Loading…
Loading…
Tender ID
Tender Value
Refer Docs
Closing Date
16 Mar 2026, 5:00 pmClosed
DGM (MM), MMD, TSECL
O/o the DGM (MM), MMD, TSECL
Setting up of cumulative 50MW / 200 MWh Standalone Battery Energy Storage Systems ( BESS) at 33 KV level spread over a number of 33 KV Sub-stations in TSECL
2026_POWER_70975_1
F1(77)/GM(tech)/TSECL/10031-39
Open Tender
Supply, Erection and Commissioning
EOI
Under TSECL
As per EOI
2 documents required · 2 mandatory
₹0
Exempted
9 Mar 2026
25 Feb 2026
17 Mar 2026
25 Feb 2026
16 Mar 2026
27 Feb 2026
25 Feb 2026 - 26 Feb 2026
stage.html
html • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Tendernotice_2.pdf
PDF • 0.96 MB
Batteryenergystore.pdf
Additional Documents • 0.95 MB
BatteryQ.pdf
PDF • 0.96 MB
corrigendumbattery.pdf
PDF • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .