Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.5 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹65.3 L+₹1.8 L (2.90%)Rejected-Finance 09 DADU BAGH MARKET KANKHAL HARIDWAR | HARIDWAR | HARIDWAR | UTTARAKHAND | L2 | Rejected-Finance Second Lowest |
Tender Value
₹74 L
EMD Value
₹1.5 L
Closing Date
19 Feb 2018, 3:00 pmClosed
Project Manager
Office of the Project Manager Construction Unit Uttarakhand Peyjal Nigam Srinagar
Construction of CMO Non Residential Building Rudraprayag with Other Appurtenent works
2018_MDPEY_8628_1
LetterNo 133/G-12/18 Dated 01.02.2018
Open Tender
Civil Works
Item Rate
120 days
Rudraprayag
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,720
Project Manager Construction Unit UKPJN
₹1.5 L
Srinagar Garhwal
25 Jan 2020
2 Feb 2018
19 Feb 2018
3 Feb 2018
19 Feb 2018
9 Feb 2018
8 Feb 2018
Amount
Excavation in hilly areas in hard rock lift up to1.5m and disposal.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for :5.9.1 Foundations, footings, bases of columns, etc. for mass concrete
Disposal of earth
Backfilling behind abutment, wing wall and return wall complete. HP stone filling in back of walls including supply of all material,labour, T&P etc. required for proper completion of the work.
Providing weep holes in brick masonary/ rcc wing wall
Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
goyal and sons
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_11158.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .