: Starters Make:Marine Electrical,415V,3Ph,50Hz Overhaul following starters renew defective parts and prove it for satisfactory operation.SPP and OLR to be renewed. Job involve repair of broken door and locking arrangement.Renew Neoprene Rubber Gasket for all starters.
2029 Eqpt/System: Starters (a)12.5 HP starters (Star Delta Starters)
2029 Eqpt/System: Starters (b)7.5 HP starters (Star Delta Starters)
2029 Eqpt/System: Starters (c)5 HP starters (Star Delta Starter)
2029 Eqpt/System: Starters (d)3 HP starters (DOL Starter)
2029 Eqpt/System: Starters (e )2 HP starters (DOL Starter)
2029 Eqpt/System: Starters (f)1 HP starters (DOL Starter)
2029 Eqpt/System: Starters (g) 0.5 HP starters (DOL Starter)
2029 Eqpt/System: Starters (h) 0.25HP Starters (DOL Starter)
2030 Eqpt/System: Generators Make:Kirlosker,415V,3Ph,100KVA,50Hz,1500RPM Carryout complete overhauling of alternator renew defective part and prove it for satisfactory performance.
2030 Eqpt/System: Generators (a)overhaul the generators
2030 Eqpt/System: Generators (b)Renew the IEVR (Electronic Voltage Regulator) fitted on board.
2030 Eqpt/System: Generators (c)Renew Rotating rectifier assembly.
2030 Eqpt/System: Generators (d)Renew neoprene rubber gasket.
2030 Eqpt/System: Generators (e )Renew perished control wiring and connecting lugs
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (Make:Power Control Engineers)
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (a)carry out compleat overhauling of control panel and prove to operational.
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (b)Renew the main PCBs in control system
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (c)Renew the Analog gauges belongs to LOP,FWT,LOT & etc Size:50X50; Make: Rishabh
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (d)Renew the SMF Exide Batteries 12V,12AH.for standby supply purpose
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (e )Renew the Convertion Modules (Resistance to current) for Temperature
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (f)Renew the Convertion Modules (Resistance to current) for Pressure.
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (g)Renew the Convertion Modules (Pulse to Digital) for RPM
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (h)Renew the SMPS (power supply system) 10A
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System (i)Renew the indication lamps with holders
2031 Eqpt / System :-Main Engine(Cummins india ltd) Control System ( j)Renew the Relays 24V DC
2032 Eqpt / System:- Air Horn
2032 Eqpt / System:- Air Horn (a)Carryout compleat overhaul routines renew defective part and prove it for satisfactory performance / Made operational (Leakage observed in air pipe to be stopped.)
2032 Eqpt / System:- Air Horn (b)Solenoid assembly to be renewed.
2033 Eqpt / System:- Renewal of electrical horn(water tight) Electrical horn fitted on board perished to be renewed.
2034 Eqpt / System:- Renewal of submersible pump (20 TPH) along with starter & cable 30rmtrs.
2034 Eqpt / System:- Renewal of submersible pump (20 TPH) along with starter & cable 30rmtrs. (a)Submersible pump fitted on board not working to be renewed. Body of pump corroded, pump damaged
2035 Eqpt / System :- Renewal of wiring (3 core cable 25 sq mm) Three core cable fitted on board perished, to be renewed. Detail of cable is as follows
2035 Eqpt / System :- Renewal of wiring (3 core cable 25 sq mm) (a) from main switch board to machinary DB.
2035 Eqpt / System :- Renewal of wiring (3 core cable 25 sq mm) (b) from machinery DB to GS pump 1 and 2
2035 Eqpt / System :- Renewal of wiring (3 core cable 25 sq mm) (c ) from Starter of anchor wind lass to motor.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (Make:Rolls Royce)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (a)Carryout compleat overhaul routines renew defective and prove it for satisfactory performance.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (b)carry out serviceability checks/repair of controller fitted in wheel house.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (c)Carry out serviceability checks/repair of power supply unit fitted in steering compt.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (d)Carry out serviceability checks/repair of supply change over unit fitted in steering compt.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (e )Carry out serviceability checks/repair of control unit fitted in steering compt.
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (f)Renew the Primary cards (Make Rolls Royce) for steering control
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (g)Renew the Secondary cards (Make Rolls Royce) for steering control
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (h)Renew the Angel sensor (part no A7350920-001)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (i)Renew the Pressure switches (part no A7429733)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system ( j)Renew the Pressure switches (part no A7429745)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (k)Renew the Pressure switches (part no A7427312) (Located at Oil Tank)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (m)Renew the Thrust Direction Indicator unit (in wheel house consol panel)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (n)Renew the Aqupilot control panel unit (in wheel house consol panel)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (p)Renew the potentiometer in wheel house (part no:A7351949, & A7352224)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (q)Renew the Pulse Amplifier (RPM Convertor) in transimitter box (part no A7351928)
2036 Eqpt / System :- SRP (Steerable Rudder Propulsion) system (r)Renew the Auxilary Relays (Part nos A7479077,A7474614)
2037 Renewal of Nav Light Cable:-(multi Core,2.5sqmm) Renew nav light cable from control panel to Nav light fitting, fitted on upper deck.
2038 Eqpt / System :- Split Acs 2Tons-4nos,1.5tons-2nos. Make:Carrier
2038 Eqpt / System :- Split Acs (a)Carryout the complete servicing (overhaul routines) of complete set and made it operational.(Presently 4 in nos are not working effectivaly due to gas leakages)
2038 Eqpt / System :- Split Acs (b)Renew the AC stabilisers Make:V guard.
DRY DOCK AND ALLIED SERVICES WORK PACKAGE 1. (A) Docking and undocking charges (Both Versions)
(B) Dock blocks preparation & laying out as per docking plan
2 Dock hire charges for an estimated duration of 60 Days as per OCR
3.Wet basin/alongside hire charges for the remaining duration (i.e. total refit duration of – 60 days docking period)
4 Provision of sufficient lighting for duty staff
5.Quote for maintenance of two in no. fire lines for the refit duration .
6.Provision of two transports (cars) for entire refit duration (one for refit Co-ordinating staff and one for ND(V) monitoring Team) for 12 hrs or 100KM/day whichever is less
7.Provision of stationory / office items for ND(V) / Refit monitoring team for entire refit duration period. Cater budget of Rs 2000/- per month. Requirement will be intimated RMT/ NDV on as requirement basis. Payment at actuals. Note:- firms to quote.
8.Mail man services (02 Nos) for entire refit duration (one for user department and one for planning / Co-ordinating department ) to be provided for 10 Hrs per day
9.QC inspection for the entire scope of work by third party IRS/LRS/ABS/QC/TPI for the refit duration as per the QIS.
MAIN ENGINES 6K ROUTINES:- 1 3629140 GASKET, ROCKER LEVER COVER
2 3075831 TAPPET HYD VAR TIMING
3 KIT3238296 BARREL AND PLUNGER
4 3609964 CUP, INJECTOR
5 193736 SEAL O RING
6 174299 RETAINER, SCREEN
7 3042428 SPRING, INJECTOR
8 167157 BALL, CHECK
9 203426 PIN, ROLL
10 3054999 SCREEN, FILTER
11 173086 GASKET, INJECTOR
12 3042427 SPRING, INJECTOR
13 207244 SEAL, INJECTOR
14 3545647 TURBO REPAIR KIT
15 3071368 GASKET, TURBO CHARGER
16 KITBM68536 GASKET, GOVERNOR SET
17 146483 SCREEN, FILTER
18 207244 SEAL, INJECTOR
19 3040570 PLUNGER, GOVERNOR
20 3033740 VALVE, CHECK
21 3348327 VALVE, SHUT OFF
22 3889310 ELEMENT, LUBOIL
23 KIT3879488 KIT SUPER BYPASS FILTER
24 KIT3238493 FUEL FILTER
25 3100308 RESISTOR, CORROSION
26 3010937 SEAL O RING
27 3875391 ELEMENT AIR CLEANER
28 3875393 ELEMENT AIR CLEANER
29 4926654 PRE MIXED COOLANT - 10LTR
MAIN ENGINES 6K ROUTINES:- 30 3067371 HOSE PLAIN
31 3630125 HOSE PLAIN
32 36303974 CLAMP T BOLT
33 36303975 CLAMP T BOLT
34 3633805 CLAMP V BAND
35 AK4010 SS HOSE FLEXIBLE
36 3349150 HOSE FLEXIBLE
37 3631884 HOSE FLEXIBLE
38 3628925 HOSE FLEXIBLE
39 3628927 HOSE FLEXIBLE
40 3628929 HOSE FLEXIBLE
41 3963454 HOSE FLEXIBLE
42 3408326 ACTUATOR ETR FUEL CONTROL
43 3034243 PUMP GEAR FUEL
44 4372338 PUMP WATER
45 3897387 PUMP SEA WATER
DIESEL GENERATOR 12K ROUTINES:- 1 BM98224 LINER CYLINDER
2 3009218 LOCK PLATE
3 KIT 4105239 KIT PISTON & RING SET
4 KIT3240000 SET MAIN BEARINGS (STD)
5 203670 BRG CON ROD 10 U/S
6 9195 3 BOLT CON ROD
7 69936 NUT, HEAVY HEXAGON
8 3025100 WASHER CON ROD
9 KITBM54940 UPPER ENGINE GASKET SET
10 KITBM62427 LOWER ENGINE GASKET SET
11 BM27253 BEARING CAMSHAFT
12 92351 WASHER THRUST
13 127677 LOCK PLATE
14 127678 LOCK PLATE
15 136698 LOCK PLATE
16 70549 O RING COUNTER BALANCE
17 168306 ADJ SCREW
19 3046418 PUSH ROD VALVE
20 3046431 PUSH ROD
21 S 127 SCREW EXH MFG
22 S 155 SCREW EXH MFG
23 301057 O RING
24 157551 GASKET
25 110848 ELEMENT LUB OIL COOLER
26 110827 RETAINER COOLER
27 3019116 O RING LO COOLER
28 3008017 GASKET OIL COOLER SUPP
29 68210 GASKET CONNECTION
30 144911 VALVE EXHAUST
31 150288 VALVE INTAKE
32 66890 GUIDE VALVE STEM
33 69965 INSERT VALVE SEAT
34 89012 SLEEVE INJECTOR
35 S 2037 COLLET VALVE
36 111446 SPRING VALVE
37 123558 GUIDE,VALVE CROSS HEAD
38 3235611 GUIDE,VALVE SPRING
39 66871 RETAINER,VALVE SPRING
40 KIT3880780 KIT INJECTOR REPAIR NT 495
41 166009 SPRING,COMPRESSION
42 167157 BALL,CHECK
43 70855 CONNECTOR,FEMALE
44 68174 KEY,SQUARE
45 100192 SHAFT,FUEL PUMP DRIVE
46 S 1650 BEARING,BALL
47 KITBM68356 GASKER,GOVERNOR SET
48 146483 SCREEN,FILTER
49 157088 CAP,FUEL PUMP FILTER
50 BM28848 DRIVE TECHOMETER
51 101918 HUB,JAW COUPLING
52 104087 SHAFT,TECHOMETER DRIVE
53 202897 DAIAPHGRAM,FUEL PUMP
54 4913272 VALVE,CHECK
55 3034412 SEAL,O RING
56 S 1028 ELBOW PLAIN ADAPTOR
57 3240573 VALVE,SOLENOID
58 BM30265 MANIFOLD,FUEL
59 BM31780 MANIFOLD,FUEL DRAIN
60 190397 SLEEVE,WEAR
61 3008947 SEAL KEY WAY
62 181236 SLINGER
63 154087 SEAL,RECTANGULAR RING
64 3247372 ADAPTOR DOUBLE DRIVE
65 3166497 PUMP WATER
66 9097 GASKET W.P.
67 135675 THERMOSTAT
68 186780 SEAL,TEHRMOSTAT
69 3167216 INHIBITOR CORROSION,2 LTR
70 AX1013359 RDIWASH,3LTR
72 43828 D CLAMP HOSE
74 43828 B CLAMP HOSE
76 43828 A CLAMP HOSE
77 AK 6045 SS HOSE BYPASS FILTER
78 AK 6065 SS HOSE BYPASS FILTER
79 AK 10031 SS HOSE FUEL FILTER
80 AK 10070 SS HOSE FUEL TANK
81 AK 6065 SS HOSE PUMP RETURN
82 AK 8085 SS HOSE INJECTOR RETURN
83 AK 10021 SS HOSE
84 KIT 3238204 ELEMENT, LUB OIL FILTER
85 KIT 3238493 ELEMENT FUEL FILTER
86 KIT 3879488 ELEMENT BY PASS FILTER
87 3010937 SEAL O RING
88 4055575 ELEMENT AIR CLEANER
89 4055576 ELEMENT AIR CLEANER
90 3872813 INDICATOR, RESTRICTION
91 3225879 PUMP SEA WATER
92 3545399 TURBO REPAIR KIT
94 219138 NUT, REGULAR HEXAGON
95 AK 6054 ST HOSE FLEXIBLE
96 AK 16013 46MC HOSE FLEXIBLE
97 68241 ZINC PLUG
98 137067 GASKET
99 137071 GASKET
100 137074 O RING
101 137075 O RING
102 137076 GASKET
103 2884937 GASKET, COVER PLATE
104 500181 CAP H.E.
106 43828 E CLAMP HOSE
107 3040349 BELT, V
108 3873542 BREATHER, CRANK CASE
109 4056441 HOSE, HUMP
110 4056442 HOSE, HUMP
111 140332 CLAMP, T BOLT
112 149437 CLAMP, T BOLT
113 3225660 CAP, DUST
114 S 1059 COUPLING, PLAIN PIPE
115 68139 ELBOW, MALE ADAPTOR
116 AK 4160 MS HOSE, FLEXIBLE
117 3056356 HARNESS, WIRING
118 2897691 SWITH PRESSURE
119 4327021 SWITCH TEMPARATURE
120 4359612 SWITH PRESSURE
121 4327022 SWITCH TEMPARATURE
122 3056357 HARNESS, WIRING
123 3231354 SWITCH, OVERSPEED
124 500109 GAUGE, PRESSURE
125 500108 R GAUGE TEMPARATURE
126 4971772 GAUGE TEMPARATURE
127 501151 HOUR METER
128 503473 CABLE, FLEXIBLE DRIVE
129 502881 AMMETER
130 504975 SWITCH KEY
DIESEL GENERATOR 12K ROUTINES:- 131 3167235 CAM SHAFT
132 3881121 CRANK SHAFT KIT
133 AR96205 PUMP LUB OIL
134 194730 ELEMENT , HEATING
135 3013282 ROD, ENGINE CONNECTING
136 3034243 PUMP, GEAR FUEL
137 KIT 3238552 CONVERSION KIT TURBO
SRP SPARES:- 138 A 6720027 DIR. CONTROL VALVE
139 A 6659861 FILTER ELEMENT
140 A 6648103 GREASE NIPPLE
141 A 5204216 HOSE ASSEMBLY
142 A 5204222 HOSE ASSEMBLY
143 A 5210935 HOSE CONNECTOR
144 A 6659872 PRESSURE FILTER
145 A 6680006 PRESSURE GAUGE
146 A 6700007 PRESSURE RELIEF VALVE
147 A 7429733 PRESSURE SWITCH
148 A 7429745 PRESSURE SWITCH
149 A 6375792 PROPELLER SHAFT SEAL
150 A 6335752 RADIAL SEAL
151 A 6342951 RADIAL SEAL
152 A 6349625 RADIAL SEAL
153 A 6275066 SEAL
154 A 7427202 TEMPERATURE SWITCH
155 A 5352445-000 ZINC ANODE
156 A 8112167 ZINC ANODE
CO2 F/F SYSTEM SPARES 157 NI- CO2-V1-1.0 CO2 PNEUMATIC VALVE
158 NI- CO2-H1-1.0 DISCHARGE HOSE
159 NI-CO2-H2-1.0 1/4" ACTUATION HOSE
160 NI-CO2-H3-1.0 1/4" ACTUATION HOSE
161 NI-CO2-NRV-1.0 RELIEF VALVE
162 NI-CO2-SV-1 SOLENOID VALVE
163 NI-CO2-VV-1 BLEEDER VALVE
164 NI-CO2-DC-V-1 DIRECTIONAL CONTROL VALVE
165 NI-CO2-DPS-2.0 LOW PRESSURE SWITCH
166 NI-CO2-DPS-1 DISCHARGE VALVE SWITCH
167 NI-CO2-HD-1 HEAT DETECTOR
168 NI-CO2-N-H-1 NOZZLES
SAGAR SHIP REPAIRERS AND MARINE SERVICES
Flash Forge Private Limited
YEOMAN MARINE SERVICES PVT. LTD.
MARINE CARE N ASSOCIATES
Patel Engineering Works Vizag
WINTECH ENGINEERING WORKS
Bidder Name
Sadhav Offshore Engineering Company
Patel Engineering Works Vizag
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid